This document package includes an amendment to a solicitation and details regarding a related federal contract opportunity. The amendment provides responses to contractor questions about requirements for replacing a chiller pump motor and installing new VAV boxes, sensors, and EMCS panels associated with Project 520-22-166 for Miscellaneous Generator Repairs and Improvements at the Gulf Coast Veterans Health Care System in Pensacola, Florida. Offerors must acknowledge receipt of the amendment. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses and proposals must come from verified SDVOSBs. The project involves furnishing all labor, tools, materials, equipment, supervision and other requirements to perform generator repairs and improvements at the specified location.
View the file
Other files for this federal contract opportunity
Show all 50
Misc. Generator Repairs and Improvements has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
520-22-1-7045-0002
520-22-166
Department of Veterans Affairs
Gulf Coast Veterans Health Care System
Network Contracting Office 16
400 Veterans Avenue
Biloxi MS 39531
Department of Veterans Affairs
Gulf Coast Veterans Health Care System
Network Contracting Office 16
400 Veterans Avenue
Biloxi MS 39531
To all Offerors/Bidders
36C25621R0179
09-01-2021
X
X X
(PLEASE SEE PAGE 2 OF 2)
Cynthia L. Kinsman
Contracting Officer
36C25621R0179 0003
Amendment 0003
520-22-166 Miscellaneous Generator Repairs and Improvements
A. The purpose of this amendment is to provide responses to RFI’s.
B. Responses to RFI’s:
1. Per SOW, ACCU-1 Chill Water Pump is to be replaced. Will this pump require a VFD with bypass or will it remain on a disconnect switch?
If a VFD is required, what is the line voltage and HP of the motor to be installed? It will require a new VFD w/bypass. The line voltage for the motor is 480V and it will require a 5HP motor and pump.
2. For 11 New VAV boxes to be installed no GPM flow per box is provided on schedule. Can Reheat Supply Water Temperature, Air Handler Supply Air
Temperature, and Required Reheat Temperature delta for VAV boxes be provided to calculate valve/coil size?
Entering Water Temp 160 degrees. Entering Air Temperature is 55 degrees. The delta T for air across the coil shall be 40 degrees.
3. ACCU-1 drawing does not show supply/return temp sensors or flow meter. Will the new chiller require these sensors to be installed?
Yes. Provide both temperature and flow sensors.
4. Can rooms in close proximity to each other utilize a common Room Condition
Monitor or does each room require its own Room Condition Monitor?
Yes. Rooms in close proximity to each other can utilize a common Room Condition
Monitor.
5. Are all EMCS Field Panels related to the chiller/AHU10 portion of the project on emergency power or will emergency power circuits be required to installed to these field panels?
Emergency power circuits will be required for the EMCS Field Panels.