36C25621R0179 0003.pdf

PDF 185 KB Posted

Attached to
Misc. Generator Repairs and Improvements Federal contract opportunity
Solicitation number
36C25621R0179
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document package includes an amendment to a solicitation and details regarding a related federal contract opportunity. The amendment provides responses to contractor questions about requirements for replacing a chiller pump motor and installing new VAV boxes, sensors, and EMCS panels associated with Project 520-22-166 for Miscellaneous Generator Repairs and Improvements at the Gulf Coast Veterans Health Care System in Pensacola, Florida. Offerors must acknowledge receipt of the amendment. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses and proposals must come from verified SDVOSBs. The project involves furnishing all labor, tools, materials, equipment, supervision and other requirements to perform generator repairs and improvements at the specified location.

View the file

Other files for this federal contract opportunity

Other files attached to Misc. Generator Repairs and Improvements, newest first.
File Type Posted
S06 36C25621R0179 0002.pdf PDF
S06 36C25621R0179 0001 (JACC650KW).pdf PDF
S06 36C25621R0179 0001 (IMG_1379).jpg JPG image
S06 36C25621R0179 0001 (JACC350KW).pdf PDF
S06 36C25621R0179 0001 (E-5.01-Layout1).pdf PDF
36C25621R0179 0001.pdf PDF
36C25621R0179.pdf PDF
VAP-MH-205.pdf PDF
Section 28 05 11 - Common Work Results for Electronic Safety-Security.docx DOCX document
Section 22 05 11 - Common Work Results For Plumbing.docx DOCX document
Section 26 24 16 - Panelboards.docx DOCX document
ICRA.pdf PDF
Room Detail Draft VAP-MH-101-2P.pdf PDF
Room 1C151 Draft-MH-101-3.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
Room 2A121 Draft VAP-MH-102-1.pdf PDF
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Draft VAP-MH-101-4.pdf PDF
Section 26 05 71 - Electrical System Protective Device Study.DOC DOC document
VAP-MH-603.pdf PDF
VAP-PL-501.pdf PDF
Section 26 05 26 - Grounding and Bonding for Electrical Systems.docx DOCX document
Section 26 32 13 - Engine Generators.docx DOCX document
Section 23 09 23 - Direct Digital Control System for HVAC.docx DOCX document
Section 22 11 23 - Domestic Water Pumps.docx DOCX document
Section 23 01 00 - General Provisions of HVAC Systems.doc DOC document
Section 22 05 23 - General Duty Valves For Plumbing Piping.docx DOCX document
Draft VAP-GS-121S-6.pdf PDF
Draft VAP-MH-101-2P.pdf PDF
VA CATEX Form- JACC NRM HVAC and Generators.pdf PDF
Section 23 05 41 - Noise and Vibration Control for HVAC Piping-Equipment.docx DOCX document
VAP-MH-206.pdf PDF
General Decision FL20210203 Escambia 05-07-2021.pdf PDF
Section 23 21 23 - Hydronic Pumps.docx DOCX document
Rooms C271A_C272A_2D122_2D142_2D143_2D146_2D153 Draft-MH-102-4.pdf PDF
Section 23 21 20 - Hydronic Specialties.doc DOC document
Room 2B137 Draft-MH-102-2.pdf PDF
Section 23 07 10 - Insulation.doc DOC document
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
DWH2.pdf PDF
Section 23 05 93 - Testing Adjusting and Balancing for HVAC.docx DOCX document
VHA Directive 1193 - COVID 2019 Vaccination Program.pdf PDF
VAP-MH-601.pdf PDF
ACC-1 Power Supply Drawing E-6_01.pdf PDF
VAP-MH-401.pdf PDF
Section 26 36 23 - Automatic Transfer Switches.docx DOCX document
Section 23 07 11 - HVAC and Boiler Plant Insulation.docx DOCX document
Section 26 05 13 - Medium Voltage Cables.docx DOCX document
Show all 50

Misc. Generator Repairs and Improvements has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

520-22-1-7045-0002

520-22-166

Department of Veterans Affairs

Gulf Coast Veterans Health Care System

Network Contracting Office 16

400 Veterans Avenue

Biloxi MS 39531

Department of Veterans Affairs

Gulf Coast Veterans Health Care System

Network Contracting Office 16

400 Veterans Avenue

Biloxi MS 39531

To all Offerors/Bidders

36C25621R0179

09-01-2021

X

X X

(PLEASE SEE PAGE 2 OF 2)

Cynthia L. Kinsman

Contracting Officer

36C25621R0179 0003

Amendment 0003

520-22-166 Miscellaneous Generator Repairs and Improvements

A. The purpose of this amendment is to provide responses to RFI’s.

B. Responses to RFI’s:

1. Per SOW, ACCU-1 Chill Water Pump is to be replaced. Will this pump require a VFD with bypass or will it remain on a disconnect switch?

If a VFD is required, what is the line voltage and HP of the motor to be installed? It will require a new VFD w/bypass. The line voltage for the motor is 480V and it will require a 5HP motor and pump.

2. For 11 New VAV boxes to be installed no GPM flow per box is provided on schedule. Can Reheat Supply Water Temperature, Air Handler Supply Air

Temperature, and Required Reheat Temperature delta for VAV boxes be provided to calculate valve/coil size?

Entering Water Temp 160 degrees. Entering Air Temperature is 55 degrees. The delta T for air across the coil shall be 40 degrees.

3. ACCU-1 drawing does not show supply/return temp sensors or flow meter. Will the new chiller require these sensors to be installed?

Yes. Provide both temperature and flow sensors.

4. Can rooms in close proximity to each other utilize a common Room Condition

Monitor or does each room require its own Room Condition Monitor?

Yes. Rooms in close proximity to each other can utilize a common Room Condition

Monitor.

5. Are all EMCS Field Panels related to the chiller/AHU10 portion of the project on emergency power or will emergency power circuits be required to installed to these field panels?

Emergency power circuits will be required for the EMCS Field Panels.