Appendix_14-_Site_Electrical_Service_Details.pdf

PDF 194 KB Posted

Attached to
Temporary Lodging Facility
Solicitation number
W-091238-15-R-0063
Issued by

About this file

Appendix 14

View the file

Other files

File Type Posted
Atch_4_Contract_Acknowledgement.pdf PDF
Appendix_13-_Site_Electrical_Service_Connection.pdf PDF
Appendix_15-_Site_Electrical_Service_Specifications.pdf PDF
Appendix_4_-_Additional_Division_1_Specifications.pdf PDF
Appendix_16_LEED_Notebook.pdf PDF
15R0063_Amend_0005.pdf PDF
Appendix_12_-_Connection_for_Gas_Line_Sheet_C-101_BAEY_140002.pdf PDF
Addendum_1_beale_temp_lodging.pdf PDF
WR0063_CLIN_structure.pdf PDF
Appendix_2_-_Volume_1_Specifications.pdf PDF
Appendix_14-_Site_Electrical_Service_Details.pdf PDF
Atch_1_Scope_of_Work.pdf PDF
Appendix_13-_Site_Electrical_Service_Connection.pdf PDF
Amend03-Addendum_1_beale_temp_lodging.pdf PDF
Appendix_15-_Site_Electrical_Service_Specifications.pdf PDF
15-R-0063_TLF_Amend03_sf30.pdf PDF
Amend03-Atch_4_Contract_Acknowledgement.pdf PDF
Addendum_1_beale_temp_lodging.pdf PDF
Appendix_2_-_Volume_1_Specifications.pdf PDF
Amendment_No._0002.pdf PDF
Appendix_12_-_Connection_for_Gas_Line_Sheet_C-101_BAEY_140002.pdf PDF
Atch_4_Contract_Acknowledgement.pdf PDF
Appendix_4_-_Additional_Division_1_Specifications.pdf PDF
2015_0804_15-R-0063_Amend_01.pdf PDF
Site_Visit_Directions_to_COE_Trailer.pdf PDF
Addendum_1_beale_temp_lodging.pdf PDF
Appendix_7_-_Beale_AFB_New_Constr._ _Demo._Final_Env._Assessment.pdf PDF
Appendix_2_-_Volume_1_Specifications.pdf PDF
Appendix_6_-_Geotech_Report_-_Beale_AFB_TLF.pdf PDF
Appendix_5_-_PDF_of_Exterior_ _Interior_Sample_Color_Boards.pdf PDF
Atch_3_Davis_Bacon_Wage_Determination.pdf PDF
Atch_1_Scope_of_Work.pdf PDF
Appendix_3_-_Volume_2_Specifications.pdf PDF
Atch_2_Supplemental_Contract_Requirements.pdf PDF
Appendix_10_-_Signed_TLF_401_Application.pdf PDF
Atch_4_Contract_Acknowledgement.pdf PDF
Appendix_4_-_Additional_Division_1_Specifications.pdf PDF
A07.1_W91238-15-R-0063_TLF_Beale_AFB.pdf PDF
Appendix_8_-_Fish_ _Wildlife_Biological_Opinion_on_TLF_MILCON.pdf PDF
Appendix_11_-_Signed_TLF_404_Application.pdf PDF
Appendix_9_-_Signed_New_Constr._ _Demo._FONSI_FONPA.pdf PDF
Appendix_1_-_100__Design_Drawings.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30A (VERIFY FUSE WITH AFP PROJECT)

SINGLE LINE GENERAL NOTES

SINGLE LINE KEYED NOTES

POLE TOP FUSED CUT OUT ASSEMBLY CONDUIT POLE RISER

ELECTRICAL SINGLE LINE DIAGRAM

TFL

TFL

Coatings Engr Protective Engineer Corrosion Engineer Pavements

Engineer Roofing

Management Construction

Operations Chief of

Fire Chief

Systems Security

Police Security

Engineer Bioenvironmental

Computers Communications Safety Ground

Manager Airfield

User

Contracting Design Chief of Engineering Chief of Engineer Base Civil

OFSHEET

SHEET TITLE

Drawing Number

Project Number

DateDrafter

Project ManagerDesigner

REVISION

COORDINATION

OFFICESIGNATURE

APPROVED

FILE:

SCALE

DESIGN FIRM:

7/3/2014

MOB

BAEY 140003

Facility Number

BY/DATE

CONSTRUCT

TLF UTILITIES

UTILITIES

65% DESIGN 07/3/2014

95% DESIGN 08/27/2014

100% DESIGN 09/25/2014

10/8/2014

FOR

CONSTRUCTION

l2pmmjtt Rectangle l2pmmjtt Line l2pmmjtt Line l2pmmjtt Rectangle l2pmmjtt Line l2pmmjtt Line

File details come from the government source that posted it. Updated .