Appendix_2_-_Volume_1_Specifications.pdf
PDF 6 MB Posted
- Attached to
- Temporary Lodging Facility
- Solicitation number
- W-091238-15-R-0063
About this file
Appendix 2
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TEMPORARY LODGING FACILITY
BEALE AIR FORCE BASE
CALIFORNIA
Solicitation Number F41999-12-P-1052
AIR FORCE PERSONNEL CENTER
SERVICES DIRECTORATE
LACKLAND AIR FORCE BASE
SAN ANTONIO, TEXAS
100% RTA DESIGN SUBMITTAL
SPECIFICATIONS
Volume 1
DATE: 23 DECEMBER 2013
l2ctagt9 Cross-Out
23-DEC-13
Temporary Lodging Facility TABLE OF CONTENTS Beale AFB, CA 00 00 01- 2
06 17 53 SHOP-FABRICATED WOOD TRUSSES
06 22 00 EXTERIOR ARCHITECTURAL FIBER CEMENT CARPENTRY
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATION
DIVISION 07 - THERMAL & MOISTURE PROTECTION
07 19 00 WATER REPELLENTS
07 21 00 THERMAL INSULATION
07 25 00 WEATHER BARRIERS
07 61 00 PREFORMED SHEET METAL ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 71 00 ROOF SPECIALTIES
07 84 13 PENETRATION FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 31 16 ACCESS PANELS AND FRAMES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 80 00 GLAZING
08 83 00 MIRRORS
DIVISION 09 - FINISHES
09 24 00 PORTLAND CEMENT PLASTERING
09 29 00 GYPSUM BOARD
09 30 00 TILING
09 51 13 ACOUSTICAL PANEL CEILINGS
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 19 LUXURY VINYL TILE FLOORING
09 68 16 SHEET CARPETING
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
10 14 24 PANEL SIGNAGE
10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES
10 44 13 FIRE EXTINGUISHER CABINETS
10 51 00 WALL SURFACE PROTECTION
10 51 16 LOCKERS
10 57 20 CLOSET SPECIALTIES
DIVISION 11 - EQUIPMENT
11 31 00 RESIDENTIAL APPLIANCES
DIVISION 12 - FURNISHINGS
12 35 30 RESIDENTIAL CASEWORK
12 36 61 SOLID SURFACE COUNTERTOPS
12 48 17 ALUMINUM RECESSED WALKOFF MATS
Beale AFB, CA 00 00 01- 3
VOLUME 2
DIVISION 21 - FIRE SUPPRESSION
21 21 00 FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)
DIVISION 22 - PLUMBING
22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22 05 18 ESCUTCHEONS FOR PLUMBING PIPING
22 05 19 METERS AND GAGES FOR PLUMBING PIPING
22 05 23 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 19 PLUMBING PIPING INSULATION
22 11 16 DOMESTIC WATER PIPING
22 11 19 DOMESTIC WATER PIPING SPECIALTIES
22 11 23 DOMESTIC WATER PUMPS
22 13 16 SANITARY WASTE AND VENT PIPING
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS
22 41 00 RESIDENTIAL PLUMBING FIXTURES
22 42 16.16 COMMERCIAL SINKS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 HVAC INSULATION
23 11 23 FACILITY NATURAL-GAS PIPING
23 31 13 METAL DUCTS
23 33 00 AIR DUCT ACCESSORIES
23 34 23 HVAC POWER VENTILATORS
23 37 13 DIFFUSERS, REGISTERS, AND GRILLES
23 54 00 FURNACES
23 62 00 PACKAGED COMPRESSOR AND CONDENSER UNITS
23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS
DIVISION 26 - ELECTRICAL
26 05 13 MEDIUM-VOLTAGE CABLES
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 48 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 23 LIGHTING CONROL DEVICES
26 13 00 MEDIUM-VOLTAGE SWITCHGEAR
26 23 00 LOW-VOLTAGE SWITCHGEAR
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 13 FUSES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 43 13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
Beale AFB, CA 00 00 01- 4
DIVISION 27 - COMMUNICATIONS
27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
27 15 00 COMMUNICATIONS HORIZONTAL CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
31 31 16 TERMITE CONTROL
31 50 00 EXCAVATION SUPPORT AND PROTECTION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 13 13 CONCRETE PAVING
32 13 73 CONCRETE PAVING JOINT SEALANTS
32 14 00 CONCRETE GRID PAVEMENTS
32 17 13 PARKING BUMPERS
32 17 23 PAVEMENT MARKINGS
32 84 00 PLANTING IRRIGATION
32 92 00 TURF AND GRASSES
32 93 00 PLANTS
DIVISION 33 - UTILITIES
33 05 00 COMMON WORK RESULTS FOR UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 41 00 STORM UTILITY DRAINAGE PIPING
33 70 02 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
APPENDIX A
GEOTECHNICAL REPORT
APPENDIX B
FIRE PROTECTION DESIGN ANALYSIS REPORT
-- End of Project Table of Contents --
Bid Schedule
L2COCYC9
Line
Line
BEALE AIR FORCE BASE – TEMPORARY LODGING FACILITY
BAEY 14-3002
AFBCIF 145001
Beale Air Force Base, California
100% RTA Bid Schedule 23 December 2013
1. Contract Line Item (CLIN) 0001 – Base Bid – New TLF including Sitework
The Scope of Work consists of a new Temporary Lodging Facility (TLF)
Construction Budget: ____________________
2. Contract Line Item (CLIN) 0002 – Base Bid – Contractor Furnished FF&E
Provide Contractor Furnished Contractor Installed FF&E as noted on unit plans.
Construction Budget: ____________________
Base Bid Total:
Bid Options
3. Contract Line Item (CLIN) 0003 – APF Expense – Monument Sign
Provide monument sign as shown on AS-101
Construction Budget: _______________________
4. Contract Line Item (CLIN) 0004 – Deductive Bid Option – Provide metal roof in lieu of clerestory
Provide metal roof in lieu of clerestory structure, windows, finishes, and associated light fixtures.
Construction Budget: ___________________
L2COCYC9
Line
BEALE AFB TLF, CA
100% RTA Bid Schedule
5. Contract Line Item (CLIN) 0005 – Additive Bid Option – Add door operators on doors 201D and 401D
Add door operators on doors 201D and 401D per door schedule.
Construction Budget: ___________________
Bid Options Total:
Base Bid + Bid Option:
L2COCYC9
Line
Temporary Lodging Facility SUMMARY OF WORK Beale AFB, CA 01 01 10 - 1
SECTION 01 01 10
SUMMARY OF WORK
PART 1 - GENERAL
1.1 REQUIREMENTS INCLUDED:
A. Definitions
B. Work covered by contract documents
C. Use of premises.
D. Record drawings
1.2 DEFINITIONS:
A. Any reference throughout this specification to “Architect -Engineer” should be understood as a reference to “Contracting Officer.”
B. Any reference throughout this specification to “Owner” should be understood as a reference to “The Government.”
C. Payment provision contained in any portion of the referenced specifications and standards are to be disregarded.
D. ENGINEER - All references to the engineer shall be replaced with the Contracting Officer.
E. ARCHITECT - All references to the architect shall be replaced with the Contracting
Officer.
F. THE OWNER and OWNER'S REPRESENTATIVE - All references to the owner shall be coordinated with and approved by the Contracting Officer.
G. LANDSCAPE ARCHITECT - All references to the landscape architect shall be replaced with the Contracting Officer.
H. DOR – All references to DOR or Designer of Record shall be replaced with the
Contracting Officer.
I. SUBMITTALS - All references to ACTION SUBMITTALS shall be replaced with
"Government Approved (G)" and processed in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. All references to "INFORMATIONAL SUBMITTALS" shall be replaced with "Information Only" and processed in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. All submittals shall be made to the Contracting Officer. No other agent shall receive submittals defined in the Technical Specification Sections unless approved by the Contracting Officer.
J. QUALITY ASSURANCE - All paragraphs entitled QUALITY ASSURANCE shall be replaced with the title QUALITY CONTROL BY THE CONTRACTOR and shall be performed as defined in Section 01 45 01 USACE QUALITY CONTROL.
K. QUALITY CONTROL - All references to owner provided actions, agencies, and personnel such as those in paragraphs entitled FIELD QUALITY CONTROL, SOURCE QUALITY
Beale AFB, CA 01 01 10 - 2
CONTROL, PRECONSTRUCTION TESTING, FIELD INSPECTION, SPECIAL
INSPECTIONS, TESTING, TESTING AGENCY shall be replaced with the CONTRACTOR'S QUALITY CONTROL ORGANIZATION and shall be performed as defined in Section 01 45 01 USACE QUALITY CONTROL.
1.3 WORK COVERED BY CONTRACT DOCUMENTS:
A. The following is a summary of work for work located at Beale AFB, California. The project shall include but is not limited to:
1. Four new one story TLF buildings, two with 8 units, one with 9 units, and one with 7 units and 2 accessible units for a total of 34 units. The buildings are exempt from all provisions of the ATFP requirements. The site is located at the corner of Robert Nicoletti Way and C Street.
2. The total estimated gross footprint area for all four buildings is 44,191 gross square feet.
3. Eight units are to be pet friendly rooms. They are located in Building B. Floor finishes in these rooms are limited to tile and laminate, no carpet.
4. Buildings A and C contain back of house areas including staff restroom, housekeeping and laundry, linen storage, break room, bulk storage, janitor/supply closet, and mechanical, electrical, and communication rooms.
5. Parking lots are provided with two means of access from C Street. Sidewalks are provided from the parking lots to the entrances of the buildings.
6. A screened dumpster area is provided in the northwest corner of the site.
7. A playground area is provided in the southwest corner of the site.
8. Base officials have indicated an APF companion project will be required to bring the necessary utilities to the site and mitigate impact of the vernal pools and wetland areas as well as modify the monitoring well. The APF companion project will remove manmade components to provide a clean site.
9. Building exterior walls are composed of 2x6 wood stud walls with CMU veneer wainscot and cement plaster finish above the CMU wainscot. A pre-cast concrete sill sits on top of the CMU wainscot.
10. The roof of the building is composed of pre-manufactured wood trusses supporting sheathing and standing seam metal roof panels.
11. Windows are to be aluminum thermally broken window frames with double pane, insulated, laminated glazing. Glazing shall meet ATFP Standard 10 low level protection.
12. Exterior doors are to be aluminum storefront. Unit entry doors are to be solid core wood doors in hollow metal frames. Doors in the units are to be solid core doors in wood frames.
13. Floors are slab on grade with cast in place foundation below.
14. Interior walls are 2x4 wood construction inside the unit and 2x6 wood stud construction between the units and corridors. Unit and corridor walls are to be
Beale AFB, CA 01 01 10 - 3 minimum 1/2 hour rated and of 54 STC minimum construction. Walls will be painted.
15. In units, the ceilings will be gypsum board attached to trusses and wood frame construction; In the corridors and housekeeping area, the ceilings will be acoustical tile.
16. Floor finishes are carpet with carpet base or porcelain tile or luxury vinyl tile with cove base. Building B, the pet friendly unit has tile and vinyl tile floor finishes in the units.
17. Walls will be painted gypsum board. Chair rails will be mounted on the corridor walls. Vinyl corner guards will be installed at outside corners of the corridor. In the units, polycarbonate corner guards will be used.
18. Mechanical Equipment – Electric Cooling / Gas Heating: Each living unit will be provided with one independent vertical split system HVAC unit and grade-mounted condensing unit. The vertical furnace will be complete with blower, evaporator coil, natural gas fired heating burner, internal controls, and required accessories. The condensing unit will be grade-mounted and utilize R-410a refrigerant with compressor, condenser coils, condenser fan, expansion valves, seismic restraints, and required accessories. The indoor furnace will be installed in a mechanical closet in each living unit, and the evaporator coil will be connected to the condensing unit with insulated refrigerant lines. Condensing units will be minimum 15 SEER efficiency and will be Energy Star qualified.
19. Air Distribution System: Ductwork from the furnace to the air devices will be low pressure sheet metal duct designed and constructed to current SMACNA standards for 0.5 inch water column pressure class and seal class A. Insulated flexible duct may be used where appropriate. Ductwork will be internally lined at the discharge and return air plenums for sound attenuation if necessary. Where possible, ducts will be routed in the attic inside the insulated building envelope.
Where necessary, ductwork located in unconditioned space will be externally insulated with R-3.5 duct insulation. Transfer grilles mounted high and low on opposite sides of a single stud space or flexible jump ducts between two ceiling grilles, in addition to 1” door undercuts, will provide a pressure balancing return air path between rooms.
20. Supply air grilles will be specified as stamped face, surface mount type for installation in gypsum board ceilings or walls as required. Return and exhaust grilles will be specified as heavy duty louvered face type.
21. Ventilation: The ventilation rates for each air handling system serving public space or service areas will be specified to comply with current commercial ventilation codes at the rate of 5 cfm/occupant and 0.06 cfm/square foot of occupied area. Ventilation rates for living units comply with residential ventilation codes at the rate of 7.5 cfm/occupant and 1.0 cfm/square foot of occupied area.
22. Outside air for each living unit will be ducted from an intake, located 10 feet above grade and minimum 3 feet from any exhaust outlet or contaminant source, to the return air plenum of the furnace. Exhaust air will be ducted to a discharge location above the roof. The thermostat will cycle the furnace blower and bathroom exhaust fan to provide adequate space ventilation.
23. Service areas and corridors will use energy recovery ventilators to provide the higher required ventilation rate.
Beale AFB, CA 01 01 10 - 4
24. Temperature Controls: Each living unit will be provided with a wall-mounted electronic thermostat providing adjustable room heating and cooling set points, fan control, and automatic change-over from heating to cooling. No connections to site-wide temperature control system are anticipated.
25. Domestic Water: Domestic water piping systems will be constructed of Type “L” copper tubing and wrought copper fittings with soldered joints. The new building will have a metered water service entrance served from the on-site water main.
The cold water supply piping will be distributed above the ceiling and will be insulated for condensation control. Shut-off valves will be provided at the service entrance to each living unit.
26. Domestic hot water will be generated by an instantaneous type water heater located in each unit. The water heater will provide water at 110°F. Water heaters will use natural gas. The shower will be provided with an anti-scald shower valve.
The hot water supply piping will be distributed above the ceiling and will be insulated.
27. Sanitary Drain, Waste, Vent: Sewer waste and vent piping systems will be constructed of no-hub cast iron piping and fittings or PVC pipe with solvent weld PVC pipe fittings for above grade and PVC for below grade. The building drain(s) will be routed out to on-site sewer main(s).
28. Vent piping systems will be constructed of no-hub cast iron piping and fittings or PVC pipe with solvent weld PVC pipe fittings for above grade and PVC for below grade.
29. Fixtures specified will include countertop lavatories, flush tank water closets with elongated bowl and closed front seat, shower fittings, and double basin kitchen sinks.
30. Rough-in and hook ups will be provided for washing machines, dishwashers, and refrigerator ice makers. Janitor/Service sinks will be provided in the janitor/service areas. Washing machine hook-ups will be provided in the laundry service area as required. Hose bibbs will be provided on the outside wall near the water service entrance.
31. Each building will be metered separately; individual units will not be metered.
32. Service shall be 120-208vac, 3 phase, 4 wire to a main switchboard for each building.
33. This main switchboard will have 120-208vac, single phase distribution circuit breakers to feed the individual unit loadcenters.
34. Main switchboard shall be centrally located in each building to limit voltage drop on the feeders.
35. Site lighting will be HID type on 20 foot poles in the parking area and 12 foot poles in common areas.
36. All lighting shall use energy efficient fluorescent lamps in compact style for the unit and T8 size in common areas.
37. Low voltage communications shall be wired in the units to a media center located in the closet. These will all connected back to the main communications equipment room (CER) located in a central location of each building. All voice and data circuits shall be limited to the 300 foot rule from outlet to the CER. Fiber
Beale AFB, CA 01 01 10 - 5 optic cable shall be interconnected with all buildings on the site and terminated in rack mounted panels.
38. Communications equipment rooms shall be located and sized per the latest Air Force Guidelines.
39. Cat. 6 cabling and RG6 coax will be used in the units.
40. Coordination will be required with the facility engineer to determine the interface point with the base communications.
41. Each unit shall have code required receptacles located in all rooms. Split receptacles will be used and controlled by a wall switch for table lamp locations.
42. Cable TV outlets and telephone will be located where indicated on the floor plans.
43. Ceiling fans will be located with wall mounted on-off switch, (1) for the light portion and (1) for the fan portion.
44. Lighting fixture will be recessed using compact fluorescent (CFL) light sources where indicated. Surface mounted fixtures will be located in closets and storage areas.
45. Each unit shall have wireless internet capability.
46. Housekeeping and office areas shall use recessed fluorescent lights in ceiling grid using T8 lamps.
47. Wiring shall be type NM for the interior electrical system and type RG 6 for cable TV systems.
48. Photo-cell type smoke detectors rated at 120 volt will be provided in all bedrooms and living areas. These detectors do not operate the whole building alarm system, only localized individual units. Water flow switches at each fire sprinkler riser will activate a whole building alarm. Each unit shall have one building fire alarm notification device. A Mass Notification System will be provided.
B. Bid Options (see attachment 4 contract acknowledgement for more information):
1. CLIN 0003 is to provide the monument sign as shown in the Architectural Site Plan.
2. CLIN 0004 is to omit all cupola roof structure, windows, and framing. Provide metal roof in lieu of clerestory structure, windows, finishes, and associated light fixtures.
3. CLIN 0005 is to add door operators on Doors 201D and 401D.
C. The above description of work is for the purpose of general information only and is not intended to include and describe every feature or item of work or to define the scope of work.
PART 2 - PRODUCT (NOT USED)
PART 3 - EXECUTION (NOT USED)
-- End of Section --
L2COCYC9
Line
L2COCYC9
Line
L2COCYC9
Line
L2COCYC9
Line
L2COCYC9
Line
Polygon
Temporary Lodging Facility INTERFACING OF NEW AND EXISTING WORK Beale AFB, CA 01 03 10-1
SECTION 01 03 10
INTERFACING OF NEW AND EXISTING WORK
A. Work items shall be scheduled to avoid or minimize interference between the various trades involved.
B. In addition to demolition specified on drawings, and that specifically shown, the Contractor shall cut, move, or remove items as necessary to provide access or to allow alterations and new work to proceed. This includes:
1. Repair or removal of hazardous or unsanitary conditions.
2. Removal of items and items serving no useful purpose, such as abandoned piping, conduit and wiring, unless otherwise indicated.
3. Removal of unsuitable or extraneous materials not marked for salvage, such as abandoned furnishings and equipment, and debris such as rotted wood, rusted metals and deteriorated concrete.
4. Cleaning of surfaces and removal of surface finish as needed to install new work and finishes.
1.2 RELATED REQUIREMENTS:
A. Section 01 01 10: Summary of Work.
B. Section 01 04 50: Cutting and Patching.
C. Section 01 33 00: Submittal Procedures
D. Section 01 50 00: Construction Facilities and Temporary Controls.
E. Section 01 70 00: Contract Close Out.
1.3 ALTERATIONS, CUTTING, AND PROTECTION:
A. Assign the work of moving, removal, cutting, and patching to trades qualified to perform the work in a manner to cause least damage to each type of work, and provide means of returning surfaces to appearance of new work.
B. Perform cutting and removal work to remove minimum material necessary and in a manner to avoid damage to adjacent work. Cut finish surfaces such as concrete, tile, gypsum wallboard, plaster, wood rails, or metal surfaces in a straight line or at a natural point of division.
C. Perform cutting and patching as specified in Section 01 04 50.
D. Protect from damage by adjacent work all existing structural members, finishes, facility systems and equipment that are to remain. Also provide temporary enclosures, water-
Beale AFB, CA 01 03 10-2 proofing, heating, or other means to protect remaining existing work and new work from damage by weather or temperature/humidity extremes.
E. Provide temporary enclosures as specified in Section 01 50 00 to separate work areas from existing building, areas occupied by Government, and to provide weather protection.
PART 2 - PRODUCTS
2.1 SALVAGED MATERIALS:
A. Do not incorporate salvaged or used material in new construction except as indicated or with approval of Contracting Officer.
2.2 PRODUCTS FOR PATCHING, EXTENDING, AND MATCHING:
A. Contractor work shall:
1. Provide same products or types of construction as that in existing structure, as needed to patch, extend, or match existing work.
a. Generally, Contract Documents will not define products or standards of workmanship present in existing construction. Contractor shall determine products by inspection and any necessary testing. Workmanship standard shall be determined by use of the existing as a sample for comparison.
2. Require that patching, extending, or matching be performed as to the extent necessary to make work complete and consistent with identical standards of quality.
PART 3 - EXECUTION
3.1 PERFORMANCE:
A. Patch and extend existing work using skilled mechanics that are capable of matching existing quality of workmanship.
B. Quality of patched or extended work shall be not less than that specified for new work.
3.2 ADJUSTMENTS:
A. Where partitions are removed, patch floors, walls, and ceilings with finish materials to match existing.
1. Where removal of partitions results in adjacent spaces becoming one, rework floors and ceilings to provide smooth planes without breaks, steps, or bulkheads.
2. Where extreme change of plane of two inches or more occurs, request instructions from Contracting Officer as to method of making transition.
B. Trim and refinish relocated or existing doors as necessary to clear new floors.
3.3 DAMAGED SURFACES:
A. Patch and replace any portion of an existing finished surface which is found to be damaged, lifted, discolored, or shows other imperfections with matching material.
Beale AFB, CA 01 03 10-3
1. Provide adequate support of substrate prior to patching the finish.
2. Refinish patched portions of painted or coated surfaces in a manner to produce uniform color and texture over entire surface.
3. When existing surface finish cannot be matched, refinish entire surface to nearest intersections.
3.4 TRANSITION FROM EXISTING TO NEW WORK:
A. When new work abuts or finishes flush with existing work, make a smooth and workmanlike transition. Patched work shall match existing adjacent work in texture, color, and appearance so that the patch or transition is invisible at a distance of five feet.
1. When finished surfaces are cut in such a way that a smooth transition with new work is not possible, terminate existing surface in a neat manner along a straight line at a natural line of division, and provide trim appropriate to finished surface.
-- End of Section --
Temporary Lodging Facility CUTTING AND PATCHING Beale AFB, CA 01 04 50 - 1
SECTION 01 04 50
CUTTING AND PATCHING
PART 1 GENERAL
A. Requirements and limitations for cutting and patching of work.
1.2 RELATED REQUIREMENTS:
A. All required safety and fire permits shall be completed prior to construction start.
1.3 DESCRIPTION:
A. Execute cutting, fitting, and patching to complete work and to:
1. Fit the several parts together, to integrate with other work.
2. Uncover existing work to install new work.
3. Remove and replace defective and nonconforming work.
4. Remove samples of installed work for testing.
5. Provide openings in nonstructural elements for penetrations of mechanical and electrical work.
1.4 SUBMITTALS:
A. Submit written request in advance of cutting or alteration which affects:
1. Structural integrity of any element of project.
2. Integrity of weather-exposed or moisture-resistant element.
3. Efficiency, maintenance, or safety of any operational element.
4. Visual qualities of sight-exposed elements.
5. Work of Government.
B. Shop Drawings: Submit Shop drawings showing intent of cutting and above information.
C. Include in request:
1. Identification of project.
2. Location and description of affected work.
3. Necessity for cutting or alteration.
4. Description of proposed work, tools, equipment, and shoring to be used.
Temporary Lodging Facility CUTTING AND PATCHING Beale AFB, CA 01 04 50 - 2
PART 2 PRODUCTS
2.1 MATERIALS:
A. Same material as original installation, unless specifically indicated otherwise in the drawings and technical sections of specifications.
B. For any change in materials, submit request for substitution in accordance with Section 01
33 00.
PART 3 EXECUTION
3.1 INSPECTION:
A. Inspect existing conditions, including elements subject to damage or movement during cutting and patching.
B. After uncovering, inspect conditions affecting performance of work.
C. Beginning of cutting or patching means acceptance of existing conditions.
3.2 PREPARATION:
A. Provide supports to assure structural integrity of surroundings. Also provide devices and methods to protect other portions of project from damage.
B. Provide protection from elements for areas which may be exposed by work.
3.3 PERFORMANCE:
A. Execute work by methods to avoid damage to other work, and which will provide proper surfaces to receive patching and finishing.
B. Restore damages with new products in accordance with contract requirements.
C. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersections. Refinish entire unit when the surface is part of an assembly.
Temporary Lodging Facility REGULATORY REQUIREMENTS Beale AFB, CA 01 06 00 - 1
SECTION 01 06 00
REGULATORY REQUIREMENTS
1.1 INDUSTRY STANDARDS
A. The latest editions of the following codes shall apply to this work:
1. International Building Code
2. International Mechanical Code.
3. International Plumbing Code.
4. International Electric Code
5. National Fire Protection Association.
1.2 U.S. GOVERNMENT AGENCY PUBLICATIONS
A. US GOVERNMENT AGENCY PUBLICATIONS: Application for copies should be addressed to the Superintendent of Documents, Government Printing Office, and Washington, DC 20402.
1. MIL-HDBK-1190, (MILITARY HANDBOOK 1190), Facility Planning and Design, Part II, Technical Guidance, September 1, 1987
2. OSHA, Occupational Safety and Health Act Requirements.
3. Uniform Federal Accessibility Standards (UFAS).
4. Unified Facilities Criteria (UFC)
B. AIR FORCE PUBLICATIONS: Application for copies should be addressed to the
Superintendent of Documents, Government Printing Office, Washington, DC 20402.
1. AFI 32-1021, Planning and Programming of Facility Construction Projects.
2. AFI 32-1023, Design and Construction Standards and Execution of Facility
Construction Projects.
3. Air Force Occupational Safety and Health Requirements.
1.3 REFERENCE DOCUMENTS
A. Code of Federal Regulations
1. 29 CFR 1910, “Occupational Safety and Health Administration General Industry Standards”.
2. 29 CFR 1910.134, “Respiratory Protection”.
3. 29 CFR 1910.1000, “Air Contaminant - Permissible Exposure Limits”.
4. 29 CFR 1910.1020, “Employee Access to Exposure and Medical Records”.
Temporary Lodging Facility REGULATORY REQUIREMENTS Beale AFB, CA 01 06 00 - 2
5. 20 CFR 1926, “Occupational Safety and Health Administration Construction Industry Standards”.
6. 29 CFR 1926.59, “Hazard Communication”.
7. 29 CFR 1926.62, “Lead Exposure in Construction; Interim Final Rule”.
8. 40 CFR 261, “Identification and Listing of Hazardous Waste”.
9. 40 CFR 262, “Standards Applicable to Generators of Hazardous Waste”.
10. 40 CFR 263, “Standards Applicable to Transporters of Hazardous Waste”.
11. 40 CFR 264, “Standards for Owners and Operators of Hazardous Waste
Treatment, Storage, and Disposal Facilities”.
12. 40 CFR, “Interim Status Standards for Owners and Operators of Hazardous
Waste Treatment, Storage, and Disposal Facilities”.
13. 40 CFR 268, “Land Disposal Restrictions”.
14. 40 CFR 300, “National Oil and Hazardous Substances Pollution Contingency Plan”.
15. 40 CFR 302, “Designation, Reportable Quantities, and Notification”.
16. 40 CFR 50, Appendix G, “Reference Method for the Determination of Lead in
Suspected Particulate Matter Collected from Ambient Air”
B. National Institute for Occupational Safety and Health
1. NIOSH Method 7082, “Lead”.
C. American Conference of Governmental Industrial Hygienists Threshold Limit Values for
Chemical Substances and Physical Agents and Biological Exposure Indices:
1. Heat Stress Guidelines
D. EPA (Environmental Protection Agency) Publications:
1. SW-846, Test Methods for Evaluating Solid Waste - Physical/ Chemical Methods
2. EPA Method 3050, “Acid Digestion of Sediments, Sludges, and Soils”.
E. National Institute of Building Sciences (NIBS) Guidelines.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION NOT USED
Temporary Lodging Facility SAFETY REQUIREMENTS Beale AFB, CA 01 07 00 - 1
SECTION 01 07 00
SAFETY REQUIREMENTS
1.1 GENERAL:
A. This Section specifies the health and safety requirements to be enforced during the performance of the work specified herein.
1.2 SUBMITTALS
A. Safety Program: The Contractor shall submit a Safety Program in accordance with paragraph 1.07.
1.3 RESPONSIBILITY:
A. The Base Ground Safety Officer or his representative will attend preconstruction conferences to brief contractors on pertinent safety regulations and to provide guidance for safe operations during contract performance. Local safety guidance will be furnished to the Contractor for briefing his personnel.
B. It is the responsibility of any person who discovers a safety violation to report it immediately.
C. The Contractor shall perform whatever work is necessary for safety and shall be solely and completely responsible for conditions of the job site, including care and safety of all property and safety of all persons whether or not employed by the Contractor during the Contract Period.
1. This requirement shall apply continuously and not be limited to normal working hours and shall apply to all activities both directly and indirectly associated with all work covered by the Contract.
2. These requirements do not supersede, but are in addition to any federal, OSHA, state, or local regulations.
3. If a conflict occurs between these requirements and current regulations, the more stringent shall apply.
D. The Contractor shall, at all times, provide proper facilities for safe access to the Work by authorized Government officials.
E. It shall be the responsibility of the Contractor to be familiar with the required health and safety regulations in the performance of this work.
F. It is the Contractor’s responsibiilty to ensure that:
1. Safety equipment is available for Contractor personnel and is properly maintained.
2. Use of personal protective equipment and clothing by personnel entering the site is enforced.
Beale AFB, CA 01 07 00 - 2
3. Communication with all Contractor Personnel, the Contracting Officer, and other personnel regarding safety matters is maintained.
4. Corrective actions are implemented immediately in the event of emergency or unsafe conditions.
1.4 APPLICABLE PUBLICATIONS:
A. Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities, U.S. Department of Health and Human Services, October 1985
B. Environmental Protection Agency (EPA), Standard Operating Safety Guidelines, Office of
Emergency and Remedial Response, Hazardous Response Support Division, November 1985.
C. American National Standards Institute (ANSI), American National Standard Practices for
Respiratory Protection, 1980.
D. U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.
E. 29 CFR 1910 and 29 CFR 1926.
F. All Beale Air Force Base and State of California Traffic Laws and Regulations.
1.5 EMERGENCY AND FIRST AID REQUIREMENTS
A. The Contractor shall prearrange for emergency medical care services at a nearby medical facility and establish emergency routes.
B. The Contractor shall establish communication links with health and emergency services to inform them of any emergency situations that may arise.
C. In the event of any emergency associated with or resulting from Work at this site, the
Contractor shall without delay:
1. Cease Work activity on the site
2. Take diligent action to remove or otherwise minimize the cause of the emergency
3. Render full assistance to Local authorities to remedy any impact on local residents or property.
4. Alert the Contracting Officer and Government.
5. Institute whatever measures are necessary to prevent any repetition of the conditions or actions leading to or resulting in the emergency.
1.6 PERSONAL PROTECTION EQUIPMENT
A. The Contractor shall provide all on-site Contractor and Subcontractor personnel with appropriate personal safety equipment.
1.7 SAFETY PROGRAM
A. The Contractor shall provide, no later than five days after receiving Notice of Award, four
(4) copies of their written safety program to the Contracting Officer for review. No
Beale AFB, CA 01 07 00 - 3 construction shall commence until the Contractor’s Safety Program has been reviewed by the 9th RW Safety Office.
B. The Safety Program shall include detailed description of the Contractor’s Safety
Organization, responsibilities, method of program implementation and description of methods for corrective measures.
C. The Contractor shall not deviate from their written Safety Program.
D. All Subcontractors shall follow the Contractor’s Safety Program.
PART 3 - EXECUTION (NOT USED)
Temporary Lodging Facility REFERENCE STANDARDS Beale AFB, CA 01 09 00 - 1
SECTION 01 09 00
REFERENCE STANDARDS
A. Applicability of Reference Standards.
B. Provision of Reference Standards at Site.
C. Acronyms used in Contract Documents for Reference Standards. Source of Reference
Standards.
1.2 QUALITY ASSURANCE:
A. For products or workmanship specified by association, trade, or Federal Standards, complies with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. The latest standard shall be used, except when a specific date is specified.
C. When required by individual Specifications section, obtain copy of standard. Maintain copy at jobsite during submittals, planning, and progress of the specific works until completion.
1.3 SCHEDULE OF REFERENCES:
AABC Associated Air Balance Council 1000 Vermont Avenue NW Washington, DC 20005
ACI American Concrete Institute Box 19150 Redford Station Detroit, MI 48219
ADC Air Diffusion Council 435 North Michigan Avenue Chicago, IL 60611
AISC American Institute of Steel Construction 1221 Avenue of the Americas New York, NY 10020
AITC American Institute of Timber Construction 1757 K Street N.W.
Washington, D.C.
APA America Plywood Association 7011 South 19th Street P.O. Box 11700 Tacoma, WA 98411
Beale AFB, CA 01 09 00 - 2
AMCA Air Movement and Control Association 30 West University Drive Arlington Heights, IL 60004
ANSI American National Standards Institute 1430 Broadway New York, NY 10018
ASHRAE American Society of Heating, Refrigerating, and Air-Conditioning Engineers 1791 Tullie Circle NE Atlanta, GA 30329
ASTM American Society of Testing and Materials 1916 Race Street Philadelphia, PA 19103
AWI Architectural Woodwork Institute 2310 S. Walter Reed Drive Arlington, Virginia 22206
AWS American Welding Society 2501 NW 7th Street Miami, FL 33125
CS United States Department of Commerce Standard
FS Federal Specification General Services Administration Specifications and Consumer Information Distribution Section (WFSIS) Washington Navy Yard, Bldg. 197 Washington, DC 10407
MAG Maricopa Association of Governments 1820 West Washington Street Phoenix, Arizona 85007
MCDH Maricopa County Department of Health Services Department of Health Services 1845 E. Roosevelt Street Phoenix, Arizona 85007
NBS National Bureau of Standards
NEMA National Electrical Manufacturers’ Association 2101 L Street NW Washington, DC 20037
NFPA National Fire Protection Association 60 Batterymarch Street Boston, MA 02110
NWMA National Woodwork Manufacturers’ Association
Beale AFB, CA 01 09 00 - 3
OSHA Occupational Safety and Health Administration U.S. Department of Labor c/o Superintendent of Documents U.S. Government Printing Officer Washington, DC 20402
SMACNA Sheet Metal and Air-Conditioning Contractors’ National Association 8224 Old Court House Road Vienna, VA 22180
UL Underwriters’ Laboratories, Inc.
333 Pfingston Road Northbrook, IL 60062
IBC International Building Code International Conference of Building Officials 5360 South Workman Mill Road Whittier, CA 90601
UPC International Plumbing Code International Conference of Building Officials 5360 South Workman Mill Road Whittier, CA 90601
WCLIB West Coast Lumber Inspection Bureau Box 23145 Portland OR 97223
WWPA Western Wood Products Association 522 SW 5th Ave Yeon Bldg Portland, OR 97204-2122
PART 3 - EXECUTION (NOT USED)
26-DEC-13
Temporary Lodging Facility WORK RESTRICTIONS Beale AFB, CA 01 14 00 - 1
SECTION 01 14 00
WORK RESTRICTIONS
1.1 DEFINITIONS
1.1.1 State
"State" when used in in the Contract Documents references to states within the United States of America.
1.2 SUBMITTALS
A. Preconstruction Submittals: Submit the following:
1. Purchase orders
2. List of Contact Personnel
3. Personnel List
4. Vehicle List
5. Statement of Acknowledgement Form SF 1413
1.3 SPECIAL SCHEDULING REQUIREMENTS
A. Temporary construction facilities and controls shall be ready for operation as approved by Contracting Officer before work is started on the project site.
B. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
C. The Base will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the activity.
D. Permission to interrupt any Activity roads, railroads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.4 CONTRACTOR ACCESS AND USE OF PREMISES
A. Activity Regulations: Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
1. Subcontractors and Personnel Contacts: Furnish a list of contact personnel of the
Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
2. Identification Badges: Identification badges, if required, will be furnished without charge. Application for and use of badges will be as directed. Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at
Beale AFB, CA 01 14 00 - 2 http://www.uscis.gov/files/form/I-9_IFR_02-02-09.pdf. Immediately report instances of lost or stolen badges to the Contracting Officer.
3. Employee List: The Contractor shall provide to the Contracting officer, in writing, the names of two designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract. The Contractor shall adhere to the Base requirements.
4. Personnel Entry Approval: Failure to obtain entry approval will not affect the contract price or time of completion.
5. No Smoking Policy: Smoking is prohibited within and outside of all buildings except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
B. The use of yellow, yellow-orange, red and magenta materials for the following purposes is prohibited: sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding of identification marks on tools, and boundary markers such as ribbons. Obtain Contracting Officer's prior approval for use of such colored materials for other purposes, such as buried vapor barrier membranes.
1.5 SECURITY REQUIREMENTS
Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," and "FAC 5252.236- 9301, Special Working Conditions and Entry to Work Area," apply.
1.6 CITIZENSHIP STATUS
A. No employee or representative of the Contractor will be admitted to the work site unless he furnishes satisfactory proof that he is a citizen of the United States, or is an alien legally authorized to work in USA, or is specifically authorized admittance by the Contracting Officer.
B. Personnel Information - All duty authorized non-military personnel utilizing the base are required to have in their possession at all times a Base Entry Pass. A minimum of 5 working days prior to start of work, the Contractor shall furnish to the Base Security Department, via the Contracting Officer, the following information for Contractor and subcontractor personnel required to enter the Base:
1. Name of the company
2. Name of the employee
3. Social Security Number
4. Proof of U.S. citizenship
5. A completed application for Base Entry Pass
C. Proof of Citizenship - Proof of citizenship will consist of copies of birth certificates, military dependent ID card, naturalization papers, or green card which will be returned once entered into the security computer system. The Security Department will run a criminal history check on Contractor employees and, as a condition of employment, each employee must willingly sign an authorization form allowing the Security Department to conduct the criminal history check. Subject authorization form will be maintained on file by the Security Officer. Based on proof of U.S. citizenship and the results of the criminal history check, the Security Officer will or will not grant entry to the Station. If entry is denied, the Contractor will be immediately notified.
http://www.uscis.gov/files/form/I-9_IFR_02-02-09.pdf
Beale AFB, CA 01 14 00 - 3
D. Contractor Responsibility for Employees - The Contractor is responsible for employees under his employment. Ensure that employees are familiar with and obey station traffic, safety, and security regulations.
E. Motor Vehicle Operation - Ingress and egress of personnel will be subject to the security regulations of the Station.
1. All personnel must be made aware of the base speed limits:
Housing areas 5 mph Parking areas 10 mph All other areas 25 mph (unless otherwise posted)
2. Parking is in designed areas only, between two white lines. No parking is permitted in fire lanes, on seeded areas, in parking slots reserved for general officers and handicapped personnel.
3. Traffic accidents should be reported immediately to the Security Police Law
Enforcement Desk.
4. All personnel entering the installation are subject to random vehicle inspections.
The purpose of these inspections is to detect the theft of Government and private property, and to detect contraband or illegal drugs.
5. Required Information on Privately Owned Vehicles - Advise company employees who desire to use their privately owned vehicles to personally bring the vehicle, vehicle registration, copy of vehicle insurance policy, valid state inspection documentation, and driver's license to the Visitor Control Center at the South Gate.
6. Access to Restricted Areas - Base entry passes allow access to designated areas on the installation only. Entry into off limits areas is prohibited unless the contract requires it.
7. Current Information - Contractors will be responsible for keeping the vehicle and employee lists current, and for securing and returning identification cards belonging to terminated employees to the Contracting Officer.
8. Base Entry Passes - Contractor base entry passes will be valid for each Base entry from 6:00 a.m. to 6:00 p.m., Monday through Friday only, unless prior arrangements have been made with the Contracting Officer. The passes are the property of the base and are to be returned to Visitors Control Office upon completion of the contract or termination of employment. Replacement passes must be requested in writing and be accomplished by written authorization from the Contracting Officer.
9. Providing Information to Subcontractors - Prime Contractors shall be responsible for ensuring that subcontractors receive security information. Failure to comply with the specified requirements will result in prime contractors and subcontractors being denied access to the construction site.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
Temporary Lodging Facility ADMINISTRATIVE REQUIREMENTS Beale AFB, CA 01 30 00 - 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
1.1 SUMMARY
A. This Section includes:
1. Project management and coordination.
2. Construction progress documentation.
3. Submittal procedures and general requirements for Submittals.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
15 CFR 772 Definition of Terms
15 CFR 773 Special Licensing Procedures
1.3 SUBMITTALS
The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
A. Submit five sets of color boards within 90 calendar days after Contract Award. Each set of boards shall include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. The samples shall be presented on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts. Modules shall be designed to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, samples not less than 12 inches square shall be submitted with the board. If more space is needed, more than one board per set may be submitted. The Contractor shall certify that he has reviewed the color samples in detail and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples shall not relieve the Contractor of the responsibility to submit samples required elsewhere herein.
B. Photographically document site conditions prior to start of construction operations.
Submit monthly, and within one month of the completion of work, digital photographs showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit a view location sketch indicating points of view.
Submit with the monthly invoice two sets of digital photographs each set on a separate CD-R, cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Photographs for each month shall be in a separate monthly directory and each file shall be named to indicate its location on the view location sketch.
The view location sketch shall also be provided on the CD as digital file. All file names shall include a date designator]. Cross reference submittals in the appropriate daily report. Photographs shall be provided for unrestricted use by the Government.
Beale AFB, CA 01 30 00 - 2
C. Register this project with the United States Green Building Council in the LEED For Homes 2009 Edition Rating System;
D. Contact and contract a LEED For Homes Green Rater and LEED for Homes Provider.
LEED for Homes Provider to provide LEED related inspections. See Section 01 33 29 LEED Documentation, LEED for Homes Reference Guide, and LEED for Homes Notebook for more information.
1.4 MINIMUM INSURANCE REQUIREMENTS
Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:
A. Comprehensive general liability: $500,000 per occurrence
B. Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage
C. Workmen's compensation as required by Federal and State workers' compensation and occupational disease laws.
D. Employer's liability coverage of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .