SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER
ATTACHMENT TITLE
J-0200000-01 DEFINITIONS AND ACRONYMS
J-0200000-02 WAGE DETERMINATIONS / INVOICING PROCEDURED
J-0200000-03 REQUIRED CONFERENCES AND MEETINGS
J-0200000-04 DIRECTIVES, INSTRUCTIONS, AND REFERENCES
J-0200000-05 FORMS
J-0200000-06 GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
J-0200000-07 SERVICE PROVIDER INFORMATION
J-0200000-08 ASSET INFORMATION
J-0200000-09 NAVFAC MAXIMO DATA REPORTING
J-0200000-10 NAVFAC MAXIMO SYSTEM ACCESS PROCEDURES
J-0200000-11 SECURITY REQUIREMENTS
J-0200000-12 CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG
J-0200000-13 EXHIBIT LINE ITEM NUMBERS
ATTACHMENT J-0200000-01
DEFINITIONS AND ACRONYMS
Definition Description Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Business Management System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
Component Inventory Management Unit
(CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Contracting Officer
(KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or SPAR.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Definition Description Electronic Operation And Maintenance And Support Information (eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility A building or structure designed and created to serve a particular function.
Fixed Burden Rate
(FBR)
The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Infrastructure Condition Assessment Program
(ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Definition Description Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Load Handling Equipment
A term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used WITH RIGGING to raise, lower and/or horizontally move a load.
Maintenance And Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Performance Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract.
Property Management Program
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance
(QA)
The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
Real Property Inventory Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.
Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.
An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
Definition Description Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Unit Priced Labor (UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity;
costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
Acronym Title ACO Administrative Contracting Officer BW Biweekly CDR Contract Discrepancy Report CIA Controlled Industrial Area CIMU Component Inventory Management Unit CMMS Computerized Maintenance Management System COR Contracting Officer Representative COR Condition of Readiness DBH Diameter at Breast Height DCR Direct Condition Rating DoD Department of Defense DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract FSCM Facility Support Contract Manager GIS Geospatial Information System GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials HCA Head Contracting Agency ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MAP Maintenance Action Plan MDI Mission Dependency Index MEP Mechanical, Electrical and Plumbing MPAS Monthly Performance Assessment Summary MRI Mission Readiness Index MSDS Material Safety Data Sheets NAVFAC Naval Facilities Engineering Command NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet PEO Program Executive Officer PM Project Manager PM Planned Maintenance or Preventative Maintenance PRCSP Permit Required Confined Space Program
Acronym Title PWS Performance Work Statement PWO Public Works Officer Q Quarterly QC Quality Control RPIE Real Property Inventory Equipment RSL Remaining Service Life SC Security Clearances SM Semimonthly SPAR Senior Performance Assessment Representative TE Technical Exhibit VIQ Variation in Quantity WBS Work Breakdown Structure
ATTACHMENT J-0200000-02
WAGE DETERMINATIONS / INVOICING PROCEDURED
INVOICING PROCEDURED:
All invoices shall be submitted using the Wide Area Work Flow (WAWF) electronic invoicing system in accordance with FAC Clause 5252.232-9301 Invoicing Procedures Electronic (NAVFAC SW March 2009).
Pay Office
The designated paying office will be determined upon award of this contract. Invoices shall be submitted to the office identified in Block 7 of the DD Form 1155, “Order for Supplies or Services”.
Content of Invoices
The following information must be shown on the invoice to be accepted and processed for payment:
a. Contractor’s name and address on original company letterhead
b. Contractor’s TIN#, CCR Expiration date, CAGE Code, and DUNS#
c. Contract number/Task Order number
d. Period of Performance or completion date. Note: Date of invoice must be after receipt of product by the Government.
e. Brief description of service provided.
f. Amount
g. Amount previously billed
h. Amount remaining
i. Payment terms (i.e. net 30 days).
j. Invoice number.
k. Contract Line Item number with exhibit line numbers (as applicable)
l. Original signature.
Payment shall be based on invoices submitted by the contractor for completed work and made upon receipt of a proper invoice and Government acceptance of the respective services.
Submission of Invoices:
a. Invoices not completed in accordance with contract requirements shall be returned to the Contractor for correction of deficiencies.
ATTACHMENT J-0200000-03
REQUIRED CONFERENCES AND MEETINGS
ANNEX/ SPEC ITEM DESCRIPTION DATE/TIME FRAME
0200000-2.3.3.1 Pre-Performance Conference Determined by KO.
0200000-2.3.3.1 Partnering/ Formal Meetings As required. Determined by
SPAR/COR/KO.
0200000-2.3.3.1
Site Visits As required. Determined by
SPAR/COR/KO.
ATTACHMENT J-0200000-04
DIRECTIVES, INSTRUCTIONS, AND REFERENCES
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Mandatory
P.L. 91-596 Occupational Safety and Health Act
ASME A17.1 Safety Code for Elevators and Escalators Mandatory
ASME A17.2.1 Inspector's Manual for Electric Elevators Mandatory
ASME A17.2.2 Inspector's Manual for Hydraulic Elevators Mandatory
ASME A17.2.3 Inspector's Manual for Escalators and Moving Walks Mandatory ASME A17.3 Safety Code for Existing Elevators and Escalators Mandatory ASME A18.1 Safety Standard for Platform Lifts and Stairway Chairlifts Mandatory ASME B20.1 Safety Standard for Conveyors and Related Equipment Mandatory ASME publications may be ordered by contacting:
The American Society of Mechanical Engineers 22 Law Drive Fairfield, NJ 07004 Phone 800-843-2763
FAX 973-882-5155
E-mail - Infocentral@asme.org
Website - http://www.asme.org
ASME a17.2 Inspection of Vertical Transportation Equipment.
NAVFAC Maintenance and Operations Manuals (MOs) may be obtained from the website https://www.wbdg.org/ffc/navy-navfac/maintenance
Mandatory
NFPA 70 National Electric Code NFPA 70 may be ordered by visiting the website http://www.nfpacatalog.org/
NOSC 5100.5c Occupational Safety and Health Manual (NOSC only) mailto:Infocentral@asme.org https://www.wbdg.org/ffc/navy-navfac/maintenance http://www.nfpacatalog.org/
ATTACHMENT J-0200000-05
FORMS
Vertical Transportation Equipment (VTE) Test Report
Contractor shall provide a VTE Test Report of all testing and inspection in compliance with ASME A17.1
Provided by the Contractor for Government review and acceptance.
5-Year “Full Load” Elevator Safety Test
Contractor shall provide a 5-Year “Full Load” Elevator Safety Test report in compliance with ASME A17.1
Contractor Incident Report System
Provided as a separate attachment. (Open in Adobe Acrobat to enable fillable fields)
Contractor’s Quality Control and Production Report
Quality Control Inspection Checklist
Safety Inspection Checklist
On the first of each month the Contractor shall submit a report to the KO of all Emergency Service Orders performed at all applicable locations, in the format shown below:
SECTION F SUBMITTAL TRANSMITTAL FORM
PART 1 – FOR CONTRACTOR USE
From (Contractor): To ACO and PAR:
Contract No: N62473- Annex/J No: Spec Item No:
The following deliverable is submitted in accordance with Section F (Spec Item Title):
It is hereby certified that the deliverable in this submittal is that proposed to be incorporated into
Contract: N62473-
Task Order:
Certified by QCM (Signature):
Date:
PART 2 – FOR OICC/FSC USE
From FSC Reviewer:
To ACO:
This submittal has been reviewed. The submittal is found to be:
Acceptable Unacceptable
If the submittal is found “Unacceptable” the FSC Reviewer shall provide an explanation and recommendation:
Certified by FSC Reviewer (Signature):
ATTACHMENT "A"
CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO
1 Does the operator know the weight of the load to be lifted?
2 Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?
3 Is the crane level and on firm ground?
4 Are outriggers required?
5 If so, are outriggers fully extended and down, and the load off the wheels?
6 If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?
7 If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?
Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?
9 Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?
10 Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?
11 Is the lift swing path clear of obstructions?
12 If rotation of the load being lifted is hazardous, is tag line or restraint line being used?
13 Are personnel prevented from standing or passing under a suspended load?
14 Are personnel prevented from entering the load fall zone?
15 Is the crane operator's attention diverted?
16 Are proper signals being used at all times?
17 If radio communications are used is the frequency isolated to the crane team?
18 Do the operations ensure that side and tip loading is prohibited?
19 Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?
20 If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?
21 Is the lift a critical lift?
22 If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?
23 Is Attachment "A" current, filled out completely, and posted in the crane?
Contractor Name (Print Legibly):
Contractor Name (Signature):
Location: Date:
CRANE AND RIGGING GEAR ACCIDENT REPORT
Accident Category: Crane Accident Rigging Gear Accident From:
UIC:
To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709
Activity:
Report No:
Crane No:
Category:
Accident Date:
Time: hrs:
Category of Service: SPS GPS Crane Type:
Crane Manufacturer:
Was Crane/Rigging Gear Being Used in SPS: Yes No
Was Crane/Rigging Gear Being Used in a Complex Lift/Critical Non-Crane Rigging Operation:
Location:
Weather:
Crane Capacity:
Hook Capacity:
Weight of Load on hook:
Fatality or Permanent Disability? Yes
N
Material/Property Cost Estimate:
Reported to NAVSAFECEN? Yes
N
Accident Type:
Personal Injury Overload Derail Damaged Rigging Gear
Load Collision Two Blocked Dropped Load Damaged Crane
Crane Collision Damaged Load Other:
Specify
Cause of Accident:
Improper Operation Equipment Failure Inadequate Visibility
Improper Rigging Switch Alignment inadequate Communication
Track Condition Procedural Failure Other:
Specify
Chargeable to:
Crane Walker Rigger Operator
Maintenance Management/Supervision Other:
Specify
Crane Function:
Travel Hoist Rotate Luffing Telescoping Other N/A Is this accident indicative of a recurring problem? Yes No If yes, list Accident Report Nos :
ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE
ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure List immediate and long term
Preparer:
Phone:
E-mail:
Code:
Concurrences: (Include Code, Signature and Date)
Certifying Official (Crane Accident Only):
ATTACHMENT J-0200000-05
FORMS
CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS
This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.
1. Accident Category: Indicate either crane accident or rigging gear accident.
2. From: The naval activity that is responsible for reporting the accident and UIC number.
3. Activity: The naval activity where the accident took place.
4. Report No.: The activity assigned accident number (e.g., 95-001).
5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.
6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.
7. Accident Date: The date the accident occurred.
8. Time: The time (24 hour clock) the accident occurred (e.g., 1300).
9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).
10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.
11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.
12. SPS: Was the crane or rigging gear being used in an SPS lift?
13. Complex lift: Was the crane or rigging gear being used in a complex lift?
14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).
15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).
16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.
17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.
18. Weight of Load on Hook: If applicable, the weight of the load on the hook.
19. Fatality or Permanent Disability?: Check yes or no.
20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.
21. Reported to NAVSAFECEN?: Self-explanatory.
22. Accident Type: Check all that apply.
23. Cause of Accident: Check all that apply.
24. Chargeable to: Check all that apply.
25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.
26. Is this a recurring problem?: Check yes or no. Identify any other similar accidents.
27. Situation Description/Corrective Actions: Self-explanatory.
28. Preparer: Self-explanatory.
29. Concurrences: Self-explanatory.
30. Certifying Official (Crane Accidents Only): Self-explanatory.
31. Brief Description: No more than one paragraph summarizing the resultant incident.
32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.
33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term Corrective Actions are those actions taken that will allow return to work in short time frame. Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.
CRANE AND RIGGING GEAR NEAR MISS REPORT
Near Miss Category: Crane Near Miss Rigging Gear Near Miss
From:
UIC:
To: Navy Crane Center Bldg 491 NNSY Portsmouth, VA 23709 Fax (757) 967-3808 nfsh_ncc_accident@navy.mil
Activity: Report No:
Crane/Equipment No: Category: Near Miss Date: Time:
hrs
Category of Service:
SPS GPS Crane /Equipment Type:
Crane/Equipment Manufacturer:
Location: Weather:
Crane/Equipment Capacity: Hook Capacity: Weight of Load on Hook:
Is this near miss indicative of a recurring problem? Yes No
If yes, list report numbers:
In the space below, include a brief description of the event and corrective actions taken to prevent recurrence:
Preparer:
Phone and email
Code Date
CRANE AND RIGGING GEAR NEAR MISS INSTRUCTIONS
This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.
1. Near Miss Category: Indicate either crane or rigging gear near miss.
2. From: The naval activity that is responsible for reporting the near miss and UIC number.
3. Activity: The naval activity where the near miss took place.
4. Report No.: The activity assigned near miss number (e.g., 95-001).
5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.
6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.
7. Near Miss Date: The date the near miss occurred.
8. Time: The time (24 hour clock) the near miss occurred (e.g., 1300).
9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).
10. Crane Type: The type of crane involved in the near miss (e.g., mobile, bridge), if applicable.
11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.
12. Location: The detailed location where the near miss took place (e.g., building 213, dry dock 5).
13. Weather: The weather conditions at time of the near miss (e.g., wind, rain, cold).
14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.
15. Hook Capacity: The capacity of the hook involved in the near miss at the maximum radius of the operation, if applicable.
16. Weight of Load on Hook: If applicable, the weight of the load on the hook.
17. Is this a recurring problem?: Check yes or no. Identify any other similar near misses or accidents.
18. Situation Description/Corrective Actions: Self-explanatory.
19. Preparer: Self-explanatory.
ATTACHMENT J-0200000-06
GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES
GOVERNMENT FURNISHED FACILITIES (GFF)
If deemed necessary, and if available, the Contractor may be provided with a workspace / office at each Installation under this Contract. If the Contractor chooses to utilize this area, he or she will be responsible for all facility maintenance and service costs in this area for the duration of the contract. The Contractor shall also be fiscally liable for any damage their personnel cause to the building beyond normal wear and tear.
The Contractor shall obtain written approval from the Contracting Officer prior to making any modifications or alterations to the space or to available utilities. Any such modifications or alterations approved by the Government will be made at the expense of the Contractor. At the completion of the contract the space shall be returned to the Government free of excess materials, free of vegetation and free of all other debris.
(OR)
If space is available, the Contractor may set up a portable temporary office trailers and storage containers at no cost to the Government. The temporary office trailers and containers shall be maintained in a sightly appearance. The space shall meet or exceed all local installation requirements for secure fencing and signage. The Contractor shall be responsible and accountable for the provided space and shall take the necessary actions to prevent fire hazards, odors, and vermin. The space shall be maintained in a neat and sightly appearance at all times. Where required, the Contractor shall perform landscape maintenance as part of the agreement to occupy the space.
GOVERNMENT FURNISHED EQUIPMENT (GFE)
No GFE shall be furnished by the Government under this Contract.
GOVERNMENT FURNISHED UTILITIES (GFU)
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines.
Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
GOVERNMENT FURNISHED SERVICES (GFS)
No GFS shall be provided by the Government under this Contract.
ATTACHMENT J-0200000-07
SERVICE PROVIDER INFORMATION
Provided as a separate document.
ATTACHMENT J-0200000-08
ASSET INFORMATION
ATTACHMENT J-0200000-09
NAVFAC MAXIMO DATA REPORTING
PURPOSE AND OVERVIEW:
The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for NAVFAC MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated NAVFAC business process and procedures for how data is to be submitted.
GENERAL TYPES OF DATA:
Work Order Data
Work order data includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program or as part of IMP), and work issued as IDIQ. Specific NAVFAC MAXIMO fields required for work order data are listed on the Service Provider Information spreadsheet provided in J-0200000-07.
Asset Data
Asset data includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected. Specific NAVFAC MAXIMO fields required for asset data are listed on the Asset Information spreadsheet provided in J- 0200000-08. When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset.
Condition Assessment Data
Condition assessment data includes all necessary information for the accurate condition rating of all assets in support of the Infrastructure Condition Assessment Program (ICAP). Specific NAVFAC MAXIMO fields required for condition assessment data are listed on the Characteristic Meter Reading Information spreadsheet provided in Attachments J-0200000-07 and J-0200000-08.
METHOD FOR DATA SUBMISSION:
The Contractor shall provide work order, asset, specification, and condition assessment data using the method as specified in Section C. Additional details are provided below for submission of data via the Direct Entry method.
Direct Data Entry
In this method a Contractor obtains authorized access as specified in Section C and directly enters data into NAVFAC MAXIMO. Detailed guidance on NAVFAC MAXIMO System Access Procedures is provided in J- 0200000-10. All reference value verification is provided by NAVFAC MAXIMO.
All Contractors who obtain authorized access will be granted entry only within the applicable NAVFAC MAXIMO screens necessary to enter work order, asset, specification, and condition assessment data. Contractors are only authorized to view, edit, report or otherwise access data related to their work. Any unauthorized attempt to do otherwise may be grounds for removal of access privileges. Contractors will be assigned a specific work center code for their work and shall utilize this code for all such data entry and retrieval.
ATTACHMENT J-0200000-10
NAVFAC MAXIMO SYSTEM ACCESS PROCEDURES
Purpose and Overview
In order to obtain access to NAVFAC MAXIMO for direct entry, Contractor personnel must obtain a Common Access Card (CAC) with DoD PKI certificates for the access to Government Information Systems (IS) and must have an account established within NAVFAC MAXIMO.
CAC Application Procedures Once the Contractor has provided the list of personnel requiring MAXIMO accounts, the Government Trusted Agent (TA) will sponsor the Contractor personnel initiating the process to obtain a CAC. Contractor personnel must submit an application for the CAC within the Trusted Associate Sponsorship System (TASS). Contractor personnel must log into TASS within seven days of the application's approval and must complete the application for a CAC within 30 days of the initial login. Refer to Attachment J-0200000-10a NAVFAC SW Contractor CAC SOP, and http://www.cac.mil/common-access-card/getting-your-cac/for-contractors/ for additional information.
After approval in TASS, the Contractor personnel must go to a Real-Time Automated Personnel Identification System (RAPIDS) site for final verification and issuance of the CAC with associated DoD PKI certificates.
NCMI Access Procedures The Contractor shall provide all necessary computer equipment and Internet Service Provider (ISP) accounts to access MAXIMO for Direct Entry of required data as outlined in Annex 020000 C, Spec Item 2.8.9, Access to Navy Marine Corps Intranet (NMCI).
NAVFAC MAXIMO Account Requests
The Contractor shall submit a request for establishing a NAVFAC MAXIMO account to the Contracting Officer using the System Access Authorization Request – Navy (SAAR-N) form (OPNAV 5239/14), and indicate the role the user will have and the specific account privileges desired. Refer to Attachment J-0200000-10b to find a fillable SAAR-N form.
Account requests SHALL NOT be submitted prior to having received a CAC.
Specific steps for requesting account access include:
• Complete Information Assurance (IA) training o Cyber Awareness Challenge version 3.0 (current requirement, subject to change based on policy) http://www.cac.mil/common-access-card/getting-your-cac/for-contractors/ o Annual IA training is required to maintain access to Government IS
• Submit a complete and digitally signed SAAR form detailing the following required access:
o Requesting a NITC portal SSO account o Requesting a STS account o Request a NAVFAC Maximo account
• After the SSO/STS accounts are created, submit a STS ticket requesting a new Maximo account.
• The local NAVFAC Business Office will determine level of access and restrictions for users by configuring
NAVFAC MAXIMO Work Center access. The Contractor will receive notification that the NAVFAC MAXIMO account has been created and NAVFAC MAXIMO access URL details.
ATTACHMENT J-0200000-11
SECURITY REQUIREMENTS
To be coordinated with POCs at each Installation.
ATTACHMENT J-0200000-12
CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG
ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
| FORMS |
| PURPOSE AND OVERVIEW: |
| GENERAL TYPES OF DATA: |
| Work Order Data |
| Asset Data |
| Condition Assessment Data |
| METHOD FOR DATA SUBMISSION: |
| Direct Data Entry |
| Purpose and Overview |
| NAVFAC MAXIMO Account Requests |