This document is a field inspection report for Structure No. 1430-031P, the Windy Creek Bridge, located in Glacier National Park, Montana. The bridge is in fair condition, primarily due to deterioration of the original and widened structural concrete on the south side. Recommendations include removing the wearing surface, installing a waterproofing membrane and new wearing surface, removing vegetation growth and debris, and restriping the roadway. The estimated cost for rehabilitation is provided.

The related federal contract opportunity is for the MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation project, solicited by the Department of Transportation Federal Highway Administration. The full requirements for this project are provided in the attachment.

View the file

Other files

File Type Posted
BidTab_MT NP GLAC 14(6).pdf PDF
BidSum MT NP GLAC 14(6).pdf PDF
QA_07-24-24.pdf PDF
QA_07-23-24.pdf PDF
QA_07-22-24.pdf PDF
QA_07-18-24.pdf PDF
583022-2.1622 swiftcurent Green Shed.pdf PDF
glac14-6_Plans-Legal.pdf PDF
VT_ALI_PARK_03.pdf PDF
NPS HQ and Swiftcurrent Geotech Rpt.pdf PDF
HA_ALI_PARK_02.pdf PDF
MT NP GLAC 14(6)_CompiledSWPPP_Final.pdf PDF
HA_ALI_ML-SC_01.pdf PDF
583022-1 Swifcurrent Green Shed.pdf PDF
XS_ALI_PARK_03.pdf PDF
XS_Turnout2390_LT.pdf PDF
NamedBoundaryQuantities.pdf PDF
XS_APPR_10.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
GM 3123 Final Geo Recommendations Swiftcurrent Rehabilitation.pdf PDF
MT NP GLAC 14(6) - Swift Current Spur Rd Rehab_Amended Final Pavement Memo.pdf PDF
VT_ALI_APPR_10.pdf PDF
XS_Culverts.pdf PDF
HA_ALI_PARK_03.pdf PDF
Physical Data MT NP GLAC 14(6).zip ZIP file
Survey_control.xlsx XLSX spreadsheet
IFB 69056724B000012.pdf PDF
HA_ALI_APPR_10.pdf PDF
VT_ALI_PARK_02.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 1430-031P

WINDY CREEK BRIDGE INSPECTION DATE: 10/12/17

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 36.7 FT (11.2 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 16.0 FT (4.9 M)

WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 32.0 FT (9.8 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 25.5 FT (7.8 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1953

PROJ./PLAN REF. NO: ......... GNP 3-B / P22-5 SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1953 - BRIDGE WIDENED. 2015 - BRIDGE REHABILITATED.

LOCATION

GLACIER NATIONAL PARK MILE POINT: ..................... 10.42 (KM PT 16.77)

STATE: ................................. MONTANA LOCATION: 8.8 miles west of U.S. Route 89 (at Babb, MT) on Many Glacier Road. FACILITY CARRIED: ............ MANY GLACIER ROAD

FEATURE INTERSECTED: .. WINDY CREEK

STRUCTURE EVALUATION SUMMARY

This concrete frame bridge is in fair condition, primarily due to deterioration of the original and widened structural concrete on the south side. Rehabilitation of the north half of the bridge (westbound lane) took place during 2015.

Approximately 4' of the north face of the bridge and parapet had been repaired. The northern 3' of asphalt wearing surface was removed and prepped for paving.

Problems include widespread deterioration with exposed rebar at the junction between the original and widened portions of the frame; rutting of the asphalt wearing surface from tire action; and sloughing of the channel banks.

Additional problems include a missing object marker, faded roadway striping, vegetation encroaching on the structure, and paved over (plugged) deck drains along the south curb.

It should also be noted that this bridge has been designated as "Scour Critical" based on a 1999 hydraulic study. The calculated scour depth is lower than the bottom of the pier footings. While no significant scour was observed at the abutments or piers, it is recommended that the structure be checked for any visible effects of scour immediately following major flood events.

INSPECTION TEAM: J. HENSLEY, A. SMYTH

CONDITION ASSESSMENT:

JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/13/18

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 1430-031P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

58.3 REMOVE WEARING SURFACE, INSTALL WATERPROOFING

MEMBRANE

AND PLACE NEW WEARING SURFACE.

58.7, 60.6 REMOVE VEGETATION GROWTH AND DEBRIS FROM SOUTH

CURBLINE AND ADJACENT TO ALL WINGWALLS. CLEAR DECK

DRAINS AS NECESSARY.

58.10, 222.9

RESTRIPE CENTERLINE AND EDGE LINES.

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN AND CONSTRUCTION ENGINEERING (APPROXIMATELY 70%

OF TOTAL REHAB COST) PLUS PARK LOCATION FACTOR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 1430-031P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

(STRIPING)

N N F N N N N N G

N G

F F N G P G

F

N

G

F

58.1, 59.3 MINOR CRACKING ON SOUTH SIDE WITH MODERATE

EFFLORESCENCE. STRUCTURE WAS WIDENED ON SOUTH SIDE IN

1953. MINOR SPALLING OF SLAB AND CRACKING WITH

EFFLORESCENCE ON LONGITUDINAL JOINT BETWEEN ORIGINAL

SLAB AND WIDENED PORTION. SEVERAL AREAS OF MINOR

HONEYCOMBING ON DECK UNDERSIDE. MINOR TO MODERATE

TRANSVERSE CRACKING ON DECK UNDERSIDE NEAR PIERS (UP TO

1/16" WIDE) EXTENDS FULL WIDTH OF WIDENED SECTION OF

BRIDGE.

58.3,4 MINOR TO MODERATE RUTTING OF ASPHALT WEARING SURFACE IN

WHEEL PATHS OVER STRUCTURE.

NORTH 3' OF ASPHALT PAVEMENT OVER BRIDGE REMOVED AND

REPLACED IN 2015.

58.6, 60.6 MASONRY MORTAR JOINTS OF PARAPETS AND WINGWALLS HAVE

BEEN CLEANED AND REPOINTED ON SOUTH SIDE. NORTH

PARAPET AND WINGWALLS HAVE BEEN COMPLETELY

RECONSTRUCTED.

MEDIUM SIZED TREE GROWING AGAINST SOUTHEAST WINGWALL.

58.7 THREE DECK DRAINS ALONG NORTH CURB FUNCTIONING

NORMALLY; ALL THREE DECK DRAINS ALONG SOUTH CURB PAVED

OVER.

MINOR ACCUMULATION OF GRAVEL AND VEGETATION GROWTH IN

SOUTH CURBLINE. LARGE VEGETATION GROWTH AT NORTHWEST

CURBLINE WING OF BRIDGE. MINOR VEGETATION IN NORTHEAST

CURBLINE WING OF BRIDGE.

58.8 TWO SMALL BLACK PLASTIC UTILITY CONDUITS BURIED IN

UPSTREAM CHANNEL. (UNABLE TO VERIFY DURING THIS

INSPECTION)

58.10, 222.9 CENTERLINE, NORTH EDGE LINE, AND SOUTH EDGE LINE STRIPING

FADED.

BREASTWALLS OR COLUMNS 1. F

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. N

BACKWALLS AND/OR BULKHEADS 4. N

FOUNDATIONS 5. N

WINGWALLS 6. G

WEEP HOLES 7. N

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR 9. G

SETTLEMENT OR DEFLECTION 10. G

SLOPE PROTECTION 11. N

OTHER (VEGETATION) 12. F

PIER(S)

F13. WALLS AND/OR COLUMNS

N14. PILE BENTS

N15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS

G17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

INSPECTION DATE: 10/12/17

STRUCTURE NO. 1430-031P FIELD INSPECTION REPORT

WINDY CREEK BRIDGE

ITEM REFERENCE AND REMARKS

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

1. ALIGNMENT

61. CHANNEL 5

G F N G N

MED

SUFF

7 FT.

9. STREAM BED COMPOSITION :

GRAVEL, COBBLE, BOULDERS

222. APPROACHES 7

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS

(STRIPING)

N N N F G F F F F

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 0

N N N

60.1,13

60.6,12

61.2

61.4

222.4,6

222.7

36.A

MINOR RANDOM HORIZONTAL AND VERTICAL CRACKING (UP TO

1/16" WIDE) WITH EFFLORESCENCE ON ABUTMENT AND PIER

WALLS. MODERATE VERTICAL CRACK (UP TO 1/8" WIDE) WITH

EFFLORESCENCE AND RUST STAINING IN EAST ABUTMENT WALL AT

WIDENING CONSTRUCTION JOINT. MINOR SPALLING OF WEST

PIER, WEST FACE ALONG CONSTRUCTION JOINT. SEVERAL AREAS

OF MINOR HONEYCOMBING ON WEST ABUTMENT BREASTWALL

AND BOTH PIERS. TIMBER FORM REMAINS IN PLACE ON NORTH

END OF EAST PIER, WEST SIDE.

TREES GROWING AGAINST SOUTH WINGWALLS.

MODERATE SLOUGHING OF CHANNEL BANKS.

LARGE SOIL AND GRAVEL DEPOSIT FROM 6/95 FLOOD ON

UPSTREAM SIDE.

MODERATE RUTTING OF ASPHALT PAVEMENT IN WHEEL LINES OF

BOTH APPROACHES.

MINOR SETTLEMENT (<1.5") OF BOTH APPROACHES.

TYPE 3 REFLECTIVE OBJECT MARKERS AT ALL CORNERS OF

BRIDGE.

PARAPET HEIGHT OF 2'-0" DOES NOT MEET AASHTO MINIMUM

HEIGHT SPECIFICATION OF 2'-3" FOR TRAFFIC BARRIERS.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 1430-031P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 13 12 22 20

HS 24 22 41 37

TYPE 3 23 21 38 34

TYPE 3S2 36 33 60 54

TYPE 3-3 44 40 74 67

DESIGN LOADING: H15 (M13.5)

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

X ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 1/15

LOAD RATING CONTROLLED BY: MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1430-031P

STRUCTURE IDENTIFICATION

(201) PARK: GLACIER NATIONAL PARK

(202) STRUCTURE NAME: .......... WINDY CREEK BRIDGE

(203) STRUCTURE KIND: ............ 1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 1430-031P

(205) NPS REGION: .................... 1 - INTERMOUNTAIN

(206) ROUTE CODE NUMBER: ... 14

(207) ROAD SECTION NO: .......... 031P

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. PARK

(211) PROJECT NO(S): ................ GNP 3-B

(212) DRAWING NUMBERS: ....... P22-5

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

308 - MONTANA (MT)

039 - GRANITE

161182020

WINDY CREEK

MANY GLACIER ROAD

1430031P0000000

8.8 miles west of U.S. Ro

99.99 FT (99.99 M)

10.42 (KM PT 16.77)

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

01 - SLAB

16.0 FT (4.9 M)

36.7 FT (11.2 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 24.0 TONS (21.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 41.0 TONS (37.2 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 10/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: Y - 3 - LOAD RATING CALCULATION (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: 9/98 INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1430-031P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 48°49'39.30" (51) CURB TO CURB WIDTH: ........... 25.5 FT (7.8 M)

(17) LONGITUDE: ......................... 113°36'26.20" (52) DECK WIDTH: ............................ 32.0 FT (9.8 M)

(19) DETOUR LENGTH: ............... 99 MI (159 KM) (32) APPR. ROADWAY WIDTH: ........ 30.0 FT (9.1 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 4.0 FT (1.2 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 452 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2017 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 542 (47) TOTAL HORIZ. CLEARANCE: .... 28.0 FT (8.5 M)

(115) YEAR OF FUTURE ADT: ..... 2037 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 3 - PARAPET ONLY

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 9 - OTHER

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.00 FT (0.61 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK: .............. 35 - GENERAL REHAB

(75B) WORK DONE BY: ............. 1 - CONTRACT

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

3 - Scour critical; foundations un

2 - REHAB/RECONSTRUCTION

D - MINOR

$0

$81,000

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1953 - BRIDGE WIDENED. 2015 - BRIDGE REHABILITATED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

Span #1 & #3 - Length 10.4', Span #2 16'; Type 207 (Conc. Frame) 3-each http:113�36'26.20 http:48�49'39.30

APPENDIX STRUCTURE NO. 1430-031P

PHOTOGRAPHS STRUCTURE NO. 1430-031P

PHOTO #1 - LOOKING EAST

FLOW

PHOTO #2 - SOUTH (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL VIEW OF TOPSIDE LOOKING EAST

PHOTO #4 - SPALL ON EASTBOUND LANE NEAR WEST SIDE

PHOTO #5 - TRANSVERSE CRACKING OF PAVEMENT ALONG EAST

APPROACH END

PHOTO #6 - TYPICAL RUTTING AND SPALLING IN WESTBOUND LANE

NEAR EAST SIDE

PHOTO #7 - TYPICAL STONE CURB AND PARAPET CONDITION

PHOTO #8 - SOIL AND VEGETATION ON CURB LINE; SOUTH CURB AND

RAIL SHOWN LOOKING EAST

PHOTO #9 - COMPLETED REPAIR OF STONE PARAPET AND PAVEMENT

ALONG NORTH SIDE

PHOTO #10 - GENERAL VIEW OF EAST ABUTMENT

PHOTO #11 - TYPICAL LONGITUDINAL CRACKING ON EAST ABUTMENT

WALL

PHOTO #12 - GENERAL UNDERSIDE VIEW OF EAST SPAN LOOKING

SOUTH

PHOTO #13 - GENERAL VIEW OF REPAIRS ON NORTH FACE; BOTH

PIERS SHOWN

PHOTO #14 - TYPICAL SCALING ON ALL PIER AND ABUTMENT WALL

FACES; EAST FACE OF EAST PIER SHOWN

PHOTO #15 - LONGITUDINAL CRACKING WITH MODERATE

EFFLORESCENCE ON UNDERSIDE OF SLAB IN EAST SPAN NEAR

NORTH SIDE

PHOTO #16 - TYPICAL VERTICAL CRACKING ON EAST FACE OF EAST

PIER

PHOTO #17 - SPALLING AND HONEYCOMBING ON EAST FACE OF EAST

PIER NEAR SOUTH END

PHOTO #18 - TYPICAL DIAGONAL AND HORIZONTAL CRACKING WITH

EFFLORESCENCE ON EAST FACE OF EAST PIER WALL WHERE PIER

MEETS SLAB

PHOTO #19 - GENERAL VIEW OF EAST PIER; EAST FACE SHOWN

PHOTO #20 - GENERAL VIEW OF EAST PIER; WEST FACE SHOWN

PHOTO #21 - HORIZONTAL CRACKING WITH EFFLORESCENCE ON

SOUTH EDGE FACE OD SLAB ABOVE EAST PIER

PHOTO #22 - GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING

PHOTO #23 - LONGITUDINAL CRACKING WITH EFFLORESCENCE AND

RUST STAINING ALONG WIDENING JOINT IN CENTER SPAN NEAR

SOUTH SIDE

PHOTO #24 - TYPICAL LONGITUDINAL CRACKING WITH

EFFLORESCENCE UNDER CENTER SPAN

PHOTO #25 - TYPICAL HONEYCOMBING ON EAST FACE OF WEST PIER

WHERE SLAB MEETS PIER

PHOTO #26 - LONGITUDINAL CRACKING WITH EFFLORESCENCE

EXTENDING FROM EAST PIER WALL INTO UNDERSIDE OF CENTER

SPAN

PHOTO #27 - GENERAL VIEW OF WEST PIER; EAST FACE SHOWN

PHOTO #28 - GENERAL VIEW OF WEST PIER; WEST FACE SHOWN

PHOTO #29 - TYPICAL HORIZONTAL AND MAP CRACKING ON SOUTH

FACE OF WEST PIER

PHOTO #30 - HONEYCOMBING AND SCALING NEAR BASE OF EAST

FACE OF WEST PIER

PHOTO #31 - SPALLING ON NORTHWEST CORNER OF WEST PIER

PHOTO #32 - GENERAL UNDERSIDE VIEW OF WEST SPAN LOOKING

PHOTO #33 - LONGITUDINAL CRACKING WITH EFFLORESCENCE

ALONG CONCRETE REPAIR JOINT IN WEST SPAN NEAR NORTH SIDE

PHOTO #34 - SPALLING (UP TO 0.75"D) ALONG WIDENING JOINT IN

WEST FACE OF WEST PIER NEAR SOUTH SIDE

PHOTO #35 - HORIZONTAL AND LONGITUDINAL CRACKING WITH

EFFLORESCENCE AND RUST STAINING ALONG WIDENING JOINT IN

WEST SPAN NEAR SOUTH SIDE

PHOTO #36 - TYPICAL MAP CRACKING AND SPALLING ON SOUTH FACE

OF SLAB EDGE IN WEST SPAN

PHOTO #37 - GENERAL VIEW OF WEST ABUTMENT

PHOTO #38 - LARGE DIAGONAL CRACK WITH EFFLORESCENCE IN

WEST ABUTMENT EXTENDING FROM CONCRETE REPAIR ON NORTH

SIDE

PHOTO #39 - TYPICAL VERTICAL CRACKING AND HONEYCOMBING

ALONG WEST ABUTMENT WALL

PHOTO #40 - UPSTREAM CHANNEL

PHOTO #41 - DOWNSTREAM CHANNEL

PHOTO #42 - EAST APPROACH

PHOTO #43 - WEST APPROACH

File details come from the government source that posted it. Updated .