Cofferdam_Hydraulics_Memo.pdf

PDF 2 MB Posted

Attached to
Eckert Road Bridges 2147 and 2148– Boise River and Ridenbaugh Canal, Eckert Road and Boise Avenue Roundabout
Solicitation number
CT227-01
Issued by
Ada County, Idaho

About this file

This is a hydraulic analysis memorandum prepared by HDR, Inc. for the Nampa & Meridian Irrigation District (NMID) and Ada County Highway District (ACHD) regarding cofferdam installations associated with the Ridenbaugh Headworks Modernization project and the Eckert Road bridge replacement project. The analysis examines the hydraulic impacts of coffer dam placements on the Boise River, utilizing two-dimensional hydraulic modeling in HEC-RAS version 6.6 software based on LiDAR terrain data modified to reflect fall 2026 as-built conditions. Six scenarios were simulated to assess water surface elevations and velocities across river flows ranging from 200 to 1,600 cubic feet per second, comparing conditions with the Ridenbaugh cofferdam alone against scenarios incorporating Eckert Road coffer dams positioned on both the west and east banks, with and without stop logs placed at the existing diversion dam. The analysis collected critical data at specific monitoring locations upstream of the Ridenbaugh cofferdam and within the Boise River channel where flow constriction was greatest.

The hydraulic analysis concludes that neither Eckert Road bridge coffer dam installation will substantially impact hydraulic conditions at the Ridenbaugh cofferdam. Water surface elevation differences between baseline and coffer dam scenarios remained consistently less than 0.1 feet across all simulated flows. Velocity differences were typically less than 0.1 feet per second when stop logs were active with water diversion into the Ridenbaugh canal, and up to 0.7 feet per second reduction when stop logs were removed with no canal diversion. The analysis recommends that if a larger coffer dam than the conceptual designs modeled is ultimately installed, the hydraulic analysis should be updated to reassess potential impacts.

View the file

Other files

File Type Posted
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout_(Addendum_#5_Revision).pdf PDF
12806_12811_Eckert_Bridges_Utility_Vault_Detail_-_ADDENDUM_TWO.pdf PDF
BK12810_Repair_-_ADDENDUM_TWO.pdf PDF
BR12805_Repair_-_ADDENDUM_TWO.pdf PDF
Eckert_Boise_River_-_Global_Analysis-UPDATED_-_ADDENDUM_TWO.pdf PDF
Basin_Inlet_Protection_-_ADDENDUM_TWO.pdf PDF
Final_Bridge_Hydraulics_Report.pdf PDF
Proposed_Merged_Surface_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
12805_Bridge_Plans.pdf PDF
12805_Plans.pdf PDF
12810_Bridge_Plans_pt_1_-_pt_4.pdf PDF
Boise_Parks_Multi-Use_Path-_Concrete.pdf PDF
Eckert_Roundabout_Surface_Export_-_This_Document_is_in_XML_Format_-_May_not_open_in_CADD_File_Form_.xml XML file
2147_Eckert_Utility_Hang_Plan_Sheet.pdf PDF
Proposed_FG_Roadway_and_Bridge_Deck_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
SAMPLE_Contract_Agreement.pdf PDF
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout.pdf PDF
NMID_Approval_Letter_070162026.pdf PDF
Combined_Special_Provisions_1_-_120.pdf PDF
Eckert_Roundabout_Plan_Sheets_1-65.pdf PDF
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_B&N_combined_basemap.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Survey_Information.jpg JPG image
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Bridge_-_Corners_Monuments_-_All_points_through_021226.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Updated_boundary_linework.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.CSV CSV file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Add_Topo_020926.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-Calibration_Point_Table.xlsx XLSX spreadsheet
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_WORKMAP-20260211_linework.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_ECKERT_HDR_DESIGN_20260630.dwg DWG drawing
Bid_Bond.pdf PDF
CADD_FILE_-_Eckert_Road_Bridges_-Benchmarks.dwg DWG drawing
19-Eckert_Bridges_Utility_Plans_1-9.pdf PDF
16_Eckert_Bridges_-_Boise_River_PLAN_Sheet_1-71.pdf PDF
15-Eckert_Bridges_-_Ridenbaugh_Canal_Bridge_PLAN_SHEETS_1-54.pdf PDF
17-Eckert_Bridges_Roadway_Plan_Sheet_1_-_109.pdf PDF
18_-_Eckert_Bridges_Greenbelt_Link_Plan_Sheets_1-14.pdf PDF
Geotechnical_Engineering_Report_-_Eckert_Road_Boise_River_Bridge.pdf PDF
Roadway_Materials_Report_-_Eckert_Rd-Boise_River_-_Ridenbaugh_Canal_Bridges.pdf PDF
Cross_Sections_-_Eckert_Bridges_PS&E_1-29.pdf PDF
Environmental_Document_-_Permit_Boise_River_-_Bridge_Replacement.pdf PDF
Infiltration_Letter_-_Eckert_Road_and_Boise_Avenue_Roundabout_-_62235109A.pdf PDF
Environmental_Documents_-_Eckert_Road_Bridge_-_Boise_River_-LILB.pdf PDF
Eckert_Bridges_SWPPP_Narrative.pdf PDF
Eckert_Roundabout_SWPPP_Template.pdf PDF
Utility_Information_Sheet.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

hdrinc.com 412 East Parkcenter Blvd, Suite 100, Boise, ID 83706-6659

(208) 387-7000

Memo Date: Tuesday, June 02, 2026

Project: Ridenbaugh Headworks Modernization

To: Dave Rader, ACHD Project Manager

From: Mike Schubert, PE (HDR) Brandon Hobbs, PE, BC.WRE, CFM (HDR) Kyler Ashby, PE (HDR)

Subject: NMID Eckert and Ridenbaugh Cofferdam Hydraulic Analysis

Introduction Dewatering efforts associated with constructing the next phase of the Ridenbaugh headworks modernization will require a coffer dam to be installed on the east (descending right) end of the new diversion structure. The Eckert Road bridge replacement project timeline will overlap with the Ridenbaugh project and will also require dewatering using coffer dams. The Nampa &

Meridian Irrigation District (NMID) requested HDR, Inc. (HDR) perform a hydraulic analysis of the anticipated Ridenbaugh and Eckert Road coffer dam emplacements. The analysis will examine the hydraulic conditions and determine whether the Eckert Road coffer dams will have any significant impact on the Ridenbaugh coffer dam. This memo documents the results of the hydraulic analysis.

Hydraulic Model This analysis utilizes two-dimensional (2D) hydraulic modeling in the Hydrologic Engineering

Center River Analysis System (HEC-RAS) version 6.6 software. Model terrain is based on the most recent LiDAR collected in the modified to include the as-built conditions at the Ridenbaugh

Diversion in fall of 2026. The range of upstream river flows run for the simulations is from 200 to

1600 cubic feet per second (cfs).

The anticipated layout of the Ridenbaugh coffer dam was provided by NMID and incorporated into the 2D model. The Eckert Road bridge project will require two separate coffer dam installations for bridge pier foundation construction, one on the left bank (west side) and one on the right bank (east side). The two conceptual layouts were provided by the bridge design engineers and incorporated into the model terrain. Figure 1 and Figure 2 show the layouts for the coffer dams used in the simulations.

Figure 1: Coffer dam layouts with Eckert coffer dam on west side (Scenarios 2 and 5).

Figure 2: Coffer dam layouts with Eckert coffer dam on east side (Scenarios 3 and 6).

A total of six scenarios were run and analyzed for this hydraulic analysis. The first three scenarios (Scenarios 1, 2, and 3) assumed that the stop log elevation at the existing diversion dam would be set at 2754.7 feet and river flows would enter the Ridenbaugh Diversion Channel and flow into the Ridenbaugh canal at a rate of 400 cfs. Scenario 1 only includes the

Ridenbaugh cofferdam. Scenarios 2 and 3 include the Eckert Road coffer dam installed on the west and east side of the Boise River, respectively.

The other three scenarios (Scenarios 4, 5 and 6) assumed that the stop logs would be removed at the existing diversion dam and river flows would be prevented from flowing into Ridenbaugh canal. Scenario 4 only includes the Ridenbaugh coffer dam. Scenarios 5 and 6 include the

Eckert Road coffer dam installed on the west and east side of the Boise River, respectively.

Results Water surface elevations and velocity data for each scenario were queried at specific locations around the Ridenbaugh coffer dam in the model, shown in Figure 3. The water surface elevation data was taken just upstream of the Ridenbaugh coffer dam. The water velocity data was taken in the Boise River channel where the flow is the most constricted by the Ridenbaugh coffer dam.

These locations represent critical points to determine what effects the installation of either the east or west Eckert coffer dams may have on the Ridenbaugh installation.

Figure 3: Data collection point locations.

Plots depicting stage-flow and velocity-flow relationships for the six scenarios were created from the collected data. These plots are included below as Figure 4, Figure 5, Figure 6, and Figure 7.

Figure 4. Water surface elevations comparison for scenarios 1, 2 and 3

2753.5

2754.5

2755.5

2756.5

2757.5

200 400 600 800 1000 1200 1400 1600

W a te r S u rf a c e E le v a ti o n ft

Flow (cfs)

Water Surface Elevations

Scenario 1 Scenario 2 Scenario 3

Figure 5. Water surface elevations comparison for scenarios 4, 5 and 6

Figure 6. Velocities comparison for scenarios 1, 2 and 3

2752.5

2753.5

2754.5

2755.5

2756.5

200 400 600 800 1000 1200 1400 1600

W a te r S u rf a c e E le v a ti o n ft

Flow (cfs)

Water Surface Elevations

Scenario 4 Scenario 5 Scenario 6

0.5

1.5

2.5

3.5

4.5

5.5

200 400 600 800 1000 1200 1400 1600

V e lo c it y ft /s

Flow (cfs)

Velocities Comparison

Scenario 1 Scenario 2 Scenario 3

Figure 7. Velocities comparison for scenario 4, 5 and 6

Conclusions As shown in Figure 4, Figure 5, Figure 6, and Figure 7, the difference between the baseline

(Scenario 1 and Scenario 4) installation of just the Ridenbaugh coffer dam and the results of the west (Scenario 2 and 5) and east (Scenario 3 and 6) Eckert Road coffer dam installations are very small. The change in water surface elevation was typically less than 0.1 ft throughout the range of flows simulated. The difference in velocity was typically less than 0.1 ft/s throughout the range of flows simulated for scenarios with the stop logs included at the diversion dam.

With the stop logs removed and no water diversion into the Ridenbaugh canal in Scenario 5 and

6, the measured velocities were reduced from the baseline scenario by up to 0.7 ft/sec. The change in water surface elevation was still less than 0.1 ft throughout the range of flows simulated.

In both scenarios with stoplogs placed and active diversion into the Ridenbaugh canal, and without those conditions, the overall effect of the Eckert Road bridge coffer dams appears minor. It can be concluded that neither Eckert Road bridge coffer dam installation will substantially impact the hydraulic conditions at the Ridenbaugh coffer dam. If a larger coffer dam is installed, this analysis should be updated.

200 400 600 800 1000 1200 1400 1600

V e lo c it y ft /s

Flow (cfs)

Velocities Comparison

Scenario 4 Scenario 5 Scenario 6