Amendment 0003.pdf
PDF 206 KB Posted
- Attached to
- Tobyhanna Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W25G1V-21-R-0014
About this file
This solicitation seeks proposals for an Indefinite Delivery Indefinite Quantity Multiple Award Task Order Contract to provide real property maintenance, alterations and repair of minor construction at Tobyhanna Army Depot. Services include basic facility maintenance, repair and minor construction work such as interior and exterior renovations, HVAC, plumbing, electrical, fire suppression, site work, landscaping, fencing, masonry, roofing, concrete, asphalt paving, storm drainage, limited environmental remediation, construction of new facilities, surveys, studies and design-build. The estimated value is over $10 million with the NAICS code 236220.
Proposals are due no later than July 22, 2021 at 4:00 pm Eastern through the DoD SAFE Service system. In addition to the base MATOC, the solicitation includes Exhibit A which provides details for a seed project to renovate Building 14. A site visit for this project will be held on July 1, 2021 at 10:00 am. Awards will be made to contractors who provide the best overall proposals as determined by technical, past performance and price factors.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Incorporate Exhibit A(7) Bldg 14 TO HAZMAT Report.
2) Update W25G1V21R0014 Section L - A.1c. Volume I Technical Max Pages from 50 to 100.
3) Update Exhibit A(1) Rev1 Bldg 14 TO RFP w ith Rev2 Bldg 14 TO RFP to extend the proposal due date to 28 July at 4:00PM EST and identify proposal submission must be submitted in accordance w ith solicitation W25G1V21R0014.
4) Extend the proposal due date from 22 July 2021 to 28 July 2021 at 4:00pm EST.
4) Post Q&A dated 14 July 2021.
Please acknow ledge this amendment in your proposal submission.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W25G1V21R0014
X 9B. DATED (SEE ITEM 11)
22-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jul-2021
CODE
ACC-APG, TOBYHANNA DIVISION
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
W25G1V 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W25G1V21R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
CONTRACTING OFFICER NOTES
A) Approximately 15 awards will be made as a result of this 100% Small Business Set-aside solicitation. Basis of Award, as stated in Section M, awards will be made to the offerors who provide the best overall proposals that are determined to be the most beneficial to the Government, with appropriate consideration given to the following three evaluation factors: Technical, Past Performance and Price.
B) Offerors are hereby notified that Building (Bldg) 14 Renovation project Task Order (TO), (Exhibit A) to the solicitation, shall be used to develop the proposed Accident Prevention Plan (APP); Quality Control Plan (QCP) and Price. Offerors shall submit the APP and QCP as part of Volume I Technical and the Pricing as part of Volume III see Section L for details. These documents shall be evaluated for the MATOC award and the Building 14 Renovation project TO award.
C) The Building 14 Renovation project TO, (Exhibit A) to the solicitation, may be awarded as a result of this solicitation to the proposal that is most advantageous to the Government considering the APP submitted under Technical Subfactor b, Safety; QCP submitted under Technical Subfactor c, Quality Control Approach and Price.
The Government intends to directly compare the two technical submissions stated and the total evaluated price of all offers and make award without conducting discussions with offerors. However, in the event that the Contracting Officer determines that discussions with offeror(s) is in the best interest of the Government, the Contracting Officer may do so at their discretion. As a result, offerors are encouraged to submit the best offer with their initial proposal.
Offerors are further advised that award of any resultant task order from Exhibit A(1) Building 14 project TO RFP may not necessarily be made to the lowest priced offer or most highly technically rated APP and QCP.
D) The minimum guarantee is $400.00; all successful awardees will receive TO 0001 in the amount of $400.00 for attendance of the MATOC kick-off meeting. Details of the kick-off meeting will be provided after award.
E) Site Visit: IAW FAR Clause 52.236-27 -- Site Visit for Bldg 14, one (1) site visit will be conducted. The site visit will be held on Thursday, 1 July 2021 at 10:00AM EST. This solicitation includes a single scheduled site visit for all interested Offerors to attend. The Government will not consider any requests for separate or individual site visits.
Though the site visit is not mandatory, it is highly recommended. It’s anticipated the Offeror would face extreme difficulties in formulating an accurate proposal for the requirement without examining the existing equipment and conditions as well as determining the existence of other potential obstacles. Potential Offerors are expected to inspect the site to gather all possible information regarding the general and local conditions which may affect the cost/price of contract performance (to the extent that the information is reasonably obtainable). In no event shall failure to attend the site visit and/or inspect the site constitute grounds for a claim after contract award.
Interested Offerors are required to make a reservation by emailing the name, company, and e-mail address for each of the attendees to the Contract Specialist at jacqueline.d.ramsey.civ@mail.mil no later than (NLT) the preceding business day at 2:00PM EST. Each interested Offeror is limited to a maximum of three (3) individuals. Attendees are encouraged to arrive at least 15-30 minutes early in order to check in. Visitors will be required to present a valid, Government issued photo identification in order to gain access to the base (vehicle registration and insurance may also be required).
The starting location for the site visit is Building 20 (Security) at Tobyhanna Army Depot. Attendees may use the following address as a destination for purposes of navigation/traveling directions: 11 Hap Arnold Blvd, Tobyhanna, PA 18466. Prior to proceeding through security at this gate, attendees will be required to check in at the Visitor
Control Center (building on the right when facing the gate), where they will present the required identification and vehicle information and in order to obtain a temporary visitor pass. Attendees will then go through security at the gate and proceed straight along Hap Arnold Blvd, which leads to the main parking lot. At the end of this lot is the starting location for this site visit, Building 20 (Security). All Government personnel and attendees will then walk Bldg 14, the worksite for this project.
F) Information provided at the site visit, as well as answers to any general questions, shall not affect the terms and conditions of the solicitation and/or specifications. Terms remain unchanged unless the solicitation is amended in writing. See Paragraph G, below, for more information regarding Questions and Answers.
G) All questions must be submitted via e-mail, to jacqueline.d.ramsey.civ@mail.mil, not later than seven days before the solicitation closes; no further questions will be accepted after this time. All questions and answers will be provided via a notice to the solicitation announcement posted to beta.sam.gov.
H) All responses to this solicitation are due no later than 28 July 2021 at 4:00PM EST. All responsive and responsible proposals must be received prior to the closing date and time in order to be considered for award.
Offerors are encouraged to not wait until the last hour to send proposals due to the high potential for technical difficulties and/or other delays. The Government shall not be responsible for, and reserves the right to not consider, any proposals that were received beyond the due date as a result of technical issues or delays. The Government does not anticipate extending the solicitation response date.
I) Proposal Submission. Proposals must be submitted in accordance with Solicitation Section L, specifically Instructions to Offerors’. Proposals not adhering to the format and requirements specified may not be considered for award.
J) Reps and Certs. Offeror’s shall review and complete (as required) the necessary representations and certifications in Solicitation Section K in order to be considered for award.
K) Amendments. Any amendment issued to this solicitation will be synopsized in the same manner as the solicitation. Offerors are advised that they must acknowledge all amendments issued to the solicitation in order to be considered for award. Any proposal response failing to acknowledge all solicitation amendments may be deemed inadequate by the Contracting Officer and may not be evaluated or further considered by the Government.
L) The magnitude of this construction project is more than $10 million.
M) The following bond verifications are required to be eligible for award. (1) Technical Evaluation Factor for evidence of bonding capacity of $5M. Building 14 Renovation project TO, Bid Guarantee per FAR 52.228-1, Bldg 14 TO RFP in Exhibit A(1); Performance and Payment Bond per FAR 52.228-15, Bldg 14 TO RFP in Exhibit A(1).
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
ATTACHMENTS
ATTACHMENT DATE NAME/TITLE Number of Pages
#1 01 MAY 2021 MATOC SOW 1
#2 01 APRIL 2021 IDG MASTER SPEC - MATOC 2663
#3 01 MAY 2021 ACCIDENT PREVENTION PLAN
EVALUATION CRITERIA
#4 01 MAY 2021 QUALITY CONTROL PLAN
EVALUATION CRITERIA
#5 01 MARCH 2021 PAST PERFORMANCE
QUESTIONNAIRE (PPQ)
EXHIBIT A 07 April 2021 (1) Bldg 14 TO RFP 8 01 April 2021 (2) Bldg 14 TO SOW 12 30 April 2021 (3) Bldg 14 TO Drawings 66 30 April 2021 (4) Bldg 14 TO Specs 1714 01 April 2021 (5) Bldg 14 TO QASP 11 09 April 2021 (6) DBA PA20210098 8 01 September 2020 (7) HAZMAT Report 64
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTION TO OFFERORS
A. PROPOSAL SUBMISSION (Section L)
1. PROPOSAL SUBMISSION REQUIREMENTS
a. Only electronic proposals will be accepted. No hardcopy proposals will be accepted. Electronic offers shall be submitted via the DoD SAFE Service site, https://safe.apps.mil. NOTE: The Offeror is encouraged to test the DoD SAFE site in advance of the due date of proposals to familiarize themselves with the system.
A “drop-off” code is required for non-DoD Offerors. Offerors who do not have a CAC must submit a request for the “drop-off” code to Ms. Jacqueline Ramsey at jacqueline.d.ramsey.civ@mail.mil at least ten
(10) days prior to the proposal due date; once a code is provided it is only good for fourteen (14) days. The Government will not consider proposals that were delayed or otherwise not timely delivered to the SAFE Service site because of an issue with the Offeror or the Government's service providers, to include email maintenance, firewall or delivery to any other email box (e.g. junk). Therefore, the Offeror should anticipate delays in transmission and are advised to plan ahead and to begin transmitting their proposal in time to ensure successful delivery prior to the close of the solicitation. Each volume shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 5).
The Offeror shall indicate that their proposal remains valid for a minimum of 90 days and shall not contain classified data/information.
b. Each paragraph should be single spaced, and shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be produced in landscape mode.
c. The following volumes of material shall be submitted:
Volume Title Digital Copies Maximum Pages
I Technical 1 100
II Past Performance 1 15
III Price 1 No Page Limit
IV Solicitation, Offer and Award Documents, and Certifications / Representations and Submittals
1 No page limit
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
2. PROPOSAL FILES
a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and Request for Proposal (RFP) number in the header and/or footer. A Table of Contents shall be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
The following additional restrictions apply:
b. File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or shall be in read-only format, using PDF files. **Please note – Self extracting executable (.exe) files are not acceptable.
c. Content Requirement. All information shall be confined to the appropriate file. The Offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the Volumes:
(i) VOLUME I – Technical. The volume shall be organized into the following sections:
(1) Section 1 – Subfactor a. This subfactor evaluates the Offerors’ Bonding Capacity. The Offeror shall provide information to substantiate the following:
KEY POINT: The Offeror shall provide a signed letter from its chosen surety demonstrating that it can obtain at least $5M of performance and payment bonds or evidence that it currently has at least $5M of spare performance and payment bond capacity per year for this contract. This is in addition to the bid bond, performance and payment bond required for the Building 14 Renovation TO, Exhibit A. The Offeror shall also provide contact information for the surety so that the Government can at its discretion verify the information provided. Surety companies utilized for the proposal and contract must be listed on the U.S. Department of the Treasury website.
(2) Section 2 – Subfactor b. This subfactor evaluates the Offerors’ Safety Program. The Offeror shall
KEY POINT #1: The Offeror is required to submit an Accident Prevention Plan (APP) for the Building 14 TO in accordance with the requirements of the Unified Facilities Guide Specifications (UFGS) 01 35 26 and compliant with United States Army Corp of Engineers Engineering Manual 385-1-1 (USACE EM385) Safety Standards and Controls requirements (see Attachment 3). This APP will be used in the Base MATOC Award and Building 14 seed project TO evaluation.
KEY POINT #2: The Offeror shall provide the Experience Modification Rate (EMR) for itself and teaming partners for at a minimum the previous three (3) full year operating period from issue date of RFP. The required EMR information shall be provided in a letter format from the insurance companies of the Offeror. The Offeror shall also provide contact information for the insurance companies so that the Government can at its discretion verify the information provided.
KEY POINT #3: The Offeror shall provide the Occupational Safety and Health Administration
(OSHA) recordable injuries/illnesses reports and Days Away Restricted or Transferred (DART) rate for at a minimum the previous three (3) full year operating period from issue date of RFP.
(3) Section 3 – Subfactor c. This sub-factor evaluates the Offerors’ Quality Control. The Offeror shall
KEY POINT: The Offeror is required to submit a Quality Control Plan (QCP) for the Building 14 TO in accordance with the requirements of the Unified Facilities Guide Specifications (UFGS) 01 35 26 and compliant with United States Army Corp of Engineers Engineering Manual 385-1-1 (USACE EM385) Safety Standards and Controls requirements (see Attachment 4). This QCP will be used in the Base MATOC Award and Building 14 seed project TO evaluation.
(4) Section 4 – Subfactor d. This sub-factor evaluates the Offerors’ Contract Management Plan (CMP): The
Offeror shall provide information that demonstrates/substantiates the following:
Describe the overall company structure, experience and capability related to fulfilling the potential requirements described in this MATOC for NAICS Code 236220.
Provide general overview of planned contract execution.
Organization: Organization and ability to manage multiple projects through adequate and qualified on-site staffing to support at least three (3) ongoing task orders.
Scheduling methodology: Describe the scheduling techniques and project planning methodology. Describe the criteria for selecting and qualifying subcontractors.
Include a plan for providing additional resources, manpower and technical expertise for support of the field office to cover peak workloads, special projects and urgently required projects. Response time shall be not more than one (1) hour from notification of emergency projects.
Provide discussion and documentation/evidence of how the Offeror has the ability to provide a sufficient quantity of qualified personnel, i.e. U.S. Citizens, who can obtain mobility access badges for the security areas of Tobyhanna Army Depot.
Describe method of evaluating and selecting Architect/Engineering (A/E) firm on
Design/Build Task Orders.
(ii) VOLUME II - Past Performance. This volume shall contain past performance information regarding similar contracts. This volume shall not exceed 15 pages excluding Past Performance Questionnaire Forms. The Offeror shall submit five (5) recent Government and/or commercial contracts for the prime Offeror in performance or awarded during the past five (5) years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. This MATOC may include (but not limited to) renovation, HVAC, additions, alterations, maintenance and repairs with a dollar range of $15,000.00 - $15M. Relevant efforts are defined as services/efforts that are the same as or similar to the effort as compared to North American Industry Classification System (NAICS) code 236220 required by the RFP. This volume shall be organized into the following sections:
(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format.
(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).
(b) Government contracting activity, and current address, Procuring Contracting Officer’s name, e-mail address, telephone and fax numbers.
(c) Government’s technical representative/Contracting Officer’s Representative and current email address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative Contracting Officer’s name, and current e-mail address, telephone and fax number.
(e) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers.
(f) Contract Type (specific type such as Firm Fixed-Price (FFP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).
(g) Awarded price/cost.
(h) Final or projected final price/cost.
(i) Final or projected final, delivery schedule, including dates of start and completion of work.
(j) Original delivery schedule, including dates of start and completion or work.
(2) Section 2 – Performance. The Offeror shall provide a specific narrative explanation of each contract listed in Section 1, Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offeror shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The Offeror shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offeror shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the Offerors’ delivered product.
(3) Section 3 – New Corporate Entities. New corporate entities may submit data on prior contracts involving its offices and employees. However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above. Letters of Commitment shall be included in the proposal for these employees in order to be considered.
(4) Past Performance Questionnaire (PPQ). For all contracts identified in Section 1, Contract Descriptions, a PPQ shall be completed and submitted. The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire, providing detailed description on all ratings other than Satisfactory Confidence; when detailed information is not provided, the rating will be considered Satisfactory Confidence for evaluation purposes. The entire questionnaire shall be e-mailed to the Contract Specialist at jacqueline.d.ramsey.civ@mail.mil no later than the proposal due date.
The Offeror shall also e-mail to the Contract Specialist a list of all the POCs who were sent a questionnaire. The Government must receive this list no later than the proposal due date. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number;
Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address; and Date E-Mail to POC (month/day).
(5) Submissions. The Offeror is discouraged from providing points of contact with another contractors’ facility, i.e., in case the Offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. The Offeror shall provide and submit the prime contract number and all Governmental agency POCs in lieu of subcontract numbers or prime contract POCs in situations as described above.
(iii) VOLUME III – Pricing.
(1) The Offeror shall complete the pricing page of the Exhibit A(1), Building 14 Renovation TO RFP, and not on the SF1442. Fill-in an amount for each Contract Line Item Number (CLIN) including Options. Offeror shall provide a complete breakdown of CLIN pricing with the offer including labor categories, hourly labor rates, number of labor hours, materials, supplies, equipment, other direct costs (quantity and unit price), profit, and indirect costs in sufficient detail to provide thorough evaluation per Federal Acquisition Regulation (FAR) 52.215-20 Alt I in electronic Excel spreadsheet format. When subcontractors are used, provide evidence of competitive award; if subcontract is not competitively awarded provide subcontractor’s detailed pricing as previously described.
(2) Compliance. Failure to comply with the RFP requirements for cost information may result in an adverse assessment of the Offeror’s proposal and remove the proposal from evaluation due to being non-responsive. The Offeror shall ensure that the information presented in this volume is consistent and correlates with the information contained in the other proposal volumes. Also, the Offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the Exhibit A(1) Bldg 14 Renovation TO RFP.
(3) General Instructions. In accordance with Federal Acquisition Regulation (FAR) 15.402 and 15.403-1, certified cost or pricing data are not required based on the fact that adequate competition is expected for this procurement. Information other than certified cost or pricing data shall be provided in accordance with FAR 52.215- 20 Alt I. Additionally, in the event that adequate competition is not obtained, the Contracting Officer may request a Certificate of Current Cost or Pricing Data. There are no page limitations for this volume. Proposal information included in this volume which is not directly related to Cost will be disregarded.
(iv) VOLUME IV – SOLICITATION, OFFER AND AWARD DOCUMENT AND
CERTIFICTIONS/REPRESENTIONS.
(1) Section A – Standard Form 1442 (SF 1442), Solicitation, Offer and Award - An authorized official of the firm shall sign the SF 1442 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission. All Amendments must be acknowledged on SF 1442.
(2) Section K – Certifications and Representations – Each Offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the MATOC
RFP.
(3) Joint Venture (JV) Offerors: The Offerors shall provide a copy of the signed joint venture agreement with the proposal.
(4) Teaming Offerors: If the offer is based on a teaming/partnering relationship (as described in Section H, Special Contract Requirements), the Offeror shall provide all required solicitation information for all parties including a copy of the teaming/partnership agreement.
(5) Exhibit A – Building 14 Renovation TO Bid Guarantee for Building 14 TO must be included with proposal.
(End of Summary of Changes)