This document contains a request for information (RFI) response and related federal contract opportunity solicitation. The RFI response addresses questions regarding construction plans for repairing fire suppression systems in three buildings at Mississippi Air National Guard Base, providing corrected plans and clarifying that no architectural drawings are included. The related federal contract opportunity solicitation seeks fixed-price bids to perform the repair work in accordance with attached documents. Interested small businesses meeting the $45 million size standard must register in SAM and attend an optional pre-bid conference on May 16 to bid by June 1. The work is a total small business set-aside for the Army National Guard.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MDVL042061 – Repair Fire Suppression Systems Bldgs 150, 151, and 160
RFI #1
1. Sheet 00S-001 of the Plans appears to have an issue with the .PDF file. Information on the left side seems to be truncated, leaving part of the notes on the left side unreadable. Can the file be corrected and the sheet reissued to contain the full notes?
Sheet 00S-001 has been fixed so the entire sheet is visible. The new drawings are attached in SAM.gov with the new title of MDVL042061 B-3 Construction Plans rev 12 May 23_NM. The original Plans have been removed from SAM.gov and are no longer an attachment to the SF1442.
2. Sheet 00FP-001 references Details 2/3 on 00A-001. However, Sheet 00A-001 does not appear to be included in the set of Plans issued. Please provide the appropriate sheet.
References to details “2/3 00A-001” in Door Schedule on Drawing 00FP-001 have been replaced with “2/3 00FP-001” in the new construction plans.
3. There does not appear to be a copy of the applicable Wage Determination for the project. Please provide.
The Wage Determination begins on page 63 of the attached document entitled W50S7J23B0001 – SF1442.
4. There do not appear to be any Architectural Drawings which show the Floor Plans and specifically the doors with Schedule Door Marks. While Sheet 01FP-101 appears to show some Door Marks it does not seem to be complete or conclusive as to that being the intent. Are there available Architectural Sheets showing the Floor Plan with the Door Marks for each of the buildings?
There are no architectural drawings. Please refer to the contract documents, specifically the specifications within Divisions 07, 08, and 09, along with Drawings 00FP-001, 01FP-101 through 01FP-104, General Notes, and Key Notes for specific requirements as they pertain to doors, ceilings, and painting. The Schedule Door Marks on Drawings 01FP-101 through 01FP-104 align with the Door Numbers within the Door Schedule on Drawing 00FP- 001.