W431_PROJECT_INITIATION_FORM_aka_PIF_(revised_2021_07_06).docx
DOCX document 21 KB Posted
- Solicitation number
- 25-598-IFB
- Issued by
- Orange County, Orlando City, Florida
About this file
The Project Initiation Form (PIF) is a document from the Orlando Executive Airport (ORL) involving the Florida Department of Transportation (FDOT) and Federal Aviation Administration (FAA) for an East Ramp Rehabilitation project across three phases. The project's objective is to rehabilitate the existing East Ramp as identified in the FDOT's 2019 Airfield Pavement Management Program, with construction work including mill and overlay of asphalt pavement, reconstruction of isolated areas, and associated markings, lighting, and signage. The project requires an Owner's Authorized Representative (OAR), a Project Manager, and Airport Operations Area (AOA) access, with specifications already drafted and additional specification assistance needed.
The estimated project budget is $9,000,000, funded through FAA, FDOT, and capital expenditure sources. The project will be procured through the Construction Department using Policy 130.01 or 130.02, and is not a replacement for an existing contract or part of a broader project. It is a one-time project with no recurring requirements, and will be executed using a Design-Bid-Build approach. The contract does not have option periods, and procurement will be handled by the Construction Department with concurrence required from the Director of Engineering, Senior Director of Planning, Engineering, and Construction, and the Chief Executive Officer.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT INITIATION FORM-PROFESSIONAL SERVICES
| TO: |
| Phil Brown, Chief Executive Officer |
| FROM: |
| Mark W. Birkebak, Director of Engineering |
| PROJECT TITLE: |
| W-431 ORL East Ramp Rehabilitation – Phases 1, 2 & 3 |
| FUNDING SOURCE/BUDGET CODE: |
| FAA, FDOT, Capital Expenditure |
| ESTIMATED BUDGET: |
| $9,000,000.00 |
BRIEF SCOPE OF WORK:
The objective of this project is to rehabilitate the existing East Ramp at the Orlando Executive Airport as identified in the FDOT 2019 Airfield Pavement Management Program report. Construction work generally includes mill and overlay for the asphalt pavement including reconstruction for some isolated areas, associated markings, lighting and signage.
PROJECTED OUTCOME:
| CCNA or PREDOMINATELY DESIGN OR CONSTRUCTION RELATED? |
| |X| Yes |
| |_| No |
| OAR REQUIRED? |
| |X| Yes |
| |_| No |
| PROJECT MANAGER REQUIRED? |
| |X| Yes |
| |_| No |
| AOA ACCESS REQUIRED? |
| |X| Yes |
| |_| No |
| RECURRING REQUIREMENT? |
| |_| Yes |
| |X| No |
Base Period:
| years |
| Option Periods: |
| REPLACES AN EXISTING CONTRACT? |
| |_| Yes |
| |X| No |
Contract #:
Expires as of:
| PART OF A BROADER PROJECT / LINKED TO ANOTHER CONTRACT? |
| |_| Yes |
| |X| No |
| Contract #: |
| Project #: |
| Project Type: |
| |_| Design -Build |
| |_| Design-Bid-Build |
| DRAFT SPECIFICATIONS PREPARED? |
| |X| Yes |
| |_| No |
| SPECIFICATION ASSISTANCE WILL BE REQUIRED? |
| |X| Yes |
| |_| No |
| Recommend procurement is done by: |
| |_| Purchasing Department |
| |X| Construction Department |
| Procurement in accordance with: |
| |_| Policy 450 |
| |X| Policy 130.01 or 130.02 |
Mark W. Birkebak, Director of Engineering
Date
|_| Concur
Davin Ruohomaki, Sr. Director of Plan., Eng., & Const. or Designee
Date
|_| Concur
Phillip Brown, Chief Executive Officer or Designee
Date
WXXX PIF Page 1 of 1