VAP-MH-401.pdf
PDF 1 MB Posted
- Attached to
- Misc. Generator Repairs and Improvements Federal contract opportunity
- Solicitation number
- 36C25621R0179
About this file
This document package includes mechanical drawings and specifications for generator repairs and improvements at a Department of Veterans Affairs medical facility, as well as a related federal contract opportunity notice. The drawings depict mechanical systems and equipment in Room 1B179, and include notes specifying work such as installing piping, ductwork, equipment, and signage. The solicitation is a total SDVOSB set-aside requiring offerors to be verified in Vendor Information Pages. It seeks a contractor to furnish all labor, tools, materials, equipment, supervision, and other requirements necessary to perform miscellaneous generator repairs and improvements for the Gulf Coast Veterans Health Care System in Pensacola, Florida. Proposals are due by the date specified in the full solicitation.
View the file
Other files for this federal contract opportunity
Show all 50
Misc. Generator Repairs and Improvements has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
K.5
MECHANICAL
ROOM
EMS
STORAGE
LARGE
EQUIP
PNEUMATIC
TUBE CENTAL
STA.
1B176
1B178
1B179
1B181
X
X
X
1 12" CHWS&R
FCU-2.2
ABOVE CEILING
EF-1
FCU-4
X
X
R
R
30X18 EA LOUVER
AND SCREEN
T
20X18 UP TO
AHU-10 ON
ROOF ABOVE
BV
1-1/4" COND.
3/4" CW
PROJECT NUMBER
DRAWING NUMBER
Office of
Facilities
Management
SHEET TITLE
HEERY INTERNATIONAL, INC.
999 PEACHTREE STREET, NE
ATLANTA, GEORGIA 30309
CONSULTANTS: PROJECT NAME
COPYRIGHT 2005 BY HEERY
INTERNATIONAL, INC. ALL RIGHTS
RESERVED.THIS DOCUMENT IS
THE PROPERTY OF HEERY
INTERNATIONAL, INC. IT IS TO BE
USED ONLY FOR THE SPECIFIC
PROJECT IDENTIFIED OR REFERRED
TO HEREIN AND IS NOT TO BE USED
ON OTHER PROJECTS OR EXTENSIONS
TO THIS PROJECT, IN WHOLE OR PART,
EXCEPT BY EXPRESS WRITTEN
AGREEMENT WITH AND COMPENSATION
TO HEERY INTERNATIONAL, INC.
JOINT AMBULATORY CARE CENTER
A JOINT/SHARED VA/DoD (NAVY) PROJECT
REVISIONS DATE KEY PLAN STAMP
05090-00
BUILDING NUMBER
N/A
TRUE
NORTH
DRAWN
CHECKED
DATE
0 4’ 8’
1/4"= 1’-0"VA GULF COAST VETERANS HEALTH CARE SYSTEM
6425 OFFICE PARK PLAZA
NORTH PENSACOLA BLVD.
PENSACOLA, FL 32503
SCALE
PROJECT
NORTH
VA FORM 08-6231, OCT 1978
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
987654321 o n e e ig h th i n c h o n e f o o t
(f o r a s h e e t p lo tt e d a t x o n e q u a rt e r in c h o n e f o o t
(f o r a s h e e t p lo tt e d a t x th re e e ig h th s in c h o n e f o o t (f o r a s h e e t p lo tt e d a t x o n e h a lf i n c h o n e f o o t
(f o r a s h e e t p lo tt e d a t x th re e q u a rt e rs i n c h o n e f o o t
(f o r a s h e e t p lo tt e d a t x o n e i n c h o n e f o o t (f o r a s h e e t p lo tt e d a t x o n e a n d o n e h a lf i n c h e s o n e f o o t fo r a s h e e t p lo tt e d a t x th re e i n c h e s o n e f o o t
(f o r a s h e e t p lo tt e d a t x
4/20/2010
10:55AM
E:\05090-00-vap\VAP-MH-401.dgn
\\atlsv0008\IPLOT_TDS70 w:\iplot_configs\pentables\mechpoche user:
date plotted:
time plotted:
file name & path:
pen table:
plotter:
jaustin ja u st in
V A
P -M
H -4 ja u st in
/2
/2
MH-4.01
MH-4.01
K. MILNER
H. SHEINMAN
MECHANICAL PART
8"%%c
16"%%c 14"%%c
8" c c
10"%%c
10"%%c c
DN
DN
18"%%c, B.O. FLUE=12’-3"
8"%%c, FLUE, B.O. FLUE=10’-1"
8"%%c, FLUE, B.O. FLUE=10’-8"
12" CWR
12" CWS
8"%%c AT HEATER, TYP. 4 PLACES
18X18 AD
DNDN
8"%%c, B.O. FLUE=13’-1"
DASHED LINE INDICATES 2X-WALL
CONSTRUCTION, METAL-FAB
SAFE-T-VENT CI PLUS
6"%%c AT
INLET
14"%%c, B.O. FLUE =12’-7"
3" HWR, TYP. 4 PLACES
3" HWS, TYP. 4 PLACES
10" CHR
10" CHR
DHW-1 DHW-2
3" HWS
3" HWR
6" HWR
ET-1
ET-2
AS-1
10" CWR
(FUTURE)
10" CWS
(FUTURE)
AS-2
10" CHR
12" CWR
12" CWS
10" CWR
10" CWS
PNEUMATIC TUBE
SYSTEM AREA
6" HWS
6" HWR
C H
R
C H
R
34" RELIEF TO LOCAL F.D.
34" RELIEF TO LOCAL F.D.
CH-1
CH-2
PLAN
ROOM 1B179
MVD, SET 500 CFM
48X50X24 INSULATED SHEETMETAL
INTAKE PLENUM, REGISTER IN BOTTOM,
EQUAL TO TITUS 56FL
FLEXIBLE FABRIC DUCT CONNECTOR
X
MVD, SET 1000 CFM
M
IN
8" CHWS
8" CHWR
10" CHWS
10 / 31 / 05 10 / 31 / 05SUBMITTAL # 3
MH-4.02
MH-4.02
EF-14
M
M
36X48
AAV
AAV
UPDN
UP
KEYED NOTES:
34" EXPANSION LINE
34"
MM
12X12
AHU-7
M M16
CO
12X12 EXHAUST DUCT DROP WITH OPEN END,
DRAIN TO 12" ABOVE FLOOR. PROVIDE 1/2"
MESH HARDWARE CLOTH AT INLET (TYP. 2)
16"%%c 3.0, FLUE = 11’-4"
CENTERLINE ELEVATION
6" VALVED
AND CAPPED
FOR FUTURE
DF-1, HUNG FROM ROOF
STRUCTURE
BOTTOM OF UNIT = 7’-9" ABOVE FLOOR
LOCATE UNIT IN EAST-WEST DIRECTION TO
ALLOW FOR ACCESS DOOR SWINGS AND
ACCESS TO UNIT PIPING TRIM
AHU-7, HUNG FROM STRUCTURE ABOVE WITH
(4) 3/8" THREADED RODS, 2 1/2" X 2 1/2 " X 3/8"
SUPPORT ANGLES, AND VIBRATION ISOLATION
HANGERS, 0.25 INCHES MINIMUM STAC DEFLECTION
8" CHWR
(FUTURE)
8" CHWS
(FUTURE)
36X48 LOUVER AND BIRDSCREEN,
BOTTOM = 8’-8" ABOVE FLOOR 23
16X14
FLOOR DRAIN, (TYP.)
48X36 LOUVER AND BIRDSCREEN,
BOTTOM = 9’-4" ABOVE FLOOR
48X36 INTAKE LOUVER AND BIRDSCREEN,
BOTTOM = 9’-4" ABOVE FLOOR
EPO
6"%%c, B.O.
FLUE=13’-3"
12 / 25 / 05SUBMITTAL # 4
CHWP-1.3 CHWP-1.2 CHWP-1.1
WH-1.1 WH-1.2 WH-1.3 WH-1.4
HWP-1.1
HWP-1.2
FINAL SUBMITTAL FULLY SPRINKLERED
Smoke Partition
1-Hour Rated
2-Hour Rated
1-Hour Rated Fire & Smoke Partition
PARTITION TYPE LEGEND
Smoke Partition
1-Hour Rated
2-Hour Rated
1-Hour Rated Fire & Smoke Partition
PARTITION TYPE LEGEND
S
M
L
131211
FINAL SUBMITTAL 02/02/061
CENTRAL PLANT PART PLAN (ROOM 1B179)
SCALE: 14" = 1’-0"
EPO
32 31
B Y
-P A
S S
10" CHWS
M
CHWP-2.2
8" CHWS8" CHWS
8" CHWS 8" CHWS
MH-4.01
35353535
333333
EF-13 7
PROVIDE 2" CHWS&R AND 3/4" HWS&R TO AHU-7. PIPE CONDENSATE FROM P-TRAP TO SPILL INTO NEAREST FLOOR DRAIN.
CONDENSATE, SIZE OF UNIT CONNECTION, TRAPPED AND SLOPED DOWN TO SPILL INTO FLOOR DRAIN.
REFRIGERANT MONITORING SENSOR, LOW TO FLOOR.
ANCHOR PIPES HERE.
VERTICAL BLADES.
PROVIDE EPO SWITCH ON WALL, 54" A.F.F., WIRED TO WATER HEATERS AND GAS VALVES TO CLOSE VALVES AND DE-ENERGIZED WATER
SECONDARY CHILLED WATER PUMP VARIABLE FREQUENCY DRIVES, MOUNTED ON WALL.
CHILLED WATER FLOW METER.
HVAC CONTROL PANEL.
AUTHORIZED PERSONNEL ONLY. ENTRY IS LIMITED TO ONLY PERSONNEL TRAINED IN EMERGENCY PROCEEDURES WHEN
REFRIGERANT ALARM SOUNDS". PROVIDE REFRIGERANT ALARM STROBE AND HORN BESIDE DOOR.
PROVIDE TWO SETS SCBA APPARATUS, HOUSED IN WALL-MOUNTED CABINET.
SOLID STATE CHILLER STARTER, MOUNTED ON CHILLER.
HEATER. PROVIDE EPO SWITCH ON WALL, 54" A.F.F, WIRED TO CHILLERS, AHU-7 EF-13 AND EF-14 TO STOP CHILLERS, START FANS AND START AHU.
PROVIDE 1 1/2" INSULATED PIPING TO WATER FILTER, HAYWARD MINILINE EBF #03. MOUNT FILTER ON STRUT WITH ITS TOP 48" A.F.F. 15 GPM.
PROVIDE PERMANENT ENGRAVED 3-PLY PLASTIC SIGNAGE ON DOOR, STATING, IN 1 1/2" HIGH LETTERING:"MACHINERY ROOM -
MH-4.01
FLUE OUTLET DETAIL
SCALE: 3/8" =1’-0"
DF-1
SQUARE-TO ROUND TRANSITION
EXAGGERATED, FOR CLARITY.
LAG FLUE WITH MIN. 1" THICK
MINERAL WOOL
ROOF STRUCTURE
16"%%c DOUBLE-WALL FLUE
CONSTRUCTION, METAL-FAB
SAFE-T-VENT CI PLUS
45%%d CUT AT OUTLET
PROVIDE 1/2"X1/2" STAINLESS
STEEL HARDWARE CLOTH
AT OUTLET
18 GA GALVANIZED
STEEL BACK FLASHING
WITH DRIP
4’-0"
3’-6" 3’-0" MIN.
PROVIDE BUTTERFLY VALVE AND BLIND FLANGE TO CAP.
PROVIDE SHEETMETAL TRANSITION, TO 6 SQUARE-FOOT OUTLET AREA.
PIPING DOWN THROUGH FLOOR.
CENTERLINE ELEVATION = 12’-4".
CENTERLINE ELEVATION = 10’-6".
CHEMICAL TREATMENT POT FEEDER, WITH 3/4" PIPING.
HANG FAN FROM STRUCTURE WITH (4) 1/4" THREADED RODS AND VIBRATION ISOLATING HANGERS, 1.50" MINIMUM STATIC DEFLECTION. PROVIDE 1/2" X 1/2" MESH HARDWARE CLOTH ON FAN INLET.
INTERLOCK DAMPER OPERATION WITH EF-14 OPERATION TO OPEN DAMPER WHEN FAN STARTS
PROVIDE 1" THICK THROWAWAY FILTERS IN SIDE-ACCESS RACK, SHOP-FABRICATED.
PRIMARY CHILLED WATER PUMP VARIABLE FREQUENCY DRIVES, MOUNTED ON WALL.
BUILDING HEATING HOT-WATER PUMP VARIABLE FREQUENCY DRIVES, MOUNTED ON WALL. COORDINATE
EXACT LOCATION TO KEEP DRIVES FROM BEING UNDERNEATH ANY OTHER TRADE’S WORK.
COOLING TOWER FAN VARIABLE FREQUENCY DRIVES, MOUNTED ON WALL.
CONDENSER WATER SYSTEM CHEMICAL TREATMENT BOARD AND DRUMS.
FLEXIBLE FABRIC DUCT CONNECTOR.
MOTORIZED ISOLATION CONTROL VALVE, IN RISE.
MAKE UP WATER AND QUICK FILL FROM PLUMBING RPZ BACKFLOW PREVENTER.
2" CONDENSER-WATER SYSTEM MAKEUP CONTROL VALVE AND METER, FROM PLUMBING RPZ
BACKFLOW PREVENTER.
PROVIDE PERMANENT ENGRAVED 2-PLY PLASTIC SIGN, STATING IN 3/4" HIGH LETTERING: "HEATING SYSTEM IS CLOSED LOOP
HYDRONIC: CONTINUOUS BLOWDOWN IS NOT REQUIRED. SPILL ANY BLOWDOWN INTO A BUCKET, TO COOL OFF, PRIOR TO
DISCARD." PROVIDE THIS SIGNAGE ON AS-2, WH-1.1, WH-1.2, WH-1.3 AND WH-1.4.
FAN DF-1 VARIABLE FREQUENCY DRIVE AND CONTROLLER.
PIPE PRESSURE RELIEF VALVE DISCHARGE TO 18" ABOVE FLOOR DRAIN, SERVED BY A CI SANITARY SYSTEM. MOUNT WATER
HEATERS ON 4" HIGH HOUSEKEEPING PADS.
1 1/2" REFRIGERANT RELIEF VALVE DISCHARGE PIPING, UP THROUGH ROOF.
HEATING WATER SYSTEM FLOWMETER.
HEATING WATER BYPASS.
38FAN RUNS CONTINUOUSLY.
ON SHEET MH-2.01.
AND CLOSE DAMPER WHEN FAN STOPS. SEE CONTROL SEQUENCE PARAGRAPH 10,
ON SHEET MH-2.01.
REFRIGERANT MONITORING SYSTEM CONTROL BOARD, HORN AND STROBE. SEE CONTROL SEQUENCE PARAGRAPH 10, 2
2 06/20/06REVISION #2
3 REVISION #3 09/11/06
4 10/23/06MSK 05
(DELETED).
5 REVISION #5 11/06/06
6 REVISION #6 04/01/07
1" CHWS&R 3/4" HWS&R
2" CHWS
2" CHWR
CHWP-3
ET-3
2" CHWS
2" CHWR
7 REVISION #7 04/25/07
REVISION #88 08/27/07
CO
CO
1 1/4"
COND.
3/4" CW 8
08/08/08RECORD DOCUMENTS