Vandenberg AFB Risk Management Plan_June 2020.pdf
PDF 738 KB Posted
- Solicitation number
- Not on record
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VANDENBERG AIR FORCE BASE
RISK MANAGEMENT PLAN
Prepared for
Vandenberg Air Force Base
Submitted to:
Submitted by:
Mr. Steve Mattern Hazardous Materials Specialist County of Santa Barbara Environmental Health Services 225 Camino del Remedio Santa Barbara, CA 93110
30th Civil Engineer Squadron Environmental Compliance 1028 Iceland Avenue
VAFB, CA 93437-6010
June 2020
RISK MANAGEMENT PLAN VANDENBERG AIR FORCE BASE, CALIFORNIA
CALIFORNIA ACCIDENTAL RELEASE PREVENTION (CALARP) PROGRAM PAGE II
This page intentionally left blank.
CALIFORNIA ACCIDENTAL RELEASE PREVENTION (CALARP) PROGRAM PAGE III
Table of Contents
Page
Certification ..................................................................................................................................... i
Table of Contents ........................................................................................................................... iii
California Accidental Release Program Registration Form ............................................................ v
Risk Management Plan .......................................................................................................... 1 to 19
Section 1 Registration Information
Section 2. Toxics: Worst Case
Section 3. Toxics: Alternative Release
Section 7. Prevention Program: Program Level 3
Section 9. Emergency Response
Executive Summary
Appendices
A CalARP Seismic Assessment – Hypergolic Fuel & Oxidizer Storage Facility, Vandenberg AFB
CALIFORNIA ACCIDENTAL RELEASE PREVENTION (CALARP) PROGRAM PAGE IV
This page intentionally left blank.
Santa Barbara County Certified Unified Program Agency
California Accidental Release Program Registration 225 Camino del Remedio, Santa Barbara, CA 93110
DATE:
June 2020 REGISTRATION TYPE: New Update UPDATE TYPE: Add Delete Revise
FACILITY #:
4 2 0 0 0 0 1 EPA ID #:
100000064431
2 # OF FULL-TIME EMPLOYEES:
BUSINESS NAME:
Vandenberg Air Force Base
BUSINESS SITE ADDRESS:
1028 Iceland Avenue CITY: Vandenberg AFB COUNTY: Santa Barbara CA
LATITUDE:
34.724680
LONGITUDE:
-120.548220
PARENT COMPANY NAME:
U.S. Department of Defense
DUN & BRADSTREET:
n/a
OWNER/OPERATOR NAME:
30th Space Wing
PHONE:
805-606-1921
MAILING STREET ADDRESS:
1028 Iceland Avenue
CITY:
Vandenberg AFB
CA ZIP CODE:
93437-6010
RMP CONTACT NAME:
Beatrice L. Kephart
TITLE:
Chief, Installation Management Flight
DAY PHONE:
805-606-1921
EMERGENCY CONTACT NAME:
Command Post
TITLE:
Duty Controller
24 HOUR PHONE:
805-606-9961
E-MAIL ADDRESS:
Beatrice.kephart@us.af.mil
NAME OF CONSULTANT WHO PREPARED THE RMP
Cardno
MAILING ADDRESS
3888 State Street, Santa Barbara, CA 93105
PHONE:
801-726-6149
DATE OF LAST SAFETY INSPECTION:
February 1, 2008
AGENCY:
OSHA
USEPA IDENTIFIER NUMBER: (12 digits)
1000000644431
SOURCE SUBJECT TO CCR TITLE 8, Sec. 5189?
YES NO
SOURCE SUBJECT TO 40 CFR 355?
YES NO
CAA TITLE V OPERATING PERMIT?
YES NO PERMIT NO. 13968-R1
PROCESS
#1: Hypergolic Fuel & Oxidizer Storage Facility (HSF)
NAICS
CODE: 92811 PROGRAM LEVEL: 1 2 3
REGULATED SUBSTANCE (RS)
PHYSICAL STATE
CAS #
CONCENTRATION (wt %)
MAXIMUM QTY. OF RS (lbs)
1,1-Dimethylhydrazine [Hydrazine, 1,1-dimethyl-]
Liquid
57147
96,000
2 Hydrazine Liquid 302012 51 and 100 120,000
Methylhydrazine [Hydrazine, methyl-]
Liquid
60344
160,000
INSTRUCTIONS FOR THE COMPLETION OF THE COUNTY OF SANTA BARBARA CUPA
UNIFIED PROGRAM FACILITY PERMIT APPLICATION
REGULATED SUBSTANCE REGISTRATION INSTRUCTIONS
Complete this form only if your business has an onsite regulated substance(s) in a process greater than the threshold quantity established by the California Accidental Release Prevention (CalARP) Program. For the purposes of this registration, any group of vessels that are interconnected or separate vessels that are located such that a regulated substance could be involved in a potential release, shall be considered a single process. If you are uncertain as to whether your business handles a regulated substance, you can contact the CUPA at (805) 681-4044.
DATE: Please enter the date.
REGISTRATION TYPE: Indicate if you are registering for the first time (New) or if you are updating your registration (Update).
UPDATE TYPE: If your registration is an update, please indicate if the regulated substance or process is being added (Add), deleted (Delete) or if the information is being revised (Revise).
FACILITY #: Leave this blank. This number is assigned by the Santa Barbara County Fire CUPA. This is the unique number, which identifies your facility.
EPA ID# (Hazardous Waste Only): If you generate, store or treat hazardous waste, enter your facility’s 12-character U.S. Environmental Protection Agency (EPA) or California Identification number. If you do not have a number, contact the Department of Toxic Substances Control (DTSC), Telephone Information Center at (916) 324-1781, (800) 61-TOXIC or (800) 618-6942, to obtain one.
# OF FULL-TIME EMPLOYEES: Enter the number of persons employed full-time at your business. Part-time and/or seasonal workers’ schedules should be totaled to determine their equivalence to full-time work.
BUSINESS NAME (Same as FACILITY NAME or DBA-- Doing Business As): Enter the full legal name of the business (please use same name as indicated on your Business License).
BUSINESS SITE ADDRESS: Enter the street address where the facility is located. No post office box numbers are allowed. This information must provide a means to geographically locate the facility.
LATITUDE: Enter the degrees of latitude for the business location. Latitude is the degrees north or south of the equator. Latitude is measured in degrees, minutes and seconds. We recommend the use of U.S. Geological Survey (USGS) topographical quadrangle maps when determining your measurements.
LONGITUDE: Enter the degrees of longitude for the business location. Longitude is the degrees east or west of the prime meridian. Longitude is measured in degrees, minutes and seconds. We recommend the use of U.S. Geological Survey (USGS) topographical quadrangle maps when determining your measurements.
(http://mac.usgs.gov/maplist/index.html). EPA maintains a web-based site-siting tool at (htt://www.epa.gov/tri/report/siting_tool/index.htm)
PARENT COMPANY NAME: Enter the legal name of the principal company or entity, which owns at least 50 percent of the voting stock.
DUN & BRADSTREET: Enter the Dun & Bradstreet number of the principal company or entity, which owns at least 50 percent of the voting stock. This number allows your business to be cross-referenced to various business information. You may be able to obtain this number form your finance department or by calling
(610) 882-7748 or by using the Internet.
OWNER/OPERATOR NAME: Enter the name, mailing address, and phone number of the business owner and/or operator.
RMP CONTACT NAME: Enter the name, title, and phone number of the individual designated as the person responsible for the RMP.
EMERGENCY CONTACT: Enter the name, title and 24-hour phone number of the designated emergency contact person.
E-MAIL ADDRESS: Enter the designated emergency contact persons e-mail address.
NAME OF RMP PREPARER: Enter the name, mailing address, and phone number of the person/consultant who prepared the RMP.
DATE OF LAST SAFETY INSPECTION: Enter the date of the last safety inspection conducted by a federal, state, or local government and the identity of the inspecting entity.
USEPA IDENTIFICATION NUMBER: Enter the stationary source 12-digit federal identification number if applicable.
SOURCE SUBJECT TO CCR TITLE 8, Sec. 5189: This section of the California Code of Regulations (CCR) and Title 29 of the Code of Federal Regulations (CFR) 1910.119 are the OSHA Process Safety Management (PSM) Standard. If any process at your facility is subject to OSHA PSM requirements, you must answer “YES” even if the PSM process does not involve a regulated substance.
SOURCE SUBJECT TO 40 CFR 355: This question refers to the Emergency Planning and Community Right-to-Know Act (EPCRA), which requires notification to local authorities of the presence of certain Extremely Hazardous Substances listed in Title 40 CFR, Part 302. If your business has a toxic regulated substance above the threshold quantity in a process, your business is subject to EPCRA and you must check “YES.”
CAA TITLE V OPERATING PERMIT: State and local operating permit programs are required under Title V of the Clean Air Act (Title 40 CFR, Part 70).
Title V requires major sources of air pollution to receive permits, pay fees to cover the cost of administering the program, and sign a binding certification of compliance on all permit applications and documents. Check the appropriate box, “YES” or “NO” and enter the permit number if applicable.
PROCESS DESCRIPTIONS: Enter a brief descriptive name for each process subject to the CalARP Program. Enter the North American Industry Classification System Code (NAICS) for your business. Indicate the proper CalARP program level. List each regulated substance, its physical state (gas, liquid or solid) and its Chemical Abstract Service (CAS) number. For mixtures, enter the CAS number of the mixture if it has been assigned a number distinct from its components.
For mixtures, enter the concentration (the percent weight) of the toxic regulated substance. Enter the maximum quantity of each regulated substance (in pounds [lbs]); for mixtures of toxic regulated substances, enter only the weight of the regulated substance in the mixture, not the entire weight of the mixture.
CalARP Registration.doc 06-16-2010
EPA FACILITY ID:
Vandenberg AFB 100000064431
Section 1. Registration Information
RMP*eSubmit Page 1 e
Reason for Resubmission
1.1 Source Identification
1.1.a. Facility Name Vandenberg AFB
1.1.b. Parent Company #1 Name n/a (military installation)
1.1.c. Parent Company #2 Name
1.2 EPA Facility Identifier 100000064431
1.3 Other EPA Systems Facility Identifier 934375DDSF747NE
1.4 Dun and Bradstreet Numbers (DUNS)
1.4.a. Facility DUNS
1.4.b. Parent Company #1 DUNS
1.4.c. Parent Company #2 DUNS
1.5 Facility Location
1.5.a. Street - Line 1 1028 Iceland Avenue
1.5.b. Street - Line 2
1.5.c. City Vandenberg AFB
1.5.d. State CA
1.5.e. Zip Code - Zip +4 Code 93437-6010
1.5.f. County SANTA BARBARA
1.5.g. Facility Latitude (in decimal degrees ) 34.724680
1.5.h. Facility Longitude (in decimal degre s) -120.548220
1.5.i. Method for determining Lat/Long GPS Code Measurements (Psuedo Range) Differential (DGPS)
1.5.j. Description of location identified by Lat/Long
Administrative Building
1.5.k. Horizontal Accuracy Measure (meter s) 0.3
1.5.l. Horizontal Reference Datum Code World Geodetic System of 1984
1.5.m. Source Map Scale Number
1.6 Owner or Operator
1.6.a. Name 30th Space Wing
1.6.b. Phone (805) 606-1921
1.6.c. Street - Line 1 1028 Iceland Avenue
1.6.d. Street - Line 2
1.6.e. City Vandenberg AFB
1.6.f. State CA
1.6.g. Zip Code - Zip +4 Code 93437-6010
Foreign Country
Foreign State/Province
Foreign Zip/Postal Code
1.7 Name, title and email address of person or position responsible for RMP (part 68) implementation
1.7.a. Name of person Beatrice L. Kephart
1.7.b. Title of person or position Chief, Installation Management Flight
1.7.c. Email address of person or position Beatrice.Kephart@us.af.mil
RMP*eSubmit Page 2 e
1.8 Emergency Contact
1.8.a. Name Command Post
1.8.b. Title of person or position On-duty Controller
1.8.c. Phone (805) 606-9961
1.8.d. 24-Hour Phone (805) 606-9961
1.8.e. 24-Hour Phone Extension/PIN #
1.8.f. Email address for emergency contact N/A
1.9 Other Points of Contact
1.9.a. Facility or Parent Company E-mail Address
Danilo.Narciso@us.af.mil
1.9.b. Facility Public Contact Phone Numb r (805) 605-7573
1.9.c. Facility or Parent Company WWW Homepage Address
1.10 Local Emergency Planning Committee
(LEPC)
California Region 1 LEPC
1.11 Number of fulltime equivalent (FTEs)
employees on site
1.12 Covered by
1.12.a. OSHA PSM Y
1.12.b. EPCRA section 302 Y
1.12.c. CAA Title V Air Operating Permit Program
Y
1.12.d. Air Operating Permit ID # 13968
1.13 OSHA Star or Merit Ranking
1.14 Last Safety Inspection (by an External
Agency) Date
12/16/2015
1.15 Last Safety Inspection Performed by an
External Agency
OSHA
1.16 Will this RMP involve Predictive Filing?
1.18 RMP Preparer Information
1.18.a. Name Cardno
1.18.b. Phone 801-726-6149
1.18.c. Street - Line 1 3888 State Street
1.18.d. Street - Line 2
1.18.e. City Santa Barbara
1.18.f. State CA
1.18.g. Zip 93105
Foreign Country
Foreign State/Province
Foreign Zip Code
RMP*eSubmit Page 3
Section 1.17 Process Specific Information
Process 1
Process ID # 1000090355 Process Description HSF (Fuel) 1.17.a. Program Level 3
1.17.b. NAICS Code(s)
92811 (National Security)
1.17.c. Chemical(s) Chemical Name CAS Number Quantity 1,1-Dimethylhydrazine [Hydrazine, 1,1-dimethyl-] 57-14-7 96,000 Hydrazine 302-01-2 120,000 Methyl hydrazine [Hydrazine, methyl-] 60-34-4 160,000
RMP*eSubmit Page 4
Section 2. Toxics: Worst Case
Scenario 1 a
Process Name HSF (Fuel)
2.1 Chemical
2.1.a. Name 1,1-Dimethylhydrazine [Hydrazine, 1,1-dimethyl-]
2.1.b. Percent Weight of Chemical 48
2.2 Physical State Liquid
2.3 Model Used Degadis
2.4 Scenario Liquid spill and vaporization
2.5 Quantity Released (lbs) 39,780
2.6 Release Rate (lbs/min) 3,978
2.7 Release Duration (mins) 10
2.8 Wind Speed (meters/sec) 1.5
2.9 Atmospheric stability class F
2.10 Topography Urban
2.11 Distance to endpoint (miles) 3.4
2.12 Estimated residential population within
distance to endpoint (numbers)
2.13 Public receptors within distance to endpoint
2.13.a. Schools
2.13.b. Residences
2.13.c. Hospitals
2.13.d. Prison/Correctional Facilities
2.13.e. Recreational Areas Y
2.13.f. Major commercial, office or industri areas l Y
2.13.g. Other Agricultural fields
2.14 Environmental receptors within distance to endpoint
2.14.a. National or State Parks, Forests or Monuments
2.14.b. Officially Designated Wildlife Sanctuaries, Preserves or Refuges
2.14.c. Federal Wilderness Area
2.14.d. Other Vandenberg State Marine Reserve
2.15 Passive mitigation considered
2.15.a. Dikes Y
2.15.b. Enclosures
2.15.c. Berms
2.15.d. Drains Y
2.15.e. Sumps Y
2.15.f. Other
2.16 Graphic file
RMP*eSubmit Page 5
Section 3. Toxics: Alternative Release
Scenario 1
3.1 Chemical
3.1.a. Name 1,1-Dimethylhydrazine [Hydrazine, 1,1-dimethyl-]
3.1.b. Percent Weight of Chemical
3.2 Physical State Liquid
3.3 Model Used Degadis
3.4 Scenario Vessel leak
3.5 Quantity Released (lbs) 788
3.6 Release Rate (lbs/min) 78.8
3.7 Release Duration (mins) 10
3.8 Wind Speed (meters/sec) 4.6
3.9 Atmospheric stability class D
3.10 Topography Urban
3.11 Distance to endpoint (miles) 0.19
3.12 Estimated residential population within
distance to endpoint (numbers)
3.13 Public receptors within distance to endpoint
3.13.a. Schools
3.13.b. Residences
3.13.c. Hospitals
3.13.d. Prison/Correctional Facilities
3.13.e. Recreational Areas
3.13.f. Major commercial, office or industri areas l
3.13.g. Other
3.14 Environmental receptors within distance to endpoint
3.14.a. National or State Parks, Forests or
3.14.b. Officially Designated Wildlife
3.14.c. Federal Wilderness Area
3.14.d. Other
3.15 Passive mitigation considered
3.15.a. Dikes
3.15.b. Enclosures
3.15.c. Berms
3.15.d. Drains
3.15.e. Sumps
3.15.f. Other
3.16 Active mitigation considered
3.16.a. Sprinkler systems
3.16.b. Deluge systems
3.16.c. Water curtain
3.16.d. Neutralization
3.16.e. Excess flow valve
RMP*eSubmit Page 6
3.16.f. Flares
3.16.g. Scrubbers
3.16.h. Emergency shutdown systems
3.16.i. Other
3.17 Graphic file
RMP*eSubmit Page 7
Scenario 2
3.1 Chemical
3.1.a. Name Hydrazine
3.1.b. Percent Weight of Chemical
3.2 Physical State Liquid
3.3 Model Used Degadis
3.4 Scenario Vessel leak
3.5 Quantity Released (lbs) 1,006
3.6 Release Rate (lbs/min) 100.6
3.7 Release Duration (mins) 10
3.8 Wind Speed (meters/sec) 4.6
3.9 Atmospheric stability class D
3.10 Topography Urban
3.11 Distance to endpoint (miles) 0.06
3.12 Estimated residential population within
distance to endpoint (numbers)
3.13 Public receptors within distance to endpoint
3.13.a. Schools
3.13.b. Residences
3.13.c. Hospitals
3.13.d. Prison/Correctional Facilities
3.13.e. Recreational Areas
3.13.f. Major commercial, office or industri areas l
3.13.g. Other
3.14 Environmental receptors within distance to endpoint
3.15 Passive mitigation considered
3.15.a. Dikes
3.15.b. Enclosures
3.15.c. Berms
3.15.d. Drains
3.15.e. Sumps
3.15.f. Other
3.16 Active mitigation considered
3.16.a. Sprinkler systems
3.16.b. Deluge systems
3.16.c. Water curtain
RMP*eSubmit Page 8
3.16.h. Emergency shutdown systems
RMP*eSubmit Page 9
Scenario 3
3.1 Chemical
3.1.a. Name Methyl hydrazine [Hydrazine, methyl-]
3.1.b. Percent Weight of Chemical
3.2 Physical State Liquid
3.3 Model Used Degadis
3.4 Scenario Vessel leak
3.5 Quantity Released (lbs) 872
3.6 Release Rate (lbs/min) 87.2
3.7 Release Duration (mins) 10
3.8 Wind Speed (meters/sec) 4.6
3.9 Atmospheric stability class D
3.10 Topography Urban
3.11 Distance to endpoint (miles) 0.11
3.12 Estimated residential population within
distance to endpoint (numbers)
3.13 Public receptors within distance to endpoint
3.13.a. Schools
3.13.b. Residences
3.13.c. Hospitals
3.13.d. Prison/Correctional Facilities
3.13.e. Recreational Areas
3.13.f. Major commercial, office or industri areas l
3.13.g. Other
3.14 Environmental receptors within distance to endpoint
3.15 Passive mitigation considered
3.15.a. Dikes
3.15.b. Enclosures
3.15.c. Berms
3.15.d. Drains
3.15.e. Sumps
3.15.f. Other
3.16 Active mitigation considered
3.16.a. Sprinkler systems
3.16.b. Deluge systems
3.16.c. Water curtain
RMP*eSubmit MPTABERNER Page 10
3.16.h. Emergency shutdown systems
Section 7. Prevention Program: Program Level 3
RMP*eSubmit Page 11
Program 1
Prevention Program Description:
Hypergolic Storage Facility (Fuel Site - 976) This Prevention Program complies with OSHA Standard 1910.119, Process Safety Management of Highly Hazardous Chemicals (PSM). The PSM was implemented at this site on 08/27/1993. The site was inspected by Prima Tech on 05/15-17/1995 and the site was found to be in conformance with the PSM Standard. The site operator holds routine weekly and monthly meetings to monitor PSM compliance. In addition to the PSM Standard, this site is maintained in accordance with Air Force Space Command Manual (AFSPCMAN) 91-710, Range Safety User Requirements Manual, Certified Current 02 December 2016.
This controlling Air Force document establishes criteria for the operation of rocket propellant storage and support facilities. The site is inspected annually by Air Force Safety officials.
The operator of the site, the United Paradyne Corporation, also performs daily inspections and effects maintenance in accordance with a Santa Barbara County Air Pollution Control District (APCD) approved inspection and maintenance plan. Site compliance with APCD permit requirements is checked on an annual basis. In accordance with the California Accidental Release Prevention (CalARP) Program, an assessment of the seismic integrity of this facility was performed on 12 March 2018 by a California licensed Professional Engineer
7.1 NAICS Code for process
7.1.a. Process Name 1000090355 (HSF (Fuel))
7.1.b. NAICS 92811 (National Security)
7.2 Chemicals
1,1-Dimethylhydrazine [Hydrazine, 1,1-dimethyl-]
Hydrazine
Methyl hydrazine [Hydrazine, methyl-]
7.3 Date on which the safety information was
last reviewed or revised
08/21/2017
7.4 Process Hazard Analysis (PHA)
7.4.a. Date of last PHA or PHA update 08/21/2017
7.4.b. Technique used
7.4.b.1. What if
7.4.b.2. Checklist
7.4.b.3. What if/Checklist Combined Y
7.4.b.4. HAZOP
7.4.b.5. Failure mode & effects analysis
7.4.b.6. Fault tree analysis
7.4.b.7. Other
7.4.c. Expected or actual date of completion of all changes resulting from last PHA or PHA update
08/21/2017
7.4.d. Major hazards identified
7.4.d.1. Toxic release Y
7.4.d.2. Fire Y
7.4.d.3. Explosion
7.4.d.4. Runaway reaction
7.4.d.5. Polymerization
7.4.d.6. Overpressurization Y
7.4.d.7. Corrosion
7.4.d.8. Overfilling Y
7.4.d.9. Contamination Y
7.4.d.10. Equipment failure Y
RMP*eSubmit Page 12 r 7.4.d.11. Loss of cooling, heating, elect instrument air icity, 7.4.d.12. Earthquake Y
7.4.d.13. Floods
7.4.d.14. Tornado
7.4.d.15. Hurricanes
7.4.d.16. Other
7.4.e. Process controls in use
7.4.e.1. Vents Y
7.4.e.2. Relief valves Y
7.4.e.3. Check valves Y
7.4.e.4. Scrubbers Y
7.4.e.5. Flares
7.4.e.6. Manual shutoffs Y
7.4.e.7. Automatic shutoffs
7.4.e.8. Interlocks
7.4.e.9. Alarms and procedures Y
7.4.e.10. Keyed bypass
7.4.e.11. Emergency air supply Y
7.4.e.12. Emergency power Y
7.4.e.13. Backup pump
7.4.e.14. Grounding equipment Y
7.4.e.15. Inhibitor additions
7.4.e.16. Rupture disks
7.4.e.17. Excess flow device Y
7.4.e.18. Quench system
7.4.e.19. Purge system Y
7.4.e.20. None
7.4.e.21. Other Gas-liquid separators
7.4.f. Mitigation systems in use
7.4.f.1. Sprinkler system
7.4.f.2. Dikes Y
7.4.f.3. Fire walls
7.4.f.4. Blast walls
7.4.f.5. Deluge system Y
7.4.f.6. Water curtain
7.4.f.7. Enclosure Y
7.4.f.8. Neutralization Y
7.4.f.9. None
7.4.f.10. Other Leak Monitoring (IAS)
7.4.g. Monitoring/detection systems in use
7.4.g.1. Process area detectors Y
7.4.g.2. Perimeter monitors
7.4.g.3. None
7.4.g.4. Other Leak Monitoring (IAS)
7.4.h. Changes since last PHA update
RMP*eSubmit Page 13 m
7.4.h.1. Reduction in chemical inventor y
7.4.h.2. Increase in chemical inventory
7.4.h.3. Change in process parameters
7.4.h.4. Installation of process controls Y
7.4.h.5. Installation of process detectio systems n
7.4.h.6. Installation of perimeter monito systems ring
7.4.h.7. Installation of mitigation syste s Y
7.4.h.8. None recommended
7.4.h.9. None
7.4.h.10. Other
7.5 Date of most recent review or revision of
operating procedures
05/01/2018
7.6 Training
7.6.a. Date of most recent review or revisio of training programs n 06/01/2016
7.6.b. Type of training provided
7.6.b.1. Classroom Y
7.6.b.2. On the job Y
7.6.b.3. Other
7.6.c. Type of competency testing used
7.6.c.1. Written test Y
7.6.c.2. Oral test Y
7.6.c.3. Demonstration Y
7.6.c.4. Observation Y
7.6.c.5. Other Computer Based Competency
7.7 Maintenance
7.7.a. Date of most recent review or revisio of maintenance procedures n 08/21/2017
7.7.b. Date of most recent equipment inspection or test
03/12/2018
7.7.c. Equipment most recently inspected tested (equipment list) r HSF fuel tanks seismic visual inspection
7.8 Management of change
7.8.a. Date of most recent changes that triggered management of change procedures
03/29/2018
7.8.b. Date of most recent review or revisio of management of change procedures n 02/07/2017
7.9 Date of most recent pre-startup review 04/12/2018
7.10 Compliance audits
7.10.a. Date of most recent compliance audits
12/28/2016
7.10.b. Expected or actual date of completi of all changes resulting from the most recent compliance audits on 01/01/2017
7.11 Incident investigation
7.11.a. Date of most recent incident investigation
05/13/2009
RMP*eSubmit Page 14
7.11.b. Expected or actual date of completion of all changes resulting from the incident investigation
05/13/2009
7.12 Date of most recent review or revision of
employee participation plans
02/07/2018
7.13 Date of most recent review or revision of
hot work permit procedures
02/07/2018
7.14 Date of most recent review or revision of
contractor safety procedures
09/26/2017
7.15 Date of most recent evaluation of
contractor safety performance
09/26/2017
RMP*eSubmit Page 15
Section 9. Emergency Response
9.1 Written emergency response (ER) plan
9.1.a. Is your facility included in the written community emergency response plan?
9.1.b. Does your facility have its own written emergency response plan?
9.2 Does your facility's ER plan include
specific actions to be taken in response to accidental releases of regulated substances?
9.3 Does your facility's ER plan include
procedures for informing the public and local agencies responding to accidental releases?
9.4 Does your facility's ER plan include
information on emergency health care?
9.5 Date of most recent review or update of
your facility's ER plan
9.6 Date of most recent ER training for your
facility's employees
Y
05/06/2014
07/31/2015
9.7 Local agency with which your facility's ER plan or response activities are coordinated
9.7.a. Name of agency Vandenberg AFB Fire Department
9.7.b. Phone number (805) 606-3111
9.8 Subject to
9.8.a. OSHA Regulations at 29 CFR 1910.38 Y
9.8.b. OSHA Regulations at 29 CFR 1910.120 Y 9.8.c. Clean Water Act Regulations at 40 CFR Y
9.8.d. RCRA Regulations at 40 CFR 264, 265, Y
279.52 9.8.e. OPA-90 Regulations at 40 CFR 112, 33 Y
CFR 154, 49 CFR 194, 30 CFR 254
9.8.f. State EPCRA Rules of Laws Y
9.8.g. Other AFI 10-2501 Emergency Management Program
RMP*eSubmit Page 16
100000064431
Executive Summary
Vandenberg Air Force Base (AFB) is the third largest Air Force installation in the nation encompassing over 99,579 acres in Santa Barbara County, California. Because of its geography, this installation provides America with a unique location from which it can place satellites into polar orbit without overflying populated areas during the launch phase. This mission--which is crucial to national security as well as the burgeoning interest in communications, land resources surveillance, and space research--is dependent on the continued launching of an array of space boosters. In addition, Vandenberg AFB conducts test launches involving Minuteman intercontinental ballistic missiles (ICBMs) and also manages the Western Range--a vast network of radar, telemetry, and optical sensors stretching across the Pacific Ocean--in which all three services conduct a variety of aeronautical and missile flight activities. The host unit on Vandenberg AFB is the 30th Space Wing.
While Vandenberg AFB comprises 620 maintained buildings and structures plus 999 family residences for military personnel, only 15 percent of its total area is developed. The remainder provides the buffer needed to preclude encroachment by local development and to protect outlying communities from launch anomalies and associated operational hazards. Restrictive easements limiting development on adjacent private land further reduces any potential risk to the public.
Significantly, over the last 57 years, approximately 2000 launches of space boosters and ICBMs have been conducted at Vandenberg AFB, and there is no known instance of serious injury or death to anyone in the surrounding communities due to the launches themselves or to supporting operations.
With this submittal, Vandenberg AFB is making a conscientious effort to fully comply with Section 112r of the Clean Air Act Amendments of 1990 as implemented by the Code of Federal Regulations, Title 40, Part 68 (40 CFR 68), as well as with the California Code of Regulations (CCR), Title 19, Division 2, Chapter 4.5, California Accidental Release Prevention (CalARP) Program. The format developed by the Environmental Protection Agency (EPA) for this submittal is generally oriented towards stationary sources that differ significantly from Vandenberg AFB in terms of physical complexity, emergency response capability, and organizational make-up. Accordingly, additional detail and clarification are incorporated in this Executive Summary to provide the public a clearer, more complete insight into the scope and effectiveness of Vandenberg AFB's accidental release prevention and emergency response programs.
Scope of the Vandenberg AFB Risk Management Plan
This Risk Management Plan (RMP) includes all covered processes within the borders of Vandenberg AFB that are subject to Department of the Air Force oversight and control. Under the Commercial Space Act, excess facilities on the base may be leased by private entities to conduct commercial activities that are not under the purview of the Department of the Air Force. Compliance with EPA RMP and CalARP requirements for covered processes that solely support such commercial activities is the responsibility of the respective commercial owner and operator;
therefore, any such covered processes are not encompassed by this RMP.
This RMP includes one process in which the EPA threshold of a regulated toxic or flammable substance is exceeded--the Hypergolic Storage Facility. This facility stores and handles the regulated toxics 1,1 dimethylhydrazine (UDMH), hydrazine, and methyl hydrazine. The largest quantities of UDMH and hydrazine occur in an approximately one-to-one mixture of the two typically referred to as Aerozine 50. In addition, the Hypergolic Storage Facility is used to store significant quantities of the toxic nitrogen tetroxide, which is included in this Risk Management Plan in accordance with the General Duty Clause: Section 112(r)(1) of the Clean Air Act Amendments of 1990.
Emergency Response Program
The Air Force Incident Management System (AFIMS) is based on National Incident Management System (NIMS) methodology and aligns Air Force emergency management planning and response with the National Response Framework (NRF) as required by Homeland Security Presidential Directive 5 and as described in Air Force Instruction 10-2501 Emergency Management (EM) Program Planning and Operations. The implementation of the AFIMS on Vandenberg AFB is detailed in the 30th SW Comprehensive Emergency Management Plan (CEMP 10-2).
Vandenberg AFB possesses significant emergency response capabilities including its own Fire Department, Disaster Response Force, and Security Police Force, in addition to contracted support for handling accidental releases of regulated hypergolic propellants and other hazardous substances.
The Vandenberg AFB Fire Department, 30 CES/CEF, is the "local agency" that responds as First
RMP*eSubmit Page 17
100000064431
Responder at the Technician Level to an accidental release of hazardous materials on the base.
This Fire Department comprises some 100 firefighters who staff five fire stations strategically positioned across the base. One fire station is located within a three-minute response time of the Hypergolic Storage Facility. This Fire Department includes a 5-person "Hot Shot" crew that is specially trained to respond to wildland fires.
The Vandenberg AFB Fire Department is fully compliant with National Fire Protection Agency standards and has mutual aid agreements with Santa Barbara County, the City of Lompoc, the City of Santa Maria, the California Forestry Department, and the Los Padres National Forest. The base Fire Department maintains a regular schedule of onsite facility inspections to identify potentially hazardous conditions to include conditions which could lead to an accidental release of a hazardous material. It should be noted that the Vandenberg AFB Fire Department is advised of all operations involving the transfer of hypergolic propellants which comprise the regulated substances at the Hypergolic Storage Facility. During launch operations, Fire Department response elements are pre-positioned to expedite response in the event of an anomaly.
Vandenberg AFB also contracts for a Hypergolic Emergency Response Team (HERT) that can respond within 60 minutes of notification with Self Contained Atmospheric Protective Ensemble (SCAPE) suit qualified technicians. This emergency response team is capable of handling the hypergolic propellants described in this submittal, and SCAPE suit qualified technicians are pre-positioned on location for hypergolic propellant transfer operations.
The Vandenberg AFB Command Post is staffed 24 hours a day, every day of the year, and provides a central point of contact in the event of an emergency on the base. Its extensive suite of communications equipment includes a hotline to Santa Barbara County Emergency Services.
Emergency response at Vandenberg AFB, which is consistent with the National Incident Management System, is implemented through the Disaster Response Force (DRF)--a management structure of experienced, senior base personnel comprising a cross-section of technical, logistical, medical, and communications expertise. In the event of an incident involving the release of a hazardous material, on-scene response will be directed by an Incident Commander certified through the Department of Defense Fire and Emergency Services Certification Program to handle such incidents. Vandenberg AFB regularly exercises the DRF in accordance with AFI 10-2501, and 30th
SW CEMP 10-2.
The Hypergolic Facility Operations Contractor, United Paradyne Corporation (UPC), maintains an operations-specific Emergency Response Plan (Performance Work instruction PWI-10-S-003H), that specifies Vandenberg AFB and UPC response personnel actions due to: minor and major hypergolic fuel and oxidizer propellant liquid and vapor releases during storage, transfer, and transportation activities; launch or aircraft failures; seismic events; security breaches; or pressure vessel releases.
The Environmental Management Cross Functional Team convenes quarterly with Fire, Safety, Environmental, Readiness, Bioenvironmental, Legal, and other key agency representatives to review the status of the hazardous material management program and to oversee the development, implementation, and integration of the risk management program elements.
Action Plan Update to Improve Safety: During the Hypergolic Facility seismic assessment conducted in March to May 2018, the following recommendations were made to improve safety.
Finding: Post base concrete by fuel scrubber. Concrete foundations for the fuel scrubber pipe supports have cracked in at least two locations.
The width of the cracks may indicate a lack of reinforcing in the top of the foundations. Building codes require at least two layers of reinforcing in the top 5 inches of column supporting pedestals.
This reinforcing provides concrete confinement which helps hold anchors in place when they're subjected to high shear or pullout forces.
Recommendation: Crack injection repairs are recommended to correct this. Rebar scanning in the top 5 inches of the foundations is recommended to confirm if hoop reinforcing is present.
Corrective Action: Completed by UPC 6 August 2019.
Finding: Support at disconnected lines. Fuel pipe that is discontinuous because of prior alterations, requires restraint at the top and bottom of the pipe discontinuity. Support is provided to the lower segment of pipe as it intersections with horizontal piping. However, the upper portion of pipe is left unrestrained.
Recommendation: A pipe support close to the discontinuity, and anchored to the concrete wall, is recommended.
Corrective Action: Completed by UPC 5 June 2019.
RMP*eSubmit Page 18
100000064431
Finding: Anchorage repair at fuel stand. The steel flange at the bottom of the fuel pipe stand is corroding, and the concrete where the stand is anchored is spalling.
Recommendation: Removal and repair of loose or spalled concrete is recommended. In addition, corrosion should be removed from the flange and the flange should be recoated to avoid future degradation of the adjacent concrete.
Corrective Action: Completed by UPC 3 October 2018
Finding: Fuel container restraint. Some fuel containers at the fuel storage facility are unrestrained.
The containers include secondary containment which provides for spill protection.
Recommendation: To reduce the risk of injury to personnel, we recommend the containers be restrained by strapping them with a durable material to the building structure, or a structural bollard anchored to the floor slab.
Corrective Action: Completed by UPC 3 October 2018. PHA 135 and Project Note UPC19-192.
Finding: Vehicle storage building. Column bases and anchors are significantly corroded at the storage building. Steel clips have been added to some of the columns to provide support where corrosion has eliminated contact between the column base and foundation. Due to the severity of corrosion, the column bases and anchors are no longer able to resist shear forces at the base of the building which may result in separation from the foundation and unpredictable behavior of the facility in an earthquake.
Recommendation: Due to the severity of corrosion in the facility, a full corrosion survey is recommended to determine if repair or replacement would be more cost effective. At a minimum, retrofit of the column bases is recommended to restore structural integrity of the columns and anchors. Corrective Action Plan: Deluge system is currently in a redesign phase by KAL Architects & Jensen Hughes Design.
Finding: Scrubber Waste Restraint. Containers of waste generated by the oxidizer scrubber are restrained with rope or bungee cord.
Recommendation: Improved restraint is recommended via use of more durable strapping material, and by strapping the containers to a post or bollard that is structurally anchored to the foundation.
Corrective Action: Issue closed by UPC 3 October 2018.
Finding: Unsupported vertical pipe at oxidizer facility. Vertical pipe runs along the west wall of the oxidizer tanks are typically restrained with a pipe support anchored to the concrete wall. However, the northern-most pipes lack this restraint and the unrestrained length of the pipe appears excessive.
Recommendation: A pipe support to restrain these pipes to the concrete wall is recommended.
Corrective Action: Completed by UPC 5 June 2019
Finding: Deluge water outlet pipe supports. Steel pipe supports are installed at various locations under the deluge water inlet pipes. The pipe supports appear to be tack welded to the pipes and the welds appear to be corroding.
Recommendation: Replacing the tack welds with 1-inch fillet welds is recommended; this is the minimum weld length required by the American Welding Society. After welding, all welds and exposed steel should be recoated.
Corrective Action Plan: Deluge system is currently in a redesign phase by KAL Architects & Jensen Hughes Design.
Recommendations for Further Study Finding: PEMB deformation relative to deluge piping. Pre-engineered metal buildings (PEMB) generally perform well in earthquakes due to the relatively small mass and inherent ductility of steel frames and metal paneling. However, ductility is accompanied by larger building drift which can be incompatible with more rigid systems connected to the building. The deluge water piping is connected by the east wall of the fuel storage building.
Recommendation: Further evaluation of the deformation compatibility between the building and deluge piping is recommended to ensure that building drift in an earthquake will not inadvertently overstress the piping.
Corrective Action Plan: Deluge system is currently in a redesign phase by KAL Architects & Jensen Hughes Design.
Finding: Pipe Support Spacing. ASME B31.1 provides recommended maximum spacing for support of pipes with varying diameters and content. In the absence of other industry regulations, ASME B31.1 is often referenced for pipe support requirements. Based on visual inspection of the hypergolic storage sites, it appears that pipe support spacing in several locations approaches, and possibly exceeds, the limits of B31.1 recommendations. Larger spacing between pipe supports is allowed by
RMP*eSubmit Page 19
100000064431
ASME B31.1 when calculations demonstrate that pipes will not be overstressed. If prior pipe stress calculations are available, they should be reviewed as part of this recommended survey.
Recommendation: A survey of the unrestrained lengths of piping is recommended at the hypergolic storage sites.
Corrective Action Plan: Weston has completed evaluation and provided a detailed analysis. UPC and Weston developed Service Order VAN-WSI-079 to complete the work.
Finding: Deluge Water Pipe Stands. Much of the deluge water piping is supported on steel pipe supports anchored to, and cantilevered from, concrete foundations. In the past few decades, research and building codes have acknowledged higher seismic forces for non-building structural components because unlike buildings, there are not ancillary components attached to the structure
RMP*eSubmit Page 20
100000064431 which dampen the effects of earthquake ground motion. Upon visual inspection, the height of the deluge pipe supports at some areas appears disproportionately tall for cantilevered columns with no bracing. Recommendation: Evaluation of this system using current standards is recommended to confirm the system will withstand an earthquake considering current practice and recommendations for non-building structural components.
Corrective Action Plan: Deluge system is currently in a redesign phase by KAL Architects & Jensen Hughes Design.
Finding: Tank anchorage. Similar to discussion of the deluge water supports, recent research and code development acknowledges that non-building structural components can experience significantly higher seismic forces than buildings. At the oxidizer storage tanks, the quantity of anchor bolts connecting the tank to foundations appears disproportionate by current standards.
Recommendation: Evaluation of this system using modern codes is recommended to confirm the system will withstand an earthquake considering practice and recommendations for non-building structural components.
Corrective Action: Issue closed 20 May 2019. UPC Project Note UPC19-058 dated 10 Dec 18 analyzed the requirements of the anchor bolts and proved that the existing bolts are more than adequate for the duty. The calculations in the project note were reviewed and accepted by 30SW Range Safety professional engineer.
Finding: Non-uniform pipe support heights. Oxidizer pipes running from the tanks to the loading area are supported on cantilevered columns of varying lengths due to the sloped surface of the containment pit. The stiffness of a cantilevered column is inversely proportional to the length of the column, so shorter columns will attract more earthquake forces than taller columns. If the pipe support columns were designed to resist seismic forces equally, the shorter pipe supports, and their anchorage, may become overstressed in the event of an earthquake.
Recommendation: A survey of the pipe supports and anchorage is recommended at the hypergolic storage sites.
Corrective Action Plan: Weston has completed evaluation and provided a detailed analysis. UPC and Weston developed Service Order VAN-WSI-079 to complete the work.
Vandenberg AFB and UPC are communicating action plan updates to the Santa Barbara Certified Unified Program Agency, most recently 23 Dec 2019. There were no other safety issues found/determined during the hazardous review process requiring changes for safety.
Additional Information
Number of Full Time Employees: The number of full-time, on-base employees at Vandenberg AFB varies daily, but generally averages approximately 3,600 military personnel, 2,100 Civil Service personnel, and 3,100 contractor personnel who work full time on the installation, bringing the total number of full-time employees to approximately 8,800. The total community population is approximately 15,000 and includes all military, spouses, family, civil servants and contractors.
Date of Most Recent Emergency Response Training for Facility Employees: It should be noted that some aspect of emergency response training for facility employees and newcomers is conducted on a regular basis at Vandenberg AFB. Specific emergency response training for the different categories of base employees--including firefighters, security police, maintenance personnel, facility managers, work-site employees, and even newcomers--overlaps considerably and culminates in periodic base-wide exercises involving the Disaster Response Force. The most recent emergency response training for facility employees was 31 May 2018 which is the base-wide exercise involving the simulated C-17 aircraft crash with a release of 12,000 pounds of fuel.
General Duty Clause: Section 112(r)(1) of the Clean Air Act Amendments of 1990--the General Duty Clause--makes it incumbent on owners and operators of stationary sources to identify hazards and to implement accidental release prevention measures relative to "any other extremely hazardous substance" that may not be included in the EPA list of regulated substances. Accordingly, Vandenberg AFB identifies nitrogen tetroxide as a highly toxic substance that is stored on the installation in quantities that could pose a risk to the general public. Nitrogen tetroxide is used primarily as the oxidizer component of the hypergolic propellants employed by various space boosters launched from Vandenberg AFB; it is also occasionally used in smaller quantities as a propellant for satellites launched from Vandenberg AFB and in the Propulsion System Rocket Engine (PSRE) of certain ICBMs tested at the base.
All aspects of Vandenberg AFB's RMP and CalARP programs--to include OSHA Process Safety Management (PSM) standards and emergency response program planning and training--encompass nitrogen tetroxide storage and operations to the same extent they apply to the regulated hydrazines as described in this submittal. It should be noted that a review of the base's five-year accident
RMP*eSubmit Page 21
100000064431 history reveals there have been no reportable accidents involving base employees, contractors, and/or anyone in the general public as a result of exposure to a release of nitrogen tetroxide.
Vandenberg AFB fully intends to maintain every aspect of its current accidental release prevention program as it applies to nitrogen tetroxide as long as significant quantities of this substance are stored or used at the base.
File details come from the government source that posted it. Updated .