The document is a Project Initiation Form (PIF) from the Greater Orlando Aviation Authority (GOAA) for the W-431 ORL East Ramp Rehabilitation project at Orlando Executive Airport. The project aims to rehabilitate the existing East Ramp through comprehensive construction work, including mill and overlay of asphalt pavement, reconstruction of isolated areas, and associated markings, lighting, and signage improvements. The estimated budget is $9,000,000, with funding sources including the Federal Aviation Administration (FAA) and Florida Department of Transportation (FDOT). The project requires a Project Manager, On-Airport Representative (OAR), and Airport Operations Area (AOA) access, with draft specifications already prepared and additional specification assistance needed.
The contract will be procured through the Construction Department in accordance with Policy 130.01 or 130.02, and is not a recurring requirement or a replacement of an existing contract. The project is not part of a broader project or linked to another contract. The procurement approach involves a comprehensive rehabilitation effort, with a focus on airfield pavement management as identified in the FDOT 2019 Airfield Pavement Management Program report. The project will involve significant infrastructure improvements, including pavement reconstruction, markings, lighting upgrades, and potential drainage system enhancements, demonstrating a strategic approach to airport infrastructure maintenance and modernization.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT INITIATION FORM-PROFESSIONAL SERVICES
| TO: |
| Phil Brown, Chief Executive Officer |
| FROM: |
| Mark W. Birkebak, Director of Engineering |
| PROJECT TITLE: |
| W-431 ORL East Ramp Rehabilitation – Phases 1, 2 & 3 |
| FUNDING SOURCE/BUDGET CODE: |
| FAA, FDOT, Capital Expenditure |
| ESTIMATED BUDGET: |
| $9,000,000.00 |
BRIEF SCOPE OF WORK:
The objective of this project is to rehabilitate the existing East Ramp at the Orlando Executive Airport as identified in the FDOT 2019 Airfield Pavement Management Program report. Construction work generally includes mill and overlay for the asphalt pavement including reconstruction for some isolated areas, associated markings, lighting and signage.
PROJECTED OUTCOME:
| CCNA or PREDOMINATELY DESIGN OR CONSTRUCTION RELATED? |
| |X| Yes |
| |_| No |
| OAR REQUIRED? |
| |X| Yes |
| |_| No |
| PROJECT MANAGER REQUIRED? |
| |X| Yes |
| |_| No |
| AOA ACCESS REQUIRED? |
| |X| Yes |
| |_| No |
| RECURRING REQUIREMENT? |
| |_| Yes |
| |X| No |
Base Period:
| years |
| Option Periods: |
| REPLACES AN EXISTING CONTRACT? |
| |_| Yes |
| |X| No |
Contract #:
Expires as of:
| PART OF A BROADER PROJECT / LINKED TO ANOTHER CONTRACT? |
| |_| Yes |
| |X| No |
| Contract #: |
| Project #: |
| Project Type: |
| |_| Design -Build |
| |_| Design-Bid-Build |
| DRAFT SPECIFICATIONS PREPARED? |
| |X| Yes |
| |_| No |
| SPECIFICATION ASSISTANCE WILL BE REQUIRED? |
| |X| Yes |
| |_| No |
| Recommend procurement is done by: |
| |_| Purchasing Department |
| |X| Construction Department |
| Procurement in accordance with: |
| |_| Policy 450 |
| |X| Policy 130.01 or 130.02 |
Mark W. Birkebak, Director of Engineering
Date
|_| Concur
Davin Ruohomaki, Sr. Director of Plan., Eng., & Const. or Designee
Date
|_| Concur
Phillip Brown, Chief Executive Officer or Designee
Date
WXXX PIF Page 1 of 1