VT_ALI_PARK_02.pdf
PDF 90 KB Posted
- Solicitation number
- 69056724B000012
About this file
This document appears to be a Vertical Alignment Review Report for the MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation project. The report provides details on the horizontal and vertical alignments for the project, including station, elevation, and tangent grade information.
The related federal contract opportunity is for the MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation project. The solicitation number is 69056724B000012, and the contracting agency is the Department of Transportation Federal Highway Administration. The project description indicates this is for rehabilitation work on the Swiftcurrent Spur Road. No other details on the required products/services, response dates, pricing, or set-asides are provided in the given information.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vertical Alignment Review Report Report Created: Friday, May 10, 2024
Time: 2:44:23 PM
Project: Design IntlFt Description:
File Name: c:\pw-work\d0586848\glac14-6-ali_Overlay.dgn Last Revised: 5/10/2024 14:14:26
Note: All units in this report are in feet unless specified otherwise.
Horizontal Alignment: ALI_PARK_02 Horizontal Description:
Horizontal Style: Alignment\Baseline
Vertical Alignment: BL3 Vertical Description:
Vertical Style: Alignment\Baseline Station Elevation
Element: Linear
START 2000+00.00 4926.725
VPI 2000+06.00 4926.606
Tangent Grade: -0.020 Tangent Length: 6.000
Element: Linear
VPI 2000+06.00 4926.606
VPI 2000+31.38 4927.018
Tangent Grade: 0.016 Tangent Length: 25.382
Element: Linear
VPI 2000+31.38 4927.018
END 2001+70.34 4930.091
Tangent Grade: 0.022 Tangent Length: 138.959
Page 1 of 1MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation
File details come from the government source that posted it. Updated .