BP-00048_ORL_East_Ramp_Rehabilitation_Phase_1_-_DWGs_Bid_Set.pdf
PDF 18 MB Posted
- Solicitation number
- 25-598-IFB
- Issued by
- Orange County, Orlando City, Florida
About this file
The provided file is a comprehensive set of engineering and construction drawings for the Orlando Executive Airport's East Ramp Rehabilitation Phase 1 project (BP-048), prepared by Mead & Hunt and dated April 17, 2025. The project involves rehabilitating the East Ramp area, which includes full-depth asphalt and base removal, pavement reconstruction, installation of new aircraft tie-downs, electrical lighting upgrades, drainage improvements, and site markings. The project is structured with a base bid and an additive alternate, covering approximately 14,475 square yards in the base bid and 10,030 square yards in the additive alternate, with work including 4" asphalt pavement installation, limerock base course, subgrade preparation, and various ancillary improvements.
The project documents detail precise technical specifications for pavement reconstruction, including 4" asphalt pavement in two 2" lifts, 6" limerock base course, and comprehensive site preparation. Electrical improvements include removing and replacing existing light poles, installing new high mast lighting, and upgrading electrical infrastructure. The project has a total construction duration of 180 calendar days, divided into a 60-day mobilization and site preparation phase, followed by 60 days for the base bid work area and potentially an additional 60 days for the additive alternate area. The estimated quantities include 3,350 tons of asphalt for the base bid and 2,300 tons for the additive alternate, with additional quantities for base course, excavation, and site improvements. The project will be conducted with careful consideration of airport operations, including maintaining access for U.S. Customs and Border Protection and ensuring minimal disruption to airport activities.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical
Professional Seals
PROJECT DESIGN TEAM:
Engineer of Record:
PROJECT SUB-CONSULTANTS:
Mead & Hunt 4010 W Boy Scout Blvd, Suite 1000 Tampa, FL 33607 (813)-210-8740 Dave.Schmidgall@meadhunt.com
Structural
BP - 048
EAST RAMP REHABILITATION
PHASE 1
TIM WEISHEYER
STEPHANIE KOPELOUSOS
M. CARSON GOOD
JOE NUNZIATA
THE HONORABLE BUDDY DYER
THE HONORABLE JERRY DEMINGS
DAN GIORDANO
LANCE LYTTLE
GOAA ENGINEERING DEPARTMENT
GOAA FACILITIES DEPARTMENT
CHAIRPERSON:
VICE CHAIRPERSON:
IMMEDIATE PAST CHAIR:
TREASURER:
BOARD MEMBERS:
CHIEF EXECUTIVE OFFICER:
Civil Support:
Electrical:
Survey:
Geotechnical:
DONNY MATTHEWS
FL PE #89403
MARK A. MORLEY
FL Reg #59813
LOCATION MAP
U
PD
AT
ED
O N
: 0
Ap r 2
5, :1
3a m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
IS
-0
.0
C ov er S he et
.d w g
ORLANDO EXECUTIVE AIRPORT
365 RICKENBACKER DRIVE
ORLANDO, FLORIDA 32803
17 APRIL, 2025
BID DOCUMENTS
John B. Webb & Associates 925 S Denning Dr Winter Park, FL 32789 (407)-622-9322
CERM, Inc.
4767 New Broad St, Suite 255 Orlando, FL 32814 (407)-514-2717
NADIC Engineering Services 601 N Hart Blvd Orlando, FL 32818 (407)-521-4771
The Ohmega Group, Inc.
25 N Market St, Suite 300A Jacksonville, FL 32202 (904)-807-6512
Mead and Hunt, Inc.
Civil
DAVID SCHMIDGALL
FL PE #44680
PROJECT LOCATION
EAST RAMP
LEGEND:
ANTENNA
BENCHMARK
BOLLARD
CONTROL POINT
CHISELED X
CLEANOUT, SANITARY OR STORM
DOWNSPOUT
ELECTRICAL METER
ELECTRICAL / COMMUNICATIONS
PEDESTAL
ELECTRICAL TRANSFORMER BOX
ELECTRICAL SERVICE PANEL
ELECTRICAL HANDHOLE/PULLBOX
FIRE HYDRANT
FLAGPOLE
GAS METER
GAS VALVE
GATE
GUY WIRE
HANDHOLE, GENERIC
INLET, CURB
INLET, ROUND
INLET, SQUARE
IRON PIN
LIGHT POLE (DOUBLE)
LIGHT POLE (SINGLE)
MAILBOX
MANHOLE, ELECTRIC
MANHOLE, FIBER OPTIC
MANHOLE, SANITARY SEWER
MANHOLE, STORM SEWER
MANHOLE, TELECOMMUNICATIONS
MANHOLE, VALVE
MARKER, CABLE
MARKER, DUCT
PK or MAG NAIL
POWER POLE
POWER POLE, DOUBLE
POWER POLE WITH LIGHT
PVC PIPE
REBAR
SANITARY VALVE
SIGN (SINGLE POST)
SIGN (DOUBLE POST)
SHRUB
STORM FLARED END SECTION
STUMP
CTV PEDESTAL BOX
WATER VALVE
WATER SHUT OFF
WATER METER
WATER SURFACE
WELL
GAS
ELECTRIC, OVERHEAD
ELECTRIC, UNDERGROUND
EXISTING CONTOUR LINES
FENCE
FIBER OPTIC CABLE
HANDRAIL
PROPERTY LINE
SANITARY SEWER
STORM PIPE
SWALE
TELEPHONE
TV CABLE
WATER
VEGETATION
PROPOSED ASPHALT PAVEMENT
B
DS
ESP
HH
MBX
E
FO
S
ST
T
MHV
C
D
PVC
SV
CTV
W V
OSW
WM
WELL
G
OHE
x
FOC
o
SS
SD
T
TV
W
ABBREVIATIONS:
ALCMS AIRFIELD LIGHTING CONTROL AND MONITORING
SYSTEM
AMSL ABOVE MEAN SEA LEVEL
AOA AIRCRAFT OPERATIONS AREA
APPROX APPROXIMATE
ARFF AIRCRAFT RESCUE AND FIRE FIGHTING
ATCT AIR TRAFFIC CONTROL TOWER
BLDG BUILDING
CA
TEAM CONSTRUCTION ADMINISTRATION TEAM
C-C CENTER TO CENTER
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CKT CIRCUIT
CSPP CONSTRUCTION SAFETY PHASING PLAN
DIA DIAMETER
EG EXISTING GRADE
ELEV ELEVATION
EOP EDGE OF PAVEMENT
FAA FEDERAL AVIATION ADMINISTRATION
FBO FIXED BASE OPERATOR
FG FINISHED GRADE
FOD FOREIGN OBJECT DEBRIS
FT FEET
GAL GALLON
GND GROUND
GPM GALLONS PER MINUTE
HDPE HIGH DENSITY POLYETHYLENE
HMA HOT MIX ASPHALT
IE INVERT ELEVATION
ILS INSTRUMENT LANDING SYSTEM
IN INCHES
LF LINEAL FEET
LOC LOCALIZER
MIN MINIMUM
MITL MEDIUM INTENSITY TAXIWAY LIGHT
MPH MILES PER HOUR
NIC NOT IN CONTRACT
NOTAM NOTICE TO AIRMAN
NTS NOT TO SCALE
OAR OWNERS AUTHORIZED REPRESENTATIVE
OFZ OBJECT FREE ZONE
PAPI PRECISION APPROACH PATH INDICATOR
PCC PORTLAND CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
QTY QUANTITY
R RADIUS
RCP REINFORCED CONCRETE PIPE
ROFA RUNWAY OBJECT FREE AREA
ROW RIGHT OF WAY
RSA RUNWAY SAFETY AREA
RWY OR
RW RUNWAY
SIDA SECURITY IDENTIFICATION DISPLAY AREA
SF SQUARE FOOT
SPCD SAFETY PLAN COMPLIANCE DOCUMENT
STA STATION
TWY TAXIWAY
TOFA TAXIWAY OBJECT FREE AREA
TSA TAXIWAY SAFETY AREA
TYP TYPICAL
OFA OBJECT FREE AREA
132.75
131.53
PROPOSED ELEVATION
EXISTING ELEVATION
ASPHALT DEMOLITION
EXISTING JUNCTION CAN
EXISTING WIRE AND CONDUIT
TO REMAIN
E
UGE
CB
CB
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, :3
5a m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C
-IS
-0 .0
.2 L
EG
EN
D
N O
TE
S.
dw g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
LOCATION MAP
X
X
X
X X
X
X X
X
X X
X
X
X
X
X
X
X
X X
X
X
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
US
C
US
TO
MS
A
ND
B
OR
DE
R
PR
OT
EC
TI
ON
RE
ST
RI
CT
ED
A
RE
A
PROJECT LOCATION
EAST RAMP
GENERAL NOTES
1. CONTRACTOR SHALL NOTIFY THE OAR OR ENGINEER IMMEDIATELY OF
ANY DISCREPANCIES IN THE LAYOUT AND SHALL NOT PROCEED UNTIL
CLARIFICATION IS PROVIDED.
2. THE CONTRACTOR IS ADVISED TO USE CAUTION WHEN OPERATING
TRUCKS OR OTHER CONSTRUCTION EQUIPMENT ON EXISTING
PAVEMENTS. EXISTING PAVEMENTS MAY NOT SUPPORT CONSTRUCTION
TRAFFIC. ANY DAMAGE TO EXISTING PAVEMENTS SHALL BE REPAIRED
AT THE CONTRACTOR'S EXPENSE.
3. WARNING: THERE ARE A NUMBER OF EXISTING UTILITIES, INCLUDING
DRAINAGE, ELECTRICAL, AND COMMUNICATIONS CABLES TRAVERSING
THE SITE. THE DESIGNER HAS ATTEMPTED TO DEPICT THE
APPROXIMATE LOCATIONS OF THESE ITEMS CURRENTLY IN PLACE. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE EVERY
EXISTING ITEM LOCATED, FLAGGED, AND IDENTIFIED PRIOR TO START
UP OF CONSTRUCTION AND TO MAINTAIN VISIBLE LOCATION
THROUGHOUT THE CONSTRUCTION DURATION. THIS SHALL INCLUDE
COORDINATION WITH ALL NECESSARY AGENCIES INCLUDING THE
AIRPORT. ANY DAMAGE DONE SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL REPAIR ANY UTILITY DAMAGED
DURING THE CONSTRUCTION BY THE CONTRACTOR'S OPERATIONS AT
NO COST TO THE AIRPORT.
INDEX OF DRAWINGS
SHEET NUMBER SHEET TITLE
IS-0.0.0 COVER SHEET
C-IS-0.0.1 SUMMARY OF QUANTITIES, INDEX OF DRAWINGS,
LEGEND & NOTES
C-2.1.1 OVERALL SITE PLAN
CD-3.1.1 EXISTING CONDITIONS AND DEMOLITION PLAN
C-1.1.1 SOIL BORING LOCATION PLAN
C-1.1.2 BORING LOGS - SHEET 1
C-1.1.3 BORING LOGS - SHEET 2
C-3.1.1 GEOMETRY & MARKING PLAN
C-9.1.1 TYPICAL SECTIONS
C-9.1.2 PAVING DETAILS
C-12.1.1 GRADING AND DRAINAGE PLAN - BASE BID
C-12.1.2 GRADING AND DRAINAGE PLAN - ADDITIVE ALTERNATE
C-15.1.1 DRAINAGE AND EROSION CONTROL DETAILS
C-40.1.1 MARKING DETAILS AND NOTES
C-40.1.2 TEMPORARY MARKING DETAILS
C-60.0.1 CONTRACTOR LAYOUT AND OVERALL PHASING PLAN
C-60.0.2 PHASING PLAN - WORK AREA A - BASE BID
C-60.0.3 PHASING PLAN - WORK AREA B - ADDITIVE ALTERNATE
C-61.0.1 SAFETY AND SECURITY NOTES
C-61.0.2 SAFETY AND SECURITY DETAILS
S-1.1.1 LIGHT POLE FOUNDATION DETAILS
E0.01 ELECTRICAL LEGEND AND NOTES
E0.02 ELECTRICAL SPECIFICATIONS
E0.03 ELECTRICAL LIGHTING FIXTURE SCHEDULE
E1.01 APRON LIGHTING DEMOLITION PLAN
E1.02 APRON LIGHTING PLAN
E2.01 APRON LIGHTING PHOTOMETRIC PLAN
E5.01 ELECTRICAL DETAILS
E5.02 ELECTRICAL DETAILS
SUMMARY OF
QUANTITIES, INDEX
OF DRAWINGS,
LEGEND & NOTES
C-IS-0.0.1
RAD
ACC
DES
APRIL 17, 2025
N.T.S.
SUMMARY OF QUANTITIES - BASE BID
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY
M-101.1 MOBILIZATION LS 1
M-102.2 SAFETY, SECURITY AND MAINTENANCE OF TRAFFIC LS 1
C-102.1 SILT FENCE INSTALLATION AND REMOVAL LF 750
C-102.2 INSTALL INLET PROTECTION (INLET SEDIMENT TRAP) EA 4
P-101.1 ASPHALT AND BASE REMOVAL, FULL DEPTH (VARIES, 6"-10") SY 14,475
P-101.2 TIEDOWN HOOK AND FOUNDATION REMOVAL EA 31
P-152.1 UNCLASSIFIED EXCAVATION (VARIES, 2"-4") CY 750
P-152.2 PREPARE SUBGRADE SY 14,475
P-152.3 UNSUITABLE EXCAVATION CY 500
P-211.1 LIMEROCK BASE COURSE (6" THICK) CY 2,413
P-401.1 4" ASPHALT PAVEMENT (2-2" LIFTS) TON 3,350
P-602.1 EMULSIFIED ASPHALT, PRIME COAT GAL 4,500
P-603.1 EMULSIFIED ASPHALT, TACK COAT GAL 1,050
P-620.2 PERMANENT PAVEMENT MARKINGS SF 1,500
P-620.3 TEMPORARY PAVEMENT MARKINGS SF 1,750
522-1 CONCRETE SIDEWALK, 4" THICK SY 60
SUMMARY OF QUANTITIES - ADDITIVE ALTERNATE
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY
M-101.1 MOBILIZATION LS 1
M-102.2 SAFETY, SECURITY AND MAINTENANCE OF TRAFFIC LS 1
C-102.1 SILT FENCE INSTALLATION AND REMOVAL LF 350
C-102.2 INSTALL INLET PROTECTION (INLET SEDIMENT TRAP) EA 4
P-101.1
ASPHALT AND BASE REMOVAL, FULL DEPTH (VARIES,
5.5"-10") SY 10,030
P-101.2 TIEDOWN HOOK AND FOUNDATION REMOVAL EA 75
P-152.1 UNCLASSIFIED EXCAVATION (VARIES, 3"-6") CY 1,500
P-152.2 PREPARE SUBGRADE SY 10,030
P-152.3 UNSUITABLE EXCAVATION CY 500
P-211.1 LIMEROCK BASE COURSE (6" THICK) CY 1,700
P-401.1 4" ASPHALT PAVEMENT (2-2" LIFTS) TON 2,300
P-602.1 EMULSIFIED ASPHALT, PRIME COAT GAL 3,200
P-603.1 EMULSIFIED ASPHALT, TACK COAT GAL 850
260502-1
ELECTRICAL DISTRIBUTION INCLUDING NEW CONDUIT,
CABLE, FROM EXISTING LIGHTPOLE LOCATION TO NEW
CONNECTION POINT INCLUDING TRENCHING, JUNCTIONS
CANS, CONNECTIONS AND ALL ASSOCIATED WORK
LS 1
260502-2
NEW HIGH MAST LIGHT INSTALLED IN CONCRETE
FOUNDATION- INCLUDES DEMOLTION OF EXISTING POLE,
FOUNDATION, AND ALL ASSOCIATED CONNECTIONS
LS 1
P-620.1 INSTALL NEW TIEDOWN HOOK AND FOUNDATION EA 45
U .S.
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D
D
D
D
D
D
D
FAA FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
DD
D
S
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X X X X
X
X
X X
X
X
X
X X X
X X X
X X
LAKE G
EO
RG
ETTE LN
RICKENBACKER DR FAIRGREEN ST
LAKE
GEORGETTE
TAXIWAY A
ATLANTIC
AVIATION
EXISTING APRON
AIRPORT ADMIN.
AND CBP
MOOG FTS HANGAR
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
COLONIAL PROMENADE
SHOPPING CENTER
TAXIWAY A3
TAXIW
AY A4
TA
XI
W
AY
A
BASE BID
ADDITIVE
ALTERNATE
00 100 200
1. THE BASE BID IS THE
REHABILITATION OF
THE EAST RAMP
SOUTH OF THE
AIRPORT
ADMINISTRATION AND
CUSTOMS BUILDING .
2. THE ADDITIVE
ALTERNATE IS THE
REHABILITATION OF
THE EAST RAMP TO
THE EAST OF THE
BASE BID.
3. THE OWNER MAY OR
MAY NOT ELECT TO
AWARD THE ADDITIVE
ALTERNATE BASED ON
PROJECT FUNDING.
ISSUED FOR
CONSTRUCTION PLANS
WILL BE MODIFIED TO
REFLECT THE
AWARDED BID
SCHEDULE(S).
4. SEE SHEET C-61.0.1
FOR STAGING AREAS,
HAUL ROUTES, AND
PHASING
INFORMATION.
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 3
M ar
5, :1 1p m , B y:
D ra w in g Pa th : X
:\4
\2
2.
\T
EC
H
\C
AD
\D ra w in gs \S he et s\ C
-2 .1
.1 O ve ra ll Si te P la n.
dw g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
NOTES
LEGEND
BASE BID PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT LIMITS
OVERALL SITE
PLAN
C-2.1.1
RAD
ACC
D
D
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
U S C
U S
TO
M S A
N D
B O
R D
ER
PR
O
TEC
TIO
N
R
ES
TR
IC
TED
A
R
EA
U S C
U S
TO
M S A
N D
B O
R D
ER
P
R O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
AIRPORT ADMIN.
AND CBP
PROTECT EXISTING
DRAINAGE INLET TO
REMAIN RIM EL. =
111.39'
PROTECT EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING SEWER MANHOLE
RIM EL. = 111.60'
EXISTING CATCH BASIN
TOP EL. = 107.25'
EXISTING CATCH BASIN
TOP EL. = 107.26'
PROTECT EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.52'
PROTECT EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.84'
PROTECT EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.78'
110.5
111.5
109.5
108.5
107.5
7.5
108.5
107.5 107.5 108 108.5
108.5
109.5
112.5
111.5 111.5
111.5
110.5
111.5111
111 111.5
109.5
PROTECT EXISTING
DRAINAGE INLET TO
REMAIN
RIM EL. = 111.28'
PAVEMENT SAWCUT
INSTALL
INLET
PROTECTION
INSTALL
INLET
PROTECTION
EXISTING REFLECTIVE
PAVEMENT MARKER TO
BE REMOVED (TYP.)
EXISTING
CONCRETE
FLUME TO
REMAIN
0.
5'
PAVEMENT REMOVAL
N: 1532427.02 E: 549834.94
PAVEMENT REMOVAL
N: 1532094.58 E: 549977.01
PAVEMENT REMOVAL
N: 1531952.58 E: 549644.16
N:1531977.58 E:549732.48
N:1532123.42 E:550070.72
EXISTING CATCH BASIN
TOP EL. = 109.76'
EXISTING CATCH BASIN
RIM EL. = 111.75'
EXISTING CATCH BASIN
RIM EL. = 112.74'
N:1531944.74 E:549726.83
N:1531934.27 E:549637.92
N:1532283.41 E:549488.86
PAVEMENT REMOVAL
N: 1531984.24 E: 549718.24
N:1531948.54 E:549636.95
PAVEMENT SAWCUT
PAVEMENT REMOVAL
N: 1532415.70
E: 549806.76
PAVEMENT REMOVAL
N: 1532401.02
E: 549774.20
INSTALL
SILT FENCE
TA
XI
W
AY
A
EXISTING AIRPLANE
TIE DOWN AND
FOUNDATION TO BE
REMOVED (TYP.)
PAVEMENT SAWCUT
EXISTING LIGHT POLE TO BE
REMOVED AND REPLACED -
SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL
INFORMATION (SEE NOTE 3)
PAVEMENT REMOVAL
N: 1532524.99 E: 550064.95
PAVEMENT REMOVAL
N: 1532193.53
E: 550206.60
N:1532214.69 E:550284.29
250'
361'
GRAVEL ACCESS TO
LAKE GEORGETTE LN
00 30 60
ASPHALT
PAVEMENT
REMOVAL
(BASE BID)
ASPHALT
PAVEMENT
REMOVAL
(ADDITIVE
ALTERNATE)
PAVEMENT
SAWCUT
DEMOLITION
/REMOVAL
INLET
PROTECTION
SILT FENCE
AIRPLANE
TIE DOWN
ANCHOR
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, 1:
am
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C D
-3 .1
.1 E
XI
ST
IN
G
C O
N D
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N P
LA
N
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
LEGEND
NOTES
1. ALL AIRPLANE TIE
DOWN LOCATIONS
SHOWN ARE
APPROXIMATE
LOCATIONS.
CONTRACTOR SHALL
FIELD VERIFY THAT
ALL TIE-DOWNS AND
FOUNDATIONS HAVE
BEEN REMOVED PRIOR
TO PAVEMENT
MILLING. TIE DOWNS
AND CONCRETE TO BE
DISPOSED OF
OFF-SITE.
2. CONTRACTOR SHALL
MAINTAIN AND
PROTECT ALL
EXISTING SIGNS,
LIGHTS, EXISTING
UTILITIES, AND
CIRCUITS UNLESS
OTHERWISE NOTED IN
THE DEMOLITION
PLANS.
3. COST OF DEMOLITION
OF EXISTING LIGHT
POLE, FOUNDATION,
AND ALL ASSOCIATED
EQUIPMENT /
CONNECTIONS SHALL
BE INCLUDED IN THE
COST OF THE NEW
LIGHT POLE.
EXISTING
CONDITIONS AND
DEMOLITION PLAN
CD-3.1.1
RAD
ACC
D
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
U S C
U S
TO
M S A
N D
B O
R D
ER
PR
O
TEC
TIO
N
R
ES
TR
IC
TED
A
R
EA
U S C
U S
TO
M S A
N D
B O
R D
ER
P
R O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
AIRPORT ADMIN.
AND CBP
B-1
B-4
B-2 B-3
B-5
B-8
B-10
B-7
B-9
B-6
TA
XI
W
AY
A
PHASE LIMIT BETWEEN
BASE BID AND
ADDITIVE ALTERNATE
HANGAR ACCESS
TAXILANE
00 30 60
NOTES
1. SEE GEOTECHNICAL
REPORT IN PROJECT
MANUAL FOR
ADDITIONAL
INFORMATION ON
PAVEMENT AND
BORING LOG DATA.
2. RESULTS SHOWN
REPRESENT ONLY
THE LOCATIONS
BORED.
CONTRACTOR MAY
ENCOUNTER
VARYING
CONDITIONS DURING
CONSTRUCTION.
BORING
LOCATION
PROJECT
LIMITS
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 3
M ar
5, :2 1p m , B y:
D ra w in g Pa th : X
:\4
\2
2.
\T
EC
H
\C
AD
\D ra w in gs \S he et s\ C
-1 .1
.3 B
O R
IN
G
L O
G S
- S H
EE
T
2.
dw g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
SOIL BORING
LOCATION PLAN
C-1.1.1
RAD
ACC
LEGEND
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 3
M ar
5, :2 1p m , B y:
D ra w in g Pa th : X
:\4
\2
2.
\T
EC
H
\C
AD
\D ra w in gs \S he et s\ C
-1 .1
.3 B
O R
IN
G
L O
G S
- S H
EE
T
2.
dw g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
BORING LOGS -
SHEET 1
C-1.1.2
RAD
ACC
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 3
M ar
5, :2 1p m , B y:
D ra w in g Pa th : X
:\4
\2
2.
\T
EC
H
\C
AD
\D ra w in gs \S he et s\ C
-1 .1
.3 B
O R
IN
G
L O
G S
- S H
EE
T
2.
dw g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
BORING LOGS -
SHEET 2
C-1.1.3
RAD
ACC
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
S
X
X X
AIRPORT ADMIN.
AND CBP
361'
BASE BID
A-A
C-9.1.1
B-B
C-9.1.1
N:1532425.83 E:549835.45
N:1531952.88 E:549644.87
N:1532283.92 E:549503.39
0'
150'
0'
11'
80'
PROPOSED DOUBLE
HEADED AIRCRAFT
PARKING POSITION
MARKING (TYP.) - SEE
DETAIL 3 SHEET C-40.1.1
PROPOSED US
CUSTOMS
CONTAINMENT
MARKING - SEE DETAIL
5 SHEET C-40.1.1
PROPOSED AIRCRAFT
TIE DOWN - SEE
DETAIL 1 SHEET
C-40.1.1
PROPOSED
NON-MOVEMENT AREA
MARKING - SEE DETAIL
2 SHEET C-40.1.1
PROPOSED SURFACE
PAINTED INDICATOR
MARKING -SEE DETAIL 4
SHEET C-40.1.1
TA
XI
W
AY
A
100'
30'
30'
N:1532010.72 E:549667.28
25'
TYP.
TY
P.50'
TYP.
N:1532524.99 E:550064.95
N:1532193.53 E:550206.60
N:1532094.77 E:549976.93 250'
ADDITIVE ALTERNATE
0'
N:1532425.83 E:549835.45
PROPOSED AIRCRAFT
TIE DOWN (TYP.) -
SEE DETAIL 1 SHEET
C-40.1.1
90'
6'
PROPOSED HIGH MAST
LIGHT POLE - SEE
ELECTRICAL DRAWINGS
AND SHEET S-1.1.1 FOR
ADDITIONAL
INFORMATION
CONSTRUCT 5' WIDE 4" THICK
CONCRETE SIDEWALK - SEE DETAIL 5,
SHEET C-9.1.2 (SEE PHASING PLAN FOR
ADDITIONAL INFORMATION)
MARK 8' X 8' SOLID
YELLOW BOX
AROUND LIGHT POLE
BASE
PROPOSED PAVEMENT
EDGE TO MATCH
EDGE OF EXISTING
CONCRETE FLUME
TIE DOWN
N:1532118.27
E:549966.89
TIE DOWN
N:1532104.77
E:549986.25
25'
TYP.
TY
P.
TIE DOWN
N:1532174.87
E:549942.70
TIE DOWN
N:1532198.17
E:549946.34
5'
SIDEWALK TO
REMAIN CLEAR OF
EXISTING SIGN POST
AND LIGHT POLE
00 30 60
LEGEND
PROPOSED
AIRCRAFT
TIE DOWN
NOTES
1. SEE TYPICAL
SECTION AND
PAVEMENT DETAIL
SHEETS C-9.1.1
AND C-9.1.2 FOR
PROPOSED
PAVEMENT
REHABILITATION.
2. LOCATION OF ALL
NEW TIE DOWNS
SHALL BE
CONFIRMED WITH
OAR AND/OR
ENGINEER PRIOR
TO INSTALLATION.
3. ALL MARKINGS ARE
LOCATED WITHIN
THE BASE BID
AREA. THERE ARE
NO MARKINGS
ASSOCIATED WITH
THE ADDITIVE
ALTERNATE.
4. ALL MARKING
DIMENSIONS
SHOWN ARE
DIMENSIONED TO
THE CENTER OF
THE MARKING.
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, 1:
am
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -3
.1 .1
G
EO
M
ET
R Y
M
AR
KI
N G
P
LA
N .d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
BASE BID PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT LIMITS
GEOMETRY &
MARKING PLAN
C-3.1.1
RAD
ACC
VARIES
(0.7% TO 1.0%)
5%
EXISTING CONCRETE
CHANNEL TO REMAIN
ELEVATION VARIES:
112.6' TO 110.8'
ELEVATION
VARIES:
109.0' TO 108.0'
PROPOSED APRON
PAVEMENT SECTION-SEE
SHEET C-9.1.2
EXISTING
GRADE
PROPOSED
GRADE
11'
PROPOSED 4" THICK 5'
WIDE CONCRETE
SIDEWALK (MAX. CROSS
SLOPE 2%)
BASE BID
PROJECT LIMITS
EXISTING
EAST RAMP
(TO REMAIN)
PROPOSED ELEVATION VARIES:
111.8' TO 108.2'EXISTING
EDGE OF
PAVEMENT
VARIES
(0.0% TO 0.7%)
PROPOSED ELEVATION
VARIES:
112.7' TO 108.5'
5%
PROPOSED APRON
PAVEMENT SECTION-SEE
SHEET C-9.1.2
TIE INTO EXISTING
PAVEMENT - SEE DETAIL
4 SHEET C-9.1.2
EXISTING
GRADE
PROPOSED
GRADE
ADDITIVE ALTERNATE
PROJECT LIMITS
SEE NOTE 1
TYPICAL SECTION A-A1 NOT TO SCALE
TYPICAL SECTION B-B2 NOT TO SCALE
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, 1:
am
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -9
.1 .2
P
AV
IN
G
D
ET
AI
LS
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
TYPICAL
SECTIONS
C-9.1.1
RAD
ACC
NOTES
1. PAVEMENT ELEVATIONS AT THIS BOUNDARY SHALL BE
DEPENDENT ON IF THE ADDITIVE ALTERNATE IS CHOSEN TO BE
AWARDED. GRADING PLANS HAVE BEEN PROVIDED FOR BOTH
SCENARIOS AND BASED UPON THE AWARDED BID SCHEDULES
ONE OF THE GRADING PLANS WILL BE INCLUDED IN THE ISSUED
FOR CONSTRUCTION PLANS.
2.5" - 4" ASPHALT
PAVEMENT
3" - 5" LIMEROCK
BASE COURSE
EXISTING SUBGRADE
2.5" - 4" EXISTING
ASPHALT TO BE REMOVED
(P-101.1) - SEE NOTE 1
3" - 4" LIMEROCK BASE
COURSE TO BE REMOVED
AND DISPOSED OFFSITE
(P-101.1)
EXISTING SUBGRADE
B
EL
O W
F
IN
IS
H
ED
G
R A D
E (S
EE
N
O
TE
VARIABLE DEPTH
SUBGRADE TO BE
REMOVED AND
DISPOSED OF
OFFSITE (P-152.1)
4" ASPHALT PAVEMENT
2 - 2" LIFTS (P-401.1)
6" LIMEROCK BASE
COURSE (P-211.1)
EXISTING SUBGRADE
TO BE COMPACTED
(P-152.2) - SEE
NOTES 2 AND 4
TACK COAT BETWEEN
LIFTS (P-603.1)
PRIME COAT (P-602.1)
EXISTING PAVEMENT SECTION1 NOT TO SCALE
DEMOLITION SECTION2 NOT TO SCALE
PROPOSED PAVEMENT SECTION3 NOT TO SCALE
4" ASPHALT PAVEMENT (P-401)
6" LIMEROCK BASE COURSE (P-211)
COMPACTED SUBGRADE
EXISTING 2.5" - 4"
ASPHALT
EXISTING
3" - 4"
LIMEROCK
BASE
COURSE
EXISTING
SUBGRADE
2'
PAVEMENT
TIE-IN
EXISTING
RAMP
ASPHALT
PROPOSED
RAMP
ASPHALT
NOTES
1. THE EXISTING ASPHALT RAMP WAS PREVIOUSLY
SEAL COATED WITH A APPROXIMATELY 1/8" THICK
SEALANT PRODUCT. THE CONTRACTOR MAY
CHOOSE TO REMOVE THIS LAYER PRIOR TO FULL
DEPTH MILLING IN ORDER TO PRESERVE THE
QUALITY OF EXISTING MILLINGS. THIS SHALL BE
DONE AT THE CONTRACTORS DISCRETION AND NO
SEPARATE PAYMENT SHALL BE MADE FOR THIS
WORK.
2. TOP 12" OF EXISTING SUBGRADE TO BE
COMPACTED TO AT LEAST 98% OF MODIFIED
PROCTOR MAXIMUM DRY DENSITY (ASTM D-1557)
3. DEMOLITION SHALL CONSIST OF REMOVAL OF
EXISTING ASPHALT, BASE COURSE, AND SUBGRADE
(AS NECESSARY) TO A DEPTH OF 10" BELOW
PROPOSED GRADES SO THAT THE NEW PAVEMENT
SECTION CAN BE CONSTRUCTED. DEMOLITION
DEPTHS SHALL BE COORDINATED WITH GRADING
PLAN.
4. A PAY ITEM(P-152.3) HAS BEEN ESTABLISHED FOR
UNSUITABLE EXCAVATION IN THE EVENT THAT
UNSUITABLE / MUCK MATERIAL IS DISCOVERED
AFTER THE REMOVAL OF EXISTING SUBGRADE. IF
REQUIRED SUBGRADE COMPACTION CANNOT BE
ACHIEVED DUE TO THESE MATERIALS THIS PAY
ITEM SHALL BE UTILIZED FOR THE REMOVAL AND
REPLACEMENT OF THIS MATERIAL. PRIOR
APPROVAL FROM THE OAR OR ENGINEER IS
REQUIRED BEFORE ANY WORK RELATED TO THIS
WORK CAN COMMENCE.
PAVEMENT CONNECTION DETAIL4 NOT TO SCALE
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, 1:
am
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -9
.1 .2
P
AV
IN
G
D
ET
AI
LS
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
PAVING DETAILS
C-9.1.2
RAD
ACC
4" CONCRETE SIDEWALK5 NOT TO SCALE
5'
1"
6"
4"
6"
VARIES
6" X 6" W1.4 X W1.4
WELDED WIRE FABRIC
6" COMPACTED SUBGRADE
@ 95% COMPACTION
VARIES
VARIES2% MAX.
CROSS SLOPE
NOTE:
CONTROL JOINTS SHALL BE LOCATED NO MORE
THAN 6'-0" O.C.
2"
D
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
AIRPORT ADMIN.
AND CBP
EXISTING SEWER MANHOLE
RIM EL. = 111.60'
MATCH EXISTING GRADE
SEE PAVEMENT CONNECTION
DETAIL SHEET C-9.1.2
EXISTING CATCH BASIN
TOP EL. = 109.76'
EXISTING CATCH BASIN
TOP EL. = 111.75'
EXISTING CATCH BASIN
TOP EL. = 112.74'
25'
TYP.
10.00'
108.16
108.50
108.69
108.88
109.07
109.26
109.45
109.64
109.82
109.98
110.15
110.31
110.47
110.63
110.79
108.50
108.67
108.86
109.05
109.24
109.43
109.62
109.81
109.99
110.15
110.31
110.47
110.63
110.79
110.96
108.55
108.70
108.90
109.10
109.29
109.49
109.68
109.88
110.06
110.23
110.40
110.57
110.74
110.92
111.09
108.40
108.64
108.85
109.06
109.26
109.47
109.67
109.87
110.07
110.26
110.44
110.63
110.82
111.01
111.19
108.33
108.60
108.81
109.02
109.23
109.44
109.65
109.87
110.08
110.28
110.48
110.69
110.89
111.09
111.30
108.31
108.54
108.76
108.98
109.20
109.42
109.64
109.86
110.08
110.30
110.52
110.74
110.96
111.18
111.40
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
9.
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
1.4
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19 111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.39
108.60
108.82
109.04
109.26
109.48
109.70
109.92
110.14
110.36
110.58
110.80
111.01
111.23
1.4
8.
8.
8.
9.
9.
9.
9.
9.
0.
0.
0.
0.
1.
1.
1.
110.86 111.02
111.15 111.26
111.38 111.49
111.50 111.50
111.50 11 1.
111.50
111.50 111.50
111.50
108.48
108.72
108.93
109.15
109.37
109.58
109.80
110.02
110.23
110.45
110.67
110.88
111.10
111.32
111.53 111.67
EXISTING
CONCRETE
FLUME TO
REMAIN
EXISTING CATCH BASIN
TOP EL. = 107.25'
10'
EXISTING MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING DRAINAGE
STRUCTURE TO REMAIN
RIM EL. = 111.39'
108.5 109
109.5
110.5
111.5
112.5
TA
XI
W
AY
A
EXISTING MANHOLE TO
REMAIN
RIM EL. = 111.52'
MATCH EXISTING
GRADE
SEE PAVEMENT
CONNECTION DETAIL
SHEET C-9.1.2
EXISTING CATCH BASIN
TOP EL. = 107.26'
EXISTING DRAINAGE
STRUCTURE TO REMAIN
RIM EL. = 111.28'
TY
P.
00 30 60
NOTES
1. NEW RAMP GRADES
HAVE BEEN
ESTABLISHED TO
PROVIDE A
CONSISTENT CROSS
SLOPE FOR THE NEW
PAVEMENT.
2. IF ADDITIVE
ALTERNATE IS
AWARDED THIS SHEET
WILL BE REMOVED
FROM THE CONTRACT
DOCUMENTS AND
SHEET C-12.1.2 SHALL
BE UTILIZED.
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, :1
4a m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -1
2.
1.
G
R
AD
IN
G
A N
D D
R
AI
N
AG
E
PL
AN
BA
SE
B
ID
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
GRADING AND
DRAINAGE PLAN
- BASE BID
C-12.1.1
RAD
ACC
D
D
D
D
D
FAA FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X
X X
AIRPORT ADMIN.
AND CBP
110.5
109.5
112.5
MATCH EXISTING
GRADE SEE
PAVEMENT
CONNECTION
DETAIL 4 SHEET
C-9.1.2
108.72
108.93
109.15
109.37
109.58
109.80
110.02
110.23
110.45
110.67
110.88
111.10
111.32
111.53
108.58
108.80
109.02
109.24
109.46
109.67
109.89
110.11
110.33
110.55
110.78
111.00
111.22
111.45
111.67
108.66
108.88
109.11
109.33
109.55
109.78
110.00
110.22
110.44
110.67
110.90
111.13
111.35
111.58
111.81
108.97
109.20
109.43
109.66
109.89
110.11
110.34
110.57
110.80
111.03
111.26
111.49 111.72
111.95
109.05
109.28
109.51
109.75
109.98
110.21
110.44
110.67
110.91
111.14
111.37
111.60
111.83
112.07
109.13
109.36
109.59
109.83
110.06
110.29
110.52
110.76
110.99
111.22
111.45
111.68
111.92
112.15
109.21
109.44
109.67
109.91
110.14
110.37
110.60
110.84
111.07
111.30
111.53
111.77
112.00
112.23
109.29
109.52
109.75
109.99
110.22
110.45
110.69
110.92
111.15
111.38
111.62
111.85
112.08
112.31
109.37
109.60
109.83
110.07
110.30
110.53
110.77
111.00
111.23
111.47
111.70
111.93
112.16
112.40
109.45
109.68
109.91
110.15
110.38
110.61
110.85
111.08
111.31
111.55
111.78
112.01
112.25
112.48
109.65
109.86
110.09
110.36
110.60
110.83
111.03
111.26
111.45
111.70
111.89
112.09
112.31 112.58
108.74 108.82
108.90 108.98
109.06 109.14
109.22 109.3225
.2 3'
TY
P. 25'
TYP.
111.68 111.76
111.90 112.04
112.16 112.24
112.33 112.41
112.48 112.58
112.66
10.00' 11.00'
EXISTING DRAINAGE
INLET TO REMAIN
RIM EL. = 111.39'
EXISTING MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING SEWER MANHOLE
RIM EL. = 111.60'
EXISTING CATCH BASIN
TOP EL. = 107.25'
EXISTING CATCH BASIN
TOP EL. = 107.26'
EXISTING MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING DRAINAGE INLET
TO REMAIN
RIM EL. = 111.28'
EXISTING CATCH BASIN
TOP EL. = 109.76'
EXISTING CATCH
BASIN
TOP EL. = 111.75'
EXISTING CATCH BASIN
TOP EL. = 112.74'
EXISTING
CONCRETE
FLUME TO
REMAIN
EXISTING
RAMP
TA
XI
W
AY
A
110.0
110.5 111.0
111.5
109.5
109.0
108.5
108.16
108.50
108.69
108.88
109.07
109.26
109.45
109.64
109.82
109.98
110.15
110.31
110.47
110.63
110.79
108.50
108.67
108.86
109.05
109.24
109.43
109.62
109.81
109.99
110.15
110.31
110.47
110.63
110.79
110.96
108.55
108.70
108.90
109.10
109.29
109.49
109.68
109.88
110.06
110.23
110.40
110.57
110.74
110.92
111.09
108.40
108.64
108.85
109.06
109.26
109.47
109.67
109.87
110.07
110.26
110.44
110.63
110.82
111.01
111.19
108.33
108.60
108.81
109.02
109.23
109.44
109.65
109.87
110.08
110.28
110.48
110.69
110.89
111.09
111.30
108.31
108.54
108.76
108.98
109.20
109.42
109.64
109.86
110.08
110.30
110.52
110.74
110.96
111.18
111.40
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
108.31
108.53
108.75
108.97
109.19
109.41
109.64
109.86
110.08
110.30
110.52
110.75
110.97
111.19
111.41
8.3
108.60
108.82
109.04
109.26
109.48
109.70
109.92
110.14
110.36
110.58
110.80
111.01 111.23
111.40
8.4
8.6
8.9
9.1
9.3
9.5
9.7
9.9
0.2
0.4
0.6
0.8
1.0
6111.27
111.47
110.86 111.02
111.15 111.26
111.38 111.49
111.50 111.50
111.50 111.50
111.50 111.50
111.50 11 1.
108.50
108.72
108.93
109.15
109.37
109.58
109.80
110.02
110.23
110.45
110.67
110.88
111.10
111.32
111.53 111.68
EXISTING MANHOLE TO
REMAIN
RIM EL. = 111.78'
EXISTING MANHOLE TO
REMAIN
RIM EL. = 111.84'
00 30 60
NOTES
1. NEW RAMP GRADES HAVE BEEN ESTABLISHED TO PROVIDE A
CONSISTENT CROSS SLOPE FOR THE NEW PAVEMENT.
2. THIS SHEET SHALL BE UTILIZED ONLY IF ADDITIVE ALTERNATE IS
AWARDED. IF ONLY BASE BID AWARDED, THIS SHEET SHALL BE
REMOVED FROM THE CONTRACT DOCUMENTS AND SHEET C-12.1.1
SHALL BE UTILIZED
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, :4
9a m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -1
2.
1.
G
R
AD
IN
G
A N
D D
R
AI
N
AG
E
PL
AN
AD
D
IT
IV
E
AL
TE
R
N
AT
E.
dw g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
GRADING AND
DRAINAGE PLAN
- ADDITIVE
ALTERNATE
C-12.1.2
RAD
ACC
BASE BID
PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT
LIMITS
GRATE
FILTER FABRICFILTER FABRIC
DRAINAGE FRAME
DRAINAGE FRAME
GRATE
ATTACH THE FILTER FABRIC TO THE POSTS
AND EXTEND IT INTO THE TRENCH.
4. EXTENSION OF FABRIC AND
WIRE INTO THE TRENCH.
2.1. SET POSTS AND EXCAVATE A 4"x4" TRENCH
UPSLOPE ALONG THE LINE OF POSTS.
BACKFILL AND COMPACT THE EXCAVATED SOIL.
4" 4"
FILTER FABRIC
3.
GENERAL EROSION CONTROL NOTES
1. THE PURPOSE OF EROSION CONTROL IS TO PREVENT POLLUTION OF BODIES OF WATER ON OR ADJACENT TO THE PROJECT SITE. IN ADDITION, EROSION CONTROL SHALL PREVENT DAMAGE TO ADJACENT PROPERTY, AIRPORT PROPERTY AND WORK IN PROGRESS.
2. ALL EROSION AND SILTATION MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN GRADING. CARE AND MAINTENANCE OF EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH DRAWINGS, TECHNICAL SPECIFICATIONS, APPROVED STORMWATER POLLUTION PREVENTION PLAN (SWPPP) OR AS DIRECTED BY THE
CONSTRUCTION MANAGER.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSPECT ALL EROSION CONTROL DEVICES PERIODICALLY AND AFTER EVERY RAINFALL. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
4. CONTRACTOR IS RESPONSIBLE FOR DEVELOPING, SUBMITTING FOR APPROVAL, IMPLEMENTING AND MAINTAINING A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP).
5. ALL STREAM CROSSINGS AND STREAM DIVERSIONS REQUIRE ENVIRONMENTAL APPROVAL PRIOR TO ANY INSTREAM CONSTRUCTION.
6. CONTRACTOR SHALL SUBMIT AND RECEIVE APPROVAL ON THROUGH THE SHOP DRAWING SUBMITTAL PROCESS AN EROSION CONTROL AND DUST CONTROL PLAN PRIOR TO ANY LAND DISTURBING ACTIVITY. EROSION CONTROL PLAN SHALL INCLUDE PROPOSED LOCATION OF SILT FENCE, INLET/OUTLET PROTECTION, AND OTHER EROSION
CONTROL MEASURES AS NECESSARY.
SODDING NOTES
1. ANY SODDED/SEEDED AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THE CONDITION THEY WERE PRIOR TO CONSTRUCTION BY THE CONTRACTOR. THIS INCLUDES APRON SHOULDER AREAS, STAGING AREAS, HAUL ROUTES, AND ANY OTHER AREAS DISTURBED DURING CONSTRUCTION. THIS SHALL BE
CONSIDERED INCIDENTAL TO THE PROJECT AND NO SEPARATE PAYMENT SHALL BE MADE.
INLET PROTECTION NOTES
1. INLET PROTECTION SHALL BE INSTALLED AT ALL INLETS WITHIN THE PROJECT WORK AREA.
2. INLET PROTECTION METHOD SHALL BE PER THE DETAIL SHOWN ON THIS SHEET. ALTERNATIVE METHODS MAY BE APPROVED THROUGH THE SHOP DRAWING SUBMITTAL
PROCESS.
3. CONTRACTOR SHALL CLEAR DEBRIS AND SILT AS REQUIRED FROM FABRIC TO MAINTAIN DRAINAGE THROUGH THE STRUCTURE.
4. FABRIC SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE.
5. PAYMENT FOR INLET PROTECTION SHALL BE INCLUSIVE OF THE C-102.2 INSTALL INLET PROTECTION PAY ITEM.
SILT FENCE NOTES
1. SILT FENCE SHALL BE INSTALLED AT THE PERIMETER OF ALL DISTURBED LAND AREAS AS SHOWN ON SHEET G012.
2. SILT FENCE SEDIMENT BARRIER SHALL BE IN PLACE PRIOR TO GRADING.
3. SILT FENCE AND FILTER FABRIC MUST BE ENTRENCHED, 4 INCHES DEEP BY 4 INCHES WIDE, ON THE UPSLOPE SIDE OF THE SILT FENCE.
4. WHEN JOINTS ARE NECESSARY, THE FABRIC SHALL BE SPLICED AT A SUPPORT POST WITH A MINIMUM 12 INCH OVERLAP AND SECURELY SEALED
5. POST FOR SILT FENCES SHALL BE 2.5 X 2 INCH DIAMETER WOOD WITH A MINIMUM LENGTH OF 5 FEET.
6. POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET APART ON CENTER AND DRIVEN SECURELY INTO THE GROUND (MIN. OF 12 INCHES).
7. SEDIMENT MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
8. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE
PROPOSED AND EXISTING GRADES, PREPARED AND SEEDED.
9. UNDER NO CIRCUMSTANCES SHOULD SILT FENCE BE CONSTRUCTED IN LIVE STREAMS.
10. SILT FENCE SHALL BE REMOVED UPON COMPLETION OF THE PROJECT OR WHEN NECESSARY PER THE APPROVED SWPPP.
11. PAYMENT FOR SILT FENCE SHALL BE INCLUSIVE OF THE C-102.1 SILT FENCE INSTALLATION AND REMOVAL PAY ITEM.
GRATE INLET PROTECTION2 NOT TO SCALE
SILT FENCE CONSTRUCTION DETAIL1 NOT TO SCALE
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 3
M ar
5, :2 4p m , B y:
D ra w in g Pa th : X
:\4
\2
2.
\T
EC
H
\C
AD
\D ra w in gs \S he et s\ C
-1 5.
1.
D ra in ag e an d Er os io n C on tro l D et ai ls
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
DRAINAGE AND
EROSION
CONTROL
DETAILS
C-15.1.1
RAD
ACC
TIE DOWN ANCHOR DETAIL1 NOT TO SCALE
NON - MOVEMENT AREA MARKING2 NOT TO SCALE
3' 3'3' 3' 3'
6"
6" 6"
D
IS
TA
N
C E
A S
S H
O W
N O
N
PL
A N
S
6" SOLID YELLOW LINE
DOUBLE HEADED AIRCRAFT LEAD IN MARKING3 NOT TO SCALE
90' (TYP.)
6'
TY
P.
ASPHALT
PAVEMENT
6" DIA.
HOLE
CORED
2" DIA. EYE
3"
90° BEND
10"±
4"
BAR
FLARED BASE.
3/4" GALVANIZED
P-610 CONCRETE
SHAVE CORE HOLE
WALL TO PROVIDE
SOLID YELLOW LINE
ON NON-MOVEMENT
SIDE
DASHED YELLOW LINE
ON MOVEMENT SIDE
SURFACE PAINTED INDICATOR MARKING4 NOT TO SCALE
11'
2'
2'
1' 1'
6" SOLID YELLOW LINE
US CUSTOMS CONTAINMENT MARKING 5 NOT TO SCALE
TWO 6" SOLID LINES
(ONE WHITE / ONE RED)
WITH 6" SPACING
BETWEEN
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
CBP AREA INSCRIPTION. 2'
STANDARD WHITE LETTERING.
INSTALL ON CENTER OF EACH
SIDE OF CONTAINMENT AREA.
MARKING SHALL BE INSTALLED 1
FT INSIDE OF CONTAINMENT
MARKING. SEE SHEET C-3.1.1
FOR LOCATION
STANDARD FAA YELLOW CHARACTERS:
4' WIDE
12' HIGH
6" SOLID YELLOW LINE
PROPOSED
NOTES:
1. SEE SHEET C-3.1.1 FOR TIE DOWN LOCATIONS. EXACT LOCATIONS
OF TIE DOWNS SHALL BE COORDINATED WITH OAR AND/OR
ENGINEER PRIOR TO INSTALLATION.
2. COST OF CORING AND CONCRETE SHALL BE INCLUDED IN THE
COST OF THE TIE DOWN.
NOTE:
1. NO BLACK OUTLINE IS REQUIRED AS ALL MARKINGS
ARE ON NEW PAVEMENT
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, :1
7a m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -4
0.
1.
TE
M
PO
R
AR
Y M
AR
KI
N G
D
ET
AI
LS
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
MARKING
DETAILS AND
NOTES
C-40.1.1
RAD
ACC
REFERENCE LOCATION
SEE SHEET C-3.1.1 FOR
COORDINATES
1'
6" SOLID WHITE LINE (OUTSIDE LINE)
6" SOLID RED LINE (INSIDE LINE)
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, :1
7a m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -4
0.
1.
TE
M
PO
R
AR
Y M
AR
KI
N G
D
ET
AI
LS
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
TEMPORARY
MARKING
DETAILS
C-40.1.2
RAD
CPS
DES
APRIL 17, 2025
N.T.S.
TEMPORARY APRON MARKING
MESSAGE AND ARROW DETAIL 11 NOT TO SCALE
TEMPORARY APRON MARKING
MESSAGE AND ARROW DETAIL 22 NOT TO SCALE
TEMPORARY APRON MARKING
MESSAGE AND ARROW DETAIL 33 NOT TO SCALE
6" SOLID YELLOW MARKING (TYP.)
STANDARD FAA YELLOW
CHARACTERS (TYP.):
4' WIDE
12' HIGH
18'
5'
12'
16'
12' 5'
12'
5'
16'
2'
(TYP.)
1'
NOTE:
1. CONTRACTOR SHALL PAINT OVER ALL TEMPORARY
APRON PAVEMENT MARKINGS WITH BLACK PAINT IN
LIEU OF MARKING REMOVAL PRIOR TO CONTRACT
COMPLETION. THIS BLACK PAINT SHALL NOT CONTAIN
REFLECTIVE GLASS BEADS.
2. COST OF TEMPORARY 'CBP' MARKINGS, INCLUDING
TEMPORARY MARKING REMOVAL, SHALL BE INCLUDED
IN THE P-620.3 PAY ITEM.
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D D
D
D
D
D
D
FAA FAA FAA FAA FAA
DD
D
S
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
XX X
X
X
X
X
X
X
X
X
X
X
TAXIWAY A
E COLONIAL DR
RUN
W
AY 13-31
TAXIW
AY E
TAXIWAY B
LAKE
GEORGETTE
FAIRGREEN ST
WORK AREA A
CONTRACTOR
STAGING
AREA
SITE ACCESS FROM
RICKENBACKER DR
RICKEN
BACKER D
R
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
COLONIAL PROMENADE
SHOPPING CENTER
ATLANTIC
AVIATION
CONTRACTOR
ACCESS GATE
(WORK AREA A)
N:1532134.76 E:549409.84
100'
0'
WORK AREA A
HAUL ROUTE
EXISTING EAST RAMP
TA
XI
W
AY
A
LAKE GEORGETTE LANE GATE
CONTRACTOR ACCESS GATE
(WORK AREA B)
WORK AREA B
HAUL ROUTE
AIRPORT
ADMINISTRATION
AND CUSTOMS
BUILDING
N:1532517.21 E:549962.83
100'
0'
WORK AREA B
CONTRACTOR STAGING
AREA
WORK
AREA B-
ADDITIVE
ALTERNATE
WORK AREA
A-BASE BID
TAXIW
AY A3
TAXIW
AY A4
NO APRON ACCESS
FROM TAXIWAY A5
FOR WORK AREA A
AIRCRAFT ACCESS
APRON FROM TAXIWAY
A3 FOR WORK AREA A
ADVENT HEALTH
HANGAR
SEE NOTE 8
TEMPORARY APRON
MARKING MESSAGE AND
ARROW PER DETAIL 1
SHEET C-40.1.2
TEMPORARY APRON
MARKING MESSAGE
AND ARROW PER
DETAIL 2 SHEET
C-40.1.2
TEMPORARY APRON
MARKING MESSAGE AND
ARROW PER DETAIL 3
SHEET C-40.1.2
00 200 400
LEGEND
CONTRACTOR
STAGING AREA
HAUL
ROUTE
BASE BID
PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT LIMITS
NOTES
1. CONTRACTOR SHALL
ACCESS SITE AS
SHOWN THROUGH THE
DESIGNATED GATES.
THEY SHALL INSTALL
THEIR OWN LOCK ON
THE GATE. GATE
SHALL BE SECURED OR
MANNED AT ALL
TIMES.
2. CONTRACTOR SHALL
PROVIDE SILT FENCE
AROUND CONTRACTOR
STAGING AREA AND BE
RESPONSIBLE FOR
RESTORING STAGING
ARE TO
PRE-CONSTRUCTION
CONDITIONS AT THE
CONCLUSION OF THE
PROJECT. THERE
SHALL BE NO
SEPARATE PAYMENT
FOR THIS WORK.
3. CONSTRUCTION
STAGING AND
EQUIPMENT PARKING
SHALL BE IN THE
DESIGNATED AREAS
ONLY OR AS
OTHERWISE APPROVED
BY THE OAR AND OR
ENGINEER.
4. CONTRACTOR TO
ACCESS WORK AREA
IN ACCORDANCE WITH
HAUL ROUTES SHOWN.
5. ACCESS TO RUNWAYS
AND TAXIWAYS IS
PROHIBITED WITHOUT
PRIOR COORDINATION
WITH THE ENGINEER
AND THE AIRPORT.
6. IN THE INSTANCE OF
ANY SCHEDULED
NIGHT WORK,
CONTRACTOR TO
PLACE AND AIM WORK
LIGHTS SO THAT THEY
FACE AWAY FROM AIR
TRAFFIC CONTROL
TOWER AND THE
AIRFIELD.
7. PRIOR TO THE
OPENING OF THE
WORK AREA, THE AREA
SHALL BE SWEPT
CLEAN OF ALL FOD
(FOREIGN OBJECT
DEBRIS - ROCKS,
DEBRIS, EQUIPMENT,
ETC.). THE AIRPORT
SHALL PERFORM AN
INSPECTION AND
APPROVE THE SITE
BEFORE BARRICADES
HAVE BEEN REMOVED.
8. NEW HANGARS MAY BE
UNDER
CONSTRUCTION AT
THE TIME OF THIS
PROJECT TAKING
PLACE.CONTRACTOR
SHALL BE AWARE OF
OTHER ONGOING
ACTIVITIES NEAR THE
WORK AREA
MOBILIZATION
60 DAYS
TOTAL CONSTRUCTION TIME=
180 CALENDAR DAYS
CONSTRUCTION PHASING DIAGRAM
NOT TO SCALE
15 30 45 60 75 90 1050
S U
B S
TA
N
TI
A L
C O
M
PL
ET
IO
N
WORK AREA A-BASE BID
60 DAYS
N O
TI
C E
TO
P
R O
C
EE
D
PHASING NOTES:
MOBILIZATION
PHASE 0 SHALL CONSIST BUT NOT BE LIMITED TO SUBMITTAL AND APPROVAL OF
SHOP DRAWINGS / MATERIAL CERTIFICATIONS/MIX DESIGNS/QUALITY CONTROL
PROGRAM, COORDINATION MEETINGS, PROCUREMENT OF MATERIALS, MOBILIZATION
OF EQUIPMENT TO THE PROJECT SITE, ESTABLISHING CONTRACTOR'S STAGING AREA
AND SITE ACCESS, SURVEY AND LAYOUT, PROCUREMENT OF MOT ITEMS, AND
RELATED WORK.
WORK AREA A
PHASE 1 SHALL CONSIST OF ALL THE PAVEMENT RECONSTRUCTION WORK WITHIN
THE BASE BID LIMITS AS SHOWN ON THE PLANS. THE PHASE 1 WORK AREA MUST BE
CONSIDERED SUBSTANTIALLY COMPLETE AND READY TO REOPEN FOR AIRPORT USE
PRIOR TO MOVING TO PHASE 2.
WORK AREA B
PHASE 2 SHALL CONSIST OF ALL WORK WITHIN THE ADDITIVE ALTERNATE LIMITS AS
SHOWN ON THE PLANS. THE PROJECT SHALL BE CONSIDERED SUBSTANTIALLY
COMPLETE AT THE CONCLUSION OF THIS PHASE. IF THE ADDITIVE ALTERNATE IS NOT
AWARDED, THE TOTAL CONTRACT DURATION SHALL BE REDUCED BY THE DURATION
OF THIS PHASE.
FINAL COMPLETION
THE CONTRACTOR HAS 45 CALENDAR DAYS TO COMPLETE DEFICIENT PUNCH LIST
ITEMS NOTED IN THE FINAL INSPECTION AND TO DEMOBILIZE FROM THE JOBSITE.
WORK AREA B-ADDITIVE
ALTERNATE
60 DAYS
120 135 150 165
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, :1
7p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -6
0.
0.
C on tra ct or
L ay ou t a nd O ve ra ll Ph as in g Pl an .d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
CONTRACTOR
LAYOUT AND
OVERALL
PHASING PLAN
C-60.0.1
RAD
ACC
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D
D
D
D
D
D
D
FAA FAA FAA FAA
FAA
SD
SD
SD
SD
SD
SD
SD
DD
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X
LAKE G
EO
RG
ETTE LN
LAKE
GEORGETTE
x x x x x x xxxxxx
EXISTING APRON
AIRPORT ADMIN.
AND CBP
CONSTRUCTION BARRICADE
FENCE - SEE DETAIL SHEET
C-61.0.2
CONTRACTOR
STAGING
AREA
HAUL ROUTE
A TEMPORARY CUSTOMS
CONTAINMENT BOX WILL BE
REMARKED ADJACENT TO
THE PROJECT SITE SO U.S.
CUSTOMS AND BORDER
PROTECTION CAN OPERATE
DURING CONSTRUCTION.
ONLY A SINGLE 6" WIDE
YELLOW CONTAINMENT BOX
MARKING IS REQUIRED FOR
THIS TEMPORARY MARKING
(NOT LEAD IN LINES OR
OTHER NOMENCLATURE)
THIS MARKING SHALL BE
REMOVED AT THE
CONCLUSION OF THE
PROJECT. ALL WORK
ASSOCIATED WITH THIS
SHALL BE INCLUDED IN THE
TEMPORARY MARKINGS PAY
ITEM.
BASE BID WORK AREA
CLOSURE OF THIS HANGAR TAXILANE
SHALL BE COORDINATED PRIOR TO
BEGINNING CONSTRUCTION - NO
SEPARATE PHASE SHALL BE DESIGNATED
FOR WORK AFFECTING THIS CLOSURE. IN
THE EVENT THAT AN AIRCRAFT IS
REQUIRED TO ACCESS THIS TAXILANE THE
CONTRACTOR MAY BE REQUIRED TO
TEMPORARILY REMOVE THE BARRICADE
FENCE SO THAT THE PLANE CAN ENTER OR
EXIT THE HANGAR TAXILANE.
CONTRACTORS ACCESS
GATE. ACCESS THROUGH
MANUAL GATE - THIS
GATE SHALL BE SECURED
OR MANNED BY THE
CONTRACTOR AT ALL
TIMES.
TEMPORARY ASPHALT
MILLINGS ACCESS PATH
(SEE NOTE 1)
TAXIWAY A5 CONNECTOR TO
EAST RAMP TO BE CLOSED
DURING CONSTRUCTION:
LOW PROFILE BARRICADE -
SEE SHEET C-61.0.2
T/ W
A
SEE NOTE 2
PROPOSED SIDEWALK
(SEE NOTE 1)
00 50 100
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
BID DOCUMENTS
No. Date Description
U
PD
AT
ED
O N
: 0
Ap r 2
5, :1
7p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -6
0.
0.
PH
AS
IN
G P
LA
N
W
O R
K
AR
EA
A
BA
SE
B
ID
.d w g
4664455-212152.02
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
PHASING PLAN -
WORK AREA A -
BASE BID
C-60.0.2
RAD
ACC
WORK AREA A
LOW PROFILE
BARRICADE
CONSTRUCTION
BARRICADE FENCE
x
NOTES
1. THE NEW SIDEWALK
SHALL BE
CONSTRUCTED AT THE
BEGINNING OF WORK
AREA A SO THAT IT
CAN BE UTILIZED
DURING THIS PHASE.
THE REMAINDER OF
THE EGRESS PATH
SHALL BE
CONSTRUCTED OF
ASPHALT MILLINGS.
THIS PORTION CAN BE
CONSTRUCTED FROM
THE FIRST MILLINGS
FROM WORK AREA A.
ALL MILLINGS SHALL
BE REMOVED AND THE
AREA SHALL BE
RETURNED TO ITS
PRE-CONSTRUCTION
CONDITION AT THE
CONCLUSION OF
WORK AREA A. ALL
COSTS ASSOCIATED
WITH THE TEMPORARY
MILLINGS PATH SHALL
BE PAID FOR UNDER
THE C-105.2 PAY ITEM.
2. THE CONSTRUCTION
BARRICADE FENCE
SHALL BE INSTALLED
ACROSS THE
NORTHERN LIMITS OF
THE WORK AREA A
CONSTRUCTION LIMITS
TO SEPARATE THE
WORK AREA FROM
CUSTOMS OPERATIONS
3. NO WORK SHALL
BEGIN IN WORK AREA
A UNTIL MOBILIZATION
IS COMPLETED AND
THE CONTRACTOR HAS
BEEN AUTHORIZED BY
THE OAR TO PROCEED
WITH WORK.
D
D
D
D
D
FAA FAA FAA FAA
FAA
SD
SD
SD
SD
SD
SD
SD
DD
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X
AIRPORT ADMIN.
AND CBP
CONTRACTOR'S
STAGING
AREA
HAUL ROUTE
x x x x x x
CONSTRUCTION BARRICADE
FENCE - SEE DETAIL SHEET
C-61.0.2
LOW PROFILE BARRICADE
- SEE SHEET C-61.0.2
T/ W
A
SEE
NOTE 1
U .S.
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
CONTRACTOR ACCESS GATE.
ACCESS THROUGH MANUAL GATE
- THIS GATE SHALL BE SECURED
OR MANNED BY THE CONTRACTOR
AT ALL TIMES.
00 50 100
NOTES
1. THE EXACT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .