Misc. Generator Repairs and Improvements Federal contract opportunity
Solicitation number
36C25621R0179
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This solicitation requests proposals for miscellaneous generator repairs and mechanical improvements at the Gulf Coast Veterans Health Care System in Pensacola, Florida. Offerors must be registered as a Service-Disabled Veteran-Owned Small Business and provide all labor, tools, materials, equipment, and supervision to perform generator repairs, HVAC upgrades including new VAV boxes and chiller replacement, boiler replacement, and electrical work. Proposals are due by October 1, 2021 and the period of performance is 270 calendar days. The award will be a firm-fixed-price contract for a project valued between $500,000 and $1,000,000 issued by the Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to Misc. Generator Repairs and Improvements, newest first.
File Type Posted
36C25621R0179 0003.pdf PDF
S06 36C25621R0179 0002.pdf PDF
36C25621R0179 0001.pdf PDF
S06 36C25621R0179 0001 (Site Visit Sign-In Sheet).pdf PDF
S06 36C25621R0179 0001 (IMG_1380).jpg JPG image
S06 36C25621R0179 0001 (230kW 1 of 2).jpg JPG image
S06 36C25621R0179 0001 (JACC650KW).pdf PDF
S06 36C25621R0179 0001 (IMG_1379).jpg JPG image
VAP-MH-206.pdf PDF
General Decision FL20210203 Escambia 05-07-2021.pdf PDF
Section 23 21 23 - Hydronic Pumps.docx DOCX document
Rooms C271A_C272A_2D122_2D142_2D143_2D146_2D153 Draft-MH-102-4.pdf PDF
Section 23 21 20 - Hydronic Specialties.doc DOC document
Room 2B137 Draft-MH-102-2.pdf PDF
Section 23 07 10 - Insulation.doc DOC document
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
DWH2.pdf PDF
Section 23 05 93 - Testing Adjusting and Balancing for HVAC.docx DOCX document
VHA Directive 1193 - COVID 2019 Vaccination Program.pdf PDF
VAP-MH-601.pdf PDF
ACC-1 Power Supply Drawing E-6_01.pdf PDF
VAP-MH-401.pdf PDF
Section 26 36 23 - Automatic Transfer Switches.docx DOCX document
Section 23 07 11 - HVAC and Boiler Plant Insulation.docx DOCX document
Section 26 05 13 - Medium Voltage Cables.docx DOCX document
Section 23 05 11 - Common Work Results for HVAC.docx DOCX document
Section 26 05 11 - Requirements for Electrical Installations.docx DOCX document
Section 01 00 00 - General Requirements.docx DOCX document
Section 23 21 13 - Hydronic Piping.docx DOCX document
Room Detail Draft VAP-MH-101-4.pdf PDF
Room 1E113 Draft-MH-101-5.pdf PDF
EXHIBIT F PROPOSAL INQUIRY FORM.docx DOCX document
Draft VAP-MH-401.pdf PDF
ACC-1 Power Panel Location EQDP E-4_01.pdf PDF
36C25621R0179.pdf PDF
VAP-MH-205.pdf PDF
Section 28 05 11 - Common Work Results for Electronic Safety-Security.docx DOCX document
Section 22 05 11 - Common Work Results For Plumbing.docx DOCX document
Section 26 24 16 - Panelboards.docx DOCX document
ICRA.pdf PDF
Room Detail Draft VAP-MH-101-2P.pdf PDF
Room 1C151 Draft-MH-101-3.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
Room 2A121 Draft VAP-MH-102-1.pdf PDF
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Draft VAP-MH-101-4.pdf PDF
Section 26 05 71 - Electrical System Protective Device Study.DOC DOC document
VAP-MH-603.pdf PDF
Show all 50

Misc. Generator Repairs and Improvements has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________

(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and tim e offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C25621R0179

X

09-01-2021

TBD 520-22-1-7045-0002 520-22-166

Department of Veterans Affairs

Gulf Coast Veterans Health Care System

Network Contracting Office 16

400 Veterans Avenue

Biloxi MS 39531

Email all offers to Mr. Charles Powell at charles.powell2@va.gov. Please put

Solicitation 36C25621R0179 for Project:

520-22-166 in the subject line.

Charles Powell 228-523-5068

This procurement is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under Public Law 109-461.

Offerors must be registered and verified as a SDVOSB in the Vendor Information Pages (VIP) at:

https://www.vip.vetbiz.va.gov/. Proposals received from contractors who are not verified as a SDVOSB in VetBiz will not be considered for award. This includes Joint Ventures. Joint Venture Agreements must be submitted with proposal to be considered. Contract award shall not be delayed due to loss of SDVOSB verification. Verification showing seal shall be included with proposal.

BASE OFFER ITEM: FURNISH ALL LABOR, TOOLS, MATERIALS, EQUIPMENT, SUPERVISION & OTHER REQUIREMENTS NECESSARY TO

PERFORM ALL WORK ASSOCIATED WITH PROJECT 520-22-166 MISCELLANEOUS GENERATOR REPAIRS AND IMPROVEMENTS FOR THE GULF COAST

VETERANS HEALTH CARE SYSTEM (GCVHCS), 790 VETERANS WAY, PENSACOLA, FL 32507.

SITE VISIT: AN ORGANIZED SITE VISIT WILL BE HELD AT THE DATE/TIME/LOCATION SHOWN IN FAR 52.236-27 SITE VISIT

(CONSTRUCTION) ALTERNATE I. THIS WILL BE THE ONLY SITE VISIT CONDUCTED FOR THIS PROCUREMENT.

INFORMATION PROVIDED AT THE SITE VISIT SHALL NOT ALTER THE TERMS AND CONDITIONS OF THE SOLICITATION. TERMS OF TH E

SOLICITATION REMAIN UNCHANGED UNLESS THE SOLICITATION IS AMENDED IN WRITING. CONTRACTORS ARE REQUIRED TO SUBMIT ALL

QUESTIONS IN WRITING, USING EXHIBIT F, (EMAIL IS ACCEPTABLE) TO THE CONTRACTING OFFICER SHOWN ABOVE NO LATER THAN

2:00 PM CST TIME ON FRIDAY – SEPTEMBER 17, 2021.

SEE BLOCK 13A FOR SOLICITATION CLOSING DATE.

THE GOVERNMENT RESERVES THE RIGHT TO AWARD THE BASE OFFER ITEM ONLY IF SUFFICIENT FUNDS ARE AVAILABLE.

PER VAAR 836.204 AND FAR 36.204 THE ESTIMATED MAGNITUDE OF THIS PROJECT IS BETWEEN $500,000 AND $1,000,000.

APPLICABLE NAICS CODE: 238220 PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS - SIZE STANDARD: $16.5M.

GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED: PENSACOLA, ESCAMBIA COUNTY, FL 32507.

APPLICABLE DAVIS-BACON WAGE DETERMINATIONS:

GENERAL DECISION FL 20210203 ESCAMBIA 05-07-2021

NOTE: ALL PRIME AND SUBCONTRACTORS SHALL COMPLY WITH VHA DIRECTIVE 1193. (LOCATED IN ATTACHEMENTS)

10 270

X X 52.211-10

X

1 2:00 PM CST

10-01-2021

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 38 U.S.C. 8127(d) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your

Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont -this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror acc epts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

See Schedule of Of fer Items & Block # 17 Continuation

36C256

Department of Veterans Affairs

Gulf Coast Veterans Health Care System

Network Contracting Office 16

400 Veterans Avenue

Biloxi MS 39531

Department of Veterans Affairs

Financial Services Center

(ATTN: CAT0474)

P.O. Box 149975

Austin TX 78714 8975

877-353-9791 512-460-5545

Cynthia L. Kinsman

NCO1615L2-4313

36C25621R0179 Project: 520-22-166 Miscellaneous Generator Repairs and Improvements

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or

Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 SCOPE OF WORK………………………………………………………………………….5

A.4 BRAND NAME OR EQUAL INFORMATION…………..……………………………….24

A.5 SCHEDULE O OFFER ITEMS…………………………………….…………………….25

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

(End of Information Regarding Bidding Material, Bid Guarantee and Bonds)

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.9 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION

(OCT 2018)

2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.11 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES

INCORPORATED BY REFERENCE (JAN 2008)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)

(JUL 2020) (DEVIATION)

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)

3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (JUL 2020)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER

COVERED ENTITIES (JUL 2018)

4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(NOV 2020)

4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

4.8 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.12 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.13 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)

4.14 852.219-10DEV VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (NOV 2020) (DEVIATION)

4.15 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND

COMPLIANCE (JUL 2018) (DEVIATION)

4.16 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.17 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

4.18 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.23 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL

PRODUCTS (APR 2019)

4.24 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.25 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020).. 77

4.26 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.27 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN

2008)

4.28 ATTACHMENTS

A.3 SCOPE OF WORK

Scope of Work Project: 520-22-166

Miscellaneous Generator Repairs & Mechanical Improvements VA Gulf Coast Veterans Health Care System

Pensacola VA Clinic - JACC Pensacola, FL 32507

Scope of Work - Table of Contents

1. Pharmacy Chiller (ACCU-1) Upgrade

2. CRAC-1 Upgrade

3. CRAC-3 Upgrade

4. VAV Box Upgrades

VAV Upgrades List of Work Schedule

5. Generator Repairs/Upgrade

6. Domestic Hot Water Boiler Replacement

7. VA Specifications for Construction

8. Interior Finishes

9. Equipment

10. Fire Protection During Construction

11. Infection Control- During Construction

12. Infection Control– Upon Project Completion

13. Installation Time

14. Special Bid Considerations by the Contractor

15. Safety Considerations

16. Notes

The awarded Contractor shall furnish all labor, tools, materials, equipment, subcontractors, and supervision necessary to safely perform all work associated with upgrading the HVAC and

Generator Systems. This work shall be performed at the VA JACC, Pensacola.

1. Pharmacy Chiller (ACCU-1) Upgrade

a. Demolition Work:

i. A survey of the work area in the cooling tower yard and 1B176 shall be performed to document existing conditions prior to the start of work.

ii. Contractor shall recover the refrigerant (R22) from ACCU-1 in accordance with federal, state, and local laws.

iii. Disconnect piping and remove the ACCU-1 pad mounted chiller.

iv. Remove local electrical and mechanical hardware being replaced.

v. Remove chilled water pump #3 (CHWP #3)

vi. Remove motorized actuators (4) for pharmacy chilled loop switching valves

vii. Any removal of the acoustical ceiling systems will require a temporary suspension to support any present electrical and mechanical fixtures.

viii. Dispose of old equipment at an offsite disposal site or recycling center in compliance with federal, state, and local laws.

b. Replace ACCU-1

i. Replace in-kind air-cooled chiller, ACCU-1.

ii. Insulate all required piping. Match existing materials and thermal resistance.

iii. Insulation of piping and ductwork shall include insulation of appurtenances such as valves, flanges, elbows, tees, circuit setters, dampers, etc.

iv. Seal all holes, pipes, conduits, penetrations, or punctures within the envelope of the work area in an appropriate manner. The selected method of sealing must maintain the construction areas required fire/smoke rating, prevent windblow rain, and match existing finishes.

v. Concrete pad repaired/adjusted as needed or replaced pending footing requirements for new chiller.

c. Pump replacement

i. Replace in-kind vertical inline pump and motor assembly, CHWP #3 ( Bell and Gossett 1.5”x1.5”x9.5”B Series e-80SC)

ii. Use OEM maintenance guidelines to properly set mechanical seal, torque and Loctite the motor collar ring, and precision set the coupler with correct gap and cap screw torque.

d. Replace motorized actuators (4)

i. Replace in-kind 4 electronic actuators above 1B176 for chilled water loop isolation.

e. Test and Integrate Chiller Swap in BAS

i. The existing controls system was built and is maintained under contract with Siemens. Therefore, all controls design, installation, and programming shall be through Siemens.

ii. All controls installed or replaced shall be native BACnet.

iii. Work with Siemens, the site BAS contractor, to functionally test the following:

1. System should automatically swap from cooling tower chilled water loop to ACCU-1 in the event cooling tower water is unable to maintain room temperature set point.

2. Chiller should cycle on weekly during normal operations to exercise. A failed test should immediately swap back to cooling tower supply water to maintain the pharmacy environments

(1B120, 1B120A, 1B121, and 1B122).

3. The controls should run an automatic lead/lag compressor sequence to equalize average run hours between units.

f. Work Schedule

i. Most of the work is to be performed during normal duty hours (0800 to

1630) Monday through Friday, exclusive of Federal holidays. However, some work must be coordinated around pharmacy schedule to prevent any environment out-of-spec events. This includes testing and start-up of the new chiller system through the BAS. Any work performed outside of normal working hours shall be coordinated with the COR.

ii. All utility or HVAC outages shall be coordinated with the COR and shall avoid impacting patient care, equipment operation, or supplies.

2. CRAC-1 Upgrade

a. Demolition Work

i. A survey of the work areas, room 2B157, and roof space shall be performed to document existing conditions prior to the start of work.

ii. Contractor shall recover the refrigerant (R22) from both the outsi de and inside units.

iii. Disconnect, de-pipe, detach, and remove the CRACU-1 pad mounted condensing unit and corresponding evaporator unit in 2B157.

iv. Remove any corresponding ductwork, electrical, and additional hardware being replaced.

v. Any removal of the acoustical ceiling system below will require a temporary suspension to support any present electrical and mechanical fixtures.

vi. Dispose of old equipment at an offsite disposal site or recycling center in compliance with federal, state, and local laws.

b. Provide and Install Floor Mounted Air Handler Unit (2B157)

i. Provide and install a new matched air-cooled system in the same general locations as the current. System shall meet or exceed the attached specifications for the original CRACU-1.

ii. Relocate as necessary the existing heating, ventilating and air conditioning system ductwork, dampers, grilles, and diffusers affected by the new construction.

iii. Replace or repair all ductwork insulation disturbed by the new construction.

iv. Insulate all hot water piping and ductwork. Match existing materials and thermal resistance.

v. All duct and insulation seams shall be aluminum taped and coated with insulating mastic.

vi. Insulation of piping and ductwork shall include insulation of appurtenances such as valves, flanges, elbows, tees, circuit setters, dampers, etc.

vii. Flex duct shall be a maximum of four feet in length and shall only be used to connect supply grills at the end of a duct run.

viii. All ductwork shall meet or exceed SMACNA standards.

ix. Upgrade obsolete controls that communicate with building automation system (BAS). Assist current HVAC contractor (Siemens) with integrating into existing BAS.

x. The existing controls system was built and is maintained under contract with Siemens. Therefore, all controls design, installation, and programming shall be through Siemens. The vendor is responsible for any necessary control system modifications required due to relocation activity.

xi. All controls installed or replaced shall be native BACnet.

xii. The unit must be able to swap from chilled water to DX as currently designed.

xiii. A qualif ied independent testing agency shall test and balance all HVAC work after final construction. Any rework required to bring the HVAC system back within design specifications is to be included within this scope of work. A digital copy of the test and balance report shall be provided.

xiv. All utility or HVAC outages shall be coordinated with the COR and shall avoid impacting patient care, equipment operation, or supplies.

xv. Air conditioning systems should be provided to heat, cool and ventilate the individual space as required to satisfy the VA HVAC design criteria.

xvi. Humidification/dehumidification capability of the new unit is expected to keep electronics within OEM tolerances.

c. Replace External DX Unit

i. Replace existing DX system condenser including line set, electrical disconnect, and controls.

ii. Insulate all required piping.

i. Seal all holes, pipes, conduits, penetrations, or punctures within the envelope of the work area in an appropriate manner. The selected method of sealing must maintain the construction areas required fire/smoke rating, prevent windblow rain, and match existing finishes.

d. Temporary Equipment

i. Temporary cooling should be provided, set-up, and monitored by contractor while the CRAC-1 system is completely off -line. At a minimum, the cooling capacity of the temporary unit should meet the capacity of CRAC-1 system being upgraded to preserve the space’s temperature and humidity requirements. For job planning, every effort should be made to leverage running the current system between DX or chilled water and limit the amount of time the room is temporarily cooled while the evaporator unit is being replaced.

e. Work Schedule

i. Most work is to be performed during normal duty hour (0800 to 1630), Monday through Friday, exclusive of Federal holidays. However, some work time is to be outside of normal duty hours and coordinated around

MRI room schedule so as not to disrupt patient care. Any work performed outside of normal working hours shall be coordinated with the COR.

3. CRAC-3 Upgrade

a. Demolition Work

i. A survey of the work area, rooms 1D115 and 1D117 shall be performed to document existing conditions prior to the start of work.

ii. Contractor shall recover the refrigerant (R22) from both the outside and inside units.

iii. Disconnect, de-pipe, detach, and remove the CRACU-3 pad mounted condensing unit and corresponding air handler above the drop ceiling in

1D115.

iv. Remove any corresponding ductwork, electrical, and additional hardware being replaced.

v. Any removal of the acoustical ceiling systems will require a temporary suspension to support any present electrical and mechanical fixtures.

vi. Dispose of old equipment at an offsite disposal site or recycling center in compliance with federal, state, and local laws.

b. Provide and Install Floor Mounted Air Handler Unit (1D115)

i. Provide and install a new matched air-cooled system in the same general locations as the current. System shall meet or exceed the attached specifications for the original CRACU-3.

ii. Relocate as necessary the existing heating, ventilating and air conditioning system ductwork, dampers, grilles, and diffusers affected by the new construction.

iii. Replace or repair all ductwork insulation disturbed by the new construction.

iv. Insulate all hot water piping and ductwork. Match existing materials and thermal resistance.

v. All duct and insulation seams shall be aluminum taped and coated with insulating mastic.

vi. Insulation of piping and ductwork shall include insulation of appurtenances such as valves, flanges, elbows, tees, circuit setters, dampers, etc.

vii. Flex duct shall be a maximum of four feet in length and shall only be used to connect supply grills at the end of a duct run.

viii. All ductwork shall meet or exceed SMACNA standards.

ix. Upgrade obsolete controls that communicate with building automation system (BAS). Assist current HVAC contractor (Siemens) with integrating into existing BAS.

x. The existing controls system was built and is maintained under contract with Siemens. Therefore, all controls design, installation, and programming shall be through Siemens. (insert) The vendor is responsible for any necessary control system modif ications required due to relocation activity.

xi. All controls installed or replaced shall be native BACnet

xii. The unit must be able to swap from chilled water to DX as currently designed.

xiii. A qualif ied independent testing agency shall test and balance all HVAC work after final construction. Any rework required to bring the HVAC system back within design specifications is to be included within this scope of work. A digital copy of the test and balance report shall be provided.

xiv. All utility or HVAC outages shall be coordinated with the COR and shall avoid impacting patient care, equipment operation, or supplies.

xv. Air conditioning systems should be provided to heat, cool and ventilate the individual spaces, as required to satisfy the VA HVAC design criteria.

xvi. Humidification / dehumidification may be required for the MRI Equipment

Room to keep the MR electronics within MR vendor tolerances.

xvii. All ductwork, fasteners, hangers, and appurtenances within the radio frequency (RF) shield shall be non-ferrous. Ductwork penetrat ions must utilize RF wave guides at the shielding feed-through points.

c. Replace External DX Unit

i. Replace existing DX system condenser including line set, electrical disconnect, and controls wiring

ii. Insulate all required piping. Match existing materials and thermal resistance.

iii. Seal all holes, pipes, conduits, penetrations, or punctures within the envelope of the work area in an appropriate manner. The selected method of sealing must maintain the construction areas required fire/smoke rating, prevent windblow rain, and match existing finishes.

iv. Concrete pad repaired/adjusted as needed or replaced pending footing requirements for new condenser

d. Temporary Equipment

i. Temporary cooling should be provided, set-up, and monitored by contractor for the time the CRAC system is completely off -line. At a minimum, the cooling capacity of the temporary unit should meet the capacity of the CRAC system being upgraded to preserve the space’s temperature and humidity requirements. For job planning, every effort should be made to leverage running the current system between DX or chilled water and limit the amount of time the room is temporarily cooled while the evaporator unit is being replaced.

e. Work Schedule

i. Most work is to be performed outside of normal duty hours. Normal duty hours are defined as 0800 to 1630, Monday through Friday, exclusive of

Federal holidays. Some work will take place during normal duty hours if it is coordinated around facility schedule and there are no potential impacts to patient care. Any work performed outside of normal working hours shall be coordinated with the COR.

4. VAV Box Upgrades

a. Install New VAVs and Temperature/Humidity Controls

i. Furnish and install new VAVs, hot water piping, ductwork modifications, BAS programming, and commissioning.

ii. Install hallway mounted alarm boxes complete with any missing control monitoring elements (temp, press, humidity, etc.).

iii. All controls installed or replaced shall be native BACnet

iv. Furnish and install piping, valves from the existing pipe to the new VAVs.

Provide isolation valves for each location.

v. Utilize existing ductwork to feed new and route as needed.

vi. Insulate all hot water piping and ductwork, match existing materials and thermal resistance.

vii. All duct and insulation seams shall be aluminum taped and coated with insulating mastic.

viii. Insulation of piping and ductwork shall include insulation of appurtenances such as valves, flanges, elbows, tees, circuit setters, dampers, etc.

ix. Flex duct shall be a maximum of four feet in length and shall only be used to connect supply grills at the end of a duct run.

x. All ductwork shall meet or exceed SMACNA standards.

xi. Demolition will involve removal of unneeded ductwork after new VAVs are installed.

xii. Each location must be completed, inspected and operational before acceptance.

xiii. Dust control measures are critical. Areas for work include multiple areas for sterile storage, medical distribution storage, exam rooms, and procedure rooms. Dust barrier or zip walls mandatory, ceiling around work area vacuumed. All HEPA filtered vacuums must have filter mechanically fastened.

xiv. Terminate all wiring in the field panel, build database points, write PPCL code to monitor rooms to initiate dehumidification routine, to include lowering ahu discharge temperature, modulating VAV to control temperature and humidity.

xv. Includes all additional electrical, wire, panel, graphics and PPCL needed to tie into the Siemens System.

xvi. The existing controls system was built and is maintained under contract with Siemens. Therefore, all controls design, installation, and programming shall be through Siemens.

xvii. Provide commissioning for VAVs, include demonstration, and verify operation in all modes.

xviii. Provide test and balance of AHU-3 zone. This zone will contain the majority of the VAV project changes.

xix. Provide VAV boxes to meet CFM values in “List of Work Schedule”.

Submit for approval. VAVs to be manufacturers standard, to include all piping accessories, strainers, circuit setters, isolation valves, unions, f lex connectors, prewired for t-stat, humidistat, and control program to initiate system dehumidification program.

xx. Remove wall mounted control elements replaced with new alarm/control panels.

xxi. Return wall f inishes and ceiling grid back to prior construction state.

b. Work Schedule

i. Most work is to be performed outside of normal duty hours. Normal duty hours are defined as 0800 to 1630, Monday through Friday, exclusive of

Federal holidays. Some work will take place during normal duty hours if there are no potential impacts to patient care. Any work performed outside of normal working hours shall be coordinated with the COR.

ii. A detailed schedule must be developed to eliminate impact on patient care. Schedule to have “less” critical areas completed first to establish reliable procedures. All work shall be coordinated with the Project Engineer/Supervisor. In addition, all work shall be coordinated with any other construction activities taking place on VA property.

iii. All utility or HVAC outages shall be coordinated with the COR and shall avoid impacting patient care, equipment operation, or supplies.

c. VAV Upgrades List of Work Schedule

(Continued on next page)

VAV Upgrades List of Work Schedule

Room Type of room Room Scope Notes

Room

Design

Supply

CFM Max CFM

Room

Press

1C151 Clean Utensils

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display

Thermostat in 1C149 130 217 +

1D116 Clean Room

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display 80 134 +

1D174 SPS- Sterile Storage

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display 70 117 +

VAV Upgrades List of Work Schedule

Room Type of room Room Scope Notes

Room

Design

Supply

CFM Max CFM

Room

Press

2A121 Director's office

- Install new box, t-stat

- Increased box size

Need to ensure we have easily adjustable click style dampers on each drop 250 418 0

2B137 RME Storage

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display 160 267 +

2C146 SPS- Derm prep/storage

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display

- Move trunk over to corridor diffuser and add box for 2C146. It was originally just going to be 2C147 140 234 +

2C185 SPS- Instr. Prep

- Install new box, t-stat

- Install space pressure, temp, and

180 301 -

VAV Upgrades List of Work Schedule

Room Type of room Room Scope Notes

Room

Design

Supply

CFM Max CFM

Room

Press display

2C186 SPS- Instr. Storage

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display 150 251 +

2C187 Cystoscopy

- Install space pressure, temp, and humidity monitoring with hallway alarm display - Add point to insight +

2C202

SPS-

ENT/Women's health/Surg

RME/Clean room

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display 90 150 +

2D122 Surgery

- Install space pressure, temp, and humidity monitoring with hallway alarm display +

2D142 Minor Procedure Room - Install space pressure, temp, and

VAV Upgrades List of Work Schedule

Room Type of room Room Scope Notes

Room

Design

Supply

CFM Max CFM

Room

Press display

2D143 EGD/Colonoscopy

- Install space pressure, temp, and humidity monitoring with hallway alarm display -

2D146 SPS- Scope storage

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display

Current hallway alarm is for 2D145.

Alarms need to be combined and placed in hallway screen outside 2D

146 90 150 +

2D153 SPS- Equipment Storage

- Install new box, t-stat

- Install space pressure, temp, and humidity monitoring with hallway alarm display 150 251 +

C2-

71A SPS

- Install space pressure, temp, and humidity monitoring with hallway alarm display

Add to Insight SPS- Navy +

VAV Upgrades List of Work Schedule

Room Type of room Room Scope Notes

Room

Design

Supply

CFM Max CFM

Room

Press

C2-

72A SPS

- Install space pressure, temp, and humidity monitoring with hallway alarm display

- Add to Insight SPS- Navy +

5. Generator Repairs/Upgrade Contractor shall provide and install new base fuel tanks and weatherproof enclosures f or both the 230KW and 650KW emergency generators at the JACC. Fuel tanks shall have secondary containment, be epoxy-rubberized coated with fuel gauges, level alarms and pressure relief valves. Generator enclosures shall be constructed of aluminum and be powder coated.

Generator enclosures shall be weatherproof and shall have acoustic insulation. Enclosures shall include interior lighting and motorized louvers. Weatherproof enclosures shall be OEM Kohler or approved equal.

a. Demolition Work

i. Remove and dispose of existing generator weatherproof enclosures.

ii. Remove fuel f rom base tanks. Fuel can be saved, polished and reused or disposed of offsite in accordance with federal, state, and local regulations.

iii. Remove and dispose of silencer/mufflers.

iv. Remove and dispose of generator fuel tanks.

v. Remove all miscellaneous parts/pieces and waste and dispose of off -site.

b. Provide temporary emergency generator(s)

i. Provide and install temporary backup generator and automatic transfer switch with enough capacity to power all emergency power panels.

ii. Install temporary conductors f rom temporary generators to building emergency power panels.

iii. Test temporary generator to ensure ATS and generator are operational.

c. Provide and install new base fuel tanks.

i. Place new base tanks for both the 230 KW and 650 KW generators on the prospective concrete pads.

ii. Install existing generators on prospective base/belly fuel tanks.

iii. Base tank fuel capacity shall match existing tank capacities.

iv. Connect new fuel line to generators and tanks.

v. Connect fuel level gauges for both units.

vi. Connect new tank level alarms and leak detection.

d. Provide and install new weatherproof enclosures

i. Install new weatherproof enclosures on prospective generators.

ii. Install/connect new automatic louvers for each generator.

iii. Install new battery boxes for each generator.

iv. Install interior lighting for each enclosure.

v. Install all insulation, panels, and miscellaneous enclosure doors. Match existing materials and thermal resistance.

e. Provide and install new silencer/muf f lers

i. Install new muff ler supports.

ii. Install new muff lers for both generators.

f. Work Schedule

ii. Most work is to be performed during normal duty hours (0800 to 1630), Monday through Friday, exclusive of Federal holidays. However, some work is to be performed outside of normal duty hours and coordinated around facility schedule so as not to disrupt patient care. Any work performed outside of normal working hours shall be coordinated with the COR.

iii. All utility or HVAC outages shall be coordinated with the COR and shall avoid impacting patient care, equipment operation, or supplies.

6. Domestic Hot Water Boiler Replacement

a. Demolition Work

i. Disconnect electrical and control wiring from existing boiler.

ii. Disconnect natural gas service line for the existing boiler.

iii. Disconnect/remove exhaust flue for existing boiler.

iv. Disconnect water lines associated with existing boiler.

v. Remove hot water boiler and dispose of offsite.

b. Install New Boiler

i. Provide and install a Lochinvar Model AW801PM domestic water heater.

ii. Provide and install a Lochinvar RJS 080 HW Storage Tank.

iii. Connect/terminate all required electrical and control wiring.

iv. Connect natural gas equipment line.

v. Provide and install new vent/exhaust stack. Heater shall be individually vented and penetrate existing North boiler plant wall.

vi. Connect all required water piping, valves, and pumps.

vii. Provide and install a new Armstrong DRV80 3” digital mixing valve.

viii. Provide and install building automation connectivity for mixing valve.

Shall be BACnet compatible for building automation.

ix. The existing controls system was built and is maintained under contract with Siemens. Therefore, all controls design, installation, and programming shall be through Siemens.

c. Testing & Commissioning

i. Test the hot water heater and place into service.

ii. Testing and commissioning shall be in accordance with manufacturer’s recommendations.

iii. Contractor shall provide four copies of O&M manuals including programming and troubleshooting guides in 3-ring binders.

d. Work Schedule

i. Most work is to be performed during normal duty hour (0800 to 1630), Monday through Friday, exclusive of Federal holidays. However, some work time is to be performed outside normal duty hours and coordinated around facility schedule so as not to disrupt patient care. Any work performed outside of normal working hours shall be coordinated with the

COR.

ii. All utility or HVAC outages shall be coordinated with the COR and shall avoid impacting patient care, equipment operation, or supplies.

Requirements for Construction

7. VA Specifications for Construction

a. HVAC Jobs

i. Specifications

1. 01 00 00 General Requirements

2. 23 01 00 GENERAL PROVISIONS OF HVAC SYSTEMS

3. 23 05 11 Common Work Results for HVAC

4. 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

5. 23 05 93 Testing, Adjusting, and Balancing for HVAC

6. 23 07 10 INSULATION

7. 23 07 11 HVAC and Boiler Plant Insulation

8. 23 09 23 Direct-Digital Control System for HVAC

9. 23 21 13 Hydronic Piping

10. 23 21 23 Hydronic Pumps

11. 23 21 20 HYDRONIC SPECIALTIES

b. Generator Job

i. Specif ications

1. 01 00 00 General Requirements

2. 26 05 11 Requirements for Electrical Installations

3. 26 05 13 Medium-Voltage Cables

4. 26 05 26 Grounding and Bonding

5. 26 05 71 Electrical System Protective Devices

6. 26 32 13 Engine Generators

7. 26 36 23 Automatic Transfer Switches

8. 26 24 16 Panelboards

c. Domestic Water Heater Job

i. Specifications

1. 01 00 00 General Requirements

2. 22 05 11 Common Work Results for Plumbing

3. 22 05 23 General Duty Valves for Plumbing and Piping

4. 22 11 23 Domestic Water Pumps

5. 23 05 11 Common Work Results for HVAC and Steam Generation

6. 23 07 11 HVAC. Plumbing and Boiler Plant Insulation

7. 28 05 11 Requirements for Electronic Safe

8. Interior Finishes

a. Replace all ceiling system disturbed by construction/demolition process.

b. Repair any damaged flooring from the construction/demolition process.

c. Repair walls/doors/trim of any damage in the construction/demolition process.

9. Equipment

a. Any heavy equipment or rigging shall be provided by the contractor or equipment vendor.

10. Fire Protection During Construction

a. Coordinate with the project Contracting Officer Representative (COR) prior to and throughout the construction period.

b. Coordinate with the project Contracting Officer Representative (COR) prior to and throughout the construction period.

c. Fire protection during construction shall comply with VA Master Construction Specification (VAMCS) 01 00 00, General Requirements. (Note: VAMCS 01 00 00, General Requirements, addresses NFPA 241, Joint Commission Interim Life Safety Measures, Hot Work Permits. This specification section was formerly section 01010.).

d. Separate all occupied areas from demolition, renovation, or construction activit ies by temporary smoke-tight construction partitions of gypsum board or other approved non-combustible or limited-combustible material. Partitions shall be full height, extending through suspended/hard ceilings to the floor slab or r oof deck above and shall be one-hour fire rated, unless sprinklers are installed and are operational on both sides of the temporary partition whereupon the partition may be permitted to terminate at the ceiling in accordance with NFPA 241.

Where the ceiling on one side of the temporary construction barrier has been removed, the temporary wall would need to go to the deck above. This requirement is due to the inherently greater potential for fire or hazardous materials incidents associated with the combustibles and operations of demolition/construction. This risk is made worse by the likelihood of compromised fire protection systems and fire/smoke resistant construction. This does not obviate the need to provide other protective measures to contain dust and debris as specified by VAMCS 01 00 00 section 1.8(D)(2). Sprinklers are considered to be operational when they are installed in accordance with NFPA 13 (spacing, protection, distance from the ceiling, etc.) and there is a sufficient automatic water supply. If the ceiling was removed and the sprinklers remain at the original ceiling level, they would likely not be considered operational.

e. Provide dust proof one-hour / f ire-rated drywall construction barriers to separate construction from the operational areas of the clinic in order to contain dir t debris and dust. Barriers shall be sealed and made presentable on clinic occupied side.

Install a self-closing rated door in a metal frame, commensurate with the partit ion, to allow worker access. Always maintain negative air. A fire-retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the COR and Safety Office.

f. Phase construction as necessary to ensure that obstruction of exits is minimized or avoided. If exits are obstructed during construction, provide alternate exit routes during each phase of construction, and identify the alternate routes on the construction drawings.

g. Minimize or avoid disruptions to fire alarm and sprinkler systems. Delineate phasing of construction to ensure that installations of new systems are expedited, and where possible, maintain existing systems in service until the replacement system is operational. If f ire protection systems are to be disrupted, ensure procedures are incorporated to maintain equivalent levels of fire protection and provide 5 calendar days formal written notif ication to COR and Safety Office before fire alarm systems are taken out of service.

11. Infection Control- During Construction

a. Implement the requirements of VAMC’s Infection Control Risk Assessment

(ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if th e saf e levels are exceeded.

b. The contractor is responsible for notifying/educating all personnel involved in the construction or renovation process in infection prevention measures established by the medical center and as noted on the ICRA Permit Form which will be provided at the Preconstruction Meeting.

c. Isolate HVAC system in area where work is to be done to prevent the contamination of the air duct system.

d. Complete all critical barriers i.e. (sheetrock, plastic, etc. to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum - prior to vacuuming and pr ior to exit) before construction begins.

e. HEPA filtration is required where the exhaust dust may re-enter the breathing zone.

f. Contractor shall verify that construction exhaust that is released to the exterior of the building is not reintroduced and circulated back to the medical center via intake vents, or other building openings.

g. Negative air pressure must be maintained within workspace throughout the construction project. Install HEPA (High Efficiency Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other pre-f ilter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced and circulated back through the medical center.

HEPA filters must be routinely monitored and replaced once filter become visibly dirty or is no longer effective.

h. Seal all holes, pipes, conduits, penetrations, or punctures within the envelope of the work area in an appropriate manner. The selected method of sealing must maintain the construction areas required fire/smoke rating, prevent windblow rain, and match existing finishes.

i. The Contractor shall construct an “ante-room” and require all personnel to pass through this room so they can be vacuumed using an HEPA vacuum cleaner before leaving the worksite or they can wear cloth or paper coveralls that are to be removed each time they leave the worksite. Keep area adjacent to the “ante -room” mopped and clean as required due to heavy worksite traffic.

j. During demolition, any dust producing work, and/or work in the ceiling, disposable shoes or shoe covers must be worn. This footwear shall be removed in the “ante-room” whenever the worker exits the work site.

k. Do not remove any construction barriers from the work area until the area is thoroughly cleaned, and the project is signed off as complete by the COR.

l. Provide and install adhesive dust “sticky” walk-off mats at each entrance/exit of construction area. These mats shall be a minimum 600mm x 900mm (24” x 36”).

Replace walk-off mats as often as required while maintaining clean work areas directly outside of the construction areas.

m. Vacuum and wet mop all transition areas between the construction area and the occupied medical center at the end of each workday. The vacuum shall utilize a

HEPA filter. Maintain the surrounding area by frequently removing debris.

Transport the debris to a location outside of the construction area. Utilize containers with tightly fitting lids and dispose of them dumpsters that are provided by the contractor.

n. There shall be no standing water created and present on the worksite during construction. This includes water located in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 30 minutes. Remove and dispose of porous materials that remain damp for more than 24 hours.

12. Infection Control– Upon Project Completion

a. During demobilization, remove barrier material carefully to minimize the spreading of dirt and debris that was generated during construction.

b. Transport construction waste in tightly covered containers.

c. Cover transport receptacles or carts with a solid lid. Tape any covering that is not covered with a solid lid.

d. Clean and mop areas with disinfectant or as approved by the COR.

e. Remove the isolation barriers that were placed upon the HVAC systems located within the areas where construction work was performed.

f. Vacuum using a HEPA filter and wipe clean all surfaces in the construction area.

This includes walls, ceilings, cabinets, casework, f urniture (built-in or free standing), partitions, flooring, etc.

13. Installation Time All work shall be completed within 270 calendar days after “Notice to Proceed” is received by the Contractor. To not/minimize impact patient care, the COR and contractor should coordinate schedule based on VAV locations and occupying end user needs.

14. Special Bid Considerations by the Contractor It is the responsibility of the Contractor and all involved sub-contractors to visit the site and field verify all existing conditions necessary to be addressed for the pricing of this subject project. All disposal costs and fees for debris removal will be the con tractor’s responsibility. The contractor will be responsible for cleanliness of the building area exterior and providing their own dumpster on site.

15. Safety Considerations Contractor’s shall provide and utilize all safety requirements in accordance with OSHA regulations in the performance of the work.

16. Notes

a. The Contractor shall submit ALL samples, including manufacture’s literature, of newly proposed materials for approval. No materials shall be procured or installed prior to the approval of the samples.

b. Site shall always be kept clean and free from debris, and the contractor shall remove debris daily from the health care system property. Contractor will not be allowed to use Government tools, materials, and/or labor for this project.

c. All work is to be performed in strict compliance with the attached specifications and

“Scope of Work”.

(End of Scope of Work)

A.4 BRAND NAME OR EQUAL INFORMATION:

PLEASE COMPLETE THE FOLLOWING:

PLEASE CHECK (√) THE APPROPRIATE BOX BELOW INDICATING WHICH EQUIPMENT

YOU ARE INCLUDING IN YOUR BID (I.E. EITHER THE EXACT EQUIPMENT OR “OR

EQUAL” EQUPMENT):

1. Generator Weatherproof Enclosures ‐ must meet the following Salient Characteristics or equal:

• Location: Installed on 230KW and 650KW emergency generators

• Manufacturer: Kohler

• Generator enclosures shall be constructed of aluminum and be powder coated, shall be weatherproof with acoustic insulation, and shall include interior lighting and motorized louvers.

_____ Generator Weatherproof Enclosures (i.e. check if providing exact equipment)

Note: If providing exact equipment, there is no need to check “OTHER” below. If not providing exact equipment, please check “OTHER” below and complete the blocks below.

_____ OTHER (i.e. check if providing “or equal” equipment and complete blocks below)

Bidding on: _______________________________________________________

Manufacturer Name: _______________________________________________

Brand: ___________________________________________________________

No.: _____________________________________________________________

(END OF BRAND NAME OR EQUAL INFORMATION)

A.5 SCHEDULE OF OFFER ITEMS

SCHEDULE OF OFFER ITEMS: Contract Line Item Number (CLIN) 0001:

(See Scope of Work, Contract Specifications and Drawings)

AWARD POLICY: The Base Offer for CLIN 0001 shall include all labor, tools, materials, equipment, transportation, and supervision necessary to perform all work associated with

Project: 520-22-166 Miscellaneous Generator Repairs & Mechanical Improvements, VA Gulf

Coast Veterans Health Care System (GCVHCS), Pensacola, Florida 32507. The Government reserves the right to award only if sufficient funds are available. Based upon availability of funds, award will be made to the offeror whose offer best conforms to the request for proposal that is most advantageous to the Government considering past performance factors, technical factors, and price-related factors, as included in the solicitation.

CLIN 0001, BASE OFFER ITEM - GENERAL CONSTRUCTION: Furnish all labor, tools, supervision, equipment, materials, supplies, permits and other requirements necessary to perform all work associated with Project: 520-22-166 Miscellaneous Generator Repairs &

Mechanical Improvements, GCVHCS, Pensacola, FL 32507.

FOR BASE OFFER…