Utility_Information_Sheet.pdf

PDF 109 KB Posted

Attached to
Eckert Road Bridges 2147 and 2148– Boise River and Ridenbaugh Canal, Eckert Road and Boise Avenue Roundabout
Solicitation number
CT227-01
Issued by
Ada County, Idaho

About this file

This is a Utility Information Sheet for the Eckert Road Bridges and Eckert Road and Boise Avenue Roundabout Project (Project #225044, 225045, and 325043) managed by the Ada County Highway District (ACHD) in Idaho. The project involves demolition of existing bridge structures and construction of new bridges over the Boise River and Ridenbaugh Canal, a single-lane roundabout at the intersection of Eckert Road and Boise Avenue, roadway reconstruction, a multi-use pathway along the west side of Eckert Road, a Greenbelt underpass, and modifications to Barber Park driveway access. Additional work includes roadway excavation, pavement construction, drainage improvements, utility adjustments, traffic control, illumination, landscaping, erosion and sediment control, and environmental protection measures. All irrigation and bridge work must comply with NMID Approval Letter dated 07/16/2026.

Utility relocations, adjustments, and installations will require approximately 160 working days from the Notice to Proceed date and may impact the contractor's critical path schedule. Utilities will coordinate work throughout all project phases, requiring the contractor to accommodate utility company schedules and construction windows. Nine utility companies are involved, including Sparklight, Lumen, City of Boise departments (Conduit and Fiber, Parks and Recreation, Public Works, and Street Lights), Intermountain Gas, Idaho Power, Syringa Networks, Veolia, and Zayo. ACHD General Conditions Section 26 applies to all utility work. The ACHD Utility Coordinator, Scott Bennett, can be contacted at (208) 387-6259 for questions regarding utility coordination and scheduling.

View the file

Other files

File Type Posted
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout_(Addendum_#5_Revision).pdf PDF
12806_12811_Eckert_Bridges_Utility_Vault_Detail_-_ADDENDUM_TWO.pdf PDF
BK12810_Repair_-_ADDENDUM_TWO.pdf PDF
BR12805_Repair_-_ADDENDUM_TWO.pdf PDF
Eckert_Boise_River_-_Global_Analysis-UPDATED_-_ADDENDUM_TWO.pdf PDF
Basin_Inlet_Protection_-_ADDENDUM_TWO.pdf PDF
Final_Bridge_Hydraulics_Report.pdf PDF
Proposed_Merged_Surface_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
12805_Bridge_Plans.pdf PDF
12805_Plans.pdf PDF
12810_Bridge_Plans_pt_1_-_pt_4.pdf PDF
Boise_Parks_Multi-Use_Path-_Concrete.pdf PDF
Eckert_Roundabout_Surface_Export_-_This_Document_is_in_XML_Format_-_May_not_open_in_CADD_File_Form_.xml XML file
2147_Eckert_Utility_Hang_Plan_Sheet.pdf PDF
Proposed_FG_Roadway_and_Bridge_Deck_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
Cofferdam_Hydraulics_Memo.pdf PDF
SAMPLE_Contract_Agreement.pdf PDF
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout.pdf PDF
NMID_Approval_Letter_070162026.pdf PDF
Combined_Special_Provisions_1_-_120.pdf PDF
Eckert_Roundabout_Plan_Sheets_1-65.pdf PDF
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_B&N_combined_basemap.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Survey_Information.jpg JPG image
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Bridge_-_Corners_Monuments_-_All_points_through_021226.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Updated_boundary_linework.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.CSV CSV file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Add_Topo_020926.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-Calibration_Point_Table.xlsx XLSX spreadsheet
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_WORKMAP-20260211_linework.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_ECKERT_HDR_DESIGN_20260630.dwg DWG drawing
Bid_Bond.pdf PDF
CADD_FILE_-_Eckert_Road_Bridges_-Benchmarks.dwg DWG drawing
19-Eckert_Bridges_Utility_Plans_1-9.pdf PDF
16_Eckert_Bridges_-_Boise_River_PLAN_Sheet_1-71.pdf PDF
15-Eckert_Bridges_-_Ridenbaugh_Canal_Bridge_PLAN_SHEETS_1-54.pdf PDF
17-Eckert_Bridges_Roadway_Plan_Sheet_1_-_109.pdf PDF
18_-_Eckert_Bridges_Greenbelt_Link_Plan_Sheets_1-14.pdf PDF
Geotechnical_Engineering_Report_-_Eckert_Road_Boise_River_Bridge.pdf PDF
Roadway_Materials_Report_-_Eckert_Rd-Boise_River_-_Ridenbaugh_Canal_Bridges.pdf PDF
Cross_Sections_-_Eckert_Bridges_PS&E_1-29.pdf PDF
Environmental_Document_-_Permit_Boise_River_-_Bridge_Replacement.pdf PDF
Infiltration_Letter_-_Eckert_Road_and_Boise_Avenue_Roundabout_-_62235109A.pdf PDF
Environmental_Documents_-_Eckert_Road_Bridge_-_Boise_River_-LILB.pdf PDF
Eckert_Bridges_SWPPP_Narrative.pdf PDF
Eckert_Roundabout_SWPPP_Template.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Utility Information

Eckert Road Bridges and Eckert Road and Boise Avenue Roundabout

Project #225044, 225045 and 325043

Utility Company Work Duration and Contact Information:

Utilities require approx. 160 working days from NTP date to complete their relocations, adjustments, and installations after clearing, grubbing, tree trimming and removal. These utility windows may impact the Contractor’s critical path schedule by that amount of time, and utilities may be working on site for every phase of the project. Project phasing may have a significant effect on the schedule for utility relocations, adjustments, and installations.

Contractor shall coordinate and accommodate work with utility companies and schedule required construction windows throughout the project.

ACHD General Conditions Section 26 applies. Contact ACHD Utility Coordinator, Scott Bennett, at (208) 387-6259, with questions.

Utilities within project:

• Sparklight – Kevin Wakagawa – (208) 954-9219 – kevin.wakagawa@sparklight.biz

• Lumen – Aaron Kowal – (208) 985-4498 – aaron.kowal@lumen.com

• City of Boise Conduit and Fiber – Adam Reno – (208) 972-8006 – areno@cityofboise.org

• City of Boise Parks and Rec – Trevor Kesner – (208) 608-7646 – tkesner@cityofboise.org

• City of Boise Public Works – Tiffany Wyer – (208) 608-7501 – twyer@cityofboise.org

• City of Boise Street Lights – Tom Marshall – (208) 388-4719 – tmarshall@cityofboise.org

• Intermountain Gas – Vic Bermudez – (208) 388-2629 – Victor.Bermudez@intgas.com

• Idaho Power – Dan Hammerquist - (208) 373-2141 - dhammerquist@idahopower.com

• Syringa Networks – Michael DeWitt - (208) 803-4000 - mdewitt@syringanetworks.net

• Veolia – Al Christy - (208) 617-9433 - Alan.Christy@veolia.com

• Zayo – Zayo Relocations - Zayo.relo.idaho@zayo.com; Joseph Kleinsasser - -

Joseph.Kleinsasser@zayo.com ; Ryan Goins (3C) – (208) 590-6681 - 3c.ryang@gmail.com mailto:kevin.wakagawa@sparklight.biz mailto:aaron.kowal@lumen.com mailto:areno@cityofboise.org mailto:tkesner@cityofboise.org mailto:twyer@cityofboise.org mailto:tmarshall@cityofboise.org mailto:Victor.Bermudez@intgas.com mailto:dhammerquist@idahopower.com mailto:mdewitt@syringanetworks.net mailto:Alan.Christy@veolia.com mailto:Zayo.relo.idaho@zayo.com mailto:Joseph.Kleinsasser@zayo.com mailto:3c.ryang@gmail.com