QA_07-18-24.pdf

PDF 94 KB Posted

Attached to
MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation
Solicitation number
69056724B000012
Issued by

About this file

This document contains a set of Questions and Answers related to the Swiftcurrent Spur Road Rehabilitation project, Federal Contract Opportunity 9a9956f6dcef4d06b852a0206d159d52. The key details are:

The project, MT NP GLAC 14(6), involves the rehabilitation of the Swiftcurrent Spur Road. The solicitation is issued by the Department of Transportation Federal Highway Administration. The Questions and Answers provide clarification on the size and source of boulders (barrier rock) to be used in the project. Specifically, the plan sheets indicate the typical dimensions for the boulders, and the contract specifications state there is no supplemental park source for the boulders - the contractor is responsible for procuring them.

View the file

Other files

File Type Posted
BidTab_MT NP GLAC 14(6).pdf PDF
BidSum MT NP GLAC 14(6).pdf PDF
QA_07-24-24.pdf PDF
QA_07-23-24.pdf PDF
QA_07-22-24.pdf PDF
583022-2.1622 swiftcurent Green Shed.pdf PDF
glac14-6_Plans-Legal.pdf PDF
VT_ALI_PARK_03.pdf PDF
NPS HQ and Swiftcurrent Geotech Rpt.pdf PDF
HA_ALI_PARK_02.pdf PDF
MT NP GLAC 14(6)_CompiledSWPPP_Final.pdf PDF
HA_ALI_ML-SC_01.pdf PDF
583022-1 Swifcurrent Green Shed.pdf PDF
XS_ALI_PARK_03.pdf PDF
XS_Turnout2390_LT.pdf PDF
NamedBoundaryQuantities.pdf PDF
XS_APPR_10.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
GM 3123 Final Geo Recommendations Swiftcurrent Rehabilitation.pdf PDF
MT NP GLAC 14(6) - Swift Current Spur Rd Rehab_Amended Final Pavement Memo.pdf PDF
VT_ALI_APPR_10.pdf PDF
XS_Culverts.pdf PDF
1430-031P Windy Crk Bridge Inspection.pdf PDF
HA_ALI_PARK_03.pdf PDF
Physical Data MT NP GLAC 14(6).zip ZIP file
Survey_control.xlsx XLSX spreadsheet
IFB 69056724B000012.pdf PDF
HA_ALI_APPR_10.pdf PDF
VT_ALI_PARK_02.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: MT NP GLAC 14(6), Project : Swiftcurrent Spur Road Rehabilitation

# General Technical Question Answer Date

1 X SCR 705.08 gives a general description of the shape of the boulders needed but does not give a size. How big do the boulders need to be?

See plan sheet C.1 for typical boulder (barrier rock) dimensions.

7/18/24

2 X Is there a source within the Park for these boulders? See SCR’s subsections 203.03 Salvaging Material, 251.06A Boulders, and SCR 705.08

Boulders (Barrier Rock). There is no supplemental park source for boulders. 7/18/24

Check General or Technical