This document provides details for a federal construction contract opportunity for the Space Control Facility project at Peterson Air Force Base in Colorado. The United States Property and Fiscal Office for Colorado is soliciting fixed-price bids to construct a 12,100 square foot facility for the 140th Wing. The scope of work includes building the space control facility using conventional methods along with associated site work like utility connections, pavement, fencing and landscaping. There are also options to include additional asphalt work. Bidders must use certain brand name products specified in the solicitation. The construction magnitude is between $5-10 million and work must be completed within 365 days of the notice to proceed. This opportunity is set aside for small businesses with a size standard of $36.5 million. Bidders must perform at least 15% of the work with their own employees according to limitations on subcontracting.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLORADO AIR NATIONAL GUARD

BUCKLEY AIR FORCE BASE – 140 CES

PROJECT NO. TDKA 16-9004

SPACE CONTROLE FACILITY

Peterson Air Force Base, Colorado Springs, CO

BID ADDENDUM NUMBER 3

10 August 2020

BID ADDENDUM NUMBER 3

PART I – PROJECT REQUIREMENTS

1. The Contractor is to provide all plant, material, equipment, and labor necessary to perform the work outlined in this Addendum.

2. All work shall be performed in accordance with the contract drawings and specifications.

3. The Contractor is to include the following changes to Specifications and Drawings as indicated below.

PART II – TECHNICAL SPECIFICATIONS

1. Specification Section 04 20 00, Unit Masonry, Para. 3.10 A.: Change “Contracting Officer” to “Contractor”.

PART III – CONTRACT DRAWINGS

1. Drawing CL-001, Landscape Design Plan – Base Bid: Add note to read:

“New Gravel Mix shall be River Cobble with a gradation of 2” to 4””.

2. Drawing CL-002, Landscape Design Plan – Bid Options: Add note to read:

“New Gravel Mix shall be River Cobble with a gradation of 2” to 4””.

3. Drawing S-101, Foundation Plan: Replace drawing S-101 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.

Changed note on the top of the foundation plan that reads: “Note 13” to read “See General Note M”. And added dimensions for the raised floor area.

4. Drawing A-111, Reflected Ceiling Plan: Delete Keynote “P”.

5. Drawing A-111, Reflected Ceiling Plan: Change Keynotes;

a. Change Keynote 2 to read: “Hard-Coat Exterior Finish System on

Cement Board and Metal Stud Framing at Soffit.”

BID ADDENDUM NUMBER 3

b. Change Keynote 3 to read: “Hard-Coat Exterior Finish Control Joint (Typ.).”

6. Drawing A-501, Wall Sections: Change Keynote 25 to read: “Hard-Coat

Exterior Finish System on Cement Board and Metal Stud Framing at Soffit.”

7. Drawing A-521, Exterior Details, Detail A6, Storefront Sill: Add note to detail:

“Provide fluid-applied membrane damp-proofing and vapor barrier at exterior face of CMU within cavity at brick veneer walls.”

END OF ADDENDUM 3