Addendum 1

View the file

Other files

File Type Posted
Appendix_16_LEED_Notebook.pdf PDF
15R0063_Amend_0005.pdf PDF
Appendix_12_-_Connection_for_Gas_Line_Sheet_C-101_BAEY_140002.pdf PDF
Addendum_1_beale_temp_lodging.pdf PDF
WR0063_CLIN_structure.pdf PDF
Appendix_2_-_Volume_1_Specifications.pdf PDF
Appendix_14-_Site_Electrical_Service_Details.pdf PDF
Atch_1_Scope_of_Work.pdf PDF
Atch_4_Contract_Acknowledgement.pdf PDF
Appendix_13-_Site_Electrical_Service_Connection.pdf PDF
Appendix_15-_Site_Electrical_Service_Specifications.pdf PDF
Appendix_4_-_Additional_Division_1_Specifications.pdf PDF
Appendix_15-_Site_Electrical_Service_Specifications.pdf PDF
15-R-0063_TLF_Amend03_sf30.pdf PDF
Appendix_14-_Site_Electrical_Service_Details.pdf PDF
Amend03-Atch_4_Contract_Acknowledgement.pdf PDF
Appendix_13-_Site_Electrical_Service_Connection.pdf PDF
Amend03-Addendum_1_beale_temp_lodging.pdf PDF
Appendix_12_-_Connection_for_Gas_Line_Sheet_C-101_BAEY_140002.pdf PDF
Atch_4_Contract_Acknowledgement.pdf PDF
Appendix_4_-_Additional_Division_1_Specifications.pdf PDF
Addendum_1_beale_temp_lodging.pdf PDF
Appendix_2_-_Volume_1_Specifications.pdf PDF
Amendment_No._0002.pdf PDF
2015_0804_15-R-0063_Amend_01.pdf PDF
Site_Visit_Directions_to_COE_Trailer.pdf PDF
Atch_1_Scope_of_Work.pdf PDF
Appendix_3_-_Volume_2_Specifications.pdf PDF
Atch_2_Supplemental_Contract_Requirements.pdf PDF
Appendix_10_-_Signed_TLF_401_Application.pdf PDF
Atch_4_Contract_Acknowledgement.pdf PDF
Appendix_4_-_Additional_Division_1_Specifications.pdf PDF
A07.1_W91238-15-R-0063_TLF_Beale_AFB.pdf PDF
Appendix_8_-_Fish_ _Wildlife_Biological_Opinion_on_TLF_MILCON.pdf PDF
Appendix_11_-_Signed_TLF_404_Application.pdf PDF
Appendix_9_-_Signed_New_Constr._ _Demo._FONSI_FONPA.pdf PDF
Appendix_1_-_100__Design_Drawings.pdf PDF
Appendix_7_-_Beale_AFB_New_Constr._ _Demo._Final_Env._Assessment.pdf PDF
Appendix_2_-_Volume_1_Specifications.pdf PDF
Appendix_6_-_Geotech_Report_-_Beale_AFB_TLF.pdf PDF
Appendix_5_-_PDF_of_Exterior_ _Interior_Sample_Color_Boards.pdf PDF
Atch_3_Davis_Bacon_Wage_Determination.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Beale AFB Temporary Lodging Facility Addendum No. 1 7/9/2015

1. For clarification and bidding: The applicable editions of codes for this projects shall follow the drawings instead of the specification on this project. Prior code editions listed in the specifications to those on Sheet G-05 will be superseded by those shown on Sheet G-005.

2. For clarification and bidding: Specification 28 31 76 under paragraph Design Services shall be amended as follows: all Fire alarm and MNS shall require the design services and review of a qualified engineer and a qualified engineer is defined as an individual meeting one of the following condition: A registered professional engineer having a Bachelor of Science or Masters of Science Degree in Fire Protection Engineering from an accredited university engineering program, plus a minimum of four years work experience in fire protection engineering; A registered professional engineer (P.E.) in fire protection engineering is defined as Registered Professional Engineer with verification of experience and at least five years of current experience in the design of the fire protection and detection systems. A NICET Level 3 Fire Alarm Technician will not be defined as a qualified engineer.

3. For clarification and bidding: All Manual Pull Station will require addressable double action type manual pull stations.

4. For clarification and bidding: Division 26 specification codes shall also follow the NFPA codes listed below.

NFPA 70 National Electrical Code NFPA 72 National Fire Alarm Code NFPA 70E Standard for Electrical Safety in the Workplace

NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems

NFPA 101 Life Safety Code

NFPA 170 Standard for Fire Safety and Emergency Symbols

Please see the code edition on sheet G-0005

5 For clarification and bidding: Ground rods shall be driven 1 ft below finished grade, per UFC 03-550-01 paragraph 3-14 DISTRIBUTION SYSTEM GROUNDING. This supersedes the specification section 26 05 26 paragraph 3.4.C Ground Rod Installation which states the ground rods shall be driven until the tops are 2 inches below finished floor or final grade unless otherwise indicated.

6 For Clarification and bidding: Per UFC 3-550-01 (February 3, 2010) paragraph 3-11.2.2

Installation, it requires to provide 3 in clearance between conduits utilizing interlocking plastic spacers for medium voltage conduit. Detail 3/E501 shall include this requirement and contractor shall bid accordingly.

7. For Clar i f icat ion and b idding : Per UFGS 33 71 02 paragraph 3.7.8.1 Encasement

Under Roads and Structures, it states that "Under roads, paved areas, and railroad tracks, install conduits in concrete encasement of rectangular cross-section providing a minimum of 3 inch concrete cover around ducts. Concrete encasement must extend at least 5 feet beyond the edges of paved areas and roads, and 12 feet beyond the rails on each side of railroad tracks. Depths to top of the concrete envelope must be not less than 24 inches below finished grade." All electric and communication conduit shall follow the above requirement.

Beale AFB Temporary Lodging Facility Addendum No. 1 7/9/2015

Contractor shall bid accordingly.

8. For Clarification and Bidding: For all fire alarm systems, Class B pathways for addressable detection, notification, and signaling circuits will be provided in accordance with UFC 3-600-01 requirements. Looped conduit system is not required to be provided as specified in specification 28 31 76 paragraph SYSTEM OPERATION. Contractor shall bid accordingly.

9. For Clarification and Bidding: The CO detectors shall be connected to the fire alarm and mass notification system. Contractor shall bid accordingly.

10. For Clarification and Bidding: The current transceiver that they are going to use on this project is a BT-XM which will connect with a EST3, Notifier NFS2-3030, Simplex 4100ES, or a Gamewell E3. Contractor shall bid accordingly.

11. For Clarification and Bidding: All plans in this solicitation are “100% Construction Set”.

The wording in the plan that said “100% design submittal for Construction” is therefore substituted and shall be replaced to read “100% Construction Set”.

12. For Clarification and Bidding: The contractor shall assume the responsibilities of being the CxA as outlined in section 01 90 00. Contractor shall bid this accordingly.