Amendment 04 - W50S6V20B0001-04 - SPCS Bid Addendum 4.pdf

PDF 74 KB Posted

Attached to
Space Control Facility, 140th Wing, Amendment 05 - Bid Abstract Federal contract opportunity
Solicitation number
W50S6V20B0001
Issued by
Department of the Army Colorado Army National Guard

About this file

This document provides details for a federal solicitation to construct a new Space Control Facility for the 140th Wing on Peterson Air Force Base in Colorado. The solicitation seeks a firm fixed-price construction contract valued between $5 million and $10 million to build a 12,100 square foot facility utilizing conventional methods. The facility is to include space for command and administration, operations, maintenance, security forces, and support functions. Construction must meet DoD and Air Force standards including antiterrorism and force protection requirements. The project scope includes new utility connections, pavement, and general site work. The solicitation is set aside for total small businesses with a size standard of $36.5 million. Offerors must perform at least 15% of the work with their own employees. The performance period is 365 calendar days with the pre-bid conference scheduled prior to proposals due on an unspecified date. Interested parties must register in the System for Award Management and plans are available through a controlled package process.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLORADO AIR NATIONAL GUARD

BUCKLEY AIR FORCE BASE – 140 CES

PROJECT NO. TDKA 16-9004

SPACE CONTROLE FACILITY

Peterson Air Force Base, Colorado Springs, CO

BID ADDENDUM NUMBER 4

12 August 2020

SPACE CONTROLE FACILITY

PROJECT NO. TDKA 16-9004

BID ADDENDUM NUMBER 4

PART I – PROJECT REQUIREMENTS

1. The Contractor is to provide all plant, material, equipment, and labor necessary to perform the work outlined in this Addendum.

2. All work shall be performed in accordance with the contract drawings and specifications.

3. The Contractor is to include the following changes to Specifications and Drawings as indicated below.

PART II – TECHNICAL SPECIFICATIONS

No Changes.

PART III – CONTRACT DRAWINGS

1. Drawing C-120, Fence Plan – Base Bid: Add the following sentences to

Keynote 19: “Install Fiber Optic Intrusion Detection System (FOIDS) to the New and Temporary security fencing. The FOIDS shall be installed in a winding serpentine pattern”

2. Drawing C-121, Fence Plan – Bid Options: Add the following sentences to Keynote 19: “Install Fiber Optic Intrusion Detection System (FOIDS) to the New and Temporary security fencing. The FOIDS shall be installed in a winding serpentine pattern”

END OF ADDENDUM 4