This document consists of utility plans prepared by Ada County Highway District for the Eckert Road Bridges project involving the demolition and reconstruction of bridge structures over the Boise River and Ridenbaugh Canal at the intersection of Eckert Road and Boise Avenue. The utility plans (sheets UTIL 001 through UTIL 005) and corresponding profiles (UTIL 001P through UTIL 004P) detail the locations and required actions for multiple utility systems operating within the project corridor from Station 405+60 to Station 420+44. The plans identify utilities owned and operated by Idaho Power Company, Lumen Fiber, Sparklight Fiber, Zayo Fiber, Intermountain Gas, City of Boise Sanitary Sewer, Veolia Water, Nampa Meridian Irrigation District, ACHD Storm Sewer and Telemetry, and private landowners. Each utility is assigned specific actions including placement with protection in place (Action A), adjustment or relocation at company expense (Action B), or removal and relocation (Action C). The construction area encompasses approximately 4.84 miles of roadway work with proposed utility vaults and junction boxes for future ACHD fiber infrastructure shown throughout the project limits.

The utility plans indicate critical coordination requirements including mandatory field verification of all utility locations prior to construction through Dig Line Inc. at 811, with at least two business days' notice required before commencing work. Utility owners located in the project vicinity must receive notification of anticipated construction times fifteen days prior to construction start. The plans establish proposed locations for utility infrastructure adjustments, including S-45T junction boxes with risers for future ACHD fiber and proposed utility vaults for future use. Profile drawings show elevation details for all identified utilities across the four main plan sheets, enabling contractors to coordinate excavation depths and clearances with existing and proposed utility infrastructure. The project coordination is subject to approval requirements outlined in the NMID Approval Letter dated July 16, 2026, with all irrigation and bridge work to be completed in accordance with irrigation district specifications.

View the file

Other files

File Type Posted
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout_(Addendum_#5_Revision).pdf PDF
12806_12811_Eckert_Bridges_Utility_Vault_Detail_-_ADDENDUM_TWO.pdf PDF
BK12810_Repair_-_ADDENDUM_TWO.pdf PDF
BR12805_Repair_-_ADDENDUM_TWO.pdf PDF
Eckert_Boise_River_-_Global_Analysis-UPDATED_-_ADDENDUM_TWO.pdf PDF
Basin_Inlet_Protection_-_ADDENDUM_TWO.pdf PDF
Final_Bridge_Hydraulics_Report.pdf PDF
Proposed_Merged_Surface_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
12805_Bridge_Plans.pdf PDF
12805_Plans.pdf PDF
12810_Bridge_Plans_pt_1_-_pt_4.pdf PDF
Boise_Parks_Multi-Use_Path-_Concrete.pdf PDF
Eckert_Roundabout_Surface_Export_-_This_Document_is_in_XML_Format_-_May_not_open_in_CADD_File_Form_.xml XML file
2147_Eckert_Utility_Hang_Plan_Sheet.pdf PDF
Proposed_FG_Roadway_and_Bridge_Deck_-_This_Document_is_in_XML_Format_-_FOR_VIEWING_PURPOSES_ONLY.xml XML file
Cofferdam_Hydraulics_Memo.pdf PDF
SAMPLE_Contract_Agreement.pdf PDF
Eckert_Road_Bridges_2147_and_2148–_Boise_River_and_Ridenbaugh_Canal,_Eckert_Road_and_Boise_Avenue_Roundabout.pdf PDF
NMID_Approval_Letter_070162026.pdf PDF
Combined_Special_Provisions_1_-_120.pdf PDF
Eckert_Roundabout_Plan_Sheets_1-65.pdf PDF
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_B&N_combined_basemap.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Survey_Information.jpg JPG image
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Eckert_Bridge_-_Corners_Monuments_-_All_points_through_021226.TXT TXT text file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Updated_boundary_linework.dwg DWG drawing
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-TBMs_5-18-26.CSV CSV file
CADD_FILE_-_Eckert-BoiseAve_Roundabout_-_Add_Topo_020926.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-Calibration_Point_Table.xlsx XLSX spreadsheet
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(EG).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-24006-Topo-(Bridge_Surface).dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_WORKMAP-20260211_linework.dwg DWG drawing
CADD_FILE_-_Eckert_Road_Bridges_-_ECKERT_HDR_DESIGN_20260630.dwg DWG drawing
Bid_Bond.pdf PDF
CADD_FILE_-_Eckert_Road_Bridges_-Benchmarks.dwg DWG drawing
16_Eckert_Bridges_-_Boise_River_PLAN_Sheet_1-71.pdf PDF
15-Eckert_Bridges_-_Ridenbaugh_Canal_Bridge_PLAN_SHEETS_1-54.pdf PDF
17-Eckert_Bridges_Roadway_Plan_Sheet_1_-_109.pdf PDF
18_-_Eckert_Bridges_Greenbelt_Link_Plan_Sheets_1-14.pdf PDF
Geotechnical_Engineering_Report_-_Eckert_Road_Boise_River_Bridge.pdf PDF
Roadway_Materials_Report_-_Eckert_Rd-Boise_River_-_Ridenbaugh_Canal_Bridges.pdf PDF
Cross_Sections_-_Eckert_Bridges_PS&E_1-29.pdf PDF
Environmental_Document_-_Permit_Boise_River_-_Bridge_Replacement.pdf PDF
Infiltration_Letter_-_Eckert_Road_and_Boise_Avenue_Roundabout_-_62235109A.pdf PDF
Environmental_Documents_-_Eckert_Road_Bridge_-_Boise_River_-LILB.pdf PDF
Eckert_Bridges_SWPPP_Narrative.pdf PDF
Eckert_Roundabout_SWPPP_Template.pdf PDF
Utility_Information_Sheet.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G V

W

ITD - Plan 2019

PRINTS ONLY

ARE FOR 11" X 17"

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

SHEET OF

ENGLISHUTILITY PLAN

ECKERT ROAD BRIDGES

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 001.SHT

JULY 2026 91

ADA

12806/12811

Ada County Highway District

20 0 20 40

SCALE: 1" = 40'

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

IRRIGATION

PRIVATE LANDOWNER

M A T C

H L

IN

E S

T A

STA. 405+60 TO STA. 408+50

B O

IS

E

A

V E

E. 2523539.4961

N. 691877.7361

STA. 405+37.00

BRIDGE KEY NOS. 12806 & 12811

BEGIN CONSTRUCTION

7D

2C

10E

1C

8F

8C

SEE REMOVAL PLANS

LUMINAIRE POLES

9F

9A

9C

1A

ECKERT ROAD

10E

1C

1C

VAULT

F/O UTILITY

PROPOSED

4F

3F

2F

1F

RISER FOR FUTURE ACHD FIBER

S-45T JUNCTION BOX WITH

8E

7E

SHOWN FOR REFERENCE ONLY

APPROXIMATE PROPOSED OHE

6C

6F

7/15/2026

-5.000%

-1.100%

-5.000%

.6

.0

V P

I

.7

I

.2

.9

C

.1

T

.2

C

.4

T

.4

.5

C

PRINTS ONLY

ARE FOR 11" X 17"

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

SHEET OF

ITD - Profile 03-2007

ENGLISH

Ada County Highway District

UTILITY PROFILE

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 001P.SHT

JULY 2026 92

ADA

12806/12811

ECKERT ROAD BRIDGES

+6%

+4%

+2%

0%

-2%

-4%

-6%

+6%

+4%

+2%

0%

-2%

-4%

-6%

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IRRIGATION

PRIVATE LANDOWNER

405+00 406+00 407+00 408+00404+00

M A

T C

H L

IN

E

S T

A

ECKERT ROAD PROFILE

ECKERT ROAD SUPERELEVATION

M A

T C

H L

IN

E

404+00 406+00405+00 407+00 408+00

E. 2523539.4961

N. 691877.7361

STA. 405+37.00

BRIDGE KEY NOS. 12806 & 12811

BEGIN CONSTRUCTION

STA. 405+37.00 TO STA. 408+50.00

-1.51.5

~+1.7% LT EOP

CROSS SLOPE

MATCH EXISTING

+37.00

PGL & AXIS OF ROTATION

RT EOP -1.5%

LT EOP +1.5%

STA. 407+00.00

BEGIN PERMANENT PAVING

ASPHALT PAVING,

END TEMPORARY

~-5.1% RT EOP

CROSS SLOPE

MATCH EXISTING

+37.00

RT EOP -1.5%

+00.00

LT EOP +1.5%

+40.50

GRADE

ROUNDABOUT PROFILE

BOISE AVE & ECKERT RD

APPROXIMATE FUTURE

1F

2F

FUTURE ACHD FIBER NOT SHOWN)

(S-45T JUNCTION BOX WITH RISER FOR

PROPOSED F/O UTILITY VAULT

3F

4F

8F

G

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

SHEET OF

ENGLISHUTILITY PLAN

ECKERT ROAD BRIDGES

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 002.SHT

JULY 2026 93

ADA

12806/12811

Ada County Highway District

20 0 20 40

SCALE: 1" = 40'

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

IRRIGATION

PRIVATE LANDOWNER

STA. 408+50 TO STA. 413+00

M A

T C

H

L

IN

E

S

T A

M A

T C

H

L

IN

E

S

T A

10E

8B

3B

2B

3B

2B

8F

4F

1F

3F

VAULT

F/O UTILITY

PROPOSED

VAULT

IPCO UTILITY

PROPOSED

1C

2F

B O

IS

E

R

IV

E R

C A

N A

L

R

ID

E N

B A

U G

H

ECKERT ROAD

¡ BARBER PARK

1F

RISER FOR FUTURE ACHD FIBER

S-45T JUNCTION BOX WITH

SEE ROADWAY PLANS

ACHD LIGHT POLE, TO BE REMOVED

7D 8B

5C

2F

8C

8F

2F

3F

4F

3F

1F

4F

2F

2B

6B

6F

-0.500%

.8

I

.2

.5

T

PRINTS ONLY

ARE FOR 11" X 17"

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

UTILITY PROFILE

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 002P.SHT

JULY 2026 94

ADA

12806/12811

ECKERT ROAD BRIDGES

+6%

+4%

+2%

0%

-2%

-4%

-6%

+6%

+4%

+2%

0%

-2%

-4%

-6%

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IRRIGATION

PRIVATE LANDOWNER

409+00 410+00 411+00 412+00 413+00

ECKERT ROAD PROFILE

ECKERT ROAD SUPERELEVATION

M A

T C

H L

IN

E

S T

A

M A

T C

H L

IN

E

M A

T C

H L

IN

E

M A

T C

H L

IN

E

S T

A

410+00409+00 411+00 412+00 413+00-1.51.5

PGL & AXIS OF ROTATION

LT EOP +1.5%

RT EOP -1.5%

-1.51.5

STA. 408+50.00 TO STA. 413+00.00

STA. 408+84.35

CANAL BRIDGE

BEGIN RIDENBAUGH

STA. 409+75.20

CANAL BRIDGE

END RIDENBAUGH

STA. 410+60.06

RIVER BRIDGE

BEGIN BOISE

PROPOSED GRADE

EXISTING GROUND

SEE BRIDGE PLANS

ABUTMENT GRADING

APPROXIMATE PROPOSED

1F

FUTURE ACHD FIBER NOT SHOWN)

(S-45T JUNCTION BOX WITH RISER FOR

PROPOSED F/O UTILITY VAULT

2F

VAULT

IPCO UTILITY

PROPOSED

3F

4F

8F

413 414 415 416 417

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

SHEET OF

ENGLISHUTILITY PLAN

ECKERT ROAD BRIDGES

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 003.SHT

JULY 2026 95

ADA

12806/12811

Ada County Highway District

20 0 20 40

SCALE: 1" = 40'

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

IRRIGATION

PRIVATE LANDOWNER

M A

T C

H

L

IN

E

S

T A

M A

T C

H

L

IN

E

S

T A

STA. 413+00 TO STA. 417+50

6B

8B

7D

4B

3B

1F

1C

ECKERT ROAD

SEE ROADWAY PLANS

ITD ATR

UTILITY VAULT

PROPOSED F/O

UTILITY VAULT

PROPOSED IPCO

RISER FOR FUTURE ACHD FIBER

S-45T JUNCTION BOX WITH

1A

6F8F4F 3F 2F

1C

1C 1C

-0.500%

.7

.0

C

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

UTILITY PROFILE

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 003P.SHT

JULY 2026 96

ADA

12806/12811

ECKERT ROAD BRIDGES

+6%

+4%

+2%

0%

-2%

-4%

-6%

+6%

+4%

+2%

0%

-2%

-4%

-6%

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IRRIGATION

PRIVATE LANDOWNER

2790 2790

413+00 414+00 415+00 416+00 417+00

M A

T C

H L

IN

E

M A

T C

H L

IN

E

M A

T C

H L

IN

E

S T

A

M A

T C

H L

IN

E

S T

A

ECKERT ROAD PROFILE

ECKERT ROAD SUPERELEVATION

413+00 414+00 415+00 416+00 417+00

RT EOP -1.5%

PGL & AXIS OF ROTATION

LT EOP +1.5%

STA. 413+00.00 TO STA. 417+50.00

-1.51.5-1.51.5

STA. 414+24.06

RIVER BRIDGE

END BOISE

CROSSING

PROPOSED GREENBELT

EXISTING GROUND

PROPOSED GRADE

SEE BRIDGE PLANS

GRADING

PROPOSED ABUTMENT

1F

VAULT

IPCO UTILITY

PROPOSED

1F

2F

FUTURE ACHD FIBER NOT SHOWN)

(S-45T JUNCTION BOX WITH RIDER FOR

PROPOSED F/O UTILITY VAULT

3F

4F

8F6F

LANDSCAPED AREA

419 420

WM

WM

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

SHEET OF

ENGLISHUTILITY PLAN

ECKERT ROAD BRIDGES

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 004.SHT

JULY 2026 97

ADA

12806/12811

Ada County Highway District

20 0 20 40

SCALE: 1" = 40'

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

IRRIGATION

PRIVATE LANDOWNER

M A

T C

H

L

IN

E

S

T A

STA. 417+50 TO STA. 420+32

BRIDGE KEY NOS. 12806 & 12811

END CONSTRUCTION

E. 2524562.4436

N. 692730.9866

STA. 420+44.00

ECKERT ROAD

M

IL

L B

R O

O K

W A

Y

8B

UTILITY VAULT

PROPOSED IPCO

UTILITY VAULT

PROPOSED F/O

RISER FOR FUTURE ACHD FIBER

S-45T JUNCTION BOX WITH

1A

10E

10E

10E

10A

10A

9E

9E

10E

10E

10A

10A

11C

7D

6B

6A

8A

8F

7E

7E

7D

7A

7E

7A

7A

1C 4B 3B

3B

1C

4F3F2F 1F

-4.500%

0.400%

.7

I

.0

T

.2

.1

C

.2

T

.1

.2

L

P

PRINTS ONLY

ARE FOR 11" X 17"

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

UTILITY PROFILE

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 004P.SHT

JULY 2026 98

ADA

12806/12811

ECKERT ROAD BRIDGES

+6%

+4%

+2%

0%

-2%

-4%

-6%

+6%

+4%

+2%

0%

-2%

-4%

-6%

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IRRIGATION

PRIVATE LANDOWNER

M A

T C

H L

IN

E

S T

A

M A

T C

H L

IN

E

419+00418+00 420+00 421+00 422+00

ECKERT ROAD PROFILE

ECKERT ROAD SUPERELEVATION

418+00 419+00 420+00 421+00 422+00

RT EOP -1.5%

PGL & AXIS OF ROTATION

LT EOP +1.5%

BRIDGE KEY NOS. 12806 & 12811

END CONSTRUCTION

E. 2524562.4436

N. 692730.9866

STA. 420+44.00

STA. 417+50.00 TO STA. 420+44.00

-1.51.5

RT EOP 0.0%

+30.50

LT EOP +1.5%

+96.75

RT EOP -1.5%

+96.75

PROPOSED GRADE

EXISTING GROUND

LT EOP ~-0.6%

MATCH EXISTING

+44.0

RT EOP ~0.0%

MATCH EXISTING

+44.00

1F

2F

VAULT

IPCO UTILITY

PROPOSED

FUTURE ACHD FIBER NOT SHOWN)

(S-45T JUNCTION BOX WITH RISER FOR

PROPOSED F/O UTILITY VAULT

3F

4F

8F

10 11 12

SCALES SHOWN

DESIGNED

DESIGN CHECKED

DETAILED

DRAWING CHECKED DRAWING DATE:

CADD FILE NAME

NO. DATE BY DESCRIPTION

REVISIONS

COUNTY

KEY NUMBER

SHEET OF

ENGLISHUTILITY PLAN

ECKERT ROAD BRIDGES

R. WILLIAMS

C. WAITE

W. MEYER

R. BLOWER

12806_12811 UTIL 005.SHT

JULY 2026 99

ADA

12806/12811

Ada County Highway District

20 0 20 40

SCALE: 1" = 40'

NOTES:

1. FIELD VERIFY THE LOCATION OF

UTILITIES PRIOR TO CONSTRUCTION.

CALL "DIG LINE INC." AT 811 AT LEAST

TWO (2) BUSINESS DAYS PRIOR TO

CONSTRUCTION.

2. NOTIFY UTILITY OWNERS LOCATED IN

THE VICINITY OF THE PROJECT OF

ANTICIPATED CONSTRUCTION TIMES 15

DAYS PRIOR TO THE START OF

CONSTRUCTION.

IDAHO POWER COMPANY1

LUMEN FIBER2

6 INTERMOUNTAIN GAS

SEWER

CITY OF BOISE SANITARY

8 VEOLIA WATER

IRRIGATION DISTRICT

NAMPA MERIDIAN

UTILITY OWNER:

10 ACHD STORM SEWER

TELEMETRY

IRRIGATION DISTRICT

NAMPA MERIDIAN

LEGEND:

ACTION:

A

PLACE

RETAIN AND PROTECT IN

B

COMPANY EXPENSE

ADJUST OR RELOCATE AT

C REMOVE AND RELOCATE

ABANDONED, REMOVED

SEE ROADWAY PLANSE

SPARKLIGHT FIBER3

ZAYO FIBER4

CONSTRUCTION PLANS

PROPOSED LOCATION, SEE

F

R E

E

NI

GNE LANOIS

S

E

F O

R P

O H

A

DI FO E

T A

T S

DESNECI

L

R E

Y

EM .A YEL

S

E W

20046

IRRIGATION

PRIVATE LANDOWNER

E C

K E

R T

R

O A

D

DRIVEWAYBARBER P

ARK

CANAL

RI

DENBAUGH

RIVER

BOISE

STA. 9+80 TO STA. 14+00

4F3F

8F

2F

1F

12806_12811 UTIL 001
12806_12811 UTIL 001P
12806_12811 UTIL 002
12806_12811 UTIL 002P
12806_12811 UTIL 003
12806_12811 UTIL 003P
12806_12811 UTIL 004
12806_12811 UTIL 004P
12806_12811 UTIL 005 Barber Park

File details come from the government source that posted it. Updated .