About this file

This is a Bid Bond form issued by the Ada County Highway District (ACHD) in Idaho for the Eckert Road Bridges 2147 and 2148 project. The project encompasses major construction work including demolition of existing bridge structures; construction of new bridges over the Boise River and Ridenbaugh Canal; construction of a single-lane roundabout at the intersection of Eckert Road and Boise Avenue; and reconstruction of roadway approaches. Additional project components include a multi-use pathway along the west side of Eckert Road, a Greenbelt underpass beneath Eckert Road, modifications to Barber Park driveway access, roadway excavation and embankment, pavement construction, curb and gutter work, sidewalks, retaining walls, drainage improvements, irrigation and utility adjustments, traffic control, permanent signing and pavement markings, illumination, landscaping, erosion and sediment control, and environmental protection measures. All work involving irrigation and bridge construction must comply with the NMID Approval Letter dated July 16, 2026, unless otherwise approved by the irrigation district.

The Bid Bond requires contractors to submit a bond equal to ten percent (10%) of the total proposal amount as security for the bid. Upon contract award, the principal must execute a contract with ACHD within ten days (excluding weekends and legal holidays) and furnish Performance and Labor and Material Payment bonds to satisfy the bid bond obligation. The form requires execution by the principal and surety, with the surety agent's Power-of-Attorney documentation mandatory for bond validity. This bond serves as a guarantee of the contractor's good faith and commitment to enter into the construction contract on the terms proposed.

View the file

Other files

File Type Posted
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout_(Addendum_#5_Revision).pdf PDF
12806_12811_Eckert_Bridges_Utility_Vault_Detail_-_ADDENDUM_TWO.pdf PDF
BK12810_Repair_-_ADDENDUM_TWO.pdf PDF
BR12805_Repair_-_ADDENDUM_TWO.pdf PDF
Eckert_Boise_River_-_Global_Analysis-UPDATED_-_ADDENDUM_TWO.pdf PDF
Basin_Inlet_Protection_-_ADDENDUM_TWO.pdf PDF
Final_Bridge_Hydraulics_Report.pdf PDF
Proposed_Merged_Surface_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
12805_Bridge_Plans.pdf PDF
12805_Plans.pdf PDF
12810_Bridge_Plans_pt_1_-_pt_4.pdf PDF
Boise_Parks_Multi-Use_Path-_Concrete.pdf PDF
Eckert_Roundabout_Surface_Export_-_This_Document_is_in_XML_Format_-_May_not_open_in_CADD_File_Form_.xml XML file
2147_Eckert_Utility_Hang_Plan_Sheet.pdf PDF
Proposed_FG_Roadway_and_Bridge_Deck_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
Cofferdam_Hydraulics_Memo.pdf PDF
SAMPLE_Contract_Agreement.pdf PDF
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout.pdf PDF
NMID_Approval_Letter_070162026.pdf PDF
Combined_Special_Provisions_1_-_120.pdf PDF
Eckert_Roundabout_Plan_Sheets_1-65.pdf PDF
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_B&N_combined_basemap.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Survey_Information.jpg JPG image
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Bridge_-_Corners_Monuments_-_All_points_through_021226.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Updated_boundary_linework.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.CSV CSV file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Add_Topo_020926.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-Calibration_Point_Table.xlsx XLSX spreadsheet
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_WORKMAP-20260211_linework.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_ECKERT_HDR_DESIGN_20260630.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-Benchmarks.dwg DWG drawing
19-Eckert_Bridges_Utility_Plans_1-9.pdf PDF
16_Eckert_Bridges_-_Boise_River_PLAN_Sheet_1-71.pdf PDF
15-Eckert_Bridges_-_Ridenbaugh_Canal_Bridge_PLAN_SHEETS_1-54.pdf PDF
17-Eckert_Bridges_Roadway_Plan_Sheet_1_-_109.pdf PDF
18_-_Eckert_Bridges_Greenbelt_Link_Plan_Sheets_1-14.pdf PDF
Geotechnical_Engineering_Report_-_Eckert_Road_Boise_River_Bridge.pdf PDF
Roadway_Materials_Report_-_Eckert_Rd-Boise_River_-_Ridenbaugh_Canal_Bridges.pdf PDF
Cross_Sections_-_Eckert_Bridges_PS&E_1-29.pdf PDF
Environmental_Document_-_Permit_Boise_River_-_Bridge_Replacement.pdf PDF
Infiltration_Letter_-_Eckert_Road_and_Boise_Avenue_Roundabout_-_62235109A.pdf PDF
Environmental_Documents_-_Eckert_Road_Bridge_-_Boise_River_-LILB.pdf PDF
Eckert_Bridges_SWPPP_Narrative.pdf PDF
Eckert_Roundabout_SWPPP_Template.pdf PDF
Utility_Information_Sheet.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we ___________________________________ _____________________________________ of _____________________________________ as Principal, and ______________________________________________________________ as Surety, are held and firmly bound unto the Ada County Highway District (hereinafter called ACHD) in the full and penal sum of ten percent (10%) of the total amount of the proposal of said Principal for the work hereinafter described, for the payment of which will and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, firmly by these presents.

The condition of this obligation is such that whereas the Principal has this day submitted a sealed proposal for:

(Contract Name)

(Contract Number)

NOW, THEREFORE, if said Principal shall be awarded and shall duly make and enter into a contract with ACHD in accordance with the terms of said proposal and award, and shall within ten (10) days (not including Saturdays, Sundays and legal holidays) after presentation of the contract furnish Performance and Labor and Material Payment bonds, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

IN WITNESS WHEREOF, the above bounden parties have executed this instrument this _____ day of _______________, ________.

Witness: (if Individual or Firm)

Principal:

Attest: (if Corporation) By:

Title:

Corporate Seal:

Attest

Surety:

By:________________________________ (Signature)

(Print Name)

(Title)

SURETY AGENT'S POWER-OF-ATTORNEY MUST BE ATTACHED

NOTE:

This form is included for optional use by the Contractor and Bonding

C

SURETY AGENT'S POWER-OF-ATTORNEY MUST BE ATTACHED

File details come from the government source that posted it. Updated .