ATTACHMENT 3 Accident Prevention Plan Evaluation Criteria 20210603.pdf
PDF 608 KB Posted
- Attached to
- Tobyhanna Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W25G1V-21-R-0014
About this file
This document provides an Accident Prevention Plan Evaluation Criteria for a Multiple Award Task Order Contract solicitation for facility maintenance, repair, and minor construction services at Tobyhanna Army Depot. Services include interior and exterior renovations, HVAC, plumbing, fire suppression, electrical work, communications, site work, fencing, roofing, concrete, asphalt paving, storm drainage, limited environmental remediation, construction of new facilities, surveys, design-build, and other related work. The estimated value is over $10 million with NAICS code 236220. Proposals are due by July 22, 2021 and must be submitted through DoD SAFE. The Accident Prevention Plan criteria include signature sheets, background information on the contractor and project, safety policies and responsibilities, training requirements, inspection plans, safety compliance policies, mishap reporting procedures, and specific safety plans required in areas such as emergency response, medical support, hazard controls, and fall protection.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
MATOC SOLICITATION W25G1V21R0014
Accident Prevention Plan Evaluation Criteria
1 May 2021
1) Signature sheet:
a. Includes the name, signature, and title of the Plan Preparer Qualified person, (i.e. corporate safety staff person, QC).
b. Includes the name, signature, and title of the Plan Approver (e.g. owner, company president, regional vice president).
2) Background information:
a. Includes the Contractor Name.
b. Includes the Contract Number.
c. Includes the Project Name.
d. Includes the Brief Project Description.
e. Includes the Location of the Project (map).
f. Includes the Contractor Accident Experience (Copy of OSHA 300).
g. Includes the Listing of Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).
3) Statement of Safety and Health Policy:
a. Includes a copy of the corporate safety policy.
b. a copy of the corporate safety program
4) Responsibilities and Lines of Authorities:
a. Includes the identification and job responsibilities of personnel responsible for safety - at both corporate and project level – including their resumes.
b. Includes the lines of authority.
5) Training:
a. Includes the list of subjects to be discussed with employees at safety indoctrination.
b. Includes the list of mandatory training and certifications applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, diver, vehicle operator, HAZWOPER training and certification, PPE) and any requirements for periodic retraining / recertification.
c. Includes the identity requirements for emergency response training.
d. Includes the outline requirements (who attends, when given, who will conduct, etc.) for supervisory and employee safety.
6) Safety and Health Inspections:
a. Includes the name(s) of individual(s) responsible for conducting safety inspections, (e.g., PM, safety professional, QC, supervisors, employees).
b. Includes proof of inspector's training / qualifications.
c. Indicates when inspections will be conducted.
d. Furnished sample forms upon which inspections will be recorded.
e. Indicates deficiency tracking system and follow-up procedures.
f. Includes the names of competent and / or qualified person(s) and proof of competency / qualification to meet specific OSHA
Competent / qualified person(s) requirements.
g. Includes any external inspections / certifications which may be required, (e.g., US Coast Guard).
7) Safety and Health Expectations, Incentive Programs, and
Compliance:
a. Includes the company's written safety program goals, objectives, and accident experience goals.
b. Includes a brief description of the company's safety incentive programs (if any).
c. Includes the policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements).
d. Includes the written company procedures for holding managers and supervisors accountable for safety.
8) Mishap Reporting:
a. The plan identifies how, when, and who shall complete the Exposure data (man-hours worked).
b. The plan identifies how, when, and who shall complete mishap investigations, reports, and logs.
c. The plan identifies how, when, and who shall make immediate notification of major mishaps.
9) Plans (Programs, Procedures) required by the Safety Manual:
a. Fatigue Management Plan (01.A.20)
b. Emergency response plans:
(1) Procedures & Test (01.E.01)
(2) Spill Plans (01.E.01, 06.A.02)
(3) Fire Fighting Plan (01.E.01; 19.A)
(4) Posting of Emergency Telephone Numbers (01.E.05)
c. Plan for prevention of alcohol and drug abuse (01.C.02)
d. Site Sanitation Plan (Section 02.B)
e. Medical Support Plan, (03.A.01; 03.A.06; 03.D)
f. Blood borne Pathogen Plan (03.A.05)
g. Exposure Control Plan (03.A.05)
h. Site Layout Plan (04.A)
i. Access/Haul road Plan (04.B)
j. Hearing Conservation Program (05.C)
k. Respiratory Protection Plan (05.G)
l. Health Hazard Control Program (06.A)
m. Process Safety Management Plan (06.B.04)
n. Lead Abatement Plan (06.C & Specs)
o. Asbestos Abatement Plan (06.C & Specs)
p. Radiation Safety Program (06.F)
q. Abrasive Blasting Plan (06.I)
r. Heat/Cold Stress Monitoring Plan (06.J)
s. Indoor Air Quality Management Plan (06.L)
t. Mole Remediation Plan (06.L.04)
u. Chromium (VI) Exposure Evaluation (06.M)
v. Crystalline Silica Assessment (06.N)
w. Lighting Evaluation (07.A)
x. Lighting Plan for Night Operations (07.A.09)
Traffic Control Plan (08.C.05)
z. Fire Prevention Plan (09.A.01)
aa. Wild Land Fire Management Plan (09.L)
bb. Arc Flash Hazard Analysis (11.B)
cc. Assured Equipment Grounding Control Program (AEGCP), (11.D.05, App D)
dd. Hazardous Energy Control Plan, (12.A.01)
ee. Standard Pre-Lift Plan (LHE) (16.A.03, 16.L.15)
ff. Critical Lift Plan – LHE (16.H)
gg. Contingency Plan for Severe Weather (19.A.03)
hh. Fall Protection Program, (21.D)
ii. Demolition/Renovation Plan (to include engineering survey)
jj. Excavation/Trenching Plan, (25.A.01)
File details come from the government source that posted it. Updated .