glac14-6_Plans-Legal.pdf
PDF 20 MB Posted
- Solicitation number
- 69056724B000012
About this file
This document appears to be a set of plans and legal documents related to the federal contract opportunity for the MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation project.
The federal contract opportunity is a solicitation issued by the Department of Transportation Federal Highway Administration for the rehabilitation of the Swiftcurrent Spur Road. The project details and requirements are provided in the attached plans and documents. The solicitation number is 69056724B000012. No specific due date or award date is provided. The contract will likely be awarded to a qualified construction contractor to perform the rehabilitation work on the road, which appears to be located in Montana. No information is provided about set-asides, incumbents, or pricing terms.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DAVID ROEMER Digitally signed by DAVID ROEMER Date: 2024.05.13 11:01:04 -06'00'
BRENT L COE Digitally signed by BRENT L COE Date: 2024.05.29 12:48:10 -07'00'
:3
A
M
M a y
S h e e t
I n d e x c p w w o r k \d
\m t-n p g la c A
S h e e ts
.d g n
SHEET INDEX
PROJECT
NUMBER
SHEET
A.2
NPS Drwg No. xxxxxx NPS PMIS No. 259122
MT NP GLAC 14(6)
BH TP
NO SCALE
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
SEC.
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
A A
DI
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
11/2001 DETAIL APPROVED FOR USE
6/2022
10/2014 10/2009 1/2007 9/2005 REVISED: 101-1W
ABBREVIATIONS
PLAN SYMBOLS AND
:3
P a y
S
T D
D e ta il W
-1
P la n S y m b o ls a n d A b b ri v ia ti o n s p w
-w o rk \d
\m t-n p -g la c -1
(6
A
S h e e ts .d g n
WFLHD DETAIL
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PROJECT
A.3
N
Mountain
Wynn
Mountain
Allen
Grinnell
Mount
Henkel
Mount
Area
Loop and Parking
Many Glacier Hotel
S w iftc u rre n t
C re ek
W in d y
C r e e k
C a n y o n C re e k
Apikuni Creek
C a ta r a c t
C r e e k
B ou ld er C re ek
Bo ul de r
Creek
Mountain
Apikuni
Scale in feet
0 2000 4000 6000
END PROJECT
Sheet A.5
See Vicinity Map 2
BEGIN PROJECT
LAKE
SHERBURNE
L A
K E
S W
IF
T C
U R
R E
N T
L A
K E J
O S E P H
IN
E
LAKE
FISHERCAP
GRIN
NELL
LAKE
LAKEBULL
HEAD
LAKE
NATAHKI
KENNEDY LAKE
LAKE
REDROCK
L A
K E
IC
E
B E
R G
C R A C K E R L
A K E
RIDGE LAKE
SWIFTCURRENT
LAKE
FA
LL
IN
G
LE
AF
GLACIER
NATIONAL
PARK
MANY
GLACI
ER
ROAD
B O
U N
D A
R Y
Babb ±5 mi les t o
Ice be rg Creek
C O
N
TIN
EN
TA
L
D
IV
IN
E
P A
R K
" 66+65ALI-ML-SC-01"
LAKE
SNOW
M
OON
"ALI-ML-SC-01" 15+98
:0 a y
V ic in it y
M a p p w w o r k \d
\m t-n p g la c A
S h e e ts
.d g n
SHEET 1 of 2
VICINITY MAP
PROJECT
A.4
Scale in feet
500 0 500 20001000 1500
Motor Inn Parking Area
Swiftcurrent
Upper & Lower Campground Loop
Lodging Area
Administrative Area
Picnic Area Loop
Boat ramp
Water source
52+01.96
END PROJECT
BEGIN PROJECT
L A
K E
S W
IF
T C
U R
R E
N T
Pt ar m ig an T ra il
S w iftcu rren t
TrailPass
Swiftcurrent Creek
MANY
GLACI
ER
R O
AD
Swif tcu rre nt
Cre ek
Saddle HorseCorralTra il
W ilburCreek
S w if tc u r r e n t
L a k e
T ra il
Allen Creek
C ra c k e r L a k e T ra il
P ie g a n P a s s T ra il
S Sh or e
J o s e p h in e L a k e
T ra il
S w iftc u rre n t C re e k
Bab b
±11 mil es to
" 66+65ALI-ML-SC-01"
" 15+98ALI-ML-SC-01"
:2
M a y
V ic in it y M a p w w o r k \d
\m t-n p g la c A
S h e e ts
.d g n
SHEET 2 of 2
VICINITY MAP
PROJECT
A.5
NPS PMIS No. 259122 NPS Drwg No. xxxxxx
Sheet and Description
Section D Section E Section F Section G Section H Section I
Plan and Plan
Parking Areas, Turnouts and
Approach Roads
Soil Erosion and Sediment
Control Drainage Temporary
Traffic Control Permanent
Traffic Control Allowance Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-5000 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM LPSM All ALL
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 3,676 364 4,040
A0160 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0180 20101-0000 CLEARING AND GRUBBING ACRE 3.2 1.7 5.0
A0200 20301-0200 REMOVAL OF BOULDER EACH 65 203 12 280
A0220 20301-0700 REMOVAL OF DELINEATOR EACH 7 7
A0240 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0260 20301-2400 REMOVAL OF SIGN EACH 17 17
A0280 20302-0625 REMOVAL OF CURB, LOG LNFT 1,363 67 1,430
A0300 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 15 10,082 603 10,700
A0320 20303-3000 REMOVAL OF SIDEWALK, ASPHALT SQYD 574 26 600
A0340 20304-5000 REMOVAL OF BUILDING LPSM All ALL
A0360 20315-0000 SAWCUTTING PAVEMENT LNFT 44 1,190 284 392 1,910
A0380 20401-0000 ROADWAY EXCAVATION CUYD 18 3,148 334 3,500
A0400 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 (ENERGY
DISSIPATOR) CUYD 13 42 5 60
A0420 25125-0000 BOULDER (BARRIER ROCK) EACH 682 259 59 1,000
A0440 30110-0000 AGGREGATE SURFACE COURSE TON 27 3 30
A0460 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 100 4,925 375 5,400
A0480 30402-5000 FULL DEPTH RECLAMATION, METHOD 2 SQYD 18,812 938 19,750
A0500 31303-0000 AGGREGATE-TOPSOIL COURSE CUYD 94 185 50 329
A0520 40301-0000 ASPHALT CONCRETE PAVEMENT TON 1,075 4,391 234 5,700
A0540 40301-0000 ASPHALT CONCRETE PAVEMENT (WEDGE AND LEVELING
COURSE) TON 239 68 13 320
A0560 41201-0000 TACK COAT TON 8.9 3.4 0.7 13.0
A0580 60201-0400 12-INCH PIPE CULVERT LNFT 43 7 50
A0600 60201-0800 24-INCH PIPE CULVERT LNFT 195 10 205
A0620 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT LNFT 142 8 150
A0640 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT LNFT 51 9 60
A0660 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 4 4
A0680 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH
OR ELLIPTICAL PIPE CULVERT EACH 2 2
MileStone: Final Date Completed: 06/24/24 Report Date: 06/24/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-J un
-2
1:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
C pw -w or k\ d0 gl ac
-6 _B
-S he et s.
xl sm
]S he et
PROJECT
B.1MT NP GLAC 14(6)
NPS PMIS No. 259122 NPS Drwg No. xxxxxx
Sheet and Description
Section D Section E Section F Section G Section H Section I
Plan and Plan
Parking Areas, Turnouts and
Approach Roads
Soil Erosion and Sediment
Control Drainage Temporary
Traffic Control Permanent
Traffic Control Allowance Bid Schedule
A0700 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH
OR ELLIPTICAL PIPE CULVERT EACH 1 1
A0720 60901-0000 CURB, CONCRETE (PRECAST SIMULATED LOG PATTERN) LNFT 1,790 90 1,880
A0740 60915-1000 WHEELSTOP, CONCRETE (PRECAST SIMULATED LOG
PATTERN) EACH 133 133
A0760 61501-0600 SIDEWALK, EXPOSED AGGREGATE COLORED CONCRETE SQYD 550 30 580
A0780 61504-2000 ACCESSIBILITY RAMP, EXPOSED AGGREGATE CONCRETE
(COLORED) SQYD 104 104
A0800 61509-0000 DETECTABLE WARNING PANELS SQYD 17 3 20
A0820 61902-2700 GATE, CHAIN LINK EACH 1 1
A0840 61920-1000 REMOVE AND RESET BOLLARD POST EACH 3 3
A0860 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 30 30
A0880 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 40 40
A0900 62201-3300 HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM
CAPACITY HOUR 40 40
A0920 62301-0000 GENERAL LABOR HOUR 60 60
A0940 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH SQYD 532 48 580
A0960 62501-0000 TURF ESTABLISHMENT (GOVERNMENT PROVIDED SEED) ACRE 2.4 1.3 0.4 4.1
A0980 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 35 3 38
A1000 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (TRAILHEAD
SIGN) EACH 2 2
A1020 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN (RADAR
SPEED SIGN) EACH 1 1
A1040 63302-0000 SIGN SYSTEM SQFT 112 10 122
A1060 63309-0000 DELINEATOR EACH 7 3 10
A1080 63316-1000 REMOVE AND RESET SIGN EACH 12 2 14
A1100 63318-1000 SNOW POLE HOLDER EACH 41 4 45
A1120 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID (DOUBLE YELLOW) LNFT 9,080 455 9,535
A1140 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID (WHITE) LNFT 69 18,386 925 19,380
A1160 63403-0400 PAVEMENT MARKINGS, TYPE D (HELIPAD SYMBOL) SQFT 117 8 125
A1180 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW EACH 2 2
A1200 63405-1350 PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW EACH 14 14
A1220 63405-1500 PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE EACH 1 1
A1240 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL EACH 10 10
A1260 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6
A1280 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 80 80
A1300 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 116 9 125
A1320 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 109 11 120
A1340 63703-0000 RESIDENTIAL HOUSING EACH 2
-J un -2
1:
P M
MileStone: Final Date Completed: 06/24/24 Report Date: 06/24/24
C pw -w or k\ d0 gl ac
-6 _B
-S he et s.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
PROJECT
B.2MT NP GLAC 14(6)
LC
3-inch depth
Aggregate-topsoil course, TYPICAL SECTION NO.1
"ALI-ML_SC-01"
21+81 to 66+65
[2] pavement, 2-inch compacted depth
Asphalt concrete course, 1-inch compacted depth
(wedge and leveling course)
Asphalt concrete pavement, [5]
Existing asphalt
Tack coat
Existing ground
Existing ground
Existing ground course, 3-inch depth
Aggregate-topsoil
Existing ground
Finished grade centerline
Roadway
Edge of travel way
Hinge point
Boulder (typ.)
Existing Surfacing60' grade line
Existing road2"
E n d ty p ic a l vertical pavement
Sawcut
Tack coat
Remove pavement (mill)
Asphalt overlay
Varies � [1] � Varies [1]
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
10'
Travel lane
10'
Travel lane
Esta blish ment Establishment
Turf Turf
Shoulder
1'
Shoulder
1'
[4]
[3] Boulder (barrier rock)
C o n s tr u c ti o n l im it
Shoulder
14"-18" (typ.)
1' (min)
3"
18"
Esta blishment Turf
C o n s tr u c ti o n l im it
1'
Shoulder
14"-18" (typ.)
1' (min)
3"
18"
Establishment
Turf
1:6 1:6
Varies
2'
10'
Center to center
10' Spacing (typ.)
BOULDER DETAIL
CONNECTION DETAIL 66+65 NO SCALE
See E.Sheets for Typical Section 15+98 to 21+81.
NOTE:
1.
FOOTNOTE:
operation.
operation, and asphalt concrete in a continuous Place wedge and leveling course in a continuous
Match existing superelevation or normal crown at 2%
[3]
Protect existing asphalt surface.
See "D Sheets" for Boulder (barrier rock) station limits.
See Boulder Detail this sheet.
:3
M a y
T y p ic a l S e c ti o n o f p w
-w o rk \d
\g la c
-6 p ln ty p
.d g n
SHEET 1 of 2
TYPICAL SECTIONS
PROJECT
C.1
Sawcut pavement
Tack coat
LC
3-inch depth Aggregate-topsoil course, TYPICAL SECTION NO.2
"ALI-ML_SC-01"
CULVERT REPLACEMENTS
23+81, 27+74 32+83, 41+39 59+35 63+10, 63+14 of pavement Existing top method 2. 6-inch compacted depth Roadway aggregate, pavement, [2]2-inch compacted depth
[2]course, 1-inch compacted depth
(wedge and leveling course)
[2] pavement, 3-inch compacted depth
Existing ground
Existing ground
Existing ground Existing ground
Finished grade course, 3-inch depth Aggregate-topsoil
No.1 Typical Section
No.2 Typical Section
TRANSITION DETAIL
� Varies [1] Varies � [1]
[6] n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
1'
Shoulder
10'
Travel lane
10'
Travel lane
1'
Shoulder
Esta blishment Establishment
TurfTurf
C o n s tr u c ti o n l im it
1'
Shoulder
Esta blishment Turf
14"-18" (typ.)
1' (min)
3"
18"
C o n s tr u c ti o n l im it
1'
Shoulder
14"-18" (typ.)
1' (min)
3"
18"
Establishment
Turf
1:61:6
NO SCALE
See E.Sheets for Typical Section 15+98 to 21+81.
NOTE:
1.
FOOTNOTE:
operation.
operation, and asphalt concrete in a continuous Place wedge and leveling course in a continuous
Match existing superelevation or normal crown at 2%
Protect existing asphalt surface.
See "D Sheets" for Boulder (barrier rock) station limits.
See Boulder Detail this sheet.
[6] existing conditions at culverts.
Reconstruct slopes outside the roadway to match
:2
J u n e
T y p ic a l S e c ti o n o f p w
-w o rk \d
\g la c
-6 p ln ty p
.d g n
SHEET 2 of 2
TYPICAL SECTIONS
PROJECT
C.2 points.
computed distance by a mean combined factor of the two the ground, inverse the state plane coordinates and divide the
To precisely check distances between points as measured on1.
NOTE:
NOTE:
location, quality and quantity of survey control points is not guaranteed.
Verify survey control points. Due to removal and displacement by others,1.
:3
M a y
S
U R
V E
Y C
O N
T R
O L o f p w w o r k \d
\g la c p ln p p .d g n
SHEET 1 of 2
SURVEY CONTROL
PROJECT
D.1
CP
CP
CP
CPCP
CP
CP
CP
CP
CPCP
CP
CP
CP
CP CP
CP
CP
CP22192
CP22193
CP22194
CP22195CP22196
CP22197
CP22198
CP22199
CP22200
CP22201
CP22202CP22203
CP22204
CP22205
CP22206
CP22207
CP22209
DJA11
DJA12
MG101
END PROJECT
BEGIN PROJECT
Motor Inn
Swiftcurrent
CP22208
CP2
0 3 5 4
E= 966,714.114
N= 1,685,757.787
"ALI ML-SC-01" 66+65
E= 962,480.926
N= 1,684,787.580
"ALI ML-SC-01" 15+98
CP
:3
M a y
S
U R
V E
Y C
O N
T R
O L o f p w w o r k \d
\g la c p ln p p .d g n
SHEET 2 of 2
SURVEY CONTROL
PROJECT
D.2
:4
M a y
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
IE
S o f p w w o r k \d
\g la c p ln p p .d g n
SHEET 1 of 2
TABULATION OF QUANTITIES
PROJECT
D.3 placement locations. See Sheet C.2
Includes approximately 16 tons for Typical Section No.2 at culvert placement locations. See Sheet C.2
Includes approximately 33 tons for Typical Section No.2 at culvert under Section 251.
Conserve boulders that meet the required dimensions for reuse
FOOTNOTE:
:2
M a y
T
A B
U L
A T
IO
N
O F
Q U
A N
T
IT
IE
S o f p w w o r k \d
\g la c p ln p p .d g n
SHEET 2 of 2
TABULATION OF QUANTITIES
PROJECT
D.4
CP22209
N
Removal of log curb
16+22 to 17+59 LT
Removal of log curb
16+02.to 16+03 LT
Removal of log curb
16+02 to 16+03 RT
Removal of log curb
16+25 to 16+75 RT
Removal of log curb
16+97 to 21+28 RT
LT & RT Removal of log curb
18+37 to 20+10
Removal of log curb
18+07 to 19+30 LT
Removal of log curb
19+33 to 21+22 LT
Removal of sidewalk, asphalt
18+03 to 21+22 LT
Removal of sidewalk, asphalt
15+98 to 17+84 LT
Removal of sidewalk, asphalt
15+98 to 16+75 RT
Removal of sidewalk, asphalt
18+35 to 20+13 LT & RTRemoval of boulders
16+03 to 16+24 LT
Removal of boulders
16+04 to 16+25 RT
Edge of pavement
Edge of pavement
Edge of pavement
Edge of pavement Edge of pavement
Construction limit limit
ConstructionConstruction limit
BEGIN PROJECT
See riprap detail on sheet E.13
SWIFTCURRENT MOTOR INN
PARKING AREA
See Section E for details
"ALI_ML-SC_01" 15+98.00
N= 1684827.093
E= 961898.976
SWIFTCURRENT
MOTOR INN
SWIFTCURRENT MOROR INN
NORTWEST PARKING AREA
TELEPHONE
CP
DJA12
CP22207
CP
CP
CP22206
CP
CP22208
N
Construction limit
Construction limit water line to be constructed by others
Proposed underground
See Section G culvert w/ end section on inlet.
arch or elliptical pipe
18" Equivalent dia.
Install
15" outlet, 12" inlet
Remove existing pipe.
23+81
"ALI_ML-SC_01" 22+27.51 =
"ALI_ML-SC_01" 22+27.54 =
Removal of delineator
21+23 to 21+53 LT
Removal of boulder
21+32 to 21+97 LT
Removal of boulder
21+18 to 22+16 RT
TYPICAL SECTION 1
BEGIN
Line to be constructed
"ALI ML-SC 01"
Edge of pavement
Edge of pavement
Edge of shoulder
"ALI_ML-SC_01" 27+10.72 =
Boulde r (barr ier Roc k)
Boulder (barrier Rock)
Boulder (barrier Rock)
Boulder (barrier Rock)
21+19 to 22+18 LT
22+36 to 23+90 LT
21+19 to 22+20 RT 22+35 to
26+97 RT
"ALI_APPR_2228_L" 200+00.00
"ALI_APPR_2228_R" 100+00.00
N= 1684787.5802
E= 962480.9254
21+81.29 "ALI_ML-SC_01"
SWIFTCURRENT SPUR ROAD
Construct turnout 23+90 to 32+10
See Section E
"App_2711_R" 300+00.00
NOTE:
2.
1.
See Sheets E.1-15
Swiftcurrent Motor Inn Northwest Parking Area.
Swiftcurrent Motor Inn Parking Area. See Sheets E.1-15
See Section E for Boulders (Barrier rock)
Turnout 23+90 LT to 32+10 LT. See Sheets E.1,16-18.
4.
3.5 :1
M a y
A
L I_
M L
-S C
P L
A N
A N
D P
L A
N
S h e t] p w w o r k \d
\g la c p ln p p .d g n
15+98 TO 27+20
PLAN AND PLAN
PROJECT
D.5
WV
WV
WF
VALVE
WATER
VALVE
WATER
VALVE
WATER
WF
WF
CP
CP22205
N waterline to be constructed by others Proposed underground waterline to be constructed by others Proposed underground
See Section E
Removal of building
30+33 LT
Construction limit
Construction limit
Edge of pavement
Edge of pavement
Edge of shoulder
Edge of shoulder
See Section G and end section
Remove existing 18" pipe
27+60 See Section G w/end section on inlet
Install 24" pipe culvert
27+74
"ALI_ML-SC_01" 31+43.58 =
"ALI_ML-SC_01" 28+54.51 =
"ALI ML-SC 01" Line to be constructed
See Section G w/end section on inlet
Install 24" pipe culvert w/ end section on inlet
Remove existing 18" pipe
32+83
"ALI_ML-SC_01" 29+84.56 =
See Section E existing concrete pad
Preserve and protect
2 3 3 3
Boulder (barrier rock)
Boulder (barrier rock) Boulder (barrier rock) Boulder (barrier rock)
Boulder (barrier rock)
22+20 to 28+48 RT 28+70 to 29+95 RT 30+03 to 30+96 RT 31+18 to 38+04 RT
32+09 to 66+65 LT
SWIFTCURRENT SPUR ROAD
Construct turnout 23+90 to 32+10
See Section E
"ALI_Water_Station" 501+82.44
"ALI_APPR_2855_R" 400+00.00
"ALI_APPR_2990 RT" 500+00.00
WV
WFWV
WATER
WV
WATER
VALVE
WATER
CP22203
CP
DJA11
CP
CP
MG101
N
"ALI ML-SC 01" Line to be constructed
Construction limit
Construction limit
Edge of pavement
Edge of pavement
Edge of shoulder
Edge of shoulder
"ALI_ML-SC_01" 39+21.61 =
"ALI_ML-SC_01" 38+33.76 =
waterline to be constructed by others
Proposed underground
0 0
5 3
6 3 7 3
Boulder (barrier rock)
Boulder (barrier rock) Bou lder (ba rrie r ro ck)
Boulder (barrier rock)
32+09 to 66+65 LT
31+18 to 38+04 RT
38+59 to 38+76 RT
39+ to 4
1+
RT
SWIFTCURRENT SPUR ROAD
"ALI_PARK_03" 700+00.00
"App_3834_R" 600+00.00
NOTE:
2.
1.
Picnic Area Loop Road "ALI_PARK_03" see Sheets E.1,19-26
"ALI-APPR_2990 R" see sheets E.1, 28-305 :1
M a y
A
L I_
M L
-S C
P L
A N
A N
D P
L A
N -1
S h e p w w o r k \d
\g la c p ln p p .d g n
27+20 to 40+60
PLAN AND PLAN
PROJECT
D.6
W V
VALVE
WATER
W V
CP22201
CP
N
"ALI ML-SC 01" Line to be constructed
Construction limit
Construction limit
Edge of pavement
Edge of pavement
Edge of shoulder
Edge of shoulder
"ALI_ML-SC_01" 42+43.69 =
See Section G w/end section on inlet arch or eliptical pipe culvert Install 24" equivalent dia w/ end section on inlet Remove existing 18" pipe 41+39 w/ end section on inlet existing 24" pipe Preserve and protect 44+16
SWIFTCURRENT SPUR ROAD
PI
CN
IC
A
REA
L
O O P
RO
AD
Boulder ( ba rrier rock)
Boulder ( ba rrier rock)
Boulder ( barrier rock)
"ALI_PARK_03" 706+65.92
32+09 to 66+65 LT
36+69 to 41+89 RT 42+87 to 49+41
CP
CP22198
N
"ALI ML-SC 01" Line to be constructed
Removal of boulder 48+98 to 49+31 RT
Removal of boulder 49+73 to 50+13 RT
Removal of boulder 51+76 to 51+95 RT
Edge of pavement
Edge of pavement
Edge of shoulder
Edge of shoulder
Construction limit
Construction limit
Construction limit
Construction limit
Edge of pavement
Edge of shoulder
"ALI_ML-SC_01" 49+49.65 =
"ALI_ML-SC_01" 52+01.46 =
8 4
1 5
SWIFTCURRENT SPUR ROAD
32+09 to 66+65 LT Boulder (barrier rock)
Boulder (b arrier rock)
Boulder (barrier rock)
49+65 to 51+77 RT
42+87 to 49+41 RT
"App_Helipad_RT" 800+00.00
"ALI_App5201_R" 900+00.00
W a te r s o u rc e
Construct turnout 51+45 to 56+00 RT
See Section E
NOTE:
2.
1.
"ALI_HELIPAD" see Sheets E.1,28-29
Picnic Area Loop Road "ALI_PARK_03" see Sheets E.1,19-26 Turnout 52+00 to 56+00 RT see Sheets E.1, 27,293.1 :5
J u n e
A
L I_
M L -S
C
P L A
N A
N D
P L A
N -2
S h e p w
-w o rk \d
\g la c
-6 p ln p p
.d g n
40+60 to 54+20
PLAN AND PLAN
PROJECT
D.7
CP22195
CP22197
N
"ALI ML-SC 01" Line to be constructed
Edge of pavement
Edge of pavement
Edge of shoulder
Edge of shoulder
Construction limit
Construction limit
See Section G culvert with end section on inlet arch or elliptical pipe
Install 18" equivalent dia w/ end section on inlet
Remove existing 12" pipe
59+35
See Section E
51+45 to 56+00 RT
Construct turnout
SWIF
TCURRENT SP
UR ROAD
Boulder (barrier rock)
Boulder (barrier rock)
32+09.to 66+65 LT
55+94 to 66+65 RT
VALVE
WATER
CP
CP22195
CP
CP22194
N
"ALI ML-SC 01" Line to be constructed
Edge of pavement
Edge of pavement
Edge of shoulder
Edge of shoulder
Construction limit
Construction limit
See Section G culvert w/end section on inlet
Install 24" pipe w/end section on inlet
Remove existing 24" pipe
63+10
See Section G culvert w/end section on enlet
Install 24" pipe w/end section on inlet
Remove existing 24" pipe
63+14
END PROJECT
SWIFTCURRENT SPUR ROAD
Boulder (b arrier roc k)
Boulder ( barrier ro ck)
32+09 to 66+
65 LT
55+94 to 66+
65 RT
END CONSTRUCTION
66+64.88 "ALI_ML-SC_01"
N= 1685757.787
E= 966714.114
NOTE:
1. Turnout 52+00 to 55+00 RT see Sheets E.1, 27,291
:1
M a y
A
L I_
M L
-S C
P L
A N
A N
D P
L A
N -3
S h e p w w o r k \d
\g la c p ln p p .d g n
54+20 to 66+65
PLAN AND PLAN
PROJECT
D.8
Rounded total.
Included in Section D Roadway Quantities.
Footnote:
:2
J u n e
T a b u la to n
P a r k in g
A r e a T u r n o u t a n d A p p r o a c h
Q u a n ti ti p w w o r k \d
\g la c p ln p k n g .d g n
TABULATON OF QUANTITIES
PROJECT
E.1
Concrete sidewalk
Varies (5'-8')
64'
Varies (5'-8')
Varies [1] Varies n s tr u c ti o n l im it
Turf establishment
Turf establishment
C o n s tr u c ti o n l im it
LC
3-inch compacted depth
Asphalt concrete pavement method 2, 6-inch compacted depth
Roadway aggregate, Existing ground
(Precast simulated log pattern)
Curb, concrete
(Precast simulated log pattern)
Curb, concrete
LC
3-inch compacted depth
Asphalt concrete pavement method 2, 6-inch compacted depth
Roadway aggregate, Existing ground
(Precast simulated log pattern)
Curb, concrete
(Precast simulated log pattern)
Curb, concrete
Varies (5'-8')
-1.5% to 2.5% (max)
C o n s tr u c ti o n l im it
Turf establishment
S e e S w if tc u r r e n t M o to r I n n
N W
P a rk in g
A re a
T y p ic a l S e c tio n S h e e t E
.6
TYPICAL SECTION
SWIFTCURRENT MOTOR INN PARKING AREA
"ALI_ML-SC_01"
15+98 to 16+82
-1.5%
TYPICAL SECTION
SWIFTCURRENT MOTOR INN PARKING AREA
"ALI_ML-SC_01"
16+82 to 21+19
-1.5% Varies (1:2 m ax)
Varies (1:2 max)
No Scale
See Sheet E.14 for concrete curb and exposed aggregate sidewalk detail.
NOTE:
1. Slope varies. See sheets E.4-5
:0
M a y
S w if tc u r r e n t P a r k in g
A r e a D e ta il p w w o r k
\d
\g la c p ln p k n g
.d g n
TYPICAL SECTION
PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.2
TELEPHONE
Planar Area = 68385.8387Slope Area = 6 8486.9901
N
Construction limit
CP
CP22209
(simulated precast log pattern)
Curb,concrete
(simulated precast log pattern)
Curb,concrete
(simulated precast log pattern)
Curb, concrete
Edge of pavement
Edge of pavement
(simulated precast log pattern)
Curb,concrete
(simulated precast log pattern)
Curb,concrete aggregate colored concrete
Sidewalk, exposed aggregate colored concrete
Sidewalk, exposed aggregate colored concrete
Sidewalk, exposed
Slope stake limit aggregate concrete
Accessibility ramp, exposed aggregate concrete
Accessibility ramp, exposed aggregate concrete
Accessibility ramp, exposed aggregate concrete
Accessibility ramp, exposed
"ALI_ML-SC_01" 17+94.37, 61.57 LT =
(simulated precast log pattern)
Curb,concrete
Vegetated island
Vegetated island
Vegetated island
Vegetated island bollard posts
Remove and reset
See detail Sheet E.13
(energy dissipator)
Placed riprap method A, Class 2
(energy dissipator) See detail Sheet E.13
Placed riprap method A, Class 2
BEGIN CONSTRUCTION
END CONSTRUCTION
S86°06'57"E
P O
B
.0
10'R
SWIFTCURRENT
MOTOR INN
"ALI_APPR_10" 1000+00.00
A
A B
B D
D E
E F
F G
G
C
C
SWIFTCURRENT MOTOR IN
NW PARKING AREA
See Sheet E.6
See Sheets E.4-5 for sectional views AA-GG.
See Sheet E.14 for concrete curb and exposed aggregate sidewalk detail.
NOTE:
2.
1.
"ALI_ML_SC-01" 15+98
E= 961,898.976
N= 1,684,827.093
E= 962,418.853
N= 1,684,791.795
"ALI_ML_SC-01" 21+19
:4
M a y
S w if tc u r r e n t
M o to r I n n P a r k in g A r e a P la n o f p w w o r k
\d
\g la c p ln p k n g
.d g n
SHEET 1 of 3
PARKING AREA PLAN
SWIFTCURRENT MOTOR INN
PROJECT
E.3
Embankment
Topsoil. 4-inch depth
(Precast simulated log pattern)
Curb, concrete
(Precast simulated log pattern)
Curb, concrete
(Precast simulated log pattern)
Curb, concrete
(Precast simulated log pattern)
Curb, concrete pavement, 3-inch compacted depth
Asphalt concrete pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate, method 2, 3-inch compacted depth
Roadway aggregate, aggregate colored concrete
Sidewalk, exposed aggregate colored concrete
Sidewalk, exposed
-1.6%
8'
-3.2%
47.9'
-2.6%
41.8'
-1.4%
6'
36.5'
LC
pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate, (Precast simulated log pattern)
Curb, concrete (Precast simulated log pattern)
Curb, concrete aggregate colored concrete
Sidewalk, exposed
-1.5%
8'
-1.6%
128.1' method 2, 3-inch compacted depth
Roadway aggregate, LC
(Precast simulated log pattern)
Curb, Concrete
(Precast simulated log pattern)
Curb, Concrete
(Precast simulated log pattern)
Curb, Concrete
(Precast simulated log pattern)
Curb, Concrete pavement, 3-inch compacted depth
Asphalt concrete pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate, Topsoil. 4-inch depth
Embankment aggregate colored concrete
Sidewalk, exposed
-0.1%
44.6'
-0.3%
43.3' -1.5%
7.8'
38'
SECTION A-A
SECTION B-B
SECTION C-C
No Scale
:4
M a y
S w if tc u r r e n t
M o to r I n n P a r k in g A r e a P la n o f p w w o r k
\d
\g la c p k n g
.d g n
SHEET 2 of 3
PARKING AREA PLAN
SWIFTCURRENT MOTOR INN
PROJECT
E.4 pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate,(Precast simulated log pattern)
Curb, concrete aggregate colored concrete
Sidewalk, exposed
-1.5%
8'
-1.5%
62.4'
LC
pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate, (Precast simulated log pattern)
Curb, concrete aggregate colored concrete
Sidewalk, exposed
-1.5%
8'
-1.3%
28.5'
-4.5%
13.9'
-1.6%
20.1'
LC
(Precast simulated log pattern)
Curb, concrete pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate, aggregate colored concrete
Sidewalk, exposed
-1.5
8'
-0.8%
29.4'
-3.3%
13.9'
-1.6%
20.1'
LC
(Precast simulated log pattern)
Curb, concrete pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate, aggregate colored concrete
Sidewalk, exposed
-1.5%
8'
-0.8%
63.6'
No Scale
SECTION D-D SECTION E-E
SECTION F-F SECTION G-G
:4
M a y
S w if tc u r r e n t
M o to r I n n P a r k in g A r e a P la n o p w w o r k
\d
\g la c p k n g
.d g n
SHEET 3 of 3
PARKING AREA PLAN
SWIFTCURRENT MOTOR INN
PROJECT
E.5
BEGIN CONSTRUCTION
END CONSTRUCTION
"ALI APPR 10" Line to be constructed"ALI PARK 02" Line to be constructed
Construction limit
Construction limit
Slope stake limit
Slope stake limit
Curb, concrete (precast simulated log pattern)
Curb, concrete (precast simulated log pattern)
Curb, concrete (precast simulated log pattern)
Vegetated islandEND CONSTRUCTION
Profile grade
Existing ground simulated log pattern
Curb concrete, simulated log pattern
Curb concrete, Existing ground
Finished grade
3-inch compacted depth
Asphalt concrete pavement
6-inch compacted depth
Roadway aggregate method 2
BEGIN CONSTRUCTION
1000+00
4,920 4,920
4,930 4,930
1000+80
,9
.0
+1.64%
N= 1684918.501
E= 962095.519
"ALI_APPR_10" 1000+43.01 6.00' LT =
"ALI_PARK_02" 2000+06.00
1000+76.04 "ALI_APPR_10"
N= 1684951.1404
E= 962103.3878
H
H
I
I
"ALI_PARK_02" 2001+70.34
N= 1684928.070
E= 961931.457
66'
C L
� Varies 1.5% - 5% � Varies 1.5% - 5% Varies (1:2 max)
TYPICAL SECTION NW PARKING AREA
No scale
S e e S w if tc u rr e n t M o to r In n T y p ic a l S e c ti o n
S h e e t E
.2
C o n s tr u c ti o n l im it
Turf Establishment
"ALI_APPR_10" 1000+00.00
"ALI ML SC 01" 17+94.37, 61.57 LT =
E= 962099.063 N= 1684875.221
:0
M a y
N
W P
A R
K
IN
G A
R E
A A
L I_
P A
R K
S h e p w
-w o rk
\d \g la c -6 p ln p k n g .d g n
SHEET 1 of 2
NW PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.6 pavement, 3-inch compacted depth
Asphalt concrete method 2, 3-inch compacted depth
Roadway aggregate, Embankment
4-inch depth
Topsoil, aggregate colored concrete
Sidewalk, exposed
3-inch depth
Aggregate topsoil
3-inch depth
Aggregate topsoil
(Precast simulated log pattern)
Curb, concrete
� 1.6%
-1.6%
1'
-1.6%
16'
-1.6%
1'
LC
pavement, 3-inch compacted depth Asphalt concrete method 2, 3-inch compacted depth Roadway aggregate, (Precast simulated log pattern) Curb, concrete
(Precast simulated log pattern) Curb, concrete aggregate colored concrete Sidewalk, exposed
-1.5%
8' -3%
66.1'
No Scale
SECTION H-H
SECTION I-I
NOTE:
1.
Swiftcurrent NW Parking Area and Approach 1000+00 See Swiftcurrent Typical Section - Sheet E.2 pavement structure for
:0
M a y
S w if tc u rr e n t M o to r In n N
W P a rk in g A re a P la n o p w
-w o rk \d
\g la c
-6 p k n g
.d g n
SHEET 2 of 2
PARKING AREA PLAN
SWIFTCURRENT MOTOR INN NW
PROJECT
E.7
SC18SC19
SC20
SC21SC22
SC23
SC24
SC25
SC26
SC27
SC28
SC29
SC30
SC31
SC32
SC33 SC34 SC35
SC36
SC37
SC38
SC39 SC40
SC41
SC42
SC43 SC44
SC150
SC155
SC151
SC152SC153
SC154
SC156
SC53
SC54
SC55SC56
SC57
SC58
SC59
SC60
SC61
SC62
SC63
SC64
SC65
SC66 SC67 SC68
SC69
SC70 SC71
SC72 SC73
SC74
SC193
SC187
SC75
SC76
SC77
SC78 SC79 SC80
SC109
SC110
SC111
SC112
SC113
SC115
SC114
SC116
SC118
SC119
SC120
SC122
SC123
SC121
SC117
SC157
SC159
SC158
SC200
SC202SC201
SC170
SC160
SC192
SC186
SC124
SC125
SC161
SC162
Construction limit
Construction limit Construction limit
Construction limit
Slope stake limit
Slope stake limit
Slope stake limit
R
20'R
R
5' R
R1
R
R
R
R
R
SWIFTCURRENT
MOTOR INN
PARKING AREA
SWIFTCURRENT
MOTOR INN
NW PARKING AREA
8' 8'8'
8'
5'
6'
42.4'
41.7'
46.2'
0 20 401020
Scale in feet
:1
M a y
S w if tc u r r e n t
L a y o u t
P la n o p w w o r k
\d
\g la c p ln p k n g
.d g n
Sheet 1 of 3
LAYOUT PLAN
PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.8
TELEPHONE
CP22208
CP
DJA12
CP22209
CP
N
SC17 SC16
SC15 SC14
SC13 SC12
SC11 SC10
SC9 SC7SC8 SC6
SC5
SC4
SC3
SC2
SC1
SC45
SC46
SC47 SC48 SC49
SC50
SC144
SC52
SC51
SC142
SC145
SC146
SC147
SC148 SC149
SC143
SC141
SC140
SC139
SC81 SC82
SC83
SC85
SC84
SC86
SC87 SC88
SC89
SC90
SC91
SC92
SC93
SC94
SC95
SC96
SC97
SC98
SC99
SC104
SC105
SC106
SC107
SC108
SC194
SC196
SC198
SC195
SC197
SC199
SC126 SC127
SC129
SC130
SC131
SC133
SC134
SC135
SC136
SC138
SC128
SC132
SC137
SC100
SC101
SC102
SC103
Construction limit
Slope stake limit
Slope stake limit
Construction limit
Construction limit
Construction limit
Slope stake limit
Slope stake limit
See riprap detail Sheet E.13
See riprap detail Sheet E.13 See riprap detail Sheet E.13
5' R
R
20'R
R
R
3'R
R
SWIFTCURRENT MOTOR INN
SWIFTCURRENT
MOTOR INN
PARKING AREA
8'
42.7'
32.8'
42.7'
4'
0 20 401020
Scale in feet
:1
M a y
S w if tc u r r e n t
L a y o u t
P la n o p w w o r k
\d
\g la c p ln p k n g
.d g n
Sheet 2 of 3
LAYOUT PLAN
PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.9
SC160
SC161
SC162
SC170 SC167
SC166
SC165
SC164SC163
SC177
SC176
SC175
SC174
SC173
SC172
SC178SC179
SC182
SC183
SC184
SC185
SC171
SC191
SC190
SC189
SC188SC180
SC181
SC192
N
Construction limit
Construction limit
Slope stake limit
Slope stake limit
SC168SC169
SC193
SC187
SC39 SC40SC34 SC35
R
R
R
R
R
SWIFTCURRENT
MOTOR INN
SWIFTCURRENT
MOTOR INN
NW PARKING AREA
SWIFTCURRENT
MOTOR INN
PARKING AREA
20'R
12'
16'66'
0 20 401020
Scale in feet
:1
M a y
S w if tc u r r e n t
L a y o u t
P la n o p w w o r k
\d
\g la c p ln p k n g
.d g n
Sheet 3 of 3
LAYOUT PLAN
PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.10
Curb HeightCH= Back of SidewalkBOS= Vertical point of IntersectionVPI= Edge of PavementEOP=
Center of CurveCC= Point of TangentPT= Point of CurvaturePC=
ABBREVIATIONS:
:4
J u n e
L a y o u t T a b le s S h e e t o p w
-w o rk \d
\g la c
-6
-p ln
-p k n g
.d g n
SHEET 1 of 3
LAYOUT TABLES
PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.11
Curb HeightCH= Back of SidewalkBOS= Vertical point of IntersectionVPI= Edge of PavementEOP=
ABBREVIATIONS:
Center of CurveCC= Point of TangentPT= Point of CurvaturePC=
:5
J u n e
L a y o u t T a b le s S h e e t o p w
-w o rk \d
\g la c
-6
-p ln
-p k n g
.d g n
SHEET 2 of 3
LAYOUT TABLES
PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.12
Slope catch type C, non woven Geotextile filter, class 1, Existing ground curb Concrete
(enery dissipator) method B, class 2 Placed riprap, 5' Varies
24"
RIPRAP DETAIL
1:3
ABBREVIATIONS:
Curb HeightCH= Back of SidewalkBOS= Vertical point of IntersectionVPI= Edge of PavementEOP=
Center of CurveCC= Point of TangentPT= Point of CurvaturePC=
See Concrete Curb Details Sheet E.14
:5
J u n e
L a y o u t T a b le s S h e e t o p w
-w o rk \d
\g la c
-6
-p ln
-p k n g
.d g n
SHEET 3 of 3
LAYOUT TABLES
PARKING AREA
SWIFTCURRENT MOTOR INN
PROJECT
E.13
Curb
Raised
Transition
Vairies
8' (min.)
HANDICAP RAMP
CURB TAPER FOR
#5 Bar, 4' long, flush
#5 Bar, 4' long, flush
Formed hole for #5 bar #5 Bar, 4' long
" grout2 joint with raised curb section transition section to construct
Field cut concrete curb of parking area
Finish grade
(Precast simulated log pattern)
Top of curb, concrete
#5 bar, (typ.), see Detail A
Formed hole for
#5 Bar, 4' long of parking area
Finish grade
#5 Bar, 4' long
#5 Bar, 4' long
Concrete curb, (log pattern)
Concrete pad, 3" depth
6" compacted depth
Bed course, 3" depth
Concrete pad, log pattern)
(Precast simulated
Curb, concrete
Beginning or end of parking area
Finish grade of colored concrete 3-inch depth
Sidewalk, exposed aggregate
4-inch compacted depth
Bed course material (sidewalk), (Precast simulated log pattern)
Curb, concrete
#5 Bar, flush
Existing ground compacted depth
Bed course 6"
Concrete pad 3" depth of parking area
Finish grade
Curb height = .5' Curb height = .5'
6" adjoining sections of concrete curb Cut at same angle on both
CURB CONCRETE,
(PRECAST SIMULATED LOG PATTERN)
PLAN
DETAIL A
1:12 max.
6'
Landing
6"6"
6"6"
CURB CONCRETE,
(PRECAST SIMULATED LOG PATTERN)
ELEVATION
15"
Sidewalk, asphalt - width varies
4'
SIDEWALK, EXPOSED AGGREGATE COLORED CONCRETE WITH
CURB CONCRETE, (PRECAST SIMULATED LOG PATTERN) DETAIL
6"
Va rie s 1 :2 to :6
" Gap4
CURB CUT
CURB CONCRETE,
(PRECAST SIMULATED LOG PATTERN)
Varies
NO SCALE
:3
M a y
L o g c u r b a n d a s p h a lt s id e w a lk d e ta p w w o r k
\d
\g la c p ln p k n g
.d g n
SIDEWALK DETAIL
CONCRETE CURB AND
PROJECT
E.14
:4 m a x
(Precast simulated log pattern)
Curb, concrete colored concrete, 3" depth
Sidewalk, exposed aggregate
6-inch depth
Bed course material (sidewalk), 6" compacted depth
Bedding material
(Precast simulated log pattern)
Curb, concrete
Gutterline field with truncated domes
Detectable warning
Curb taper
Slope on landing
1.5% (1:20)
Curb taper
(Precast simulated log pattern)
Curb, concrete
:4 m a x
:4 m a x
Sidewalk colored concrete, 3" depth
Sidewalk, exposed aggregate
6-inch depth
Bed course material (sidewalk), 6" compacted depth
Bedding material
(Precast simulated log pattern)
Curb, concrete
Gutterline field with truncated domes
Detectable warning
2.35" c-c
.3 c c
6'
2.35" c-c 0.4"
.2
0.9"
TRUNCATED DOME
SECTION
PLAN
WITH TRUNCATED DOMES
DETECTABLE WARNING FIELD
Truncated dome
No scale
1:12 max.
PARALLEL CONCRETE ACCESS RAMP AT APPROACH
PARALLEL CONCRETE ACCESS RAMP AT APPROACH
LOG CURB CUTOUT DETAIL
A p p r o a c h
Mainline
6' (min.)5' (min.)
Pay limits for concrete access ramp
6' (min.)5' (min.)
Pay limits for concrete access ramp max.
1:12 1:12 max.
PARALLEL CONCRETE ACCESS RAMP
:4 m a x
6' (min.)6'6' (min.)
6' (min.)6'6' (min.)
PARALLEL CONCRETE ACCESS RAMP
LOG CURB CUTOUT DETAIL
See Curb Taper For Handicap detail Sheet E.14[1]
:3
M a y
A c c e s s ib il it y r a m p d e ta p w w o r k
\d
\g la c p ln p k n g
.d g n
ACCESSIBILITY RAMP DETAILS
PROJECT
E.15
TURNOUT CONSTRUCTION TYPICAL SECTION
23+90 Lt. to 32+10 Lt.
Proposed Profile Grade
Existing ground
Edge of travel lane
3-inch depth (typ.)
Aggregate-topsoil course, 3-inch compacted depth
Asphalt concrete pavement, method 2, 6-inch compacted depth
Roadway aggregate, details this sheet
See slope rounding
D
C o n s tr u c ti o n l im it
0.25 D
10'
0.25 D
C o n s tr u c ti o n l im it
D
� 2%
1' 29'
Varies
1:2
S a w c u tt in g p a v e m e n t
S lo p e s ta k e l im it
C o n s tr u c ti o n l im it Varies
Turf establishment
Existing ground
5'5'
FILL SLOPE ROUNDING
Existing ground
5' 5'
CUT SLOPE ROUNDING
No Scale
Slope stake limit Slope stake limit
:5
M a y
T u rn o u t
L t.
t o
L t.
p w
-w o rk
\d \g la c -6 p ln p k n g .d g n
23+90 LT. to 32+10 LT.
TYPICAL SECTION
CONSTRUCTIONTURNOUT
PROJECT
E.16
Edge of pavement
Edge of travel way
Construction limit
Slope stake limit waterline by others
Proposed underground
23+90 Begin Turnout
4 2
4 2
R
R
SWIFTCURRENT SPUR ROAD
N
CP
CP22206
Construction limit
Slope stake limit
Edge of travel way
Edge of Pavement waterline by others
Proposed underground waterline by others
Proposed underground vegetated island
Proposed vegetated island
Proposed2
8 2
SWIFTCURRENT SPUR ROAD
5'R 5'R
5'R
5'R
5'R
5'R
5'R
5'R
A
A
B
B
:0
M a y
T u rn o u t t o
L
P L p w w o r k
\d
\g la c p ln p k n g
.d g n
SHEET 1 of 2
PLAN23+90 TO 32+10 LT
TURNOUT CONSTRUCTION
PROJECT
E.17
CP22204
Construction limit
Edge of travel way
Slope stake limit
Remove building
30+33 LT
Edge of pavement
32+10 End Turnout
R
SWIFTCURRENT SPUR ROAD
R
LC
"ALI ML SC-01"
Embankment
Topsoil 4-Inch depth
Aggregate topsoil
Aggregate topsoil
Shoulder
1'
Vegetated Island
28'
Shoulder
1'
SECTION A-A
LC
"ALI ML SC-01"
Topsoil 4-inch depth
Embankment
Aggregate topsoil
Aggregate topsoil
Shoulder
1'
Vegetated island
28'
Shoulder
1'
SECTION B-B
:0
M a y
T u r n o u t t o
L
P L
A N p w w o r k
\d
\g la c p ln p k n g
.d g n
SHEET 2 of 2
PLAN23+90 TO 32+10 LT
TURNOUT CONSTRUCTION
PROJECT
E.18
Travel way
8.5'
Travel way
8.5'
Shoulder
1'
LC
Profile grade
3-inch compacted depth
Asphalt concrete pavement method 2, 6-inch compacted depth
Roadway aggregate, Existing ground
Existing ground Existing ground
3-inch depth
Aggregate topsoil course, course, 3-inch depth
Aggregate topsoil
3-inch depth
Aggrigate topsoil course, course, 3-inch depth
Aggregate topsoil
See fill slope rounding See fill slope rounding
See fill slope roundingSee fill slope rounding D
C o n s tr u c ti o n l im it
0.25 D
10'
0.25 D
C o n s tr u c ti o n l im it
D
1'
Edge of pavement
Aggregate base course
First lift of asphalt
Second lift of asphalt
SAFETY EDGE
Var ies
(1:6 to
1:2
Varies(1:6 to 1:2)
TYPICAL SECTION
PICNIC AREA LOOP
"ALI-PicnicAreaLoop"
700+11 TO 706+53
Varies(1:6 to 1:2)
Var ies
(1:6 to
1:2
PARKING RT
700+66.64 TO 704+87.71
PARKING LT
700+71.36 TO 701+64.57
701+84.87 TO 703+11.36
703+27.56 TO 705+39.69
Varies [1] n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
Turf
Establishment
Turf
Estabishment
Establishment
Turf
Estabishment
Turf
Existing ground
5'5'
FILL SLOPE ROUNDING
Existing ground
5' 5'
CUT SLOPE ROUNDING
No scale
FOOTNOTE:
Refer to layout plan on Sheets E.22-23 and staking report.
[1]
Slope stake limit Slope stake limit
:3
M a y
P ic n ic
A r e a L o o p T y p ic a l
S e c ti o n
S h e t) p w w o r k
\d
\g la c p ln p k n g
.d g n
TYPICAL SECTION
PICNIC AREA LOOP
PROJECT
E.19
"X
L
ID
U n k n o w n U
G U ti li ty
Un kn ow n
UG
Ut ili ty
1+ t o
6+
R
T
N
4" BRASS CAP
MG101
CP
DJA11
CP
ALUMINUM CAP
Line to be constructed
"ALI_PARK_03
Construction limit stake limit Slope stake limit Slope of travel way Edge pavement Edge of
BEGIN CONSTRUCTION
typical Sheet E.26 See aggregate surface surface typical Sheet E.26 See aggregate
Profile grade
Existing ground
"ALI PARK 03" 700+00.00
S09°47'52"E
S25°29'07"E
N '1
"E
PI 701+01.22
Δ = 15°41'15" (LT)
R = 200.00' T = 27.55' L = 54.76'
PI 702+27.26
Δ = 79°00'42" (LT)
R = 90.00' T = 74.21' L = 124.11'
P C
.6
P T
.4
P C
.0
PT 702+77.177
.3
700+00 701+00 702+00
4,890 4,890
4,900 4,900
4,910 4,910
,9
.1
+1.81% -1.12%
-1.91%
.0
.4
SSD = 1403'
K = 125
100' VC
PICNIC AREA LOOP ROAD
Boulder (barrier rock)
700+08 to 701+08 RT
700+10 to 706+08 LTBoulder (barrier rock)
Bo ul de r (b ar ri er r oc k)
"ALI_PARK_03" 700+10.00
N= 1684783.485 E= 964215.598
"ALI ML-SC 01" 28+54.51
S W
IF
T C
U R
R E
N T S
P U
R R
O A
D
:4
J u n e
P ic n ic A re a
L o o p
P la n
S h e p w
-w o rk
\d \g la c -6 p ln p k n g .d g n
PROJECT
E.20
" L
ID
U nknow n U G U tility
Boulder (barrier rock)
701+31 to 706+72 RT
Boulder (barrier rock)
700+10 to 706+08 LT
N
Line to be constructed "ALI-PicAreaLoop"
Construction limit
Slope stake limit stake limit Slope
Construction limit
Edge of pavement of pavement Edge
Edge of travel way
END CONSTRUCTION
Profile grade
Existing ground
"ALI PARK 03" 706+65.92
N °3
'1
"E
N12°33'37"E
N02° 19'3
1"W
PI 703+48.08
Δ = 36°44'36" (LT)
R = 150.00' T = 49.82' L = 96.19'
PI 704+10.74
Δ = 26°11'58" (LT)
R = 70.00' T = 16.29' L = 32.01'
PI 706+03.35
Δ = 14°53'08" (LT)
R = 200.00' T = 26.13' L = 51.96'
PT 702+77.17
PC 702+98.26
P C
C
.4
P C
C
.4
P T
.4
P C
.2
P T
.1
703+00 704+00 705+00 706+00
4,880 4,880
4,890 4,890
4,900
4,910 4,910
-1.00%
+4.00%
+0.64%
.0
.7
.0
.7
.0
.5
L P
.9
SSD = 658'
K = 24
40' VC
HLSD = INF'
K = 109
100' VC HLSD = 135'
K = 21
140' VC
,9
.6
PICNIC AREA LOOP ROAD
"ALI_PARK_03" 706+53.71
N= 1684906.545 E= 964507.336
"ALI ML-SC 01" 42+43.69
SW
IFTCU
RREN
T SPU
R RO
AD
:4
J u n e
P ic n ic A re a
L o o p
P la n
S h e p w
-w o rk
\d \g la c -6 p ln p k n g .d g n
PROJECT
E.21
DJA11
MG101
CP
PA1
PA2
PA3
PA4
PA5
PA6
PA7
PA10
PA11
PA12
PA13
PA15
PA103
PA65
PA63
PA66
PA67
PA68
PA69
PA70
PA71
PA72
PA73
PA74
PA75
PA78
PA79
PA80
PA82
PA84
PA83
PA85
PA86
PA87PA88
PA89
PA91 PA90
PA92
PA93
PA94
PA95
PA104
PA109
PA105
PA106
PA107
PA108
PA96
PA97
PA98
PA99
PA100
PA101
PA102
Construction limit
Construction limit
Construction limit
Construction limit
Slope stake limit
Slope stake limit
Slope stake limit
N
"ALI ML-SC 01"
17'
17'
20.1'
20.1'
21.1'
R
R
R
R
R
5'R
5'R
R
.4
R
.4
R
61.4'R
R
R
R
R
0 20 401020
Scale in feet
S W I F T
C U
R R
E N
T S
P U
R R
O A
D
:0
M a y
P ic n ic A re a L o o p L a y o u t P la n o p w w o r k
\d
\g la c p ln p k n g
.d g n
SHEET 1 of 3
LAYOUT PLAN
PICNIC AREA LOOP
PROJECT
E.22
PA17
PA18
PA19
PA20
PA22
PA24
PA25
PA26
PA16
PA64
PA23
PA47
PA48
PA49
PA51
PA50
PA52
PA54
PA53
PA55
PA56PA57
PA58
PA60
PA59
PA61
PA65
PA63
PA110
PA111
PA114
PA115
PA112
PA113
20.1'
20.1'
17'
21'
21'
21.2'
R
R
4' R 4
R
R
10'R
.4
R
R
R
100' R
.4
R
.4 R
.4
R
R
0 20 401020
Scale in feet
:3
M a y
P ic n ic A re a L o o p L a y o u t P la n o p w w o r k
\d
\g la c p ln p k n g
.d g n
SHEET 2 of 3
LAYOUT PLAN
PICNIC AREA LOOP
PROJECT
E.23
CP22201
PA25
PA26
PA27
PA28
PA29
PA30
PA31
PA32
PA33
PA35
PA36
PA34
PA37
PA39
PA40
PA41
PA42
PA43
PA45
PA44
PA38
PA81
PA46
PA14
"ALI_ML-SC_01"
R
R
R
R
20.1'
17'
S W
IF
T C
U R R E N T S
P U R R
O A D
0 20 401020
Scale in feet
:3
M a y
P ic n ic A re a L o o p L a y o u t P la n o p w w o r k
\d
\g la c p ln p k n g
.d g n
SHEET 3 of 3
LAYOUT PLAN
PICNIC AREA LOOP
PROJECT
E.24
Point of TangentPT= Point of CurvaturePC= Vertical point of IntersectionVPI= Edge of PavementEOP=
Center of CurveCC= Point of Compound CurvaturePCC=
ABBREVIATIONS:
:1
J u n e
P ic n ic A re a
L o o p
L a y o u t
P o in ts o p w
-w o rk \d
\g la c
-6
-p ln
-p k n g
.d g n
SHEET 1 of 2
LAYOUT POINT TABELS
PICNIC AREA LOOP
PROJECT
E.25
3-inch compacted depth Aggregate surface course
3-inch compacted depth Roadway aggregate method 2
Edge of pavement
Varies 7'-18'
1:16
AGGREGATE SURFACE TYPICAL SECTION
ABBREVIATIONS:
Point of TangentPT= Point of CurvaturePC= Vertical point of IntersectionVPI= Edge of PavementEOP=
Center of CurveCC= Point of Compound CurvaturePCC=
:0
J u n e
P ic n ic A re a
L o o p
L a y o u t
P o in ts o p w
-w o rk \d
\g la c
-6
-p ln
-p k n g
.d g n
SHEET 2 of 2
LAYOUT POINT TABELS
PICNIC AREA LOOP
PROJECT
E.26
Existing ground
3-inch depth (typ.)
Aggregate-topsoil course, Existing profile grade
2-inch compacted depth
Asphalt concrete pavement, 1-inch compacted depth
(wedge and leveling course), Existing undisturbed asphalt, depth varies
Turnout
Width varies
Traveled lane
10'
TYPICAL SECTION
TURNOUT OVERLAY
51+45 to 56+00 RT
Shoulder
1'
C o n s tr u c ti o n l im it
Match existing � establishment
Turf
No scale
See Sheet C.1
Turnout width varies as shown on sheet E.29
:1
M a y
T u rn o u t D e ta p w
-w o rk
\d \g la c -6 p ln p k n g .d g n
SHEET 1 of 2
TYPICAL SECTIONS
TURNOUT OVERLAY
PROJECT
E.27
2-inch compacted depth
Asphalt concrete pavement, 1-inch compacted depth
(wedge and leveling course), Asphalt concrete pavement, Existing undisturbed asphalt, depth varies
3-inch depth (typ.)
Aggregate-topsoil course, Finished grade
TYPICAL SECTION
APPROACH OVERLAY
"ALI_APPR_2990_R"
500+12.40 to 501+60.54
"APP_HELIPAD_R"
800+11.02 to 801+91.64
Shoulder
1'
Traveled lane
Varies
Traveled lane
Varies
Shoulder
1'
� Match existing
C o n s tr u c ti o n l im itestablishment
Turf
C o n s tr u c ti o n l im it est abli shment Tur f
Match existing �
See Approach Road Table Sheet E.30.
[1]1
:1
M a y
T u rn o u t D e ta il s o f p w
-w o rk
\d \g la c -6 p ln p k n g .d g n
SHEET 2 of 2
TYPICAL SECTIONS
TURNOUT OVERLAY
PROJECT
E.28
R
R 1
R
R
92'R
4.
5'
R
3'R
R
BEGIN CONSTRUCTION
END CONSTRUCTION
"ALI_ML-SC_01"
Construction limit
N
.4
R t
.3
.0
R t
.2
.0
R t
.9
.0
R t
.9
8 8 .0
R t
.3
.0
R t
.3
.5
R t
.9
14.88' Lt
+23.60
8.00' Lt
+27.79
8.00' Lt
+52.95
8.00' Lt
+79.85
8.00' Lt
+27.76
16.60' Lt
+29.92 existing concrete pad
Preserve and protect
Line to be constructed by others
Proposed waterline
Edge of pavment
Edge of pavment
Shoulder
500 5
N= 1,684,831.172
E= 963,284.566
"ALI_APPR_2990 R" 500+12.40
"ALI_APPR_2990 R" 501+60.54
N= 1,684,829.736
E= 963,421.314
SWIFTCURRENT SPUR ROAD
N
Line to be constructed
"APR_HELIPAD_R"
"ALI_ML-SC_01"
Construction limit limit
Construction
.0
R t
.6
.0
R t
.8
.0
R t
.3
.7
R t
.9
.0
L t
.8
.0
L t
.4
.9
L t
.3
59.02' Lt
+14.99
52.98' Rt
+07.47
BEGIN CONSTRUCTION
Edge of pavement
Shoulder
S W I F T
C U
R R
E N
T S
P U
R R
O A
D
R
R4
R
R
43'R
N= 1,685,289.887
E= 965,088.667
"APP_HELIPAD_R" 800+11.02
N
"ALI_ML-SC_01"
Construction limit
Construction limit
CP
CP22198
CP
CP22197
42.72' Rt
+96.93
11.00' Rt
+45.75
.5
R t
.6
.9
R t
.8
3 1 .1
R t
.2
.0
R t
.3
68.66' Rt
+05.41
38.16' Rt
+29.41
67.10' Rt
+15.47
58.16' Rt
+14.42
Edge of pavement
Shoulder
Begin Turnout
End Turnout pavement
Edge of
N58°00'43"E
SWIFTCURRENT SPUR ROAD
R
R
R
R
'R
TURNOUT 51+45 to 56+00 RT
:3
M a y
M is c e ll a n e o u s T u r n o u ts a n d P a r k in g A r e a P la n p w w o r k
\d
\g la c p ln p k n g
.d g n
TURNOUT OVERLAY PLANS
PROJECT
E.29
Edge of travel way of approach� of highway�
Existing Surfacing10' grade line Existing road2"
E n d ty p ic a l vertical pavement Sawcut
Tack coat
Remove pavement (mill)
Asphalt overlay
Existing Concrete Pad10' grade line Existing road2"
E n d ty p ic a l
Tack coat
Remove pavement (mill)
Asphalt overlay
Match existing
W
R1 [1] R2
[1
APPROACH PLAN DETAIL
APPROACH CONNECTION DETAIL 1
FOOTNOTE:
See Sheet E. 28-29 for typical section, width, radii and length of approaches.
APPROACH CONNECTION DETAIL 2
29+84 RT
31+43 RT
No scale
:2
M a y
A p p ro a c h R o a d D e ta p w
-w o rk
\d \g la c -6 p ln a p r.
d g n
APPROACH ROAD DETAILS
PROJECT
E.30
2-inch compacted depth
Asphalt concrete pavement
Full depth reclamation, method 2, 2-inch
CAMPGROUND, LODGING AND
ADMINISTRATIVE AREA ROADS
TYPICAL SECTION
Location is approximate. Verifiy in field.
Underground waterline constructed by others.
Existing ground
Travel way
18' (nominal)
No Scale match existingmatch existing
:4
M a y
C a m p g r o u n d A r e a R o a d s T y p ic a l
S e c ti o n
S h e t) p w w o r k
\d
\g la c p ln p k n g
.d g n
TYPICAL SECTION
ADMINISTRATIVE AREA ROADS
CAMPGROUND, LODGING AND
PROJECT
E.31
STONE TOP
BC
HORSE TIE
GP
GP
GP
GP
GP
GP
GPGP
GPGP
GPGP
N
100 200050100
Scale in feet
Lodging Area
Administrative Area
Campground Loop See sheet E.35
See sheet E.33
See sheet E.34
Legend:
Overlay Area
Method 2 and Asphalt Concrete Pavement, Full Depth Reclamation, Upper Campground Loop
Lower Campground Loop
:2
M a y
C a m p g r o u n d R o a d p w w o r k
\d
\g la c p la n
C a m p g r o u n d .d g n
ADMINISTRATIVE AREA ROADS
CAMPGROUND, LODGING AND
PROJECT
E.30
IN2 116-9ALTELEPHONE
26" LIDRIM
IN2
WV
Y T I L I T U
D E I R U B
G
I N R A W
HORSE TIE
GP
GP
TP
S
S
S
S
S
S
S
S
S
TP
TP
TP
U168U167
U166
U164
U165
U170
50 10002550
Scale in feet
N
Legend:
Overlay Area
Method 2 and Asphalt Concrete Pavement, Full Depth Reclamation, 9 :2
M a y
L o d g in g A re p w w o r k
\d
\g la c p la n
C a m p g r o u n d .d g n
LODGING AREA
PROJECT
E.33
STONE TOP
26" LIDRIM
IN2 116-9ALTELEPHONE
26" LIDRIM
TELE
GP
GP
GPGP
GPGP
GPGP
U180
TP
TP
TP
50 10002550
Scale in feet
N
Legend:
Overlay Area
Method 2 and Asphalt Concrete Pavement, Full Depth Reclamation, UPPER CAMPGROUND LOOP
LOWER CAMPGROUND LOOP
:2
M a y
C a m p g r o u n d L o p w w o r k
\d
\g la c p la n
C a m p g r o u n d .d g n
CAMPGROUND LOOP
PROJECT
E.34
W
GP
GP
GP
GP
W
50 10002550
Scale in feet
N
Legend:
Overlay Area
Method 2 and Asphalt Concrete Pavement, Full Depth Reclamation, 9 :3
M a y
A d m in is tr a ti v e A r p w w o r k
\d
\g la c p la n
C a m p g r o u n d .d g n
ADMINISTRATIVE AREA
PROJECT
E.35
3'-6"
2" C
2"
2" C
3"
" B2
"2
4" C
3"
14" specific project information background. Adjust text to match
Black border and text on white for sign installation
No separate payment will be made
Refer to Subsection 107.01A
SWPPP Sign
"8
Outside margin =
"8
Border radius = 1
"8
Border thickness =
:4
M a y
T a b u la ti o n o f S
E S
C Q u a n ti ti p w w o r k
\d
\g la c p ln e c .d g n
TABULATION OF QUANTITIES
PROJECT
F.1
TPIN2 116-9AL
TELEPHONE
SS
TP
TPIN2
N
Place fiber rolls
Place fiber rolls fiber rolls
Place
Turf establishment establishment
Turf
Turf establishment
Turf establishment Turf establishment
Turf establishment
Turf establishment
Turf…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .