VT_ALI_APPR_10.pdf
PDF 90 KB Posted
- Solicitation number
- 69056724B000012
About this file
This document appears to be a Vertical Alignment Review Report for a project titled "MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation". The report provides details on the horizontal and vertical alignment of the road, including the station, elevation, tangent grade, and tangent length.
The related federal contract opportunity is for the same project, "MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation". This is a solicitation issued by the Department of Transportation Federal Highway Administration, a civilian agency. The solicitation provides the full project requirements, but no additional details are included in the provided document.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vertical Alignment Review Report Report Created: Friday, May 10, 2024
Time: 2:41:13 PM
Project: Design IntlFt Description:
File Name: c:\pw-work\d0586848\glac14-6-ali_Overlay.dgn Last Revised: 5/10/2024 14:14:26
Note: All units in this report are in feet unless specified otherwise.
Horizontal Alignment: ALI_APPR_10 Horizontal Description:
Horizontal Style: Alignment\Baseline
Vertical Alignment: PRO_APPR_10 Vertical Description:
Vertical Style: Alignment\Baseline Station Elevation
Element: Linear
START 1000+00.00 4926.022
END 1000+76.04 4927.266
Tangent Grade: 0.016 Tangent Length: 76.043
Page 1 of 1MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation
File details come from the government source that posted it. Updated .