NamedBoundaryQuantities.pdf

PDF 1 MB Posted

Attached to
MT NP GLAC 14(6), Swiftcurrent Spur Road Rehabilitation
Solicitation number
69056724B000012
Issued by

About this file

This document is a Quantities Report that provides detailed information about construction materials, measurements, and quantities for the Swiftcurrent Spur Road Rehabilitation project (MT NP GLAC 14(6)).

The report covers various construction elements including pavement layers, fill, cut, turf establishment, foreslopes, and more. It provides specific quantities and measurements for each named boundary and station along the alignment. The project involves road rehabilitation work along the Swiftcurrent Spur Road. The federal agency overseeing the project is the Department of Transportation Federal Highway Administration. The solicitation number is 69056724B000012.

View the file

Other files

File Type Posted
BidTab_MT NP GLAC 14(6).pdf PDF
BidSum MT NP GLAC 14(6).pdf PDF
QA_07-24-24.pdf PDF
QA_07-23-24.pdf PDF
QA_07-22-24.pdf PDF
QA_07-18-24.pdf PDF
583022-2.1622 swiftcurent Green Shed.pdf PDF
glac14-6_Plans-Legal.pdf PDF
VT_ALI_PARK_03.pdf PDF
NPS HQ and Swiftcurrent Geotech Rpt.pdf PDF
HA_ALI_PARK_02.pdf PDF
MT NP GLAC 14(6)_CompiledSWPPP_Final.pdf PDF
HA_ALI_ML-SC_01.pdf PDF
583022-1 Swifcurrent Green Shed.pdf PDF
XS_ALI_PARK_03.pdf PDF
XS_Turnout2390_LT.pdf PDF
XS_APPR_10.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
GM 3123 Final Geo Recommendations Swiftcurrent Rehabilitation.pdf PDF
MT NP GLAC 14(6) - Swift Current Spur Rd Rehab_Amended Final Pavement Memo.pdf PDF
VT_ALI_APPR_10.pdf PDF
XS_Culverts.pdf PDF
1430-031P Windy Crk Bridge Inspection.pdf PDF
HA_ALI_PARK_03.pdf PDF
Physical Data MT NP GLAC 14(6).zip ZIP file
Survey_control.xlsx XLSX spreadsheet
IFB 69056724B000012.pdf PDF
HA_ALI_APPR_10.pdf PDF
VT_ALI_PARK_02.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quantities Report by Named Boundary

Report Created: Thursday, June 6, 2024 Time: 1:32:45 PM

Named Boundary Group:

ALI_ML-SC_01

Alignment Name: ALI_ML-SC_01

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

Station Named Boundary Name Material Count Length Top Sloped Area Volume

72+25.320 Plan 1

Fill: 2466.635

Cut: 644.417

DNC:

Turf Establishment: 38923.160

Pavement Layer 1: 91839.924 553.636

Leveling: 83522.789 113.359

Pavement Layer 2: 15265.671 61.179

Foreslope: 8402.136

Volumes_Fill: 24120.124 32.479

Volumes_Cut: 25863.789 17.333

Baseline: 4539.169

DNC: 40071.409

AUX_04: 8656.022

Edge of Widen 1: 6746.096

Edge of Widen: 6748.054

Centerline 1: 4483.583

Centerline: 4483.583

Edge of Overlay 1: 8967.165

Edge of Overlay: 8967.165

Edge of Pavt 1: 6748.566

Volumes_Topsoil Stripping Limits: 6774.861

Prop Clearing: 6881.590

Cut: 1892.569

Fill: 4155.065

FINAL

Page 1 of 1MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Time: 1:16:01 PM

Named Boundary Group:

ALI_ML-SC_01

Alignment Name: ALI_ML-SC_01

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

Station Named Boundary Name Material Count Length Top Sloped Area Volume

21+98.000 Sc_MotorInn

Fill: 3071.972

Foreslope: 402.567

Curb Bottom: 1776.287 32.888

Cut: 546.975

DNC:

Pavement Layer 1: 75937.438 702.292

Curb Top: 2118.241 55.474

Turf Establishment: 6312.876

Pavement Layer 4: 76644.519 1422.811

Subex_Exc2: 183.419 11.882

Pavement Layer 2: 764.998 5.027

Subex_Backfill2: 197.177 12.280

Sidewalk Layer 1: 4947.905 45.726

Sidewalk Layer 2: 4948.757 60.984

Verge: 3519.735 64.790

Volumes_Fill: 7966.531 150.755

Volumes_Cut: 83235.818 2030.808

Baseline: 387.072

DNC: 529.374

Centerline 1: 56.007

Centerline: 56.007

Centerline 4: 56.007

Edge of Shld: 1069.786

Edge of Shld 4: 431.148

Lane Line A1: 469.559

Edge of Pavt: 469.559

Lane Line A4: 469.559

Centerline Exist: 56.007

Terrain_Breakline: 1539.295

Terrain_Exterior: 1241.127

Concrete Median Bot: 630.815

Edge of Pavt 1: 3275.875

Edge of Pavt 4: 3047.108

Edge of pavement: 1817.992

FINAL - Swiftcurrent Motor Inn

Page 1 of 2MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Station Named Boundary Name Material Count Length Top Sloped Area Volume

Prop Clearing: 1555.514

Curb Back Agg Bot: 1769.605

Curb Back Bot: 3539.211

Curb Back Top: 1666.646

Curb Face Agg Bot: 1784.012

Curb Face Bot: 1784.012

Curb Face Pavt: 1760.876

Curb Face Top: 1778.377

Fill: 1136.007

Edge of Shld 1: 217.460

Volumes_Topsoil Stripping Limits: 1330.521

Cut: 351.747

Ditch: 30.348

Sidewalk 1: 1442.187

Sidewalk 2: 1442.187

Sidewalk: 761.963

Baseline - Alt 1: 333.791

Subex_Backfill2: 124.280

Subex_Exc2: 71.920

FINAL - Swiftcurrent Motor Inn

Page 2 of 2MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Time: 1:26:45 PM

Named Boundary Group:

ALI_ML-SC_01

Alignment Name: ALI_ML-SC_01

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

Station Named Boundary Name Material Count Length Top Sloped Area Volume

23+08.093 APP_2228_R

Pavement Layer 2: 145.852 0.598

Turf Establishment: 388.688

Cut: 40.240

Fill: 3.907

Foreslope: 76.233

Leveling: 4.475 0.003

Pavement Layer 1: 549.345 3.308

DNC:

Volumes_Fill: 65.992 0.057

Volumes_Cut: 646.588 1.877

Baseline: 182.551

Terrain_Breakline: 22.860

Terrain_Exterior: 142.074

Edge of Pavt 1: 234.589

Volumes_Topsoil Stripping Limits: 62.486

Prop Clearing: 41.883

Edge of Widen 1: 63.851

DNC: 67.427

Edge of Widen: 67.427

Edge of Overlay 1: 70.544

Edge of Overlay: 70.544

Cut: 47.591

Fill: 8.895

23+13.074 APP_2228_L

Turf Establishment: 871.984

Cut: 47.900

Fill: 77.028

Leveling: 28.396 0.148

DNC:

Pavement Layer 2: 333.056 1.350

Pavement Layer 1: 1751.814 10.638

Foreslope: 183.314

Volumes_Fill: 1284.005 6.264

Volumes_Cut: 861.301 2.043

Page 1 of 7MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Baseline: 0.003

Baseline - Approach: 61.698

Terrain_Breakline: 111.771

Terrain_Exterior: 381.801

DNC: 147.178

Edge of Widen 1: 143.208

Edge of Widen: 147.178

Edge of Pavt 1: 468.643

Edge of Overlay 1: 150.364

Edge of Overlay: 150.364

Volumes_Topsoil Stripping Limits: 142.212

Prop Clearing: 137.441

Cut: 68.764

Fill: 55.430

27+62.781 APP_2710_R

Pavement Layer 1: 1666.090 10.108

Turf Establishment: 834.721

Fill: 114.145

Foreslope: 147.770

Cut: 23.072

Leveling: 15.691 0.116

DNC:

Pavement Layer 2: 280.047 1.149

Volumes_Fill: 803.162 3.302

Volumes_Cut: 1224.131 3.583

Baseline: 0.022

Baseline - Approach: 51.225

Terrain_Breakline: 129.196

Terrain_Exterior: 257.993

Edge of Pavt 1: 519.717

Volumes_Topsoil Stripping Limits: 123.404

Prop Clearing: 108.347

Edge of Widen 1: 126.552

DNC: 130.192

Edge of Widen: 130.192

Edge of Overlay 1: 133.443

Edge of Overlay: 133.443

Cut: 60.770

Fill: 53.957

29+22.390 APP_2857_R

DNC:

Cut: 46.502

Fill: 15.709

Foreslope: 124.625

Leveling: 3.116 0.000

Pavement Layer 1: 1240.684 7.523

Page 2 of 7MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Pavement Layer 2: 237.608 0.977

Turf Establishment: 761.757

Volumes_Fill: 45.045 0.079

Volumes_Cut: 1455.310 4.957

Baseline: 118.851

Terrain_Breakline: 40.034

Terrain_Exterior: 214.980

Edge of Pavt 1: 368.272

Volumes_Topsoil Stripping Limits: 106.484

Prop Clearing: 94.000

Edge of Widen 1: 107.417

DNC: 111.005

Edge of Widen: 111.005

Edge of Overlay 1: 114.157

Edge of Overlay: 114.157

Cut: 84.970

Fill: 11.334

Baseline - Approach:

32+75.602 APP_29+89_R

Foreslope: 197.257

DNC:

Leveling: 46.306 0.033

Pavement Layer 2: 414.651 1.728

Fill: 183.061

Cut: 5.710

Pavement Layer 1: 2567.495 15.569

Turf Establishment: 1313.172

Volumes_Fill: 2537.484 7.538

Volumes_Cut: 528.382 0.300

Baseline: 400.125

Terrain_Interior: 69.734

Terrain_Exterior: 515.363

Terrain_Breakline: 151.336

Edge of Pavt 1: 947.455

Volumes_Topsoil Stripping Limits: 242.723

Prop Clearing: 253.354

Edge of Widen 1: 229.437

DNC: 229.756

Edge of Widen: 229.756

Edge of Overlay 1: 229.905

Edge of Overlay: 229.905

Cut: 52.257

Fill: 177.286

Baseline - Approach:

33+50.000 TURN_L

Cut: 8185.500 0.000

Page 3 of 7MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Pavement Layer 2: 1612.857 10.508

Foreslope: 1599.913

Pavement Layer 4: 24571.323 444.124

DNC:

Turf Establishment: 5911.913

Fill: 23.864

Verge: 1196.319 22.074

Pavement Layer 1: 22373.457 204.858

Bottom Mesh: 203.567

Volumes_Fill: 7519.168 325.749

Volumes_Cut: 25870.781 1012.507

Baseline: 838.772

Baseline - Approach: 0.974

Terrain_Exterior: 1962.194

Lane Line A1: 1058.745

Edge of Pavt: 1058.745

Lane Line A4: 1058.745

Volumes_Topsoil Stripping Limits: 825.942

Prop Clearing: 947.313

Ditch: 1659.954

DNC: 1029.624

Edge of Shld 1: 869.747

Edge of Shld: 1029.624

Edge of Shld 4: 1895.816

Edge of Pavt 1: 2775.666

Cut: 901.924

Fill: 7.456

Terrain_Breakline: 158.716

Terrain_Interior: 212.278

Edge of Pavt 4: 1904.689

Concrete Median Bot: 159.628

Leveling:

Edge of Widen 1:

Edge of Widen:

Edge of Overlay 1:

Edge of Overlay:

38+59.061 APP_3834_R

Pavement Layer 1: 574.818 3.461

Turf Establishment: 386.174

Cut: 20.272

Fill: 14.100

Foreslope: 62.590

Leveling: 7.052 0.010

Pavement Layer 2: 121.263 0.484

DNC:

Volumes_Fill: 223.435 0.520

Page 4 of 7MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Volumes_Cut: 477.262 2.246

Baseline: 133.955

Terrain_Breakline: 71.904

Terrain_Exterior: 145.978

Volumes_Topsoil Stripping Limits: 66.773

Prop Clearing: 49.629

Edge of Widen 1: 68.123

DNC: 70.868

Edge of Widen: 70.868

Edge of Pavt 1: 72.571

Edge of Overlay 1: 73.453

Edge of Overlay: 73.453

Cut: 39.384

Fill: 21.607

Pavement Layer 4:

Verge:

Bottom Mesh:

Baseline - Approach:

Lane Line A1:

Edge of Pavt:

Lane Line A4:

Ditch:

Edge of Shld 1:

Edge of Shld:

Edge of Shld 4:

Terrain_Interior:

Edge of Pavt 4:

Concrete Median Bot:

50+69.479 HELIPAD_R

Cut: 231.919

Fill: 86.198

Turf Establishment: 3770.488

Foreslope: 555.629

DNC:

Pavement Layer 1: 9156.855 55.955

Leveling: 54.402 0.041

Pavement Layer 2: 1039.313 4.249

Volumes_Fill: 3400.445 5.666

Volumes_Cut: 6926.854 26.132

Baseline: 191.987

Terrain_Breakline: 94.855

Terrain_Exterior: 639.294

Volumes_Topsoil Stripping Limits: 501.902

Prop Clearing: 550.053

Edge of Widen 1: 482.932

DNC: 482.982

Page 5 of 7MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Edge of Widen: 482.982

Edge of Pavt 1: 1522.432

Edge of Overlay 1: 482.981

Edge of Overlay: 482.981

Cut: 345.446

Fill: 87.010

Pavement Layer 4:

Verge:

Bottom Mesh:

Baseline - Approach:

Lane Line A1:

Edge of Pavt:

Lane Line A4:

Ditch:

Edge of Shld 1:

Edge of Shld:

Edge of Shld 4:

Terrain_Interior:

Edge of Pavt 4:

Concrete Median Bot:

57+22.836 TURN_R

Fill: 423.381

DNC:

Cut: 71.306

Foreslope: 647.414

Turf Establishment: 3122.553

Pavement Layer 2: 1147.652 4.612

Pavement Layer 1: 8864.523 54.096

Leveling: 78.055 0.001

Volumes_Fill: 3205.445 3.697

Volumes_Cut: 7033.192 9.108

Baseline: 551.824

Terrain_Breakline: 565.429

Terrain_Exterior: 977.446

Volumes_Topsoil Stripping Limits: 507.200

Prop Clearing: 512.137

Edge of Widen 1: 503.473

DNC: 507.212

Edge of Widen: 507.212

Edge of Pavt 1: 1577.859

Edge of Overlay 1: 509.748

Edge of Overlay: 509.748

Cut: 156.804

Fill: 300.389

Pavement Layer 4:

Verge:

Page 6 of 7MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Bottom Mesh:

Baseline - Approach:

Lane Line A1:

Edge of Pavt:

Lane Line A4:

Ditch:

Edge of Shld 1:

Edge of Shld:

Edge of Shld 4:

Terrain_Interior:

Edge of Pavt 4:

Concrete Median Bot:

Page 7 of 7MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Report Created: Wednesday, June 5, 2024 Time: 12:59:04 PM

Named Boundary Group:

ALI_PARK_03

Alignment Name: ALI_PARK_03

Input Grid Factor:

Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.

Station Named Boundary Name Material Count Length Top Sloped Area Volume

707+00.000 PicnicArea

Fill: 4712.432

Cut: 273.800

Turf Establishment: 5324.706

DNC:

Pavement Layer 4: 35007.368 622.584

Foreslope: 4112.826

Pavement Layer 1: 29148.002 266.360

Bottom Mesh: 106.203

Pavement Layer 2: 3911.461 26.577

Sidewalk Layer 1: 1399.506 12.943

Sidewalk Layer 4: 1399.506 12.943

Verge: 64.203 1.189

Volumes_Cut: 6176.155 63.553

Volumes_Fill: 35174.089 855.666

Terrain_Exterior: 1146.937

Volumes_Topsoil Stripping Limits: 1564.799

Prop Clearing: 1592.509

DNC: 6634.869

Edge of Shld 1: 1423.148

Edge of Shld: 1581.687

Edge of Shld 4: 1412.846

Edge of Pavt 1: 4675.906

Edge of Pavt: 4026.460

Edge of Pavt 4: 2943.232

Fill: 1442.876

Terrain_Breakline: 223.182

Ditch: 87.730

Lane Line A1: 1398.974

Lane Line A4: 1398.974

Cut: 96.030

Forced Slope Tie: 46.693

Edge of Widen: 24.266

SW Front Bot: 401.979

Sidewalk 4: 401.979

FINAL - Picnic Area Loop

Page 1 of 2MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Concrete Median Bot: 51.103

Centerline 1: 540.773

Centerline: 540.773

Centerline 4: 540.773

Centerline Exist: 540.773

Baseline - Alt 1: 888.217

Baseline: 665.884

FINAL - Picnic Area Loop

Page 2 of 2MT NP GLAC 14(6) Swiftcurrent Spur Road Rehabilitation

Overlay_NamedBoundrary
SCMotorInnNB_Quantities
NamedBoundrary
PicnicAreaLoopNB_Qty

File details come from the government source that posted it. Updated .