This document summarizes a pre-bid conference presentation for a federal construction contract opportunity. The solicitation is for a firm fixed-price construction project to expand an existing Munitions Storage Area at a National Guard facility in North Carolina. Key requirements include demolishing existing facilities and constructing a new administrative building, munitions storage facility, and maintenance area totaling 3,760 square feet. Additional site work is included in an optional CLIN. Bids are due in 90 days and the period of performance is 240 calendar days from notice to proceed. The small business set-aside is valued at an estimated $3 million. The pre-bid conference agenda outlines the project scope, plans and specifications, bid submission instructions, and determination of bidder responsibility. Interested parties must submit all questions in writing by the deadline and check the website for any amendments.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27 May 2021
Pre-Bid Conference/Site Visit
Solicitation Number W50S87-21-B-5003
Munitions Storage Area (MSA) Expansion
Agenda
• Introduction
• Administrative Items
• Process for Questions and Answers
• Project Overview
• Solicitation, Plans, Specifications and Amendments
• Invitation for Bid Basics and Bid Requirements
• Break – approx. 10 min
• Site Visit to follow conference
Introduction
• 1st Lt Zachary Leddy – Contracting Officer
• Lt Col Lemuel Rios – Contracting Officer’s Representative (COR)
• Maj James Eaton – COR
• Mr. Hanson Pedersen – COR
Administrative items- Attendance Roster
• Ensure you sign in on the attendance roster
• We will post this roster to www.sam.gov in order to facilitate communication between potential subs and prime contractors
• A site visit will follow this presentation
• Any questions you have during the site visit should be sent in writing for an official response in accordance with the solicitation.
http://www.sam.gov/
• Submit questions to 1st Lt Zachary Leddy. See Section 00100 for instructions.
• Questions and official answers will be posted on a non-attribution basis with solicitation information at www.sam.gov
• Submit questions NLT 7 business days prior to bid opening.
Do not contact the A/E or any Gov engineering personnel directly.
• Amendments will be only issued only if there is a change in the solicitation, specifications, or plans 5
Process for Questions and Answers
Project Overview
Project includes but is not limited to:
• Demolition of existing facilities.
• Construction of a 960 square foot administrative facility, a 1,800 square foot munitions storage facility, and 300 square foot maintenance and inspection area.
• Functional areas include administrative areas for training and support staff, equipment and maintenance rooms, storage spaces, communications room, mechanical and electrical utility rooms and latrine facilities.
• Work shall include site grading, site utilities, site paving, fencing, and fire protection.
• This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria.
• Additional items of note include providing temporary munitions storage area, blast requirements for doors, locks, and specialty hasps that need to be on the doors of the munitions storage facility and maintenance and inspection facility. 6
• A Firm Fixed Price contract will be awarded
• Invitation for Bid Procedures (FAR Part 14)
• Small Business Set-Aside
• NAICS: 236220
• Period of Performance: 240 calendar days after Notice to
Proceed (NTP) is issued. Important – Several phases
• NTP will be issued after approval of Performance and
Payment Bonds and all required pre-construction submittals
• CLINs: 2
• Brand name requirements:
– Alerton: DDC
– Best: Door hardware
– Interior and exterior finishes
– Monaco: Fire alarm transceiver
Project Overview- Bid Schedule
Base:
CLIN 0001, FFP
Base Bid: Munitions Storage Area (MSA) Expansion QUANTITY: 1 UNIT: Job Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary for munitions storage area (MSA) expansion project in accordance with specs and drawings dated February 2020 and Statement of Work dated 16 March 2020.
CLIN 0002, FFP
Option: Additional Site Work QUANTITY: 1 UNIT: Job Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to include additional site work in munitions storage area (MSA) expansion project in accordance with specs and drawings dated February 2020 and Statement of Work dated 16 March 2020.
Option:
Solicitation, Plans, Specifications and Amendments
• Located on the Contract Opportunities portion of the www.sam.gov website
• The Government is not liable for information furnished by any other source
• Amendments (SF30) will be posted to www.sam.gov. It is the offerors responsibility to check the website periodically for any amendments to the solicitation.
Bid Requirements
What you must submit (see Section 00010)
• SF 1442, (Blocks 14-20c)
– Do not enter less than 90 days in Block 17
• Section 00010, Bid Schedule- all items must be priced
– IAW Clause 252.236-7008, Contract Prices- Bidding Schedules. The prices shown in the Bidding Schedule must reflect ALL costs involved in performing the work, as described in the plans, specifications, and statement of work.
• Section 00600, Reps and Certs
– In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.
Provisions at 52.204-26 and 252.204-7016. If answer is “does,” need to fill out provisions at 52.204-24 and 252.204-7017. Recommend updating in SAM registration.
• Acknowledge all Amendments (SF 30)
• Bid Bond (Standard Form 24, 20%) and Power of Attorney
• The bid opening will occur at the time and date specified in Block 13 of the SF1442 at 4930 Minuteman Way, Charlotte, NC 28208 (map included in solicitation attachments).
• Hand Carried Bids - must be deposited in the repository prior to the time established for opening of bids.
• Mailed bids - must be received at the location specified in block 7 of the SF1442 prior to the time established for opening of bids.
• Repository and Mailing Address: 4930 Minuteman Way, Charlotte, NC 28208. Attention: Contracting Office, 1st Lt Zachary Leddy
• Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR
14.304 and in accordance with clause 52.214-7.
Bid Requirements- Bid Submission
Invitation for Bids Procedures What to expect at the Bid Opening
• Bid opening officer (BOO) will announce exact time bids are due and that no more bids will be accepted
• Bids are opened and read out loud with no discussion or comment on responsiveness (FAR 14.301) of bids, and recorded
• BOO opens Government estimate, records
• Abstract will be certified and posted to www.sam.gov as soon as practical.
Invitation for Bids Procedures Determination of Responsibility
IMPORTANT: Refer to the solicitation and FAR Part 9 for details
• A bidder is determined to be responsible in accordance with FAR
9.104
• After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
• To establish its responsibility, the apparent low bidder will be requested by the Government prior to award, to submit a statement/documents regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work.
Break
| Slide Number 1 |
| Agenda |
| Introduction |
| Administrative items- Attendance Roster |
| Process for Questions and Answers� |
| Project Overview |
| Project Overview |
| Project Overview |
| Project Overview- Bid Schedule |
| Solicitation, Plans, Specifications and �Amendments |
| Bid Requirements |
| Bid Requirements- Bid Submission |
| Invitation for Bids Procedures �What to expect at the Bid Opening |
| Invitation for Bids Procedures�Determination of Responsibility |
| Slide Number 15 |