MDVL042061 Addendum No. 2 Statement of Work.pdf
PDF 102 KB Posted
- Solicitation number
- W50S7J23B0001
- Issued by
-
Department of the Army National Guard
About this file
This addendum modifies a solicitation for construction services to repair fire suppression systems in three buildings at a National Guard facility in Mississippi. The contractor will provide a new, code-compliant fire alarm and mass notification system throughout the affected buildings as the existing system is not fully installed. New strobes and speakers must be clear with white housing and labeled as alerts. Drawings are updated to reflect the scope changes, and two new details are added. The pre-bid conference was on May 16, 2023, with bids due June 1, 2023. The solicitation is designated for small businesses with average annual revenue under $45 million.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
186TH AIR REFUELING WING
KEY FIELD, MERIDIAN, MS
PROJECT NUMBER MDVL042061
REPAIR FIRE SUPPRESSION SYSTEMS IN BLDGS 150, 151, AND 160
23 May 2023
ADDENDUM #2
STATEMENT OF WORK
1.0 SCOPE & PURPOSE. This addendum to the Statement of Work (SOW) provides updated requirements for the referenced project.
2.0 APPLICABLE DOCUMENTS.
2.1 Original project bid documents.
2.2 Revised Sheet 01FA-104
3.0 REQUIREMENTS.
3.1 The ATI MNS (in-building and wide area) System, as shown in the contract documents, has not been installed within Buildings 150, 151, and 160 as anticipated. In light of this situation, it is necessary to modify the contract documents to accommodate the absence of the ATI MNS system. Therefore, all references to the existing ATI system, notification devices, and other associated components, as shown in half-tone and described as existing, shall be provided as part of this Contract.
3.2 As part of this Contract Modification, the Contractor shall provide a fully functional, code-compliant in-building fire alarm/mass notification system in accordance with UFC 4-021-01, Specification 28 31 76. Amber-colored strobes are not being installed under this contract. New strobes and combination speaker/strobes shall be clear in color with white housing and labeled with the word “alert.” This requirement applies to all affected buildings and areas as indicated in the contract documents.
3.3 To assist bidders in understanding the scope of the modifications, we have provided a marked-up document representing changes within Area D of Building 150 (Drawing 01FA-104). The attached mark-up is for reference purposes only and should help provide clarity to bidders.
Please note that similar changes will be required throughout all affected buildings. In addition to the mark-ups, two details have been added to Drawing 00FA-501 and are included herein.
4.0 WORK SCHEDULE. No change.
5.0 PERIOD OF PERFORMANCE. No change.
6.0 WARRANTY. No change.
7.0 DEMOLISHED MATERIALS. No change.
8.0 SAFETY. No change.