Attachment 0016 Resource Distribution Table (RDT) - 20 July 2021.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Combat Net Radio (CNR) Solicitation
- Solicitation number
- W15P7T-21-R-0009
About this file
This solicitation is seeking proposals to procure a modernized Receiver Transmitter to replace the existing Combat Network Radio on behalf of the Program Executive Office Command Control Communications - Tactical. The Army Contracting Command, Aberdeen Proving Ground is requesting proposals under solicitation number W15P7T-21-R-0009 by July 5, 2021. The selected contractor will be expected to provide a modernized Receiver Transmitter unit that meets the requirements outlined in the Performance Requirements Document, as well as provide engineering documentation, hardware, software, security, logistics, sustainment, and training deliverables as specified in the exhibits attached to the solicitation. Vendors must be current DoD contractors and eligible to receive controlled and export-controlled information according to the terms specified in the document in order to receive the full solicitation including the restricted Statement of Work, Life Cycle Sustainment Plan, and Programmatic Schedule attachments.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RDT
Resource Distribution Table (RDT)
| Prime Contractor | Subcontractors | ||||||||
| Prime Contractor or Sub-Contractor | Total | In-House | Total | Sub | Sub | ||||
| Description | CNR will replace and modernize the legacy Single Channel Ground and Airborne Radio Systems (SINCGARS) to address emerging threats and meet National Security Agency (NSA)/Office of Secretary Defense mandated cryptographic modernization requirements. This radio solution will provided resilient and secured communications for Army ground forces to conduct Multi-Domain Operations (MDO) over extended mission ranges. | ||||||||
| Contractor/Organization Name | TBD | ||||||||
| Contractor/Organization Location | TBD | ||||||||
| Contract Number | TBD | ||||||||
| Total Program Office or Contract/Effort Value (Estimated), TY$M | |||||||||
| Subtotal Software Contract Value (Estimated), TY$M | |||||||||
| Government Organization or PARM | PEO C3T | ||||||||
| CSDR Direct Reporting per CWIPT (Yes/No) | Yes | ||||||||
| SRDR Direct Reporting per CWIPT (Yes/No) | No | ||||||||
| WBS NUMBERS | WBS Element Name | ||||||||
| L1 | L2 | L3 | L4 | ||||||
| 1.0 | CNR- Combat Net Radio | X | |||||||
| 1.1 | Prime Mission Product (PMP) | X | |||||||
| 1.1.1 | Receiver/Transmitter | X | |||||||
| 1.1.2 | Vehicle Mount Adapter | X | |||||||
| 1.1.3 | Battery Box | X | |||||||
| 1.1.4 | Omni-Directional Antenna | X | |||||||
| 1.1.5 | External Speaker/Microphone | X | |||||||
| 1.1.6 | R/T Unit Warranty | X | |||||||
| 1.1.7 | PMP Radio Integration, Assembly, Test and Checkout | X | |||||||
| 1.2 | Platform Integration, Assembly, Test and Checkout | X | |||||||
| 1.3 | System Engineering | X | |||||||
| 1.4 | Program Management | X | |||||||
| 1.5 | System Test and Evaluation | X | |||||||
| 1.6 | Training | X | |||||||
| 1.6.1 | Equipment | X | |||||||
| 1.6.2 | Services | X | |||||||
| 1.6.3 | Facilities | X | |||||||
| 1.7 | Data | X | |||||||
| 1.7.1 | Technical Publications | X | |||||||
| 1.7.2 | Engineering Data | X | |||||||
| 1.7.3 | Management Data | X | |||||||
| 1.7.4 | Data Depository | X | |||||||
| 1.8 | Peculiar Support Equipment | X | |||||||
| 1.9 | Common Support Equipment | X | |||||||
| 1.1 | Operational/Site Activation | X | |||||||
| 1.10.1 | System Assembly, Installation and Checkout on Site | X | |||||||
| 1.10.2 | Contractor Technical Support | X | |||||||
| 1.10.3 | Sustainment/Interim Contractor Support | X | |||||||
| 1.11 | Industrial Facilities | X | |||||||
| 1.12 | Initial Spares and Repair Parts | X | |||||||
| 1.12.1 | Receiver/Transmitter | X | |||||||
| 1.12.2 | Other Components (Batteries, Antennas, Handsets, etc.) | X |
| 1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the |
| Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform |
| to the applicable rules established for the Program Plan RDT |
| 2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included. |