This document contains a section specification for hydronic specialties and a federal contract opportunity solicitation for generator repairs and improvements.

The section specification outlines requirements for hydronic specialties including acceptable manufacturers and product details for PT test plugs, pressure gauges, thermometer test wells, and relief valves. Specified hydronic specialties include 1/4 inch solid brass PT test plugs, 3-1/2 inch liquid filled pressure gauges, stainless steel thermometer wells, and diaphragm relief valves.

The federal contract opportunity solicitation is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for generator repairs and improvements at the Gulf Coast Veterans Health Care System facility. Offerors must be registered and verified as a SDVOSB. The base item involves furnishing all labor, tools, materials, equipment, supervision and other requirements to perform miscellaneous generator repairs and improvements.

View the file

Other files for this federal contract opportunity

Other files attached to Misc. Generator Repairs and Improvements, newest first.
File Type Posted
36C25621R0179 0003.pdf PDF
S06 36C25621R0179 0002.pdf PDF
S06 36C25621R0179 0001 (JACC650KW).pdf PDF
S06 36C25621R0179 0001 (IMG_1379).jpg JPG image
36C25621R0179 0001.pdf PDF
S06 36C25621R0179 0001 (JACC350KW).pdf PDF
S06 36C25621R0179 0001 (E-5.01-Layout1).pdf PDF
36C25621R0179.pdf PDF
VAP-MH-205.pdf PDF
Section 28 05 11 - Common Work Results for Electronic Safety-Security.docx DOCX document
Section 22 05 11 - Common Work Results For Plumbing.docx DOCX document
Section 26 24 16 - Panelboards.docx DOCX document
ICRA.pdf PDF
Room Detail Draft VAP-MH-101-2P.pdf PDF
Room 1C151 Draft-MH-101-3.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
Room 2A121 Draft VAP-MH-102-1.pdf PDF
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
Draft VAP-MH-101-4.pdf PDF
Section 26 05 71 - Electrical System Protective Device Study.DOC DOC document
VAP-MH-206.pdf PDF
General Decision FL20210203 Escambia 05-07-2021.pdf PDF
Section 23 21 23 - Hydronic Pumps.docx DOCX document
Rooms C271A_C272A_2D122_2D142_2D143_2D146_2D153 Draft-MH-102-4.pdf PDF
Room 2B137 Draft-MH-102-2.pdf PDF
Section 23 07 10 - Insulation.doc DOC document
EXHIBIT E SURETY FORM.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
DWH2.pdf PDF
VAP-MH-603.pdf PDF
VAP-PL-501.pdf PDF
Section 26 05 26 - Grounding and Bonding for Electrical Systems.docx DOCX document
Section 26 32 13 - Engine Generators.docx DOCX document
Section 23 09 23 - Direct Digital Control System for HVAC.docx DOCX document
Section 22 11 23 - Domestic Water Pumps.docx DOCX document
Section 23 01 00 - General Provisions of HVAC Systems.doc DOC document
Section 22 05 23 - General Duty Valves For Plumbing Piping.docx DOCX document
Draft VAP-GS-121S-6.pdf PDF
Draft VAP-MH-101-2P.pdf PDF
VA CATEX Form- JACC NRM HVAC and Generators.pdf PDF
Section 23 05 41 - Noise and Vibration Control for HVAC Piping-Equipment.docx DOCX document
Section 23 05 93 - Testing Adjusting and Balancing for HVAC.docx DOCX document
VHA Directive 1193 - COVID 2019 Vaccination Program.pdf PDF
VAP-MH-601.pdf PDF
ACC-1 Power Supply Drawing E-6_01.pdf PDF
VAP-MH-401.pdf PDF
Section 26 36 23 - Automatic Transfer Switches.docx DOCX document
Section 23 07 11 - HVAC and Boiler Plant Insulation.docx DOCX document
Section 26 05 13 - Medium Voltage Cables.docx DOCX document
Show all 50

Misc. Generator Repairs and Improvements has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 23 21 20 - HYDRONIC SPECIALTIES

PART 1 - GENERAL

1.1 WORK INCLUDED

A. P.T. test plugs.

B. Pressure gauges.

C. Thermometer test wells.

D. Relief valves.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Bell and Gossett ITT, Dieterich Standard, Flow Design, Gerand, Mueller, Peterson Engineering, Taco, Thrush, John Wood Industrial Products, Weiss Instruments, Inc.

2.2 EQUIPMENT

A. P.T. Test Plugs:

1. Provide 1/4 inch solid brass pressure/temperature test plugs at locations shown on drawings.

2. Nordel self-closing valve to be rated for 275 degrees F. service.

3. Plugs to be manufactured by Flow Design, Peterson Engineering, SISCO, or approved equal.

B. Pressure Gauges:

1. Provide 3-1/2 inch dial, liquid filled pressure gauges at locations shown on drawings.

2. Gauges to be equal to Trerice Model No. 800LF with glycerin liquid fill, nylon, steel, or aluminum case, acrylic plastic window, brass movement, phosphor bronze bourdon tube, and brass socket.

3. Accuracy to be guaranteed within one-half percent in powerhouse and mechanical rooms, other gauges shall be 2% over middle half of scale range and 3% for remainder.

4. Select scale range of gauges to indicate design pressure near midpoint of scale.

5. Provide each gauge with 1/4 inch size, brass construction needle valve equal to Trerice Model No. 735-2.

6. Provide each gauge with impulse dampener equal to Trerice Model No. 870.

C. Thermometer Wells:

1. Provide Trerice or equal stainless steel thermometer wells for water temperature sensors and at other locations shown on drawings.

2. Test wells to be stainless steel with 2-1/2 inch extension neck and screw plug cap with chain and shall be filled with light clear oil.

D. Relief Valves:

1. Provide relief valves for each hydronic system as shown on drawings.

2. Valve to be constructed to ASME code requirements, tested by National Board, and labeled with ASME symbol.

3. Valve body to be bronze construction.

4. Valves to be diaphragm type operating with slow opening and closing feature.

5. Valve to seat against face of EPDM rubber.

6. Set differential between opening and closing pressure to prevent water flash and water hammer.

7. Valve to include manual lever for testing valve.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install hydronic specialties in strict accordance with manufacturers’ published installation instructions.

B. Provide 1/2" manual air vents at top of pipe risers and other locations where air can be trapped or collected.

C. Provide 3/4" hose end gate valve drains at bottom of pipe risers and other locations to drain water systems.

D. Pipe relief valve outlets from hydronic systems to nearest floor drain.

E. Support pump inlet and strainer fittings with floor mounted pipe and flange supports.

F. Locate thermometers and pressure gauges no higher than 7 feet above finished floor elevation.

END OF SECTION 23 21 20