Atch_4_Contract_Acknowledgement.pdf
PDF 74 KB Posted
- Attached to
- Temporary Lodging Facility
- Solicitation number
- W-091238-15-R-0063
About this file
Attachment 4
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Beale AFB - Temporary Lodging Facility 19 August 2015
Attachment 4 Page 1 of 3
W91238-R-15-0063
CONTRACT ACKNOWLEDGEMENT STATEMENT
The offeror agrees to perform the work required at the prices specified and in strict accordance with the terms of the
Task Order.
1. Name, Address, and DUNS Number of Contractor
2. Telephone Number
3. Contract No.:
4. Title of Project:
5. Name and Title of Person Authorized to Sign Offer: Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
6. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation:
7 . Signature:
8. Offer Date:
9. Amendments (Number & Date of Acknowledgement):
10. The offeror agrees to perform the required work at the prices specified below in strict accordance with the terms and conditions of this RFP, if the offer is accepted in writing within __120___ calendar days after the date offers are due.
11. Proposed Period of Performance: __540_____ calendar days
12. Total Amount $___________________________
a. Note that your statement must include your acknowledge of all amendments.
b. Include the completed Contract Line Item Number (CLIN) schedule. This is Job pricing.
Attachment 4 Page 2 of 3
CLIN Schedule (Schedule of Items)
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN
THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE
Base Bid
0001 Provide material, labor, and equipment for the construction of a new Temporary
Lodging Facility including site work at
Beale AFB, in accordance with all RFP documents, drawings and specifications. 1 Job $_________ $_________
0002 Provide material, labor, and equipment for the construction of Contractor Furnished
Contractor Installed (CF/CI) FF&E as noted on unit plans at Beale AFB, in accordance with all RFP documents, drawings and specifications. 1 Job $_________ $_________
TOTAL BASE PRICE (ITEM 0001 and 0002) $___________
Bid Options
1001 Deductive Bid Option to provide construction of metal roof in lieu of clerestory structure, windows, finishes and associated light fixtures as depicted on Drawing A-311 and A-311A as CLIN
0004. 1 Job $_________ $_________
1002 Option to provide construction of monument sign as shown on Drawing AS-
100. 1 Job $_________ $_________
1003 Option to provide construction of door operators on door 201D and 401Das depicted in Drawing A-601 1 Job $_________ $_________
Total Base Price and Options (Items 0001, 0002, 1001, 1002 and 1003) $_____________
Attachment 4 Page 3 of 3
Notes:
1. Prices must be submitted on all individual items of this CLIN Schedule. Failure to do so may cause the proposal to be determined "unacceptable".
2. If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the CLIN Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the CLIN Schedule.
3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the CLIN
Schedule. The Government may review all submitted CLIN Schedules for any unbalancing of the items. Any submitted CLIN Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".
4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
5. Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting
Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
6. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
7. The successful offeror grants the options listed in the CLIN Schedule to the Government. The options may be exercised any time up to thirty (30) days after receipt of Notice to Proceed. Exercise of the option occurs upon mailing of written notice to the Contractor. Exercise will be made by the Contracting Officer. The price for exercise of the option includes all work and effort associated with the scope of that item. No additional time for contract completion will be allowed when an option is exercised. The given contract completion time was formulated to include time necessary to perform all option work.
ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of CLIN Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
-End of Section-
File details come from the government source that posted it. Updated .