(USS LASSEN) Attachment S-7 Proposal Assessment.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- N00024-22-R-4486
About this file
This document provides information on a federal solicitation for the USS LASSEN (DDG 82) FY23 Depot Modernization Period (DMP). The solicitation seeks proposals for the execution of maintenance, modernization, and repair of the USS LASSEN, requiring facilities and human resources capable of completing, coordinating, and integrating multiple areas of ship maintenance, repair and modernization. The availability is approximately 19 months beginning in December 2022 and completing in August 2024. Interested parties must register in SAM and PIEE to receive the full solicitation and submit proposals through PIEE by September 2022. The Navy intends to make a single award contract by September 2022 for this work.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section L & M Requirements
| To be responsive, offerors should rely on the solicitation Sections L and M as this may not be a comprehensive list. | ||
| USS LASSEN (DDG 82) FY23 DMP | Offeror: [Insert Offeror Name] | |
| SECTION L, II | Yes, No | |
| Electronic Proposal(s) Format | 1. Due to ongoing restrictions resulting from the global COVID-19 pandemic, hand delivery of proposals is not possible at this time to the Washington Navy Yard. Offerors are instructed to submit proposals electronically via the Solicitation Module in PIEE located at https://piee.eb.mil. Offerors must request a PIEE account within seven days of solicitation release. | |
| 2. Offerors wishing to submit a proposal in response to this notification shall ensure a representative of their organization registers at the PIEE website and that the Proposal Manager role in the Solicitation Module is approved for the Offeror’s representative. The Proposal Manager in the Solicitation Module can search for the solicitation based on criteria such as the solicitation number, response date, status, and contracting office DoDAAC among additional criteria. Once the solicitation is found and selected, the Proposal Manager can submit a proposal by selecting the “Offer” tab, choosing the applicable CAGE code for the Offeror, uploading the attachments that comprise their offer, and digitally signing off on submission of the offer. After proposal submission, please provide email confirmation to all of the POC’s identified in paragraph I(C) above. | ||
| 3. Offerors shall address their package with the RFP number and Offeror’s company name. The Solicitation Module in PIEE will document the submittal date and time of the Offeror’s proposal submission and shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1. | ||
| 4. The Solicitation Module in PIEE does NOT accept zip file submissions. Proposal submissions shall be formatted so that each file name clearly identifies the Proposal Volume that the file is associated with (i.e. “Volume I Price Proposal – Cover Letter”). Each Volume shall be formatted with separate files submitted for each Factor. | ||
| 5. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included. | ||
| 6. Proposal Volumes shall be structured as: 1) LSN-1 USS LASSEN Price Volume and 2) LSN-2 USS LASSEN Technical Volume | ||
| SECTION L, V, A. VOLUME I | Yes, No, N/A (if N/A why) | |
| Cover Letter | Page limit of 3 | |
| Identified all enclosures included with the proposal | ||
| CAGE and DUNS numbers, name address and contact information for the Prime contractor | ||
| Provided notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications). | ||
| Provided Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more. | ||
| For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook (Attachment J-4) provide an explanation as to why. In addition, if applicable: |
(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined) (although material is proposed), provide an explanation as to why.
| Signed SF 33 | Signed SF 33 with all amendments acknowledged |
| Blocks 12 through 18 completed | |
| Completed applicable “fill-ins” filled in | |
| Signed by representative authorized to contractually bind the company providing the offer | |
| Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs | |
| Complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. | |
| Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment. | |
| Small Business Subcontracting plan per FAR Part 19, Large businesses only | An Offeror shall submit a SBSP outlining its strategy for maintaining compliance with FAR 52.219-9 for the duration of the USS LASSEN availability |
| A subcontracting goal of 25 percent of an Offeror’s total contracting dollars utilizing small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUB-Zone small businesses. Note, the 25 percent goal is inclusive of the congressionally mandated five percent (5%) goal for small disadvantaged business concerns. | |
| Offerors must provide rationale for any proposed plan which does not meet the following thresholds (as applied to total contract dollars): |
(1) 25 percent of prime contracts for small businesses;
(2) Five percent of prime and subcontracts for women-owned small businesses;
(3) Five percent of prime contracts and subcontracts for small disadvantaged businesses;
(4) Three percent of prime contracts and subcontracts for HUBZone small businesses; and
(5) Three percent of prime and subcontracts for service-disabled veteran-owned small businesses.
| In addition, Offerors must provide explanation for any SBSP which fails to address all requirements outlined in FAR 52.219-9. | ||
| Joint Venture / teaming agreements (if applicable) | Provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work. | |
| NSI 009-72 Narrative and Supporting Documentation (if applicable) | Offeror must provide a narrative as well as other than certified cost or pricing data in accordance with FAR 15.403-3. | |
| Completed Section B, Carrying forward information from applicable Pricing Workbook | Proposed on all CLINs | |
| Complete all Section B Note fill-ins | ||
| Pricing Workbook Spreadsheet | Work Item Pricing for all Base and Option Items | |
| Matches Section B CLIN pricing and notes | ||
| Daily Extension Rates | ||
| Dock Differential (if applicable) | ||
| Pier Differential (if applicable) | ||
| IPD | ||
| Fully Burdened Ship Repair Labor Rate & Material Burden Rate, New Work and Growth Reservation | ||
| NSI 009-72 Deduction (if applicable) | ||
| Completed Attachment S-7 | To be responsive, offerors should rely on the solicitation Sections L and M as this may not be a comprehensive list. | |
| SECTION L, V, B. VOLUME II | SECTION M, III, A and B | |
| Factor 1 (Technical Eligibility) (Section L) | Factor 1 Evaluation Criteria (Section M) | Proposal Reference |
| Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and dock intended to be used for the proposed availability and indicates that the pier and dock meet the minimum characteristics identified in Attachment S-5. | Provide a completed Attachment S-5 that: |
a) Identifies the specific pier(s) and dock(s) intended to be used for each proposed Availability, and
b) Indicates that those pier(s) and dock(s) meet the minimum characteristics of Table 1 on Attachment S-5.
| Provide a signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier or drydock), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone and/or a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier and drydock facilities, whether owned by the offeror or subcontractor, must be accessible by the USS LASSEN without any modification to the vessel. | Assess whether the offeror has ownership or committed access to a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3), in accordance with Section L. |
| In accordance with the most current version of MIL-STD-1625, provide a current drydock certification applicable to the drydock proposed for the Availability. Certifications shall demonstrate the drydock will remain certified from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). If the proposed drydock is currently uncertified, or if the certificate will expire prior to the ‘Undock Vessel’ milestone date, the offeror shall provide a detailed plan and schedule to certify or re-certify the drydock in order to remain certified through the period between the ‘Dock Vessel’ and ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). Certification or recertification plans shall include timeline to complete the requirements of MIL-STD-1625 including the below items. Offeror’s plan shall provide a plan of action and milestones (including specific dates or timeframes) to commence and complete the following actions: |
i. Contractor Navy Audit request.
ii. Contractor preparation of facility spaces to be inspected. Contractor shall describe when they expect these facilities to be available to complete necessary inspections and any risks to their availability.
iii. Navy examination of the facility, facility certification report, maintenance program documentation, and operational records.
iv. Navy observation of a docking or undocking operation, whenever possible. In the case of a floating dry dock, this operation shall include a submergence test to the maximum dock draft.
v. Navy evaluation of the control inspection, operating, and maintenance procedures.
vi. Navy preparation of exit brief and formalized in a written report.
vii. Contractor actions to resolve any identified deficiencies. Contractor shall explain the time allotted to deficiency resolution and any associated risks.
| viii. Navy examination of actions to resolve deficiencies. | Assess if the proposed dry-dock is certified in accordance with MIL-STD-1625D, and remains certified from “Avail Start” through “Contract Complete” as outlined in Attachment J-3A; and should the dry-dock certification in accordance with MIL-STD-1625D lapse anytime during the proposed docking period, the Offeror has adequately described a plan for recertification. | ||
| Completed Execution Milestones and Key Event Dates (Attachment J-3) | Applicable Attachment J-3A | ||
| Factor 2 (Resource Capacity & Schedule) (Section L) | Factor 2 Evaluation Criteria (Section M) | Proposal Reference | |
| Emphasis Area A - Manpower | |||
| (1) Manpower Performance Data Sheet (Attachment S-4): Provide a completed Manpower Performance Data Sheet, (Attachment S-4) in Microsoft Excel in the format provided in this solicitation. Include all projects, defined as Navy or Non-Navy Ship Repair and New Construction Projects, for which the Offeror is the prime or a major subcontractor (performing 30% or more of a CNO availability or comparable portion of a Non-Navy project) which were active (on-going or completed) or planned (awarded or proposed) (including the proposal for this solicitation) during the first month identified in Attachment S-4 and the Contract Complete Date of this solicitation. The Attachment S-4 must capture all work performed by the Offeror within the shipyard and at the local Naval Station, if the Offeror’s shipyard is within the homeport fleet concentration area. The Offeror may estimate performance information for subcontractors based on prime contractor budgets and the prime contractor’s actual outlays to subcontractors. Enter remaining growth work options in the distinguished column/row, using the phasing assumptions provided in Section B Note F. |
The “Definitions” tab within Attachment S-4 defines the following terms: Contract / Actual / Forecast Start and Completion Date, Project Status, Time-now, Cumulative Earned Value, Time-phased Earned Value, Full Time Equivalents (FTE), Budget at Complete (BAC), Estimate at Complete (EAC), Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Budget to Complete (BTC), Actual Cost of Work Performed (ACWP), Estimate to Complete (ETC), Cost Performance Index (CPI), To-Complete Cost Performance Index (TCPI), Schedule Performance Index (SPI), Remaining Growth Options, New Work, Prime Contractor Labor, Overtime Labor, Subcontractor Labor, and Temporary Labor.
a) For each project, provide the Earned Value (hours) data on a time phased, month-by-month basis (month-ending) over each project’s duration, from the Actual / Forecast Start Dates to the Actual / Forecast Completion Dates.
b) For each project, verify the cumulative hour values calculated within the S-4 in the “Cumulative EV” tab align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy. Provide the additional project related information requested in the “Cumulative EV” tab (all cells that are green).
c) Provide a list of holiday dates in the “Holiday Calendar” tab. If the monthly reporting dates associated with the monthly earned value data are not aligned to the calendar month, then provide the appropriate values for the “Month Start” and “Month End” in the “Monthly EV” tab (rows 3 and 4). This date information is necessary to convert the monthly hours data into monthly FTE as described in Attachment S-4.
The Government will evaluate Factor 2, Emphasis Area A, Manpower to:
The Government will assess the quality and risk of the Offeror’s plan to provide efficient manpower to successfully complete the availability’s requirements with a focus on workload assessment, schedule performance, labor composition and the associated narrative.
a) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s remaining outstanding proposals, as provided in Attachment S-4.
b) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s executable award scenario from the Offeror’s remaining outstanding proposals accounting for all un-mitigatable resource conflicts, as provided in Attachment S-4. This manpower chart is not required if it produces the same chart required in (2) a) above.
The Government will evaluate Factor 2, Emphasis Area A, Manpower to:
The Government will assess the quality and risk of the Offeror’s plan to provide efficient manpower to successfully complete the availability’s requirements with a focus on workload assessment, schedule performance, labor composition and the associated narrative.
(3) Manpower Narrative: Provide a narrative to characterize the workload information from the manpower charts required in Section L, paragraph V.B.2a.2.a-b, by describing and quantifying the: historical yard-wide FTE levels, forecasted yard-wide FTE levels, and the composition of historical/forecasted FTE values for: prime straight, prime overtime, subcontracted, and temporary labor. The narrative must explain how and when the Offeror plans to adjust or maintain the current workforce to achieve the proposed forecasted FTE levels and whether the adjustment occurs via additional hiring, use of subcontractors, use of temporary labor, or overtime. Provide supporting data and historical evidence to the maximum extent possible. The narrative should not exceed 20 pages. Address the following possibilities:
a) Any existing constraints between outstanding proposals that would prohibit the Offeror from executing one or more outstanding proposals.
b) Should the Offeror propose to hire additional personnel for the solicited availability, the narrative must quantify the proposed number of hires and describe the plan to hire and manage the additional personnel from Time-now through Contract Completion Date.
c) Should the Offeror propose overtime for the solicited availability, the narrative must include: the historical overtime rate, the forecasted overtime rate, and the plan to manage and provide the overtime from Time-now through Contract Completion Date.
d) Should the Offeror propose temporary labor for the solicited availability, the narrative must include: the historical temporary labor FTE, the forecasted temporary labor FTE, and the plan to manage and provide the temporary labor from Time-now through Contract Completion Date.
e) Should the Offeror propose subcontracted resources for the solicited availability, the Offeror must explain which requirements the prime contractor will complete and which work the subcontractor will complete, including the work item, trade, and duration of each subcontracted requirement. The Government considers the use of subcontractors in excess of 45% of production labor to increase the risk of unsuccessful contract performance. The Offeror must include in its narrative a plan to manage the subcontractor manning levels included from Time-now through Contract Completion Date.
f) The Offeror must explain any atypical circumstances that caused or contributed to poor historical earned value performance. The Offeror must address how its proposed approach for the evaluated project reflects resiliency to atypical causes of risk (e.g. government furnished material delays or foreseeable trade labor demand).
d) Narrative Assessment – The Government will assess the Offeror’s narrative with a specific focus on the Offeror’s:
i. Explanations and mitigations of weaknesses in Yard-Wide FTE and Labor Composition. The Government will assess the time phased plan, data, and historical evidence that support the Offeror’s risk mitigations. The Government will assess the reasonableness and effectiveness of the Offeror’s approach. The Government may assess a weakness if the narrative includes a plan for increased utilization of overtime and/or temporary labor.
ii. Explanations and mitigations of weaknesses in schedule performance. The Government will assess the evidence that supports the Offeror’s risk mitigations.
| Emphasis Area B - Physical Resource Capacity |
| 1) Complete Attachment S-8 Pier and Dry Dock Graphical Representation Template to demonstrate the Offeror has the pier and dry dock available to complete the requirements of the proposed availability. The Attachment S-8 must show (a) the piers and dry docks expected to be in working capacity by month from proposal submission through the Contract Completion Date in Attachment J-3 and (b) the awarded and outstanding projects and work using those resources by month. The Attachment S-8A must include: |
a) The piers and dry-docks required to complete work the Offeror currently has under contract based on current contract schedules.
b) The piers and dry-docks required to complete all outstanding proposals, including this proposal, per proposed schedules.
c) The piers and dry-docks required to complete any other anticipated requirements, including but not limited to Non-Navy work, pier and dry-dock upgrades, maintenance or dredging.
Physical Resource Capacity: The Government will assess whether the proposal demonstrates the Offeror's capability to provide the required physical resources to complete the availability. An emphasis will be placed on how the Offeror plans to de-conflict anticipated physical resource conflicts.
a) The Government will assess whether the Attachment S-8
ii. Shows the piers and dry docks expected to be in working capacity by month from proposal submission through the Contract Completion Date in Attachment J-3
iii. Shows the awarded and outstanding projects and work using those resources by month. The Government will assess whether the Attachment S-8:
1) Identifies the piers and dry docks required to complete projects the Offeror currently has under contract based on current contract schedules.
2) Identifies the piers and dry docks required to complete all outstanding proposals including this proposal per proposed schedules.
3) Identifies the piers and dry docks required to complete any other anticipated requirements, including but not limited to non-Navy work, pier and dry dock upgrades, maintenance, and dredging.
(2) Provide a narrative not to exceed 10 pages to support the Attachment S-8 and address:
a) If the Offeror proposes a subcontracted pier or dry dock, explain the resource requirements that the prime contractor will provide and the pier and dry dock that the subcontractor will provide.
b) The Offeror's plan to resolve pier and dry dock resource conflicts as a result of proposed and awarded projects. Piers and dry docks must not be committed to multiple ships during the same time period without explanation.
c) If the Offeror proposes an interval of less than seven days between the unberthing or undocking date of another requirement and the proposed berthing or docking date of this availability or a proposed docking date within the first seven days of this availability, then detail the necessary steps to accomplish this effort.
b) The Government will assess whether the narrative:
i. Explains the use of a subcontracted pier or dry dock, if proposed, and what resources the prime contractor will provide
ii. Explains how the Offeror will resolve pier and dry dock conflicts as a result of award of other outstanding proposals
iii. Explains, if necessary, the steps to berth or dock the ship within seven days of unberthing or undocking another ship or docking within seven days of the start of the availability.
| Emphasis Area C - Production Schedule |
| (1) Develop a Production Schedule in accordance with the following requirements: |
a) Include Key Events, Milestones, tests
b) Schedule each Work Item to the Work Activity level, listing the planned start and planned completion dates, and durations for each Work Activity.
c) Assign each Work Activity with the appropriate predecessor and successor relationships within the contractor’s scheduling software that establish the logic relationship between schedule Work Activities. Each activity must have at least one predecessor and one successor, with the exception of the Key Event Start Availability (which may have no predecessors) and the Key Event Complete Availability (which may have no successors). Each Event and Activity may have more than one predecessor and more than one successor. The preferred relationships between linked predecessor and successor activities is Finish-to-Start. The use of scheduling Lags and Leads should be minimized.
d) Assign appropriate predecessor relationships to each Key Event and Milestone(s) to ensure there is an accurate logical progression through all work activities leading to their assigned Key Event and Milestone(s), ensure milestones are linked to the Key Events they support, and ensure the Production Schedule supports accurate prediction of Key Event and Milestone(s) attainment.
e) Assign appropriate predecessor and successor relationships between the Work Activities conducted on the same component, or in the same location but under differing Work Items, to ensure all related Work Activities across all Work Items are interdependently linked together.
f) Schedule production work and preliminary inspections generating reports required by Attachment J-10A that could result in a change in work to be accomplished or additional material to be procured to support reporting no later than the first 20 percent of the availability duration.
(2) Provide an export of the Production Schedule data elements in a sortable/filterable spreadsheet format compatible with Microsoft Excel. Include the following minimum data elements for each Work Activity in the schedule, as appropriate:
a) Work Item Number (as appropriate): 4-E specification Work Item number
b) Work Activity Identifier: Numerical designator identifying the Work Activity within the Work Breakdown Structure (WBS)
c) Title: Descriptive title of Work Item and Work Activity
d) Key Event: Key Event applicable to the Work Activity
e) Milestone (as appropriate): Milestone applicable to the Work Activity
f) System (as appropriate): System(s) affected
g) Component (as appropriate): Component Unit (For example: tank, valve, motor, pump)
h) Location: Work location/compartment number
i) Executing Activity: ID specific organization: Prime KTR, Sub-KTR
j) Baseline Start: The date identified in the Production Schedule when the contractor plans to start the Work Activity
k) Baseline Finish: The date identified in the Production Schedule when the contractor plans to finish the Work Activity
l) Early Start: Software determined date. The earliest point in time that a Work Activity may start based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.
m) Early Finish: Software determined date. The earliest point in time that a Work Activity may complete based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.
n) Late Start: Software determined date. The latest point in time that a Work Activity may begin without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.
o) Late Finish: Software determined date. The latest point in time that a Work Activity may be completed without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.
p) Duration: The total number of work periods required to complete a Work Activity.
q) Calendar Identification: Number of scheduled workdays per week
r) Total Float: The total number of workdays that the Contractor can delay a Work Activity without affecting the project finish date.
s) Predecessor: An Activity or Event that immediately precedes one or more Activities or Events with a direct tie in the Total Project Network.
t) Successor: An Activity or Event that immediately follows one or more Activities or Events with a direct tie in the Total Project Network.
u) Constraints: Constraints used as applicable to Work Item or Work Activity. This may be provided within the predecessor or successor field.
(3) Provide the Proposed Production Schedule in the Native Software file
(4) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows all work item activities, milestones and key events within the Production Schedule.
(5) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows only Critical Path and Controlling Work Items at the Work Activity level and assigned Key Events and/or Milestones.
a) Critical Path: That sequence of Work Activities which forms the work and test chain of the longest duration, and directly affects the completion of the availability. Factors that influence when a Work Activity is on the Critical Path include: time duration required for the Work Activity, space limitations, manpower available, and the predecessor/successor relationships between Work Activities. The Critical Path is determined by automated schedule analysis and will include any sequential set of Work Activities forming the longest chain of events extending throughout the schedule and which has the least Total Float.
b) Controlling Work Items: Those Work Items which include activities that are on the critical path of the Production Schedule, which, by virtue of scope, material requirements, complexity, or other considerations, have the significant potential for impact on the scheduled project Key Events or completion of the availability.
(6) The Offeror shall provide a narrative to explain their Production Schedule. The narrative shall address the following:
a) Describe critical float paths and mention the work items that the Offeror estimates as the most critical and pose the most risk.
b) Demonstrate how the Offeror has scheduled the performance of all work items included in the Availability work package (including both Base and Option items) so as to permit the contract scope increases described in Section B, Note F (all growth work identified in this solicitation) without causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.
The Government will assess the Offeror’s:
a) Understanding of scope and integration of the required work items in the Specification Package (Attachment J-1).
b) Identification of the critical path and logically sequencing work items.
c) Integration of the milestones and key events in the Execution Milestones & Key Events (Attachment J-3) reasonably.
d) Extent to which the narrative describes the critical float paths and the work items that the Offeror estimates as the most critical and pose the most risk.
e) Extent to which the narrative explains how the Offeror has scheduled the performance of all work items included in the Availability work package (including both Base and Option items) so as to permit the contract scope increases described in Note F without causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.
| Factor 3 (Past Performance) (Section L) | Factor 3 Past Performance (Section M) | Proposal Reference |
| Offerors may provide past performance information for up to five (5) previous contracts. If the offeror has not completed any contracts as a prime contractor, within three (3) years of the date of the initial solicitation’s posting to https://piee.eb.mil, information regarding the offeror’s performance with regard to subcontracts and/or commercial contracts may be submitted. Offerors shall complete Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide Attachment S-9 Past Performance Questionnaire (PPQ). |
Offerors shall demonstrate within either Attachment S-2 or Attachment S-9 that the referenced contracts are recent and relevant to the efforts required by this solicitation. Offerors shall also address unfavorable reports of past performance and their response, or lack thereof, will be taken into consideration.
An offeror that does not have recent and relevant past performance to provide for consideration is requested to affirmatively state that it does not have recent and relevant past performance for the Government to consider.
If the Offeror does not have CPARS and is required to submit Attachment S-9, the Offeror shall instruct their customers to complete the Past Performance Questionnaires and return them before the closing date of this solicitation.
Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.
All Offerors that are large businesses shall also address historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan (DOD CONTRACTS)) in a separate narrative not to exceed one page. eSRS information attached to the narrative is not included in the page limits. The Past Performance factor will be rated on an Acceptable/Unacceptable basis. The Government will use information provided by the Offeror, as well as any other information deemed necessary as noted in Section L, V, B, 2 to assess the Offeror’s ability to meet the solicitation requirements. This assessment will be based on a demonstrated record of past performance, taking into consideration the recency and relevancy of the past performance information. The Government may also evaluate the past performance of the Offeror’s proposed subcontractors. In evaluating an Offeror’s past performance, the Government reserves the right to contact former customers, Government agencies, and other private and public sources of information.
In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, unknown past performance shall be considered acceptable. The evaluation will include information provided by the Offeror demonstrating compliance with the requirements of FAR 52.219-8 and 52.219-9.
File details come from the government source that posted it. Updated .