1430-031P Windy Crk Bridge Inspection.pdf
PDF 5 MB Posted
- Solicitation number
- 69056724B000012
About this file
This document is a field inspection report for Structure No. 1430-031P, the Windy Creek Bridge, located in Glacier National Park, Montana. The bridge is in fair condition, primarily due to deterioration of the original and widened structural concrete on the south side. Recommendations include removing the wearing surface, installing a waterproofing membrane and new wearing surface, removing vegetation growth and debris, and restriping the roadway. The estimated cost for rehabilitation is provided.
The related federal contract opportunity is for the MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation project, solicited by the Department of Transportation Federal Highway Administration. The full requirements for this project are provided in the attachment.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 1430-031P
WINDY CREEK BRIDGE INSPECTION DATE: 10/12/17
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 36.7 FT (11.2 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 16.0 FT (4.9 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 32.0 FT (9.8 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 25.5 FT (7.8 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1953
PROJ./PLAN REF. NO: ......... GNP 3-B / P22-5 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1953 - BRIDGE WIDENED. 2015 - BRIDGE REHABILITATED.
LOCATION
GLACIER NATIONAL PARK MILE POINT: ..................... 10.42 (KM PT 16.77)
STATE: ................................. MONTANA LOCATION: 8.8 miles west of U.S. Route 89 (at Babb, MT) on Many Glacier Road. FACILITY CARRIED: ............ MANY GLACIER ROAD
FEATURE INTERSECTED: .. WINDY CREEK
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in fair condition, primarily due to deterioration of the original and widened structural concrete on the south side. Rehabilitation of the north half of the bridge (westbound lane) took place during 2015.
Approximately 4' of the north face of the bridge and parapet had been repaired. The northern 3' of asphalt wearing surface was removed and prepped for paving.
Problems include widespread deterioration with exposed rebar at the junction between the original and widened portions of the frame; rutting of the asphalt wearing surface from tire action; and sloughing of the channel banks.
Additional problems include a missing object marker, faded roadway striping, vegetation encroaching on the structure, and paved over (plugged) deck drains along the south curb.
It should also be noted that this bridge has been designated as "Scour Critical" based on a 1999 hydraulic study. The calculated scour depth is lower than the bottom of the pier footings. While no significant scour was observed at the abutments or piers, it is recommended that the structure be checked for any visible effects of scour immediately following major flood events.
INSPECTION TEAM: J. HENSLEY, A. SMYTH
CONDITION ASSESSMENT:
JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/13/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 1430-031P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.3 REMOVE WEARING SURFACE, INSTALL WATERPROOFING
MEMBRANE
AND PLACE NEW WEARING SURFACE.
58.7, 60.6 REMOVE VEGETATION GROWTH AND DEBRIS FROM SOUTH
CURBLINE AND ADJACENT TO ALL WINGWALLS. CLEAR DECK
DRAINS AS NECESSARY.
58.10, 222.9
RESTRIPE CENTERLINE AND EDGE LINES.
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN AND CONSTRUCTION ENGINEERING (APPROXIMATELY 70%
OF TOTAL REHAB COST) PLUS PARK LOCATION FACTOR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 1430-031P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
(STRIPING)
N N F N N N N N G
N G
F F N G P G
F
N
G
F
58.1, 59.3 MINOR CRACKING ON SOUTH SIDE WITH MODERATE
EFFLORESCENCE. STRUCTURE WAS WIDENED ON SOUTH SIDE IN
1953. MINOR SPALLING OF SLAB AND CRACKING WITH
EFFLORESCENCE ON LONGITUDINAL JOINT BETWEEN ORIGINAL
SLAB AND WIDENED PORTION. SEVERAL AREAS OF MINOR
HONEYCOMBING ON DECK UNDERSIDE. MINOR TO MODERATE
TRANSVERSE CRACKING ON DECK UNDERSIDE NEAR PIERS (UP TO
1/16" WIDE) EXTENDS FULL WIDTH OF WIDENED SECTION OF
BRIDGE.
58.3,4 MINOR TO MODERATE RUTTING OF ASPHALT WEARING SURFACE IN
WHEEL PATHS OVER STRUCTURE.
NORTH 3' OF ASPHALT PAVEMENT OVER BRIDGE REMOVED AND
REPLACED IN 2015.
58.6, 60.6 MASONRY MORTAR JOINTS OF PARAPETS AND WINGWALLS HAVE
BEEN CLEANED AND REPOINTED ON SOUTH SIDE. NORTH
PARAPET AND WINGWALLS HAVE BEEN COMPLETELY
RECONSTRUCTED.
MEDIUM SIZED TREE GROWING AGAINST SOUTHEAST WINGWALL.
58.7 THREE DECK DRAINS ALONG NORTH CURB FUNCTIONING
NORMALLY; ALL THREE DECK DRAINS ALONG SOUTH CURB PAVED
OVER.
MINOR ACCUMULATION OF GRAVEL AND VEGETATION GROWTH IN
SOUTH CURBLINE. LARGE VEGETATION GROWTH AT NORTHWEST
CURBLINE WING OF BRIDGE. MINOR VEGETATION IN NORTHEAST
CURBLINE WING OF BRIDGE.
58.8 TWO SMALL BLACK PLASTIC UTILITY CONDUITS BURIED IN
UPSTREAM CHANNEL. (UNABLE TO VERIFY DURING THIS
INSPECTION)
58.10, 222.9 CENTERLINE, NORTH EDGE LINE, AND SOUTH EDGE LINE STRIPING
FADED.
BREASTWALLS OR COLUMNS 1. F
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. N
BACKWALLS AND/OR BULKHEADS 4. N
FOUNDATIONS 5. N
WINGWALLS 6. G
WEEP HOLES 7. N
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR 9. G
SETTLEMENT OR DEFLECTION 10. G
SLOPE PROTECTION 11. N
OTHER (VEGETATION) 12. F
PIER(S)
F13. WALLS AND/OR COLUMNS
N14. PILE BENTS
N15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
G17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
INSPECTION DATE: 10/12/17
STRUCTURE NO. 1430-031P FIELD INSPECTION REPORT
WINDY CREEK BRIDGE
ITEM REFERENCE AND REMARKS
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
1. ALIGNMENT
61. CHANNEL 5
G F N G N
MED
SUFF
7 FT.
9. STREAM BED COMPOSITION :
GRAVEL, COBBLE, BOULDERS
222. APPROACHES 7
OTHER 9.
ALIGNMENT 8.
SIGNS 7.
SETTLEMENT 6.
EROSION 5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
1. APPROACH SLABS
(STRIPING)
N N N F G F F F F
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION 5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
N N N
60.1,13
60.6,12
61.2
61.4
222.4,6
222.7
36.A
MINOR RANDOM HORIZONTAL AND VERTICAL CRACKING (UP TO
1/16" WIDE) WITH EFFLORESCENCE ON ABUTMENT AND PIER
WALLS. MODERATE VERTICAL CRACK (UP TO 1/8" WIDE) WITH
EFFLORESCENCE AND RUST STAINING IN EAST ABUTMENT WALL AT
WIDENING CONSTRUCTION JOINT. MINOR SPALLING OF WEST
PIER, WEST FACE ALONG CONSTRUCTION JOINT. SEVERAL AREAS
OF MINOR HONEYCOMBING ON WEST ABUTMENT BREASTWALL
AND BOTH PIERS. TIMBER FORM REMAINS IN PLACE ON NORTH
END OF EAST PIER, WEST SIDE.
TREES GROWING AGAINST SOUTH WINGWALLS.
MODERATE SLOUGHING OF CHANNEL BANKS.
LARGE SOIL AND GRAVEL DEPOSIT FROM 6/95 FLOOD ON
UPSTREAM SIDE.
MODERATE RUTTING OF ASPHALT PAVEMENT IN WHEEL LINES OF
BOTH APPROACHES.
MINOR SETTLEMENT (<1.5") OF BOTH APPROACHES.
TYPE 3 REFLECTIVE OBJECT MARKERS AT ALL CORNERS OF
BRIDGE.
PARAPET HEIGHT OF 2'-0" DOES NOT MEET AASHTO MINIMUM
HEIGHT SPECIFICATION OF 2'-3" FOR TRAFFIC BARRIERS.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 1430-031P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 13 12 22 20
HS 24 22 41 37
TYPE 3 23 21 38 34
TYPE 3S2 36 33 60 54
TYPE 3-3 44 40 74 67
DESIGN LOADING: H15 (M13.5)
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 1/15
LOAD RATING CONTROLLED BY: MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1430-031P
STRUCTURE IDENTIFICATION
(201) PARK: GLACIER NATIONAL PARK
(202) STRUCTURE NAME: .......... WINDY CREEK BRIDGE
(203) STRUCTURE KIND: ............ 1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 1430-031P
(205) NPS REGION: .................... 1 - INTERMOUNTAIN
(206) ROUTE CODE NUMBER: ... 14
(207) ROAD SECTION NO: .......... 031P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: ....... YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................ GNP 3-B
(212) DRAWING NUMBERS: ....... P22-5
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
308 - MONTANA (MT)
039 - GRANITE
161182020
WINDY CREEK
MANY GLACIER ROAD
1430031P0000000
8.8 miles west of U.S. Ro
99.99 FT (99.99 M)
10.42 (KM PT 16.77)
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
01 - SLAB
16.0 FT (4.9 M)
36.7 FT (11.2 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 24.0 TONS (21.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 41.0 TONS (37.2 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 10/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 3 - LOAD RATING CALCULATION (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: 9/98 INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 1430-031P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 48°49'39.30" (51) CURB TO CURB WIDTH: ........... 25.5 FT (7.8 M)
(17) LONGITUDE: ......................... 113°36'26.20" (52) DECK WIDTH: ............................ 32.0 FT (9.8 M)
(19) DETOUR LENGTH: ............... 99 MI (159 KM) (32) APPR. ROADWAY WIDTH: ........ 30.0 FT (9.1 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 4.0 FT (1.2 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 452 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2017 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 542 (47) TOTAL HORIZ. CLEARANCE: .... 28.0 FT (8.5 M)
(115) YEAR OF FUTURE ADT: ..... 2037 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 3 - PARAPET ONLY
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 9 - OTHER
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.00 FT (0.61 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK: .............. 35 - GENERAL REHAB
(75B) WORK DONE BY: ............. 1 - CONTRACT
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
3 - Scour critical; foundations un
2 - REHAB/RECONSTRUCTION
D - MINOR
$0
$81,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1953 - BRIDGE WIDENED. 2015 - BRIDGE REHABILITATED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
Span #1 & #3 - Length 10.4', Span #2 16'; Type 207 (Conc. Frame) 3-each http:113�36'26.20 http:48�49'39.30
APPENDIX STRUCTURE NO. 1430-031P
PHOTOGRAPHS STRUCTURE NO. 1430-031P
PHOTO #1 - LOOKING EAST
FLOW
PHOTO #2 - SOUTH (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL VIEW OF TOPSIDE LOOKING EAST
PHOTO #4 - SPALL ON EASTBOUND LANE NEAR WEST SIDE
PHOTO #5 - TRANSVERSE CRACKING OF PAVEMENT ALONG EAST
APPROACH END
PHOTO #6 - TYPICAL RUTTING AND SPALLING IN WESTBOUND LANE
NEAR EAST SIDE
PHOTO #7 - TYPICAL STONE CURB AND PARAPET CONDITION
PHOTO #8 - SOIL AND VEGETATION ON CURB LINE; SOUTH CURB AND
RAIL SHOWN LOOKING EAST
PHOTO #9 - COMPLETED REPAIR OF STONE PARAPET AND PAVEMENT
ALONG NORTH SIDE
PHOTO #10 - GENERAL VIEW OF EAST ABUTMENT
PHOTO #11 - TYPICAL LONGITUDINAL CRACKING ON EAST ABUTMENT
WALL
PHOTO #12 - GENERAL UNDERSIDE VIEW OF EAST SPAN LOOKING
SOUTH
PHOTO #13 - GENERAL VIEW OF REPAIRS ON NORTH FACE; BOTH
PIERS SHOWN
PHOTO #14 - TYPICAL SCALING ON ALL PIER AND ABUTMENT WALL
FACES; EAST FACE OF EAST PIER SHOWN
PHOTO #15 - LONGITUDINAL CRACKING WITH MODERATE
EFFLORESCENCE ON UNDERSIDE OF SLAB IN EAST SPAN NEAR
NORTH SIDE
PHOTO #16 - TYPICAL VERTICAL CRACKING ON EAST FACE OF EAST
PIER
PHOTO #17 - SPALLING AND HONEYCOMBING ON EAST FACE OF EAST
PIER NEAR SOUTH END
PHOTO #18 - TYPICAL DIAGONAL AND HORIZONTAL CRACKING WITH
EFFLORESCENCE ON EAST FACE OF EAST PIER WALL WHERE PIER
MEETS SLAB
PHOTO #19 - GENERAL VIEW OF EAST PIER; EAST FACE SHOWN
PHOTO #20 - GENERAL VIEW OF EAST PIER; WEST FACE SHOWN
PHOTO #21 - HORIZONTAL CRACKING WITH EFFLORESCENCE ON
SOUTH EDGE FACE OD SLAB ABOVE EAST PIER
PHOTO #22 - GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING
PHOTO #23 - LONGITUDINAL CRACKING WITH EFFLORESCENCE AND
RUST STAINING ALONG WIDENING JOINT IN CENTER SPAN NEAR
SOUTH SIDE
PHOTO #24 - TYPICAL LONGITUDINAL CRACKING WITH
EFFLORESCENCE UNDER CENTER SPAN
PHOTO #25 - TYPICAL HONEYCOMBING ON EAST FACE OF WEST PIER
WHERE SLAB MEETS PIER
PHOTO #26 - LONGITUDINAL CRACKING WITH EFFLORESCENCE
EXTENDING FROM EAST PIER WALL INTO UNDERSIDE OF CENTER
SPAN
PHOTO #27 - GENERAL VIEW OF WEST PIER; EAST FACE SHOWN
PHOTO #28 - GENERAL VIEW OF WEST PIER; WEST FACE SHOWN
PHOTO #29 - TYPICAL HORIZONTAL AND MAP CRACKING ON SOUTH
FACE OF WEST PIER
PHOTO #30 - HONEYCOMBING AND SCALING NEAR BASE OF EAST
FACE OF WEST PIER
PHOTO #31 - SPALLING ON NORTHWEST CORNER OF WEST PIER
PHOTO #32 - GENERAL UNDERSIDE VIEW OF WEST SPAN LOOKING
PHOTO #33 - LONGITUDINAL CRACKING WITH EFFLORESCENCE
ALONG CONCRETE REPAIR JOINT IN WEST SPAN NEAR NORTH SIDE
PHOTO #34 - SPALLING (UP TO 0.75"D) ALONG WIDENING JOINT IN
WEST FACE OF WEST PIER NEAR SOUTH SIDE
PHOTO #35 - HORIZONTAL AND LONGITUDINAL CRACKING WITH
EFFLORESCENCE AND RUST STAINING ALONG WIDENING JOINT IN
WEST SPAN NEAR SOUTH SIDE
PHOTO #36 - TYPICAL MAP CRACKING AND SPALLING ON SOUTH FACE
OF SLAB EDGE IN WEST SPAN
PHOTO #37 - GENERAL VIEW OF WEST ABUTMENT
PHOTO #38 - LARGE DIAGONAL CRACK WITH EFFLORESCENCE IN
WEST ABUTMENT EXTENDING FROM CONCRETE REPAIR ON NORTH
SIDE
PHOTO #39 - TYPICAL VERTICAL CRACKING AND HONEYCOMBING
ALONG WEST ABUTMENT WALL
PHOTO #40 - UPSTREAM CHANNEL
PHOTO #41 - DOWNSTREAM CHANNEL
PHOTO #42 - EAST APPROACH
PHOTO #43 - WEST APPROACH