About this file
This amendment to a solicitation provides revisions to specifications and drawings for a construction project to build a new Space Control Facility. Key details include:
-
The project scope involves constructing a 12,100 square foot facility for command, administration, operations, maintenance, security forces, and support functions. Revisions update specifications for general construction requirements, commissioning, sustainable building materials, structural steel, glazing, electrical work, and landscaping. Drawings were replaced or revised for existing conditions, site layout, demolition, utilities, fencing, and foundations.
-
The opportunity is a firm fixed-price construction contract awarded through sealed bidding procedures. The construction magnitude is between $5-10 million. The period of performance is 365 calendar days from notice to proceed. The North American Industry Classification code is 236220 for commercial and institutional building construction. The solicitation is set aside for small businesses with a size standard of $36.5 million in average annual receipts.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F6G3CE0135AW01
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A. See continuation sheet and attached updated Specifications and Draw ing for further details.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S6V20B0001
X 9B. DATED (SEE ITEM 11)
14-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2020
CODE
USPFO CO 140 MISSION SUPPORT CONTRACTING
18841 E CRESTED BUTTE AVE
BUCKLEY ANG CO 80011-9589
W50S6V 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S6V20B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 02 CONTINUATION PAGE
Amendment 02 SF30 CONTINUATION PAGE
B. Specification Section 01 00 00, General Requirements: Edited Paragraphs 1.28 B; and 1.28 E.
1. Change paragraph 1.28 B. to read:
“In accordance with FAR Clause 52.236-15, “Schedules for Construction Contracts”, the contractor shall within five days after work commences on the contract, or another period of time determined by the KO, prepare and submit to the KO for approval an electronic copy of a practicable schedule showing the order in which the contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing features of work. A composite schedule for the overall contract shall also be provided. The schedule shall be on an AF Form 3064, Contract Progress Schedule, or an approved computer-generated format similar to the AF Form 3064. The work shall be scheduled so that, upon the start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period will be rejected. The Contractor is required to provide monthly progress reports covering the period from notice to proceed through final inspection. Unless agreement cannot be made on the applicable percentage of progress a joint report will be submitted to the Contracting Officer.
This report shall be submitted on the NGB Contract Progress Report form (similar to an AF Form 3065), or an approved computer-generated similar format. These reports shall track progress by CLIN, if contract contains multiple CLINs, multiple AF Form 3064 and NG Contract Progress Reports will also be required for payment purposes. No work may start until the Contracting Officer approves the plan in writing.”
2. Edit paragraph 1.28 E.: Change “Bi-weekly progress reports (1st and 15th of month)…” to read “Monthly progress reports (1st Progress Meeting of month)…”
C. Specification Section 01 33 29.01, para. 1.7.F.1.: Change paragraph to read: “Submit approved Final
Commissioning Report as proof of this tracking requirement.” (No attachment) D. Specification Section 01 81 13.13: DELETE Specification Section; Replace with Section 01 81 13.13 dated 5
Aug 2020. Section has been Re-written. ATTACHMENT 1, Guiding Principles Assessment Project Information (PI) Form, TO REMAIN (no changes to Attachment 1).
E. Specification Section 06 10 53: Delete Section; Replace with Section 06 10 53 Dated 5 Aug 2020. Edited
Paragraphs 1.2.B; 1.2.C added 1.2.C. 2 through 7; para 1.3; Added Para 1.4 & 1.5; Edited New para 2.3.A.;
Edited para 2.4.A.; and Edited Para 2.2.A.1.
F. Specification Section 07 62 99, para. 1.6.B: ADD Para “1.6.B.2. Uplift Warranty Period: 5 years from date of
Substantial Completion.” (No attachment)
G. Specification Section 08 33 23, Overhead Coiling Doors: Replace Specification Section 08 33 23 with revised section dated 5 Aug 2020 Paragraph 2.2.J.8. was deleted and Changed paragraph 2.2 C to indicate Curtain U- Factor: 0.60 in lieu of ‘12 deg f x h x sq. ft/ Btu’.
H. Specification Section 08 41 13, Aluminum-Framed Entrances and Storefronts: Delete Section; Replace with
Section 08 41 13 Dated 5 Aug 2020. Edited the following paragraphs:
1. Para. 1.7.B. Changed finish warranty period to 5 years.
2. Para. II. Deleted mock-up requirement.
I. Specification Section 08 80 00, Glazing, Para. II. & Para. VI. d.: Deleted mock-up requirement.
J. Specification Section 09 65 19, Resilient Tile Flooring: DELETE Specification Section 09 65 19. (No attachment)
K. Specification Section 09 67 23 Para 2.1 Insert Para “B. Slip-Resistive Aggregate Finish: Factory-graded, packaged, rustproof, nonglazing, abrasive aggregate of fused aluminum-oxide granules or crushed emery aggregate containing not less than 50 percent aluminum oxide and not less than 20 percent ferric oxide;
unaffected by freezing, moisture, and cleaning materials.” (No attachment)
L. Specification Section 21 13 13, para. 3.16, DEMONSTATION: Insert “E. Add 1 additional hour of demonstration and training on the MIC Mitigation System.” (No attachment)
M. Replace specification section 10 14 23.13 with revised specification section 10 14 23.13 – Room Identification
Signage, dated 5 Aug 2020.
N. Specification Section 10 14 53, Traffic Signage: DELETE Specification Section 10 14 53. (No attachment)
O. Specification Section 22 11 13, Facility Water Distribution Piping: Replace section 22 11 13 with revised section dated 5 Aug 2020.
P. Specification Section 22 13 13, Facility Sanitary Gravity Sewers and Force Mains: Deleted paragraph 2.4.B.7.
referencing manhole frames and covers coal tar epoxy coating. (No attachment) Q. Specification Section 22 42 16.13 Para 1.6: DELETE Para. “1.6. A; A1; A2” entire text. (No attachment) R. Specification Section 26 52 19, para. 1.5.: Delete paragraph 1.5. Extra Materials are not required. (No attachment)
S. Specification Section 27 13 00, para. 1.9.: Delete paragraph 1.9. Extra Materials are not required. (No attachment)
T. Specification Section 32 17 23, Pavement Markings: DELETE Specification Section 32 17 23. (No attachment)
U. Drawing C-100, Existing Conditions: Replace drawing C-100 with revised drawing (pdf file with revision dated
7/31/20). See clouded changes.
V. Drawing CS-101, Site Layout Plan: Replace drawing CS-101 with revised drawing (pdf file with revision dated
7/31/20). See clouded changes.
W. Drawing CD-101, Site Demolition Plan: Replace drawing CD-101 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
X. Drawing CD-101, Site Demolition Plan: ADD Keynote 12 to read: “Salvage, and turn over to the Government, all demolished light poles and fixtures.”
Y. Drawing CU-101, Site Utility Plan – Base Bid: Replace drawing CU-101 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
Z. Drawing CU-102, Site Utility Plan – Bid Options: Replace drawing CU-102 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
AA. Drawing C-505, Construction Details 5: Replace drawing C-505 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
BB. Drawing C-120, Fence Plan – Base Bid: Replace drawing C-120 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
CC. Drawing C-121, Fence Plan – Bid Option: Replace drawing C-121 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
DD. Drawing C-509, Fence Details: Replace drawing C-509 with revised drawing (pdf file with revision dated
7/31/20). See clouded changes.
EE. Drawing CL-001, Landscape Design Plan – Base Bid: Replace drawing CL-001 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
FF. Drawing CL-002, Landscape Design Plan – Bid Options: Replace drawing CL-002 with revised drawing
(pdf file with revision dated 7/31/20). See clouded changes.
GG. Drawing S-101, Foundation Plan: Replace drawing S-101 with revised drawing (pdf file with revision dated 7/31/20). See clouded changes.
HH. All other terms and conditions remain unchanged.
(End of Summary of Changes)