Exhibit A (4) - Bldg 14 TO Specs.pdf
PDF 17 MB Posted
- Attached to
- Tobyhanna Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W25G1V-21-R-0014
About this file
This document provides details for a solicitation seeking proposals for a multiple award task order contract to provide facility maintenance, repair, and minor construction services at Tobyhanna Army Depot. Solicitation number W25G1V-21-R-0014 will result in an Indefinite Delivery Indefinite Quantity contract valued over $10 million to provide services including interior and exterior renovations, HVAC, plumbing, electrical work, communications, site work, landscaping, roofing, and other construction and facility support. A site visit will be held on July 1, 2021 to review details for the initial task order to renovate Building 14, as provided in Exhibit A. Proposals must be submitted through the DoD SAFE system by July 22, 2021. The NAICS code for this opportunity is 236220 and it is set aside for small businesses. The soliciting agency is the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
for
TOBYHANNA ARMY DEPOT
ENGINEERING DIVISION
11 HAP ARNOLD BOULEVARD
TOBYHANNA, PA 18466-5100
BUILDING #14 RENOVATIONS
100% Submission
Borton-Lawson Project No.: 2017-3101-001
Date: April 30, 2021
Prepared by:
Borton-Lawson
Engineering / Architecture
613 Baltimore Drive, Ste. 300
Wilkes-Barre, PA 18702
P: 570-821-1999/ F: 570-821-1990 www.borton-lawson.com http://www.borton-lawson.com/
Tobyhanna Building 14 Renovation 100PCT00001
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 99 08/15 SUMMARY OF WORK
01 14 00.00 99 11/11 WORK RESTRICTIONS
01 30 00.00 99 08/15 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 99 02/15 PROJECT SCHEDULE
01 32 33.00 99 03/2014 CONSTRUCTION PHOTOGRAPHY
01 33 00.00 99 01/2018 SUBMITTAL PROCEDURES
01 33 16.00 99 05/16 DESIGN DATA (DESIGN AFTER AWARD)
01 33 29.00 99 02/17 SUSTAINABILITY REPORTING
01 35 26.00 99 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 53.00 99 06/18 ANTITERRORISM/OPERATIONS SECURITY
(AT/OPSEC)
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 99 04/17 QUALITY CONTROL
01 50 00.00 99 08/09 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 09/17 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 58 00.01 08/09 PROJECT IDENTIFICATION
01 74 19.00 99 01/07 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT
01 78 00.00 99 08/11 CLOSEOUT SUBMITTALS
01 78 23.00 99 08/15 OPERATION AND MAINTENANCE DATA
01 91 00.00 99 05/19 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00.00 99 05/10 DEMOLITION
02 82 14.00 99 02/10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 13.00 99 08/11 LEAD IN CONSTRUCTION
02 84 16.00 99 04/06 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 30 00.00 99 05/14 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00.00 99 11/15 UNIT MASONRY
DIVISION 05 - METALS
05 12 00.00 99 05/14 STRUCTURAL STEEL
05 30 00.00 99 05/15 STEEL DECKS
05 40 00.00 99 05/15 COLD-FORMED METAL FRAMING
05 50 13.00 99 05/17 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00.00 99 08/16 ROUGH CARPENTRY
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 99 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16.00 99 08/10 SOLID SURFACING FABRICATIONS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00.00 99 02/16 ROOF AND DECK INSULATION
07 24 00.00 99 05/11 EXTERIOR INSULATION AND FINISH SYSTEMS
07 53 23.00 99 05/12 ETHYLENE-PROPYLENE-DIENE-MONOMER
ROOFING
07 60 00.00 99 08/08 FLASHING AND SHEET METAL
07 92 00.00 99 08/16 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13.00 99 02/10 STEEL DOORS AND FRAMES
08 33 23 08/20 OVERHEAD COILING DOORS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00.00 99 02/16 DOOR HARDWARE
08 81 00.00 99 08/11 GLAZING
08 91 00 05/11 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 06 00 05/09 SCHEDULES FOR FINISHES
09 22 00.00 99 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00.00 99 08/16 GYPSUM BOARD
09 30 10.00 99 08/17 CERAMIC, QUARRY, PORCELAIN, AND GLASS
TILING
09 51 00.00 99 08/17 ACOUSTICAL CEILINGS
09 67 23.14 99 08/16 CHEMICAL RESISTANT RESINOUS FLOORING
09 68 00.00 99 11/17 CARPETING
09 90 00.00 99 05/11 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 99 08/17 INTERIOR SIGNAGE
10 21 13.00 99 08/17 TOILET COMPARTMENTS
10 28 13.00 99 08/17 TOILET ACCESSORIES
10 44 16.00 99 05/15 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 32 00 11/16 MANUFACTURED WOOD CASEWORK
12 36 00.00 99 08/18 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
21 13 00.00 40 08/13 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 13.00 99 05/09 WET PIPE SPRINKLER SYSTEM, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00.00 99 11/15 PLUMBING, GENERAL PURPOSE
22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES
22 07 19.00 99 08/16 PLUMBING PIPING INSULATION
22 14 29.00 40 05/17 SUMP PUMPS
22 15 09.00 40 11/16 GENERAL SERVICE COMPRESSED-AIR SYSTEMS
CLEANING PROCEDURES
22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR
SYSTEMS, LOW PRESSURE
22 31 00.00 99 02/09 WATER SOFTENERS, CATION-EXCHANGE
PROJECT TABLE OF CONTENTS Page 3
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00.00 99 08/10 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
23 03 00.00 99 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15.00 99 02/14 COMMON PIPING FOR HVAC
23 05 48.00 99 08/15 VIBRATION AND SEISMIC CONTROLS FOR
HVAC PIPING AND EQUIPMENT
23 05 93.00 99 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00.00 99 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00.10 99 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 23.10 99 02/19 LONWORKS DIRECT DIGITAL CONTROL FOR
HVAC AND OTHER BUILDING CONTROL SYSTEMS
23 09 93.10 99 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 25.00 99 11/08 FACILITY GAS PIPING
23 23 00.00 99 10/07 REFRIGERANT PIPING
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 31 13.00 40 05/16 METAL DUCTS
23 34 23.00 40 02/17 HVAC POWER VENTILATORS
23 35 16.17 10 05/20 MECHANICAL ENGINE EXHAUST SYSTEMS
23 37 13.00 40 05/15 DIFFUSERS, REGISTERS, AND GRILLS
23 41 13.00 40 02/16 PANEL FILTERS
23 54 19 11/08 BUILDING HEATING SYSTEMS, WARM AIR
23 73 13.00 40 05/17 MODULAR INDOOR CENTRAL-STATION
AIR-HANDLING UNITS
23 74 33.00 40 05/17 PACKAGED, OUTDOOR, HEATING AND COOLING
MAKEUP AIR-CONDITIONERS
23 81 00.00 99 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 29.00 99 02/20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
23 82 00.00 20 02/16 TERMINAL HEATING UNITS
23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS
23 82 16.00 40 05/16 AIR COILS
23 83 00.00 99 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10.00 99 02/19 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 00 00.00 99 07/06 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 99 11/10 COMMON WORK RESULTS FOR ELECTRICAL
26 05 26.00 99 08/19 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 05 71.00 40 02/17 LOW VOLTAGE OVERCURRENT PROTECTIVE
DEVICES
26 09 23.00 40 08/19 LIGHTING CONTROL DEVICES
26 20 00.00 99 02/14 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 08/19 PANELBOARDS
26 51 00.00 99 05/16 INTERIOR LIGHTING
26 52 00.00 99 11/17 EMERGENCY LIGHTING
26 53 00.00 40 11/15 EXIT SIGNS
26 56 00.00 99 05/13 EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 4
DIVISION 27 - COMMUNICATIONS
27 05 28.36 99 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
DIVISION 31 - EARTHWORK
31 00 00.00 99 08/08 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13.00 99 11/16 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 71 02.00 99 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
DOCUMENT 00 01 15 Page 1
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause
"DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NO. REVISION
NO.
NAVFAC
DWG
TITLE
14-1-37 COVER SHEET
STRUCTURAL
14-2-9 GENERAL NOTES
14-2-10 SPECIAL
INSPECTIONS
14-2-11 FOUNDATION PLAN -
OVERALL
14-2-12 OFFICE ENTRANCE
FOUNDATION PLAN
12-2-14 CANOPY FDN PLAN
14-2-15 SECTIONS AND
DETAILS
14-2-16 FRAMING PLA AT EL
10'-9 3/4"
DOCUMENT 00 01 15 Page 2
NAVFAC
DWG
TITLE
14-2-17 ROOF FRAMING PLAN
14-2-18 EXISTING BRIDGE
CRANE REPLACEMENT
14-2-19 OFFICE ENTRANCE
ROOF FRAMING PLAN
14-2-20 CANOPY FRAMING
PLAN
14-2-21 COLUMN SCHEDULE
AND DETAILS
14-2-22 SECTIONS AND
DETAILS
ARCHITECTURAL
14-1-38 LEGENDS, NOTES,
AND ABBREVIATIONS
14-1-39 LIFE SAFETY PLAN
14-1-40 ARCHITECTURAL
SITE PLAN
14-1-41 FIRST FLOOR
DEMOLITION PLAN
14-1-42 ROOF DEMOLITION
PLAN
14-1-43 DEMOLITION
ELEVATIONS
14-1-44 FRIST FLOOR NEW
WORK PLAN
DOCUMENT 00 01 15 Page 3
NAVFAC
DWG
TITLE
14-1-46 EXTERIOR
ELEVATIONS
14-1-47 BUILDING SECTIONS
14-1-48 WALL SECTION
14-1-49 ROOF DETAILS
14-1-50 REFLECTED CEILING
NEW WORK PLAN
14-1-51 INTERIOR
ELEVATIONS
14-1-52 DETAILS
14-1-53 3D VIEWS
14-1-54 WINDOW DETAILS
14-1-55 3D VIEWS
HVAC
14-4-13 HVAC LEGEND,
NOTES, AND
ABBREVIATIONS
14-4-14 HVAC DEMOLITION
PLAN
14-4-15 HVAC NEW WORK
FLOOR PLAN
14-4-16 HVAC NEW WORK
ROOF PLAN
14-4-17 HVAC SCHEDULES
14-4-18 HVAC DETAILS
14-4-19 BAS CONTROL
DIAGRAMS
PLUMBING
DOCUMENT 00 01 15 Page 4
NAVFAC
DWG
TITLE
14-3-8 PLUMBING LEGEND,
NOTES, AND
ABBREVIATIONS
14-3-9 FIRST FLOOR
DRAINAGE
DEMOLITION PLAN
14-3-10 FIRST FLOOR WATER
& GAS DEMOLITION
PLAN
14-3-11 FIRST FLOOR
DRAINAGE NEW WORK
PLAN
14-3-12 FIRST FLOOR WATER
NEW WORK PLAN
14-3-13 FIRST FLOOR GAS
NEW WORK PLAN
14-3-14 PLUMBING ROOF PLAN
14-3-15 PLUMBING ENLARGED
SCALE FLOOR PLANS
14-3-16 PLUMBING DETAILS
14-3-17 PLUMBING SCHEDULES
FIRE
PROTECTION
14-3-17 FIRE PROTECTION
LEGEND, NOTES,
AND ABBREVIATIONS
DOCUMENT 00 01 15 Page 5
NAVFAC
DWG
TITLE
14-3-18 FIRST FLOOR FIRE
PROTECTION
DEMOLITION PLAN
14-3-19 FIRST FLOOR FIRE
PROTECTION NEW
WORK PLAN
14-3-20 FIRE PROTECTION
ENLARGED SCALE
FLOOR PLANS
14-3-21 FIRE PROTECTION
DETAILS
ELECTRICAL
14-5-13 ELECTRICAL
LEGEND, NOTES,
AND ABBREVIATIONS
14-5-14 ELECTRICAL DEMO
PLAN
14-5-15 LIGHTING PLANS
14-5-16 SITE LIGHTING PLAN
14-5-17 POWER PLAN
14-5-18 EQUIPMENT POWER
PLANS
14-5-19 EQUIPMENT POWER
PLANS
14-5-20 SIGNAL PLANS
14-5-21 ELECTRICAL SINGLE
LINES
14-5-22 ELECTRICAL
SCHEDULES
14-5-23 ELECTRICAL
SCHEDULES
DOCUMENT 00 01 15 Page 6
1.3 SUPPLEMENTARY DRAWINGS
1.3.1 Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
Subsurface data, not specified or indicated, have been obtained by the
Government at this station. The data are available for examination by prospective bidders at the station.
1.3.2 Subsurface Data
Subsurface data, not specified or indicated, have been obtained by the
Government at the station. The data are available for examination by prospective bidders at the station. The soils report is included as part of the solicitation.
-- End of Document --
SECTION 01 11 00.00 99 Page 1
SECTION 01 11 00.00 99
SUMMARY OF WORK
08/15
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 99 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes that described in the accompanying drawings, Scope of
Work Appendix, and incidental related work.
1.2.2 Location
The work is located at the Tobyhanna Army Depot, Tobyhanna, PA, approximately as indicated. The exact location will be shown by the
Government Designated Representative (GDR).
1.3 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the GDR a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the GDR. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
SECTION 01 11 00.00 99 Page 2
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with
Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating
Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the GDR at least 48 hours prior to starting excavation work.
1.6 Reserved
1.6.1 Delivery Schedule
Notify the GDR in writing at least 14 calendar days in advance of the date on which the materials and equipment are required. Pick up materials and equipment no later than 30 calendar days after such date.
1.6.2 Delivery Location
The materials and equipment are located or will be delivered as described in the Scope of Work Appendix.
1.7 GOVERNMENT-INSTALLED WORK
The Government may install equipment or perform other work at the job site, excluding inspection and testing if it listed in the Scope of Work Appendix.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the GDR to be salvaged remain the property of the
Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the GDR. Store and protect salvaged materials and equipment until disposition by the GDR.
SECTION 01 11 00.00 99 Page 3
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00.00 99 Page 4
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 14 00.00 99 Page 1
SECTION 01 14 00.00 99
WORK RESTRICTIONS
11/11
1.1 SUBMITTALS
used, a designation following the "G" designation identifies the office
Personnel List; G
List of Contact Personnel; G
Vehicle List; G
Statement of Acknowledgement Form SF 1413; G
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.2.1.1 Subcontractors and Personnel Contacts
Provide a vehicle list, personnel list and list of contact personnel of the
Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.2.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Government Designated
Representative (GDR) will identify designated smoking areas.
1.2.2 Working Hours
Regular working hours must consist of an 8 1/2 hour period established by the Government Designated Representative, between Monday through Friday, excluding Government holidays.
SECTION 01 14 00.00 99 Page 2
1.2.3 Work Outside Regular Hours
Work outside regular working hours requires Government Designated
Representative approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Government Designated Representative may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the
Government Designated Representative. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.2.4 Occupied Building
The Contractor shall be working in an existing building which is occupied.
Do not enter the building without prior approval of the Government
Designated Representative.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Government Designated Representative.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the work area during the construction period.
Relocate movable furniture as required to perform the work, protect the furniture, and replace the furniture in its original locations upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.
The Government will remove and relocate other Government property in the areas of the building scheduled to receive work.
1.2.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK
OUTSIDE REGULAR HOURS. Such interruptions are further limited to 6 hours. This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Government Designated
Representative giving reasonable advance notice when such operation is
SECTION 01 14 00.00 99 Page 3 required.
1.3 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II, "FAC
5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply:
Submit Statement of Acknowledgement Form SF 1413.
1.3.1 Identification Badges
Identification badges, if required, will be furnished without charge.
Application for and use of badges will be as directed. Furnish a completed
EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges.
This form is available at http://www.uscis.gov/files/form/I-9_IFR_02-02-09.pdf.
Immediately report instances of lost or stolen badges to the Depot Security
Office and to the Government Designated Representative.
1.3.2 1.4.1.4 Personnel Entry Approval
Failure to obtain entry approval will not affect the contract price or time of completion.
Not Used.
http://www.uscis.gov/files/form/I-9_IFR_02-02-09.pdf
SECTION 01 14 00.00 99 Page 4
SECTION 01 30 00.00 99 Page 1
SECTION 01 30 00.00 99
ADMINISTRATIVE REQUIREMENTS
08/15
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements
Manual
1.2 SUBMITTALS
used, a designation following the "G" designation identifies the office
View Location Map; G
Progress and Completion Pictures; G
1.3 VIEW LOCATION MAP
Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.
1.4 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600 x 1200 x 24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work.
Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Government
Designated Representative (GDR). Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the
Government.
SECTION 01 30 00.00 99 Page 2
1.5 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.
1.6 SUPERVISION
1.6.1 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.
1.6.2 Superintendent Qualifications
The project superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Government Designated Representative may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
For routine projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00.00 99
QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.
1.6.2.1 Duties
The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.
The superintendent is required to attend partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.6.3 Non-Compliance Actions
The Project Superintendent is subject to removal by the Government
Designated Representative for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Government Designated Representative may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.7 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Government Designated Representative to discuss and
SECTION 01 30 00.00 99 Page 3 develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule of prices or earned value report, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the
"Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work must also attend.
1.8 PARTNERING
To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership within the Project Team whose members are from the Government, the Contractor and their Subcontractors. Key personnel from the Supported Command, the End User (who will occupy the facility), the Government Design and Construction team and Subject Matter
Experts, the Installation, the Contractor and Subcontractors, and the
Designer of Record will be invited to participate in the Partnering process. The Partnership will draw on the strength of each organization in an effort to achieve a project that is without any safety mishaps, conforms to the Contract, and stays within budget and on schedule.
The Government Designated Representative will provide Information on the
Partnering Process and a list of key and optional personnel who should attend the Partnering meeting.
1.8.1 Informal Partnering
The Government Designated Representative will organize the Partnering
Sessions with key personnel of the project team, including Contractor personnel and Government personnel.
The Initial Partnering session should be a part of the Pre-Construction
Meeting. Partnering sessions will be held at a location agreed to by the
GDR and the Contractor (typically a conference room provided by the
Resident Engineer office or the Contractor). The Initial Informal
Partnering Session will be conducted and facilitated using electronic media
(a video and accompanying forms) provided by the Government Designated
Representative. The Partners will determine the frequency of the follow-on sessions, at no more than 3 to six month intervals.
1.9 ELECTRONIC MAIL (E-MAIL) ADDRESS
Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, provide the Government Designated Representative a single (only one) e-mail address for electronic communications from the Government Designated Representative related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The
Government Designated Representative may also use email to notify the
Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.
It is the Contractor's responsibility to make timely distribution of all
Government Designated Representative initiated e-mail with its own organization including field office(s). Promptly notify the Government
Designated Representative, in writing, of any changes to this email address.
SECTION 01 30 00.00 99 Page 4
1.10 MEETING INVITATIONS/NOTIFICATIONS
Notify the Government Designated Representative of all scheduled meetings a minimum of 48 hours in advance utilizing Microsoft Office Outlook Invite for invitations/notifications unless otherwise noted.
SECTION 01 32 01.00 99 Page 1
SECTION 01 32 01.00 99
PROJECT SCHEDULE
02/15
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AACE INTERNATIONAL (AACE)
AACE 29R-03 (2011) Forensic Schedule Analysis
AACE 52R-06 (2006) Time Impact Analysis - As Applied in Construction
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1-1-11 (1995) Administration -- Progress, Schedules, and Network Analysis Systems used, a designation following the "G" designation identifies the office
Project Scheduler Qualifications; G
Preliminary Project Schedule; G
Initial Project Schedule; G
Periodic Schedule Update; G
1.3 PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 2 years of experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application.
2.1 SOFTWARE
The scheduling software utilized to produce and update the schedules required herein must be capable of meeting all requirements of this specification.
SECTION 01 32 01.00 99 Page 2
2.1.1 Government Default Software
The Government intends to use Microsoft Project.
2.1.2 Contractor Software
Scheduling software used by the contractor must be commercially available from the software vendor for purchase with vendor software support agreements available. The software routine used to create the required
Microsft Project compatible file must be created and supported by the software manufacturer.
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to
FAR Clause 52.236-15, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling is the responsibility of the
Contractor. Contractor management personnel must actively participate in its development. Working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical
Path Method (CPM) of network calculation to generate all Project
Schedules. Prepare each Project Schedule using the Precedence Diagram
Method (PDM).
3.2 BASIS FOR PAYMENT AND COST LOADING
The schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment. The aggregate value of all activities coded to a contract CLIN must equal the value of the CLIN.
3.2.1 Activity Cost Loading
Activity cost loading must be reasonable and without front-end loading.
Provide additional documentation to demonstrate reasonableness if requested by the Government Designated Representative (GDR).
3.2.2 Withholdings / Payment Rejection
Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.
In the event that the Government Designated Representative directs schedule revisions and those revisions have not been included in subsequent Project
Schedule revisions or updates, the Government Designated Representative may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.
SECTION 01 32 01.00 99 Page 3
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.3.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Government Designated
Representative will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
3.3.2 Activity Durations
Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods.
Less than 2 percent of all non-procurement activities may have Original
Durations (OD) greater than 20 work days or 30 calendar days.
3.3.3 Procurement Activities
Include activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days.
3.3.4 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of SD-01 Preconstruction Submittals
(individual activity for each).
b. Submission of mechanical/electrical/information systems layout drawings.
c. Long procurement activities
d. Submission and approval of O & M manuals.
e. Submission and approval of as-built drawings.
f. Submission and approval of DD1354 data and installed equipment lists.
g. Submission and approval of testing and air balance (TAB).
h. Submission of TAB specialist design review report.
i. Submission and approval of fire protection specialist.
j. Submission and approval of Building Commissioning Plan, test data, and reports: Develop the schedule logic associated with testing and commissioning of mechanical systems to a level of detail consistent with the contract commissioning requirements. All tasks associated with all building testing and commissioning will be completed prior to submission of building commissioning report and subsequent contract completion.
SECTION 01 32 01.00 99 Page 4
k. Air and water balancing.
l. Building commissioning - Functional Performance Testing.
m. Controls testing plan submission.
n. Controls testing.
o. Performance Verification testing.
p. Other systems testing, if required.
q. Contractor's pre-final inspection.
r. Correction of punch list from Contractor's pre-final inspection.
s. Government's pre-final inspection.
t Correction of punch list from Government's pre-final inspection.
u. Final inspection.
3.3.5 Government Activities
Show Government and other agency activities that could impact progress.
These activities include, but are not limited to: environmental permit approvals by State regulators, inspections, utility tie-in, Government
Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.
3.3.6 Standard Activity Coding Dictionary
Use the activity coding structure defined in the Standard Data Exchange
Format (SDEF) in ER 1-1-11. This exact structure is mandatory. Develop and assign all Activity Codes to activities as detailed herein. A template
SDEF compatible schedule backup file is available on the QCS web site:
http://rms.usace.army.mil.
The SDEF format is as follows:
Field Activity Code Length Description
1 WRKP 3 Workers per day
2 RESP 4 Responsible party
3 AREA 4 Area of work
4 MODF 6 Modification Number
5 BIDI 6 Bid Item (CLIN)
6 PHAS 2 Phase of work
7 CATW 1 Category of work http://rms.usace.army.mil/
SECTION 01 32 01.00 99 Page 5
Field Activity Code Length Description
8 FOW 20 Feature of work*
*Some systems require that FEATURE OF WORK values be placed in several activity code fields. The notation shown is for Primavera P6. Refer to the specific software guidelines with respect to the FEATURE OF WORK field requirements.
3.3.6.1 Workers Per Day (WRKP)
Assign Workers per Day for all field construction or direct work activities, if directed by the Government Designated Representative.
Workers per day is based on the average number of workers expected each day to perform a task for the duration of that activity.
3.3.6.2 Responsible Party Coding (RESP)
Assign responsibility code for all activities to the Prime Contractor, Subcontractor(s) or Government agency(ies) responsible for performing the activity.
a. Activities coded with a Government Responsibility code include, but are not limited to: Government approvals, Government design reviews, environmental permit approvals by State regulators, Government
Furnished Property/Equipment (GFP) and Notice to Proceed (NTP) for phasing requirements.
b. Activities cannot have more than one Responsibility Code. Examples of acceptable activity code values are: DOR (for the designer of record);
ELEC (for the electrical subcontractor); MECH (for the mechanical subcontractor); and GOVT (for USACE).
3.3.6.3 Area of Work Coding (AREA)
Assign Work Area code to activities based upon the work area in which the activity occurs. Define work areas based on resource constraints or space constraints that would preclude a resource, such as a particular trade or craft work crew from working in more than one work area at a time due to restraints on resources or space. Examples of Work Area Coding include different areas within a floor of a building, different floors within a building, and different buildings within a complex of buildings.
Activities cannot have more than one Work Area Code.
Not all activities are required to be Work Area coded. A lack of Work Area coding indicates the activity is not resource or space constrained.
3.3.6.4 Modification Number (MODF)
Assign a Modification Number Code to any activity or sequence of activities added to the schedule as a result of a Contract Modification, when approved by Government Designated Representative. Key all Code values to the
Government's modification numbering system. An activity can have only one
Modification Number Code.
SECTION 01 32 01.00 99 Page 6
3.3.6.5 Bid Item Coding (BIDI)
Assign a Bid Item Code to all activities using the Contract Line Item
Schedule (CLIN) to which the activity belongs, even when an activity is not cost loaded. An activity can have only one BIDI Code.
3.3.6.6 Phase of Work Coding (PHAS)
Assign Phase of Work Code to all activities. Examples of work are procurement phase and construction phase. Each activity can have only one
Phase of Work code.
a. If the contract specifies phasing with separately defined performance periods, identify a PAse Code to allow filtering and organizing the schedule accordingly.
b. Code proposed fast track design and construction phases proposed to allow filtering and organizing the schedule by fast track design and construction packages.
c. If the contract specifies phasing with separately defined performance periods, identify a Phase Code to allow filtering and organizing the schedule accordingly.
3.3.6.7 Category of Work Coding (CATW)
Assign a Category of Work Code to all activities. Category of Work Codes include, but are not limited to construction submittals, procurement, fabrication, weather sensitive installation, non-weather sensitive installation, start-up, and testing activities. Each activity can have no more than one Category of Work Code.
3.3.6.8 Feature of Work Coding (FOW)
Assign a Feature of Work Code to appropriate activities based on the
Definable Feature of Work to which the activity belongs based on the approved QC plan.
Definable Feature of Work is defined in Section 01 45 00.00 99 QUALITY
CONTROL. An activity can have only one Feature of Work Code.
3.3.7 Contract Milestones and Constraints
Milestone activities are to be used for significant project events including, but not limited to, project phasing, project start and end activities, or interim completion dates. The use of artificial float constraints such as "zero free float" or "zero total float" are prohibited.
Mandatory constraints that ignore or effect network logic are prohibited.
No constrained dates are allowed in the schedule other than those specified herein. Submit additional constraints to the Government Designated
Representative for approval on a case by case basis.
3.3.7.1 Project Start Date Milestone and Constraint
The first activity in the project schedule must be a start milestone titled
"NTP Acknowledged," which must have a "Start On" constraint date equal to the date that the NTP is acknowledged.
SECTION 01 32 01.00 99 Page 7
3.3.7.2 End Project Finish Milestone and Constraint
The last activity in the schedule must be a finish milestone titled "End
Project."
Constrain the project schedule to the Contract Completion Date in such a way that if the schedule calculates an early finish, then the float calculation for "End Project" milestone reflects positive float on the longest path. If the project schedule calculates a late finish, then the
"End Project" milestone float calculation reflects negative float on the longest path. The Government is under no obligation to accelerate
Government activities to support a Contractor's early completion.
3.3.7.3 Interim Completion Dates and Constraints
Constrain contractually specified interim completion dates to show negative float when the calculated late finish date of the last activity in that phase is later than the specified interim completion date.
3.3.7.3.1 Start Phase
Use a start milestone as the first activity for a project phase. Call the start milestone "Start Phase X" where "X" refers to the phase of work.
3.3.7.3.2 End Phase
Use a finish milestone as the last activity for a project phase. Call the finish milestone "End Phase X" where "X" refers to the phase of work.
3.3.8 Calendars
Schedule activities on a Calendar to which the activity logically belongs.
Develop calendars to accommodate any contract defined work period such as a
7-day calendar for Government Acceptance activities, concrete cure times, etc. Develop the default Calendar to match the physical work plan with non-work periods identified including weekends and holidays. Develop
Seasonal Calendar(s) and assign to seasonally affected activities as applicable.
If an activity is weather sensitive it should be assigned to a calendar showing non-work days on a monthly basis, with the non-work days selected at random across the weeks of the calendar, using the anticipated days provided in the contract clause TIME EXTENSIONS FOR UNUSUALLY SEVERE
WEATHER. Assign non-work days over a seven-day week as weather records are compiled on seven-day weeks, which may cause some of the weather related non-work days to fall on weekends.
3.3.9 Open Ended Logic
Only two open ended activities are allowed: the first activity "NTP
Acknowledged" may have no predecessor logic, and the last activity -"End
Project" may have no successor logic.
Predecessor open ended logic may be allowed in a time impact analyses upon the Government Designated Representative's approval.
3.3.10 Default Progress Data Disallowed
Actual Start and Finish dates must not automatically update with default
SECTION 01 32 01.00 99 Page 8 mechanisms included in the scheduling software. Updating of the percent complete and the remaining duration of any activity must be independent functions. Disable program features that calculate one of these parameters from the other. Activity Actual Start (AS) and Actual Finish (AF) dates assigned during the updating process must match those dates provided in the
Contractor Quality Control Reports. Failure to document the AS and AF dates in the Daily Quality Control report will result in disapproval of the
Contractor's schedule.
3.3.11 Out-of-Sequence Progress
Activities that have progressed before all preceding logic has been satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case basis subject to approval by the Government Designated Representative.
Propose logic corrections to eliminate out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule. Address out of sequence progress or logic changes in the
Narrative Report and in the periodic schedule update meetings.
3.3.12 Added and Deleted Activities
Do not delete activities from the project schedule or add new activities to the schedule without approval from the Government Designated Representative.
Activity ID and description changes are considered new activities and cannot be changed without Government Designated Representative approval.
3.3.13 Original Durations
Activity Original Durations (OD) must be reasonable to perform the work item. OD changes are prohibited unless justification is provided and approved by the Government Designated Representative.
3.3.14 Leads, Lags, and Start to Finish Relationships
Lags must be reasonable as determined by the Government and not used in place of realistic original durations, must not be in place to artificially absorb float, or to replace proper schedule logic.
a. Leads (negative lags) are prohibited.
b. Start to Finish (SF) relationships are prohibited.
3.3.15 Retained Logic
Schedule calculations must retain the logic between predecessors and successors ("retained logic" mode) even when the successor activity(s) starts and the predecessor activity(s) has not finished (out-of-sequence progress). Software features that in effect sever the tie between predecessor and successor activities when the successor has started and the predecessor logic is not satisfied ("progress override") are not be allowed.
3.3.16 Percent Complete
Update the percent complete for each activity started, based on the realistic assessment of earned value. Activities which are complete but for remaining minor punch list work and which do not restrain the initiation of successor activities may be declared 100 percent complete to allow for proper schedule management.
SECTION 01 32 01.00 99 Page 9
3.3.17 Remaining Duration
Update the remaining duration for each activity based on the number of estimated work days it will take to complete the activity. Remaining duration may not mathematically correlate with percentage found under paragraph entitled Percent Complete.
3.3.18 Cost Loading of Closeout Activities
Cost load the "Correction of punch list from Government pre-final inspection" activity(ies) not less than 1 percent of the present contract value. Activity(ies) may be declared 100 percent complete upon the
Government's verification of completion and correction of all punch list work identified during Government pre-final inspection(s).
3.3.18.1 As-Built Drawings
If there is no separate contract line item (CLIN) for as-built drawings, cost load the "Submission and approval of as-built drawings" activity not less than $35,000 or 1 percent of the present contract value, whichever is greater, up to $200,000. Activity will be declared 100 percent complete upon the Government's approval.
3.3.18.2 O & M Manuals
Cost load the "Submission and approval of O & M manuals" activity not less than $20,000. Activity will be declared 100 percent complete upon the
Government's approval of all O & M manuals.
3.3.19 Anticipated Adverse Weather
Paragraph applicable to contracts with clause entitled TIME EXTENSIONS FOR
UNUSUALLY SEVERE WEATHER. Reflect the number of anticipated adverse weather delays allocated to a weather sensitive activity in the activity's calendar.
3.3.20 Early Completion Schedule and the Right to Finish Early
An Early Completion Schedule is an Initial Project Schedule (IPS) that indicates all scope of the required contract work will be completed before the contractually required completion date.
a. No IPS indicating an Early Completion will be accepted without being fully resource-loaded (including crew sizes and man-hours) and the
Government agreeing that the schedule is reasonable and achievable.
b. The Government is under no obligation to accelerate work items it is responsible for to ensure that the early completion is met nor is it responsible to modify incremental funding (if applicable) for the project to meet the contractor's accelerated work.
3.4 PROJECT SCHEDULE SUBMISSIONS
Provide the submissions as described below. The data CD/DVD, reports, and network diagrams required for each submission are contained in paragraph
SUBMISSION REQUIREMENTS. If the Contractor fails or refuses to furnish the information and schedule updates as set forth herein, then the Contractor will be deemed not to have provided an estimate upon which a progress payment can be made.
SECTION 01 32 01.00 99 Page 10
Review comments made by the Government on the schedule(s) do not relieve the Contractor from compliance with requirements of the Contract Documents.
3.4.1 Preliminary Project Schedule Submission
Within 15 calendar days after the NTP is acknowledged submit the
Preliminary Project Schedule defining the planned operations detailed for the first 90 calendar days for approval. The approved Preliminary Project
Schedule will be used for payment purposes not to exceed 90 calendar days after NTP. Completely cost load the Preliminary Project Schedule to balance the contract award CLINS shown on the Price Schedule. The
Preliminary Project Schedule may be summary in nature for the remaining performance period. It must be early start and late finish constrained and logically tied as specified. The Preliminary Project Schedule forms the basis for the Initial Project Schedule specified herein and must include all of the required plan and program preparations, submissions and approvals identified in the contract (for example, Quality Control Plan, Safety Plan, and Environmental Protection Plan) as well as design activities, planned submissions of all early design packages, permitting activities, design review conference activities, and other non-construction activities intended to occur within the first 90 calendar days. Government acceptance of the associated design package(s) and all other specified
Program and Plan approvals must occur prior to any planned construction activities. Activity code any activities that are summary in nature after the first 90 calendar days with Bid Item (CLIN) code (BIDI), Responsibility
Code (RESP) and Feature of Work code (FOW).
3.4.2 Initial Project Schedule Submission
Submit the Initial Project Schedule for approval within 42 calendar days after notice to proceed is issued. The schedule must demonstrate a reasonable and realistic sequence of activities which represent all work through the entire contract performance period. No payment will be made for work items not fully detailed in the Project Schedule.
3.4.3 Periodic Schedule Updates
Update the Project Schedule on a regular basis, monthly at a minimum.
Pro…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .