CCSFS MSGP Stormwater Pollution Prevention Plan 2022sm.pdf

PDF 2 MB Posted

Attached to
Space Force Range Contract (SFRC) Bidder's Library
Solicitation number
Not on record
Issued by

View the file

Other files

File Type Posted
SFRC Bidders Library 15 May 23.xlsx XLSX spreadsheet
SMC-Standard-012_16JAN2015.pdf PDF
Final CDRL Number Tracking.xlsx XLSX spreadsheet
SFRC Bidders Library 20 Apr 23.xlsx XLSX spreadsheet
How to Access Data Item Descriptions.docx DOCX document
SFRC Bidders Library 28 Mar 23.xlsx XLSX spreadsheet
WRIH Wiki Requirements Document.docx DOCX document
SLD 30 Org Chart.pdf PDF
T.O. 00-20-1.PDF PDF
T.O. 00-20-2.PDF PDF
T.O. 00-5-1.PDF PDF
SFRC Bidders Library 7 Mar 2023.xlsx XLSX spreadsheet
T.O. 00-5-3.PDF PDF
T.O. 00-20-14.PDF PDF
T.O. 00-20-3.PDF PDF
SFRC Bidders Library 17 Feb 2023.xlsx XLSX spreadsheet
StarGateUsersGuide.zip ZIP file
Q13_Supply_Point_Listing_DOL - Spares List.xlsx XLSX spreadsheet
SFRC Bidders Library 10 Feb 2023.xlsx XLSX spreadsheet
20230130 RCC Tour for SFRC Contractors - Roles and Responsibilities of RE and CTR.pdf PDF
Radar 19.39 Transmitter Heat Exchanger LTA-24.pdf PDF
SFRC Bidders Library 1 Feb 2023.xlsx XLSX spreadsheet
TWU Combined CBA 2019_recd 03AUG2021.pdf PDF
Final IAM CBA 2019_recd 03AUG2021.pdf PDF
SFRC Bidders Library 26 Jan 2023.xlsx XLSX spreadsheet
IBEW CBA LU 413 2019-2023 IO Approved_recd 03AUG2021.pdf PDF
SLD 30 Hazardous Waste Management Plan - Final.pdf PDF
AFSSI 7702.pdf PDF
FINAL IBEW TPC 2021 2025_Final Executed Agreement.pdf PDF
00-35D-54.pdf PDF
SLD 45 HWMP - SLD 45 2021.pdf PDF
Vandenberg AFB Risk Management Plan_June 2020.pdf PDF
SLD 45-CCSFS SPCC Plan_June2014 Reviewed 2022.pdf PDF
Vandenberg AFB Refrigerant Management Plan June 2020.pdf PDF
00-20-14.PDF PDF
00-25-108.PDF PDF
00-32-1-101.PDF PDF
LTRS SSG Charter FINAL June2015.pdf PDF
EWR 127-1 1999.pdf PDF
UFGS 01 57 19.pdf PDF
afgm2018-90-01.pdf PDF
RCC319-19_FTS_Commonality.pdf PDF
SFRC Bidders Library 11 Jan 2023.xlsx XLSX spreadsheet
PSFB_SWMP.pdf PDF
Vandenberg AFB Halon Management Plan June 2020.pdf PDF
00-25-234.PDF PDF
AFSSI 7700.pdf PDF
SLD 45 Facility Response Plan - December 2020.pdf PDF
EMS_Consolidated_Playbook(Guide).pdf PDF
RCC501-12 Universal Documentation System.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3/16/22, 2:21 PM Table of Contents about:blank 1/100

U.S. AIR FORCE

Storm Water Pollution Prevention Plan

Patrick Patrick - Cape Canaveral

Installation Supplement about:blank 2/100

Cover Page

Table of Contents

About This Plan

Certification

Document Control

1 Overview and Scope

2 Installation Profile

3 Environmental Management System

4 General Roles and Responsibilities

5 Training

6 Recordkeeping and Reporting

7 Minimum Control Measures and Best Management Practices

7.1 Potential Pollution Sources

7.2 Storm Water Control Measures

7.3 Schedules and Procedures for Monitoring

7.4 Inspections

7.5 Documentation to Support Eligibility Considerations Under Other Laws

8 References

9 Acronyms

10 Definitions

11 Installation Specific Content

A General Location Map and Site Maps about:blank 3/100

B Significant Spills

C Training Records

D Inspection Records

E Discharge Monitoring Reports

F CCSFS Water Sampling and Monitoring Plan

G Endangered Species Act Certification

H Material Inventory

I No Exposure Certifications

J Non-Stormwater Discharge Assessment and Certification about:blank 4/100

ABOUT THIS PLAN

This installation-specific Environmental Management Plan (EMP) was developed using the U.S. Air Force’s (AF) standardized Storm Water Pollution Prevention Plan (SWPPP) template. This plan is not an exhaustive inventory of all storm water requirements and practices. Where applicable, external resources, including Air Force Instructions (AFIs); AF Playbooks; and federal, state, local, and permit requirements are referenced.

Each section of this SWPPP begins with standardized, AF-wide “common text” language that addresses AF, Department of Defense (DoD), and federal requirements, including the Environmental Protection Agency (EPA) Multi-Sector General Permit (MSGP) requirements. This common text language is restricted from editing to ensure that it remains standard throughout all plans. The common text language is maintained and updated by the designated Office of Primary Responsibility (OPR) with assistance from the Office of Collateral Responsibility (OCR), as appropriate. Immediately following the AF-wide common text sections are Installation sections. The Installation sections contain installation-specific content to address state, local, and installation-specific requirements. Installation sections are unrestricted and are maintained and updated by installation or Section personnel.

This document is optimized to be accessed and viewed electronically. The eDASH website at https://cs2.eis.af.mil/sites/10040 is the primary communication tool for AF EMPs.

This AF standardized template may differ in format and organization from other templates developed by regulatory agencies or other organizations. If applicable, a cross-reference table of sections is included below to simplify review.

Installation Supplement

N/A https://cs2.eis.af.mil/sites/10040 about:blank 5/100

CERTIFICATION

Installation Supplement

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Responsible Official Certification

Printed Name: Steven Baker Date: 16 Mar 2022

Signature: Title: Water Program Manager

Digital Signature

BAKER, STEVEN M GS-12 USSF SSC 45 CES/CEIE BAKER, STEVEN M GS-12 USSF SSC 45 CES/CEIE Date: 03/16/2022 1:54:48 pm about:blank 6/100

DOCUMENT CONTROL

Standardized SWPPP Template

In accordance with (IAW) the Air Force Civil Engineer Center (AFCEC) Environmental Directorate (CZ) Business Rule (BR) 08, EMP Review, Update, and Maintenance, the standard content in this SWPPP template is reviewed periodically, updated as appropriate, and approved by the Water Quality Subject Matter Expert (SME).

This version of the template is current as of 06/26/2020 and supersedes the 2018 version.

NOTE: Installations are not required to update their SWPPPs every time this template is updated. When it is time for installations to update their SWPPPs, installations should adopt the most recent version of this template available.

Installation SWPPP

Record of Updates - The SWPPP is modified and updated IAW applicable permit requirements.

Record of Review - IAW AFI 32-1067, Water and Fuel Systems, the SWPPP is reviewed based on permit requirements.

Version Table - A new version of the plan is created when pen and ink changes are incorporated. Below is a list of all versions updated under the current permit.

Installation Supplement

Record of Updates

Page/Section Nature of Change Date of Change Approved By:

Entire Document 2017 Annual SWPPP Update to reflect current operations at site, update spill tables and update EPCRA 313 Facilities list.

August 2017/June 2017 John Tarantine

Entire Document 2018 Annual SWPPP Update to reflect current operations at site, update spill tables and update EPCRA 313 Facilities list.

June 2018 John Tarantine

Entire Document 2019 Annual SWPPP Update to reflect current operations at site, update spill tables and update EPCRA 313 Facilities list.

February 2019 John Tarantine

Entire Document 2020 Annual SWPPP Update to reflect current operations at site, update spill

May 2020 Karla Guerrero about:blank 7/100 tables and update EPCRA 313 Facilities list. Use updated AFCEC EMP format.

Entire Document 2021 Annual SWPPP Update to reflect current operations at site, update spill tables and update EPCRA 313 Facilities list.

Feb 2021 *

General 2022 Annual SWPPP Update. Changed document to updated 6/26/2020 Template format.

January 2022 Steven Baker

General Removed Section N and Sector P activities for DRMO, Sand Blasting/Paint Shop, Hangar Y, Vehicle Wash Area and Heavy Equipment and Boat Shops after coordination with 45 CES/CEIE in January 2021 and updated MSGP Permit Issued 5/13/2021. Sectors removed since DRMO is inactive, the Heavy Equipment Shop is inactive and has been turned over to Relativity commercial launch customer, CX 18 activities have ceased painting/corrosion control activities, Vehicle Wash Area equipment has been removed with no plans for reactivation and Hangar Y has no material exposed to storm water and didn't accurately meet the Industrial Sector Activities for coverage.

January 2022 Steven Baker

General Added the Skid Strip as a covered Industrial Activity in the MSGP after coordination in March/April 2021 with 45 CES/CEIE and updated MSGP Permit Issued 5/13/2021. Sector S added to address overall activities and anticipated upcoming buildout of taxiway, Hangars and Support Facilities south of Skid Strip in future.

January 2022 Steven Baker

General Updated remaining facility content to reflect current operations at site, update

January 2022 Steven Baker about:blank 8/100 spill tables and update EPCRA 313 Facilities list.

*Updates to the plan were made but not approved or uploaded to government approved database.

Record of Review

Review Date Review Participants Notes/Remarks Results in Plan Update (Yes or No)

02/01/2022 – 02/28/2022 Steven Baker Major changes made to reflect updated permit.

Yes

Version Table

Version Number Description Date

CY 2022 2022 Annual Revision 03/01/2022 about:blank 9/100

1 OVERVIEW AND SCOPE

This SWPPP specifies how installation personnel control pollutants in discharges to storm water from industrial operations. It contains procedures intended to minimize the risk of industrial storm water pollution in drainage areas located within the installation’s boundaries. The SWPPP describes installation:

Identification and evaluation of activities and potential storm water pollution sources Identification and implementation of storm water Best Management Practices (BMPs) Pollution reduction measures and procedures Monitoring and inspection procedures

The installation Storm Water Pollution Prevention Team (SWPPT) is responsible for developing, implementing, and managing the SWPPP.

Installation Supplement

Background

The original SWPPP was prepared to comply with federal and state regulations established for the protection of storm water runoff from industrial activities. CH2M HILL prepared the initial plan under contract to the Corps of Engineers, in September 1995. Phase 1 fieldwork was conducted during the period of November 6 to November 16, 1995. Phase 2 site assessments were conducted during the week of April 29 to May 10, 1996. The Plan has been reviewed and updated annually since April 1999 by the contractor providing environmental support to the Air Force (AF).

Installation Overview

Cape Canaveral Space Force Station (CCSFS) is located in Brevard County on a barrier island on the East Coast of Florida. The installation lies on a narrow strip of land separated from the mainland by the Banana River. The installation encompasses approximately 16,187 acres, and major features include 81 miles of paved roads, a centralized Industrial Area, a 10,000-foot skid strip, and three (3) active wharves; Trident Wharf, Poseidon Wharf, and the Air Force Wharf. The SWPPP content reflects USSF responsibilities.

The overall site map of CCSFS is in Appendix A as SWPPP Activity Map.

Overview of Industrial Sectors

Based on the original field assessment and subsequent revisions, it has been determined that the activities conducted at CCSFS fall into one or more of the following MSGP industrial sectors:

• Water Transportation Facilities (Sector Q) o Sector Q applies to facilities which have vehicle (vessel) maintenance shops and/or equipment cleaning operations. It includes facilities engaged in foreign or domestic transport of freight or passengers in deep sea or inland waters; marine cargo handling operations; ferry operations; towing and tugboat services; and marinas (facilities commonly identified as SIC Code Major Group 44). (Federal Register, page 51206).

• Air Transportation Facilities (Sector S) o Air Transportation Facilities applies to facilities which have industrial activities from vehicle maintenance areas, equipment cleaning areas, or deicing areas located at air transportation facilities. The conditions of this sector apply to airports, airport terminals, airline carriers, and establishments engaged about:blank 10/100 in servicing, repairing, or maintaining aircraft and ground vehicles, equipment cleaning and maintenance (including vehicle and equipment rehabilitation, mechanical repairs, painting, fueling, lubrication) or deicing/anti-icing operations which conduct the above described activities. (Federal Register, page 50998 S.1.a, Federal Register, page 51215 S.3) o Other operations include, but are not limited to:

Ground vehicle and equipment maintenance and servicing, storage units of all materials (e.g., used oils, hydraulic fluids, spent solvents and waste aircraft fuel), fuel servicing activities or other operations, conducted in support of the airport fuel system, aircraft and/or runway deicing/anti-icing operations.

o The operator(s)/owner(s) (the airport authority) of the storm water outfalls from the airport is responsible for compliance with all terms and conditions of this or other NPDES permits applicable to those outfalls. Storm water pollution prevention plans developed separately for areas of the airport facility occupied by tenants of the airport that are regulated under 40 CFR 122.26(b)(14) as a storm water discharge associated with industrial activity shall be integrated into the storm water pollution prevention plan for the entire airport facility.

The table below identifies which sites or activities at CCSFS are considered as a regulated industrial activity, according to the MSGP. Also shown in the table are the applicable sector designations(s) for each industrial activity.

Summary of Facilities covered by the Stormwater Pollution Prevention Plan Cape Canaveral Air Force Station

Location Stormwater Regulated Industri al Activity

Sector of MSGP Requires SWPPP Coverage

EPCRA (or SARA) 313 Facility

Trident Submarine Wharf (Facility 79100)

Y Q Y Y

Poseidon Submarine Wharf (Facility 90540)

Y Q Y Y

Air Force Wharf (Facility 92050) Y Q Y Y

Air Transportation Facilities Y S Y Y

Multi-Sector Generic Permit Special Conditions

The MSGP special conditions that apply to the CCSFS SWPPP are NSWD certification found in Appendix K, Endangered Species Act (ESA) certification found in Appendix H, representative outfalls as identified in each site-specific narrative and map and sampling and monitoring requirements described in section 7.3 and referenced in Appendix G.

The SWPPP also meets special requirements for facilities reporting Emergency Planning and Community Right-to-Know Act (EPCRA) 313 reporting (also known as Title III of SARA).

about:blank 11/100 about:blank 12/100

2 INSTALLATION PROFILE

Installation Supplement

Installation Profile and Permit Information

Scope of Plan Operations at CCSFS. For specific operational organizations for each sector please refer to Section 11.0

Facility Operator Office Symbol: SLD 45 Address:

1224 Jupiter St, Patrick SFB, FL 32925 Telephone Number: (321)494-7288

Office of Primary Responsibility (OPR) 45 CES/CEIE has overall responsibility for implementing the SWPPP and is the lead organization for monitoring compliance with applicable federal, state, and local storm water regulations

Responsible Official/Legally Responsible Person Office Symbol: 45 CES/CEI Name: Patrick Giniewski, Chief, Installation Management Telephone Number: (321)494-2939

Water Quality Program Manager (SWPPP Contact) Name: Steven Baker Title: Water Program Manager Telephone Number: (321)494-9387 Email address: Steven.Baker.44@spaceforce.mil

Permitting Authority Florida Department of Environmental Protection (FDEP)

Permit Type General Permit

Permit Number/Permit Tracking Number FLR05A947-005

Permit Expiration Date May 12, 2026

SIC Code(s) 9711, 4581, 4491

NAICS Code(s) 92811, 48831, 48832, 49311 about:blank 13/100

General Location Map Located in Appendix A SWPPP Activity Map

Site Map Located in Appendix A for each Industrial Activity Area about:blank 14/100

3 ENVIRONMENTAL MANAGEMENT SYSTEM

The AF environmental program adheres to the Environmental Management System (EMS) framework and its Plan, Do, Check, Act cycle for ensuring mission success.

Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade, Department of Defense Instruction (DoDI) 4715.17, Environmental Management Systems, AFI 32-7001, Environmental Management, and International Organization for Standardization (ISO) 14001 standard, Environmental Management Systems – Requirements with guidance for use, provide guidance on how environmental programs should be established, implemented, and maintained to operate under the EMS framework.

IAW the installation EMS framework, the storm water program employs EMS-based processes to achieve compliance with all legal obligations and current policy drivers, effectively manage associated risks, and instill a culture of continual improvement. The SWPPP serves as an administrative operational control that defines compliance-related activities and processes.

about:blank 15/100

4 GENERAL ROLES AND RESPONSIBILITIES

The SWPPP requires the involvement of multiple organizations and varied personnel on the installation, including contractors and other DoD organizations. The major roles/organizations involved in supporting the SWPPP at a typical installation include:

Installation Commander Base Civil Engineer Environmental Element Chief Water Quality Program Manager Storm Water Pollution Prevention Team (identified below) Installation Personnel

AFCEC

Unit Environmental Coordinator (UEC, see AFI 32-7001)

Organizational and personnel roles and responsibilities are described throughout this SWPPP and in referenced documents. Detailed information regarding typical AF SWPPP guidance and policy is available in AFI 32-1067 and the Water Quality Playbook. Installation-specific roles and responsibilities are documented in the BMPs below.

Installation Supplement

SWPPT responsibilities are presented below for each member or level of members.

45 CES/CEI Water Program Manager

• Remain informed on current storm water regulatory requirements and ensure compliance with MSGP and SWPPP.

Patrick F2F Storm Water Coordinator (SWC)

• Maintain the SWPPP, ensure changes to the plan are properly documented and updates are distributed to all plan holders.

• Communicate with activity site leaders’ and educate them about the requirements of the SWPPP and the responsibilities of the SWPPT.

• Coordinate SWPPT activities with team members (such as calling and chairing SWPPT meetings, initiating investigations, and monitoring progress).

• Coordinate storm water pollution prevention education for team members and installation personnel. Coordinate and maintain training documentation for each industrial activity area.

• Conduct Annual Site Compliance Evaluation (ASCE) (Section 7.4).

SWPPP Members

• Meet with the SWC to review effects of proposed construction or significant changes in facility operations.

• Review spill events and history to determine effectiveness of BMPs and need for upgrades. Investigate spill incidents and brief team on root cause and mitigation.

• Communicate storm water pollution prevention requirements to their facility personnel through routine awareness briefings, memorandums or telephone calls. It is recommended that regular briefings occur with production personnel to verify compliance at all levels.

about:blank 16/100

• Maintain a notebook or file with storm water data, investigation reports, annual review forms, training documentation and/or other relevant data.

• Contributes in preparation of ASCE by reviewing the effectiveness of the SWPPP, need for major modification to operating procedures and need for additional training as addressed in Section 7.4.

Other team members will serve as directed by the SWC. However, the SWPPT member from each site must be responsible for overseeing SWPPP implementation at their site.

Directory of Key Personnel

The directory of key environmental personnel is meant to help guide people to the appropriate source of information. Additionally, this directory will help ensure that the appropriate people are informed of pertinent events, such as spills.

Directory of Key Environmental Personnel CCSFS

Title and/or Responsibility Telephone Number

Chief, Installation Management, 45 CES/CEI 321-494-2939

Chief, Environmental Compliance, 45 CES/CEIE 321-494-7288

45 CES/CEIE Water Program Manager 321-494-9387

Patrick F2F Program Manager, Environmental Compliance 321-853-6576

Patrick F2F Stormwater Coordinator 321-853-6859

Spill Response – Cape Support 911 321-853-0911 321-853-5211

SWPPT members are identified by name or title, along with their individual responsibilities in the Storm Water Pollution Prevention Team Members table below.

Storm Water Pollution Prevention Team Members about:blank 17/100

Job Title Responsibilities Contact Information

45 CES/CEIE Water Program Manager Regulatory Compliance 321-494-9387

Patrick F2F Stormwater Coordinator Facility wide oversight and SWPPP document management, SWPPP Implementation and updates, training, monthly, quarterly inspections and Annual Site Compliance Evaluation

321-853-6859

Patrick F2F Sampling Coordinator Prepare, review and submit quarterly reports and visual inspections

321-476-2309

Poseidon Wharf Coordinator Responsible for coordinating and tracking material and waste handling activities and site specific SWPPP implementation

321-476-3809

Alternate Poseidon Wharf Coordinator Responsible for coordinating facilities management activities and site specific SWPPP implementation

321-476-7448

Trident Wharf Coordinator Responsible for coordinating and tracking material and waste handling activities and site specific SWPPP implementation

321-476-3809

Alternate Trident Wharf Coordinator Responsible for coordinating facilities management activities and site specific SWPPP implementation

321-476-7448

Air Force Wharf Supervisor for Surface Deployment and Distribution Command (SDDC) Coordinator

Responsible for coordinating and tracking site activities for loading/unloading and staging of materials and site-specific SWPPP implementation

321-853-7725

Military Sealift Command (MSC) Coordinator Responsible for coordinating and tracking site activities for MSC corrosion control maintenance and site-specific SWPPP implementation

321-853-6441 about:blank 18/100

CCSFS Skid Strip Air Feild Manager Responsible for coordnating and tracking airfield management activities and site-specific SWPPP implementation

321-853-4242 about:blank 19/100

5 TRAINING

The installation implements storm water training programs to ensure installation personnel, contractors, and visitors are aware of their roles in the program and the importance of their participation in its success. DoDI 4715.10, Environmental Education, Training, and Career Development, implements policy and provides the procedures to obtain environmental education, training, and career development programs for DoD personnel. Installation leadership ensures that appropriate personnel complete required education, training, and certification necessary to perform their jobs. Priority for training is given to the use of AF-approved education/training sources such as the Air Force Institute of Technology (AFIT) training courses and official AF-approved computer-based training resources (e.g., The Environmental Awareness Course Hub [TEACH], Advanced Distributed Learning Service [ADLS], ArcNet, etc.) to meet training needs.

Specific training requirements are outlined in Employee Training Control Measure in Section 7 below. Training records are maintained IAW the Recordkeeping and Reporting section of this plan.

Installation Supplement

Employee training is essential to the successful implementation of a pollution prevention program. The purpose of the training proposed in this section is to teach designated personnel at various levels of responsibility the components and goals of the SWPPP. The training requirements outlined in this section will address each element of the SWPPP. The SWC and SWPPT use this information as the framework for developing their SWPPP training program or supplement other training programs (e.g., spill response, pollution prevention, SPCC, etc.).

The following topics shall be included:

Understanding BMPs Spill prevention and response Good housekeeping Material management practices Inspections General pollutants of concern and potential effects on receiving waters Outfall identification

Awareness training shall be conducted for all employees responsible for SWPPP implementation. The training shall cover the SWPPP, outline individuals' responsibilities, identify new management practices that will be implemented, review locations of outfalls and review proper material handling practices and spill response procedures.

Refresher training is required annually (at a minimum) for select personnel at all Sector Q and S facilities. Refresher training shall be conducted for members of the SWPPT and other personnel identified by the SWPPT.

The SWPPT is responsible for conveying information obtained in the annual refresher-training program to appropriate employees. The method for transmitting this information will be the responsibility of the individual team members. Specific tools that may be used for disseminating this information include the following:

about:blank 20/100

Current Air Force Environmental Training Website Equivalent DOD Training Websites Virtual Email Training Employee handbooks Video presentations Drills Employee meetings Bulletin board or suggestion box Newsletters/Brochures Awards or incentives

SWPPT Training Requirements

All members of the SWPPT and their site personnel shall receive annual training in the following areas:

The general content of FDEP's storm water regulations (BMPs) Basic storm water pollution prevention concepts Thorough coverage of the contents of this SWPPP Overview of storm water pollution causes and effects BMP implementation and maintenance When and how to conduct inspections, record applicable findings, and take corrective action

The training for site personnel shall include site-specific pollution prevention guidance.

General Training Requirements

Personnel involved in the handling of bulk chemicals must be adequately trained in spill prevention practices and spill response. Copies of training records are kept in the office files of Patrick F2F, Facility 1704, Room 2310. General training will cover the following topics:

Good Housekeeping Training

Good housekeeping practices are designed to maintain a clean and orderly work environment. Training shall be provided to teach personnel how to maintain an orderly work environment. The training program shall cover the following areas or activities:

Regular sweeping or mopping of work areas Prompt cleanup of any spilled materials to prevent contamination of storm water runoff Location of floating booms, absorbent (e.g., "dry sweep"), neutralizing agents, and other housekeeping and spill response materials Signs reminding employees of the importance of good housekeeping and procedures to be implemented Review of updated or new Standard Operating Procedures (SOPs) Instruction for securing drums and containers about:blank 21/100

Instruction for monitoring storage areas for signs of leaks and for reporting findings Provide a regular schedule for performing housekeeping activities Provide assurance of management support Provide Material Management Best Practices Training

Proper Material Storage

Proper materials storage is important to prevent the release of materials and chemicals that may result in storm water contamination. Employees shall be trained in both proper materials handling and material inventory procedures. The training program shall cover the following areas or activities:

Material storage and organization, including providing adequate aisle space, proper stacking techniques, storing material indoors or under cover, avoidance of high traffic areas and segregation of materials Toxic and hazardous material identification, storage, handling and use Proper material disposal procedures Material inventory procedures and methods for keeping inventory up-to-date Methods to prevent product overstocking and exceeding required shelf life Labeling requirements for the type of materials routinely handled at the facility

Personnel must understand the requirements of the MSGP and their specific responsibilities, such as:

Design, installation, maintenance, and/or repair of controls (including pollution prevention measures) Storage and handling of chemicals and materials that could become contaminants in storm water discharges Monitoring and inspections Implementing and documenting corrective actions about:blank 22/100

6 RECORDKEEPING AND REPORTING

Installation personnel as identified in this SWPPP implement measures to ensure compliance with applicable permit recordkeeping and reporting requirements. Records are stored and maintained IAW Air Force Manual 33-363, Management of Records, and records are archived and disposed IAW the Air Force Records Information Management System (AFRIMS) Records Disposition Schedule (RDS). The installation complies with permit reporting requirements.

The installation maintains the following permit, inspection, monitoring, and certification records with the SWPPP. Overseas installations may have different requirements than the list below. When possible, an electronic version of the record is made available in the references section of this plan.

Copy of the Notice of Intent (NOI) Copy of the acknowledgement letter containing the permit tracking number Copy of the permit Description and dates of any significant spills, leaks, or other releases. Note: the installation maintains this information in the Enforcement Actions, Spills, and Inspections (EASI) database, and a link is available in the references section of this SWPPP Employee training records Documentation of maintenance and repairs of control measures Inspection reports Documentation of deviations from the schedule for monitoring or assessments and the reason for the deviation Documentation of corrective actions taken Documentation of benchmark exceedances and any response actions Documentation to support determination that pollutants of concern are not expected to be present above natural background levels if water is discharged directly to impaired waters when required by the permitting agency

Additional state, local, or host nation recordkeeping and reporting requirements are described in the Installation Supplement, as necessary.

Installation Supplement

Recordkeeping and Internal Reporting

Records are maintained in the Patrick F2F compliance files in Facility 1704, Room 2310, electronically in the Patrick F2F compliance share file location and Water Enterprise Tracker (WET). Copies of the DMR are publicly available on the FDEP EzDMR website. At a minimum, records must address results of the Annual Comprehensive Site Compliance Evaluations, routine facility inspections, spills, monitoring, and maintenance activities. Records must be retained three (3) years following the date of the recorded event.

Spills, Leaks, and Other Discharges

As part of the SWPPP, Patrick F2F will continue to implement a recordkeeping system for documenting spills, leaks, and other discharges at the facility, including discharges of hazardous substances in reportable quantities.

The records include:

about:blank 23/100

CCSFS Spill Response Report and Database. This data is maintained in the USAF EASIER Spill Database. Historic spill information is maintained in the Patrick F2F spill database. The SWPPT must review these records and, if necessary, make the appropriate revisions to the SWPPP. Also, if recommended by the SWPPT, additional equipment may need to be provided to prevent reoccurrence.

Reports to the National Response Center. In the event of a reportable quantity discharge or any significant pollution event, the National Response Center will be notified. The Installation Management office 45 CES/CEI, excluding commercial contractors operating under an executed lease with the USSF, shall make all regulatory notifications concerning reportable quantities. No other organization is authorized to contact regulatory agencies concerning reportable quantity spills.

Inspection and Maintenance Activities

Documentation of all inspections, whether routine or detailed, is a good preventive maintenance technique. Analysis of inspection records allows for early detection of potential problems. The records of inspection and maintenance activities will enable the facility to evaluate the effectiveness of the BMP program, including equipment and facility operations.

Discharge Monitoring Reports

CCSFS is regulated under Sectors Q and S of the MSGP. Consequently, a Discharge Monitoring Report (DMR) form must be completed and submitted for monitoring results obtained in years two (CY 2022) and four (CY 2024) of the five (5) years MSGP coverage cycle. Records are maintained electronically in the Patrick F2F compliance share file location and WET. Copies of the DMR are publicly available on the FDEP EzDMR website.

about:blank 24/100

7 MINIMUM CONTROL MEASURES AND BEST MANAGEMENT PRACTICES

about:blank 25/100

7.1 Potential Pollution Sources

Areas at the installation where industrial materials or activities are exposed to storm water are described in the Installation Supplement below.

Documentation of significant spills is maintained in the AF EASI database. A link to EASI is available in the references section of this plan and required information may be maintained in an appendix.

Installation Supplement

Activities, Associated Pollutants, and Potential Spills

To help identify contamination concerns for the potential pollutants identified (and for future potential pollutants), a description of the general materials found at CCSFS is presented below and is meant to be a cross-reference.

Oil, Gasoline, and Other Petroleum-based Products

Motor oil, gasoline, diesel fuel, bearing grease, machine oil, and other lubricating oils contain hazardous chemicals that can adversely affect the quality of storm water runoff.

Paints, Solvents, and Degreasing

Paint pigment or color can cause high turbidity in storm water runoff. Additionally, paint may contain heavy metals, suspended solids, and organic materials that may affect oxygen demand or aquatic toxicity. Solvents and degreasing agents may be toxic to aquatic life.

Antifreeze, Brake Fluid, and Detergents

These materials can affect toxicity and lower the dissolved oxygen of storm water runoff. A biochemical oxygen demand (BOD) test may be used to measure potential adverse effects on the dissolved oxygen of the receiving stream.

Sediment and Erosion

Erosion introduces sediments to storm water runoff. Sedimentation or siltation of receiving streams can cause aquatic toxicity and loss of habitat for aquatic species. Total suspended solids (TSS) tests can be used to measure the concentration of sediments and other particulate matter in storm water.

Pesticides and Herbicides about:blank 26/100

Pesticides and herbicides are applied at CCSFS. These chemicals shall only be applied by certified technicians who understand the potential for toxicity to aquatic organisms and non-target species and the proper applications.

Allowable NSWD

The National Pollutant Discharge Elimination System (NPDES) program provides for certain allowable NSWD (Federal Register, page 50813, S1, 9/29/1995). Allowable NSWD may include firefighting activities, fire hydrant flushing to meet testing and water quality requirements, air conditioning condensate and landscape irrigation. These NSWDs are reviewed under the National Environmental Policy Act (NEPA) to ensure they meet all discharge criteria and authorized by local environmental office.

Unauthorized NSWD and Summary of Sampling Data

NSWD not authorized for coverage under the MSGP shall be identified during periodic facility site inspections and reported as soon as possible to 45 CES/CEIE. Alternative material management options will be identified and additional training will be provided to the facility personnel by the SWPPT to coach acceptable material handling and disposal practices. Structural changes will be identified by the SWPPT members and programmed for design and construction funding through the installation work control and/or AF 332 process. NSWD Assessment and Certification is found in Appendix K.

Sampling Data Summary

Existing dischargers must summarize all storm water discharge sampling data collected at the facility. The summary shall include a narrative description (and may include data tables/figures) that adequately summarizes the collected sampling data to support identification of potential pollution sources at the facility. New dischargers must provide a summary of storm water runoff data they may have.

Please refer to the individual industrial sector narratives in Section 11 for site-specific sampling data summaries.

about:blank 27/100

7.2 Storm Water Control Measures

The installation implements control measures to meet all applicable permit effluent limits. The categories of control measures include:

Minimize exposure Good housekeeping Maintenance Spill prevention and response Erosion and sediment controls Management of runoff Salt piles MSGP sector-specific non-numeric effluent limits Employee training Waste, garbage, and floatable debris Dust generation and vehicle tracking of industrial materials

Installation-specific control measures are further described in the Installation Supplement below, along with applicable additional state or local sector-specific measures.

Installation Supplement

BMP Overview

EPA and FDEP have determined the development and implementation of BMPs is an integral part of a comprehensive storm water management program. BMP implementation improves water quality by reducing pollutants in storm water discharges. CCSFS personnel must understand the BMP concept to safeguard storm water quality. The following information is a general overview of BMPs.

BMPs are measures or practices used to reduce pollution entering storm water. BMPs may take the form of a process, activity, or physical structure.

Many are simple and can be put in place immediately; others can be more complicated and costly to implement.

BMP development and implementation requires continuous monitoring and improvement. This SWPPP establishes protocols for implementing the BMP program. CCSFS's BMP program includes the following five phases:

Planning and Organization: Identify key personnel and responsibilities. Review available documentation on facilities and applicable regulations.

Assessment: Review operations to determine the risk of storm water contamination.

Identification: Identify BMPs that can be implemented to reduce storm water contamination.

Implementation: Implement recommended BMPs, along with employee training, to lower the risk of potential storm water contamination.

Evaluation and Monitoring of Effectiveness: Monitor storm water quality to ensure compliance with the permit conditions. Conduct recommended annual site evaluations. Review and revise the SWPPP based on the effectiveness of existing BMPs and develop new BMPs, as needed, to improve discharge quality.

about:blank 28/100

BMP Selection

This section of the SWPPP presents guidance to CCSFS personnel to identify BMPs. Once BMPs are identified and presented for implementation in this SWPPP they become a requirement of the storm water permit. Hence, CCSFS is required to meet the implementation of its own recommendations. This "self-policing" approach allows the facility a wide range of flexibility as long as it follows certain federal and state guidelines for BMP development.

BMPs can be broadly classified as baseline or advanced. Baseline BMPs tend to be inexpensive, relatively simple, and applicable to a wide variety of industries or activities. Advanced BMPs are directed at reducing pollution from specific sources or activities.

Baseline BMPs

Baseline BMPs shall be implemented for each site covered in this plan, as applicable.

Good Housekeeping: Practices include proper labeling of significant materials, maintain clean, neat and well organized work areas, dispose of wastes promptly, and making the above activities a priority.

Preventive Maintenance: Storm water management devices such as an oil/water separator (OWS) and catch basins shall be inspected and maintained in good operating condition. Preventive maintenance shall address items that have the potential to directly affect storm water quality. For example, hydraulic hoses on heavy equipment shall be replaced at appropriate intervals to prevent the rupture of a deteriorated hose and subsequent release of contaminants to the environment.

Visual Inspections: Qualified personnel shall be identified who will perform the necessary visual inspections for each site. Inspection results and recommendations shall be tracked to ensure that the required follow-up actions are performed. Records shall be kept of all inspections. Inspections are covered in detail in Section 7.4 of this plan.

Spill Prevention and Response: Areas where spills may occur shall be identified and the corresponding drainage direction determined. Spill response procedures and requirements are contained in the Installation Emergency Management Plan (IEMP), Spill Prevention Control and Countermeasures (SPCC) plan and in SLD 45 Hazardous Waste Management Plan (HWMP). Appropriate spill remediation materials must be on hand, and personnel shall be trained on how to use them. Spill notification and reporting procedures must be followed and documented.

Erosion and Sediment Control: Most regulated sites at CCSFS do not have erosion and sediment control problems. However, site personnel need to check their sites for erosion and sediment control problems as needed.

Management of Runoff: This baseline BMP involves diverting, reusing, or treating runoff. Applicable runoff controls for CCSFS may include diversion curbs to prevent run-on/runoff for certain areas and vegetative swales or filter strips. This baseline BMP also can include the prevention of drainage problems such as ponding and flooding.

Personnel Training: Personnel, both military, contractor and civilian, shall receive adequate training to help them develop the proper pollution prevention practices and knowledge needed to implement this SWPPP. Adequate training typically can be provided internally through workshops about:blank 29/100 directed by personnel from Environmental Quality or other appropriate organization. Personnel also shall be given adequate time in their daily operations schedule to fulfill their pollution prevention duties. At a minimum, personnel shall receive training covering good housekeeping, spill prevention and response, and material management practices.

Recordkeeping and Reporting: Records shall be kept to document compliance with this plan and to document significant occurrences. Spills and associated remediation measures must be documented. Storm water quality sampling records and inspection records shall be kept on file. The findings, recommendations, and actions from inspections must be documented. These records shall be maintained in the Patrick F2F compliance files. Records must be kept for at least 3 years from the date of sample, measurement, evaluation, inspection, report, or application.

Advanced BMPs

Advanced BMPs may be needed to further reduce the potential for storm water contamination. Although they are generally of a higher cost and complexity than baseline BMPs, they can also be an extension of "common sense" baseline BMPs that are specific to a particular facility. Advanced BMPs can include measures for the following:

Prevention: Minimizing releases (spills or leaks) to storm water by passive management practices and cleanup of releases before they can affect storm water.

Containment: Minimizing contact with storm water via distinct separation of process area to keep pollutants from co-mingling with storm water discharges.

Mitigation: Cleanup and treatment of existing residues or discharges that may contaminate storm water.

Disposal: Disposal or reclamation of identified wastes, raw materials or residues that can contaminate storm water.

BMPs are developed based on the risk of a pollutant coming in contact with storm water. As BMPs are evaluated and identified, members of the SWPPT must be aware of the high-risk areas for storm water contamination, which include the following:

Loading and unloading operations Outdoor storage activities Outdoor manufacturing or processing activities Significant dust from particulate-generating activities Onsite waste disposal, treatment or storage practices Fueling stations Vehicle, aircraft, and equipment maintenance and cleaning areas Liquid storage tanks Hazardous waste sites (any areas where hazardous wastes or materials are handled)

Description of Activity-Specific BMPs about:blank 30/100

Many sites have common activities at CCSFS that are covered by this SWPPP. The following recommended BMPs are appropriate for a majority of the sites. Site-specific BMPs for each activity covered in this plan are presented in the applicable sections. Site-specific BMPs are based on conditions observed at the time of the site visit, whereas the generic BMPs presented in this section apply to all facilities.

Proper Petroleum, Oil, and Lubricants (POL) Storage Facility: Provisions shall be made to provide covered storage for POL and related products such as antifreeze. Secondary containment also shall be provided in designated storage areas. Suitable POL storage structures include prefabricated hazardous material storage containers, spill pallets stored under a roof or covered with tarpaulins, or storage within a building that provides adequate secondary containment.

Sorbents: Each facility shall keep sorbents prominently located in the shop or adjacent to designated fueling or materials handling areas. Containers for sorbents shall be clearly labeled. Containers must be provided and clearly labeled for used sorbents.

Develop and Implement Fueling SOPs: These SOPs shall be implemented for all fuel tankers and fuel stations. Sorbents shall be kept on fuel tankers and at fuel stations. Fuel station operators and tanker truck drivers shall be trained in proper spill response procedures. The appropriate spill response contacts and telephone numbers shall be clearly posted at all fuel stations and in all tanker trucks.

Vehicle Positioning: Vehicles prone to small leaks and spills shall be parked within a contained area, until appropriate remedial measures can be taken. Where there is a potential for a significant leak or spill of flammable liquid (such as fuel tankers) the vehicle shall not be allowed to discharge to the sanitary sewer and shall be parked as far away as possible from storm sewers and surface drainage ways. The condition of transient equipment or vehicles brought into facilities shall be inspected upon delivery. Leaking or damaged equipment shall be promptly scheduled for repair or replacement. Spill kit materials such as sorbents, shall be utilized to prevent releases to the environment until the equipment is removed or repaired.

Develop and Implement Materials Handling SOPs: Personnel involved in materials handling shall be adequately trained in appropriate spill response measures. POLs and liquid hazardous materials and hazardous waste shall always be stored in an area that provides secondary containment and that is covered. Personnel shall be trained to store significant materials in a manner that will not expose the materials to storm water.

Inspections: Regular inspections are needed to verify that structural and procedural BMPs are properly implemented. When new BMPs are implemented more frequent inspections may be needed. However, less frequent inspections may be made after coordination with and approval by

SWPPT.

Develop and Implement Wash Rack: Vehicles and equipment shall be washed inside the curbed portion of a wash rack instead of in open paved or grass areas. Trash and solid waste shall be removed before vehicles and equipment are washed. This will prevent the trash and debris from clogging the outlet grates in the wash rack catch basin. It is prohibited to dispose of any materials (such as waste oil, waste fuel, or solvents) at a wash rack.

Signs: Post signs as needed to remind personnel of the requirements in that particular area. Signs are not substitutes for training but rather augment an effective training program. Signs are particularly useful in areas where transient personnel may perform activities (at a fueling station, for example).

about:blank 31/100

Develop and Implement SOPs for Exposed Diked Areas: Several activities at CCSFS have concrete containment structures for storage of materials that are exposed to storm water. These structures typically have one or more drain valves. These valves must remain closed and locked under normal operating conditions. After a rainfall, the collected water in the structure must be observed and checked visually for oil sheen or other signs of contamination. If no signs of contamination are noted, then the drain valves can be unlocked and opened to allow the collected water to drain.

Once the water has drained, the valves must be closed and locked.

If signs of contamination are observed in the collected water, sorbent booms or rags shall be used to clean up the collected water. Contact the SWC for assistance in resolving the cleanup and disposal of contaminated water. After the water has been cleaned, the valves can be unlocked and opened to allow the water to drain. Once the water has been drained, the valves must be closed and locked. If remediation measures fail to produce acceptable results, the collected water must be pumped into appropriate containers, then closed, labeled, and disposed of, per SLD 45 Hazardous Waste Management Plan. In all cases where contamination is observed, the source of contamination shall be identified and addressed.

about:blank 32/100

7.3 Schedules and Procedures for Monitoring

The installation implements procedures for conducting the following types of monitoring, as necessary:

Benchmark monitoring Effluent limitations guidelines monitoring State or Tribal specific monitoring Impaired waters monitoring Other monitoring as required

At a minimum, procedures describe:

Locations where samples are collected Pollutant parameters sampled Monitoring schedules Numeric limits, where applicable Sample collection and analysis Sampling and Analysis reporting requirements such as a Discharge Monitoring Report (DMR)

Monitoring procedures are documented in the installation supplement below.

Installation Supplement

CCSFS Water Sampling and Monitoring Plan

The CCSFS Water Sampling and Monitoring Plan incorporating the Patrick F2F SOP for NPDES MSGP Visual and Analytical Sampling, provides technical and regulatory guidance to CCSFS regarding the site-specific monitoring requirements of the MSGP.

Sampling and Monitoring

For the activities at CCSFS, FDEP has established "benchmark" concentrations that trigger additional monitoring. If benchmark concentrations are exceeded, it may result in future numeric limitations being imposed. For each industrial sector, benchmark (also called "cut-off") concentrations are established for various pollutants that are expected to be present in the storm water discharge from each activity. These benchmark concentrations are not effluent limitations, but are considered target concentrations for CCSFS to achieve through implementation of BMPs.

Quarterly monitoring and annual reporting are required for specific parameters for certain sites at CCSFS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .