N00024-22-R-4486 A001.pdf

PDF 470 KB Posted

Attached to
Amendment 0008 - USS LASSEN (DDG 82) FY23 Depot Modernization Period (DMP)
Solicitation number
N00024-22-R-4486
Issued by

About this file

This is a solicitation for the USS LASSEN (DDG 82) FY23 Depot Modernization Period (DMP) issued by the Naval Sea Systems Command. The availability includes maintenance, modernization, and repair work requiring a contractor with shipyard facilities and resources. The work is to be completed under a single firm-fixed-price coast-wide contract awarded in September 2022, with an availability period from December 2022 through August 2024. Interested offerors must register in SAM and PIEE to receive the solicitation and submit proposals in PIEE by April 2022. The solicitation seeks pricing for base and option items, a labor rate, and milestones. Offerors must demonstrate pier and drydock capacity and an executable schedule. The Navy will evaluate cost, technical eligibility, resources, past performance, and schedule.

View the file

Other files

File Type Posted
N00024-22-R-4486 A008.pdf PDF
N00024-22-R-4486 A008 conformed.pdf PDF
USS LASSEN_QA6.xlsx XLSX spreadsheet
N00024-22-R-4486 A007 conformed.pdf PDF
N00024-22-R-4486 A007.pdf PDF
USS LASSEN_QA5.xlsx XLSX spreadsheet
N00024-22-R-4486 A006 conformed.pdf PDF
N00024-22-R-4486 A006.pdf PDF
N00024-22-R-4486 A0005 conformed.pdf PDF
USS LASSEN_QA4.xlsx XLSX spreadsheet
N00024-22-R-4486 A0005.pdf PDF
N00024-22-R-4486 A004 conformed.pdf PDF
N00024-22-R-4486 A004.pdf PDF
N00024-22-R-4486 A003.pdf PDF
USS LASSEN_QA3.xlsx XLSX spreadsheet
N00024-22-R-4486 A003 conformed.pdf PDF
N00024-22-R-4486 A002.pdf PDF
N00024-22-R-4486 A002 conformed.pdf PDF
USS LASSEN_QA2.xlsx XLSX spreadsheet
USS LASSEN_QA1.xlsx XLSX spreadsheet
N00024-22-R-4486 A001 CONFORMED.pdf PDF
(USS LASSEN) Attachment S-5 Eligibility Criteria Data Sheet.docx DOCX document
(USS LASSEN) Attachment S-8 Pier and Drydock Graphical Representation.xlsx XLSX spreadsheet
(USS LASSEN) Attachment J-7 IPTD Events SMR.docx DOCX document
(USS LASSEN) Attachment S-3 Pre-Proposal Information (PPI) Form.xlsx XLSX spreadsheet
(USS LASSEN) Attachment J-8 Government Furnished Material (GFM) List.xlsx XLSX spreadsheet
(USS LASSEN) CDRL Exhibit A.pdf PDF
(USS LASSEN) CDRL Exhibit B.pdf PDF
(USS LASSEN) Attachment J-10 20 Percent Open Inspect Milestone Reports Due.xlsx XLSX spreadsheet
(USS LASSEN) Attachment S-9 Past Performance Questionnaire.docx DOCX document
(USS LASSEN) Attachment S-4 Manpower Performance Data Sheet.xlsx XLSX spreadsheet
N00024-22-R-4486_USS LASSEN FY23 DMP.pdf PDF
(USS LASSEN) Attachment J-5 Quality Assurance Surveillance Plan.docx DOCX document
(USS LASSEN) Attachment S-7 Proposal Assessment.xlsx XLSX spreadsheet
(USS LASSEN) CDRL Exhibit C.pdf PDF
(USS LASSEN) Attachment S-2 Past Performance CPARS References.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002421FR62098C

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide bidders' questions and answ ers, and to update:

1. Support contractor’s names in Section L

2. Past Performance in Section L

3. DPAS code

4. Attachment J-3

5. Attachment J-4 fixed “Enable Content” error

6. Inter-Port Differential table

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0002422R4486

X 9B. DATED (SEE ITEM 11)

24-Feb-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2022

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVENUE

WASHINGTON NAVY YARD DC 20376

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002422R4486

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The DPAS code has changed from DO to DO-A3.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENTS/EXHIBITS/ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

No. Document Attachment S-1 RESERVED Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS)

References Attachment S-3 Pre-Proposal Information (PPI) Form Attachment S-4 Manpower Plan to Actual Data Sheet Attachment S-5 Eligibility Criteria Data Sheet Attachment S-6 RESERVED Attachment S-7 Proposal Assessment Attachment S-8 Pier and Dry-dock Graphical Representation Template Attachment S-9 Past Performance Questionnaire (PPQ)

The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:

Attachment J-1 Specification Package TPPC-DDG82-SERM-801-23 Attachment J-2 Work Item Plans, Drawings and Other References Attachment J-3 Execution Milestones and Key Event Dates - Rev 1 Attachment J-4 Pricing Workbook Attachment J-5 Quality Assurance Surveillance Plan Attachment J-6 Subcontracting Plan (to be incorporated upon award) Attachment J-7 Schedule Model Review Attachment J-8 Government Furnished Material (GFM) List Attachment J-9 Compartment Closeout List (NSI 009-81) Attachment J-10 Open & Inspect List

Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003, A005-A009, A011, A014, A016- A017) (Does not include A004, A0010, A012-A0013, or A015) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

INTRODUCTION

A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Firm-Fixed-Price contract to complete the USS LASSEN (DDG 82) DEPOT MODERNIZATION PERIOD (DMP).

B. Offerors shall propose a cumulative fixed price for the Availability Preparation and Advance Material Procurement CLINs less than:

a. $2,000,000 for USS LASSEN (CLINS 0001 and 0002)

C. The Government intends to award a single Fixed-Price contract to the Offeror whose proposal represents the Best Value to the Government, utilizing trade off source selection procedures in accordance with FAR 15.101-1 and Section M of this solicitation.

D. ALL INQUIRIES shall be made in writing and directed to Elizabeth Feliciano-Hernandez, Contracting Officer, and Daniel Breedlove, Contract Specialist, at elizabeth.feliciano-hernandez.civ@us.navy.mil, and daniel.j.breedlove.civ@us.navy.mil respectively. To ensure the Government is able to adequately address and respond to Offeror pre-proposal information (PPI) via amendment, it is requested contractors submit no more than three sets of controlled questions. The first controlled set of questions shall be submitted on or before 11 March 2022 before 11:59 pm, local time, Washington, DC. The second set of controlled questions shall be submitted on or before 25 March 2022, before 11:59 pm, local time, Washington DC. The third set of controlled questions shall be submitted on or before 08 April 2022 before 11:59 pm, local time, Washington DC. Each set of questions shall be submitted together in one attachment via email properly titled, Contractor XXXX Submission No. X (1, 2, or 3) as of date XX/XX/XXXX. For contractor planning purposes answers to each round of questions will have the following target release dates: 18 March 2022, 1 April 2022, and 15 April 2022. The Government reserves the right to not answer any more than three PPI requests per contractor during the period between 24 February 2022 and 15 April 2022. Proposal due date shall not be extended solely on the basis of more than one request, extensive questioning, or requests received after this date and time. Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation.

E. Estimated Award Date: The Government anticipates making an award in or before September 2022.

F. Potential Prime Offeror’s Negative Response: The Government requests a negative response from any potential Prime Offeror who, after reviewing this solicitation, does not intend on submitting a proposal. The Government requests delivery of negative response to the Contracting Officer and Contract Specialist listed above NLT seven (7) business dates after solicitation release.

II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

A. Proposal Due Date:

1. All copies of proposals (Volumes I & II) shall be received by the Government via the Solicitation

Module in the Procurement Integrated Enterprise Environment (PIEE) no later than 25 April 2022 at 10:00 am, local time, Washington DC. Due to COVID-19 restrictions, only electronic submittal of proposals via the Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE) will be permitted. Late proposals WILL NOT be considered. Partial proposals or attachments WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.

a) Offerors must provide a proposal valid for at least 158 calendar days from the proposal due date

(30 September 2022). (Complete block 12 of the Standard Form (SF-33).

B. Directions for Electronic Submission of Proposals:

1. Due to ongoing restrictions resulting from the global COVID-19 pandemic, hand delivery of proposals is not possible at this time to the Washington Navy Yard. Offerors are instructed to submit proposals electronically via the Solicitation Module in PIEE located at https://piee.eb.mil.

2. Offerors wishing to submit a proposal in response to this notification shall ensure a representative of their organization registers at the PIEE website within seven (7) working days of solicitation release, and that the Proposal Manager role in the Solicitation Module is approved for the Offeror’s representative. The Proposal Manager in the Solicitation Module can search for the solicitation based on criteria such as the solicitation number, response date, status, and contracting office DoDAAC among additional criteria. Once the solicitation is found and selected, the Proposal Manager can submit a proposal by selecting the “Offer” tab, choosing the applicable CAGE Code for the Offeror, uploading the attachments that comprise their offer, and digitally signing off on submission of the offer. After proposal submission, please provide email confirmation to all of the POC’s identified in paragraph I(C) above.

3. Offerors shall address their package with the RFP number and Offeror’s company name. The

Solicitation Module in PIEE will document the submittal date and time of the Offeror’s proposal submission and shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.

4. The Solicitation Module in PIEE does NOT accept zip file submissions. Proposal submissions shall be formatted so that each file name clearly identifies the Proposal Volume that the file is associated with (i.e. “Volume I Price Proposal – Cover Letter”). Each Volume shall be formatted with separate files submitted for each Factor.

5. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included.

6. Proposal volumes shall be structured as follows:

Proposal Volume Title

USS LASSEN

LSN-1 USS LASSEN Price Volume LSN-2 USS LASSEN Technical Volume

III. GENERAL INFORMATION

A. Ship Checks:

1. The USS LASSEN (DDG 82) will NOT be available for ship check prior to the proposal submission due date. Potential Offerors may inspect the sister ship USS CARNEY (DDG 64) in Mayport, FL, from 25 February 2022 to 18 March 2022.

2. To schedule a ship check, Offerors shall email a "Request for Ship Check" to Elizabeth Feliciano- Hernandez and Daniel Breedlove at elizabeth.feliciano-hernandez.civ@us.navy.mil and daniel.j.breedlove.civ@us.navy.mil, respectively. Due to the ship location, additional information will be provided upon request.

3. Participants will be subject to security, safety, and other applicable regulations established by Southeast Regional Maintenance Center (SERMC) and ship’s Commanding Officers. Contractors conducting MARMC related work efforts must visit SERMC security website for latest forms and instructions at:

a) http://www.marmc.navy.mil/visitors.html

b) https://www.cnic.navy.mil/regions/cnrsw/installations/navbase_mayport/om/force_protection/pass_and

_decal.html

B. Specifications and Associated Reference Documentation:

1. Upon request, the Government will provide the Specification Package Work Items and Work Item

References.

2. Offerors may request solicitation attachments by submitting a request to:

a) Elizabeth Feliciano-Hernandez at elizabeth.feliciano-hernandez.civ@us.navy.mil, and

b) Daniel Breedlove at daniel.j.breedlove.civ@us.navy.mil.

3. Additional work item references not already in the possession of the Offerors, commercially available, listed under 52.211-2, are available through the following websites:

a) https://jedmics.net/

b) https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx

c) https://nsedr.nnsy.navy.mil//

C. Alteration of Solicitation

1. Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

D. Proposal Information

1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, Offerors are advised conclusory statements regarding an Offeror’s experience such as: “the Offeror understands”, “the Offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors shall provide specific and concise information to validate all assertions.

E. Amendments

1. The Government may revise the solicitation at any time by means of an Amendment. It is an Offeror’s responsibility to ensure it is accessing the https://piee.eb.mil website to view potential amendments and procurement notifications for this solicitation.

F. Teaming Arrangements

1. Proposals must be submitted by one (1) Prime Contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a Prime Contractor with a unique Commercial and Government Entity (CAGE) code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), Offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.

G. One-bid Situation

1. If the Government receives only one bid for solicitation N00024-22-R-4486, the Government reserves the right to require certified cost or pricing data in accordance with DFARS 252.215-7008. As identified by the Contracting Officer, additional cost or pricing data will be required in order to determine whether proposed pricing is fair and reasonable or to comply with the statutory requirements of certified cost or pricing data in accordance with 10 USC 2306(a) and FAR 15.403-4. The Offeror agrees to provide any additional data requested within 30 days of notification.

H. Notification of Use of Navy Support Contractors for Official Contract Files

1. NAVSEA currently utilizes support contractors from DELTA Resources, Inc., Serco-IPS Corporation

(a wholly owned subsidiary of VT Group Holdings, Inc.), and Herren Associates Inc. to manage official contract files, including the official file supporting this procurement. NAVSEA may, without further notice, enter into contracts with other contractors for file management services as describe in NAVSEA Standard Text L-204-H003. Please refer to NAVSEA Standard Text L-204-H003 for further details.

IV. PROPOSAL FORMAT

A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory. PROPOSALS

WHICH DO NOT FOLLOW THIS DIRECTION MAY BE REJECTED AS NON-RESPONSIVE

AND THUS INELIGIBLE FOR AWARD. NON-RESPONSIVE PROPOSALS WILL NOT BE

EVALUATED.

B. Electronic Proposals: Electronic Proposals: All proposals shall be submitted via the Solicitation Module in PIEE as outlined above. Pages shall be formatted to 8.5 x 11 inch paper with one inch margins. The text used shall be Times New Roman with a minimum of 12 point font. Any revisions to Offerors’ proposals (if required) shall be submitted in two (2) forms: (1) a final clean revised document; and (2) a redlined document outlining the Offeror’s changes. The Contracting Officer reserves the right to provide any additional instructions regarding revisions to Offerors’ proposals via letter. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section V where required.

C. Page Limits:

1. Volume I (LSN-1):

a) Factor 1 (Price): No page limitation with the exception of the cover letter which shall not exceed three (3) pages.

2. Volume II (LSN-2)

a) Factor 1 (Technical Eligibility): No page limitation

b) Factor 2 (Resource Capacity & Schedule):

(1) Emphasis Area A (Manpower): No page limitation, with the exception of the narrative which shall not exceed 20 pages

(2) Emphasis Area B (Physical Resource Capacity): No page limitation, with the exception of the narrative which shall not exceed 10 pages

(3) Emphasis Area C (Production Schedule): No page limitation

c) Factor 3: Past Performance: No page limitation

V. PROPOSAL CONTENT

A. VOLUME I:

Price Proposal: The price proposal shall not contain non-price factor information.

1. Factor 1 - Price: The price proposal shall be comprised of the following documentation:

a) Cover Letter,

b) Signed SF 33 with all amendments acknowledged,

c) Small Business Subcontracting plan per FAR Part 19 (large businesses only),

d) Any Joint Venture / teaming agreements (if applicable),

e) NSI 009-72 Narrative and Supporting Documentation (if applicable),

f) Completed Attachment J-4 and Solicitation Section B carrying forward information from Attachment

J-4, as applicable, containing:

(1) Work Item Pricing for all Base and Option Items,

(2) Daily Extension Rates,

(3) Inter-port Differential (IPD),

(4) Fully Burdened Ship Repair Labor & Material Burden Rate, New Work & Growth Reservation,

(5) Pricing for Availability Preparation CLIN 0001 and Advance Material Procurement CLIN 0002

(6) NSI 009-72 Deduction (if applicable).

(7) Government Provided Pier Differential (if applicable)

g) Completed Execution Milestones and Key Event Dates (Attachment J-3).

h) Completed Proposal Assessment (Attachment S-7).

2. Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the Offeror shall include the following in the cover letter:

a) Identification of all enclosures included with the proposal,

b) CAGE and Data Universal Numbering System (DUNS) numbers for the Prime contractor,

c) Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).

d) Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.

e) For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook

(Attachment J-4) provide an explanation as to why. In addition, if applicable:

(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined)

(although material is proposed), provide an explanation as to why.

(2) For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.

3. Standard Form 33 (SF-33): As part of the price proposal package, the Offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.

4. Small Business Subcontracting Plan (SBSP):

a) An Offeror shall submit a SBSP outlining its strategy for maintaining compliance with FAR 52.219-9 for the duration of the USS LASSEN availability, which includes:

i. A subcontracting goal of 25 percent of an Offeror’s total contracting dollars utilizing small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUB-Zone small businesses. Note, the 25 percent goal is inclusive of the congressionally mandated five percent (5%) goal for small disadvantaged business concerns.

ii. Offerors must provide rationale for any proposed plan which does not meet the following thresholds (as applied to total contract dollars):

(1) 25 percent of prime contracts for small businesses

(2) Five percent of prime and subcontracts for women-owned small businesses

(3) Five percent of prime contracts and subcontracts for small disadvantaged businesses

(4) Three percent of prime contracts and subcontracts for HUBZone small businesses

(5) Three percent of prime and subcontracts for service-disabled veteran-owned small businesses

iii. In addition, Offerors must provide explanation for any SBSP which fails to address all requirements outlined in FAR 52.219-9.

iv. A SBSP is NOT REQUIRED from a small business concern.

5. Completed Solicitation Section B and Pricing Workbook (Attachment J-4):

a) Offerors must propose on all contract line items (CLINs) including all base and option CLINs, complete Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED),” complete Section B “NOTE D: SCHEDULE OF DAILY

RATES FOR PIERSIDE AND DRY-DOCKING (FULLY BURDENED) FOR PURPOSES OF

A COMPENSABLE EXTENSION TO THE DRY-DOCKING OR DELIVERY DATE,” and complete all tabs of Pricing Workbook (Attachment J-4) to be considered responsive.

b) The contractor must submit prices using the Pricing Workbook (Attachment J-4) for all Tabs, including: Pricing for CLINs 0001 and 0002, Work Item Pricing, Daily Extension Rates, Fully Burdened Ship Repair Labor Rate & Material Burden Rates and Total Evaluated Pricing in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between Section B and Attachment J-4, the Section B CLIN price shall govern. The Pricing Workbook (Attachment J-4) Fully Burdened Ship Repair Labor Rate and Material Burden Rate must match the rates provided in the Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED).” If there is a discrepancy between the two, the Section B Fully Burdened Ship Repair Labor Rate and Material Burden Rate shall govern.

c) Offerors are to insert pricing in all yellow shaded fields in the pricing workbook (Attachment J-4).

6. Supporting Documentation for CLIN 0002:

a. Other than Certified Cost or Pricing Data: Including, at a minimum, completing all fields included within the “Pricing for CLINs 0001 & 0002” tab of the Attachment J-4 (Pricing Workbook) to support the Offeror’s proposed CLIN 0002 pricing. For any item included on the Pricing for CLINs 0001 & 0002 Tab that exceeds $500,000, the Offeror shall provide substantiating data in the form of either one (1) quote for the same or similar item dated within the past 12 months OR two (2) instances of actual pricing for the same or similar item from within the past 24 months.

b. Material Work Item Summary: Comprised of information necessary for the Government to understand which Work Items included the material proposed to be procured under CLIN 0002.

The Contractor shall not price material in execution that was already procured as part of advanced material procurement under CLIN 0002.

7. Inter-port Differential (IPD)

a) The IPD applicable to the USS LASSEN (DDG 82) FY23 DMP must be included in all offers and reflects the cost incurred by the Navy to accomplish an availability at a port other than the homeport.

The following chart provides the values to be included in all Offerors’ price proposals to determine the Offeror’s total evaluated price.

Location* Differential

Mayport, FL $366,618 Norfolk, VA $2,388,285

Pascagoula, MS $1,966,122 Charleston, SC $2,568,219

b) An Offeror whose location is not listed in the above Government provided port differential tables shall submit a bidder’s question requesting a Government provided port differential be calculated for the Offeror’s proposed location for the USS LASSEN (DDG 82) FY23 DMP.

8. NSI 009-72 Reduction

a) Offeror must provide a narrative as well as other than certified cost or pricing data in accordance with FAR 15.403-3, supporting the impact of SI 009-72 Security Measures for Surface Combatants and Amphibious ships use of a water barrier, numbered Fleet Commander-approved barge or other physical barrier approved by the numbered Fleet Commander.

9. Government Provided Pier Differential

a) The Government provided pier differential must be included in all offers proposing to use a

Government provided pier in lieu of a contractor owned pier and is calculated using average electricity and water consumption, as well as sewage and oily waste disposal. The following chart provides the values to be included in offerors’ price proposals, as applicable, to determine the offeror’s total evaluated price:

Location Differential

Mayport, FL $383,844

B. VOLUME II – Non-Price Proposal: Do not include cost or price information in this volume. The Non-Price

Proposal shall be comprised of three (3) factors, as follows:

1. Non-Price Factor 1 – Technical Eligibility:

Offerors must provide the following to demonstrate eligibility for Award (There is no page limit associated with this Factor):

a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and dry-dock intended to be used for the proposed availability and indicates that the pier and dry-dock meet the minimum characteristics identified in Attachment S-5.

b) Provide a completed Execution Milestones & Key Event Dates (Attachment J-3) and signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Event Dates (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier or drydock), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone and/or a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier and drydock facilities, whether owned by the offeror or subcontractor, must be accessible by the USS LASSEN without any modification to the vessel.

c) In accordance with the most current version of MIL-STD-1625, provide a current drydock certification applicable to the drydock proposed for the Availability. Certifications shall demonstrate the drydock will remain certified from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). If the proposed drydock is currently uncertified, or if the certificate will expire prior to the ‘Undock Vessel’ milestone date, the offeror shall provide a detailed plan and schedule to certify or re-certify the drydock in order to remain certified through the period between the ‘Dock Vessel’ and ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). Certification or recertification plans shall include timeline to complete the requirements of MIL-STD-1625 including the below items. Offeror’s plan shall provide a plan of action and milestones (including specific dates or timeframes) to commence and complete the following actions:

i. Contractor Navy Audit request.

ii. Contractor preparation of facility spaces to be inspected. Contractor shall describe when they expect these facilities to be available to complete necessary inspections and any risks to their availability.

iii. Navy examination of the facility, facility certification report, maintenance program documentation, and operational records.

iv. Navy observation of a docking or undocking operation, whenever possible. In the case of a floating dry dock, this operation shall include a submergence test to the maximum dock draft.

v. Navy evaluation of the control inspection, operating, and maintenance procedures.

vi. Navy preparation of exit brief and formalized in a written report.

vii. Contractor actions to resolve any identified deficiencies. Contractor shall explain the time allotted to deficiency resolution and any associated risks.

viii. Navy examination of actions to resolve deficiencies.

2. Non-Price Factor 2 –Resource Capacity & Schedule:

Offerors must address three Emphasis Areas to demonstrate their ability to provide (a) manpower resources, (b) physical resource capacity, and (c) an executable schedule to complete the solicited requirements:

a) Emphasis Area A – Manpower: To assess the Offeror’s ability to provide efficient manpower to successfully complete the solicited availability, the Government requires the Offeror to provide specified workload data that contains historical workload performance and forecasted workload estimates.

(1) Manpower Performance Data Sheet (Attachment S-4): Provide a completed Manpower

Performance Data Sheet, (Attachment S-4) in Microsoft Excel in the format provided in this solicitation. Include all projects, defined as Navy or Non-Navy Ship Repair and New Construction Projects, for which the Offeror is the prime or a major subcontractor (performing 30% or more of a CNO availability or comparable portion of a Non-Navy project) which were active (on-going or completed) or planned (awarded or proposed) (including the proposal for this solicitation) during the first month identified in Attachment S-4 and the Contract Complete Date of this solicitation.

The Attachment S-4 must capture all work performed by the Offeror within the shipyard and at the local Naval Station, if the Offeror’s shipyard is within the homeport fleet concentration area. The Offeror may estimate performance information for subcontractors based on prime contractor budgets and the prime contractor’s actual outlays to subcontractors. Enter remaining growth work options in the distinguished column/row, using the phasing assumptions provided in Section B Note F.

The “Definitions” tab within Attachment S-4 defines the following terms: Contract / Actual / Forecast Start and Completion Date, Project Status, Time-now, Cumulative Earned Value, Time-phased Earned Value, Full Time Equivalents (FTE), Budget at Complete (BAC), Estimate at Complete (EAC), Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Budget to Complete (BTC), Actual Cost of Work Performed (ACWP), Estimate to Complete (ETC), Cost Performance Index (CPI), To-Complete Cost Performance Index (TCPI), Schedule Performance Index (SPI), Remaining Growth Options, New Work, Prime Contractor Labor, Overtime Labor, Subcontractor Labor, and Temporary Labor.

a) For each project, provide the Earned Value (hours) data on a time phased, month-by-month basis (month-ending) over each project’s duration, from the Actual / Forecast Start Dates to the Actual / Forecast Completion Dates.

b) For each project, verify the cumulative hour values calculated within the S-4 in the “Cumulative EV” tab align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.

Provide the additional project related information requested in the “Cumulative EV” tab (all cells that are green).

c) Provide a list of holiday dates in the “Holiday Calendar” tab. If the monthly reporting dates associated with the monthly earned value data are not aligned to the calendar month, then provide the appropriate values for the “Month Start” and “Month End” in the “Monthly EV” tab (rows 3 and 4). This date information is necessary to convert the monthly hours data into monthly FTE as described in Attachment S-4.

(2) Manpower Charts: Provide manpower charts reflecting the data in Attachment S-4. The manpower charts must represent each project’s ACWP and ETC within the Actual / Forecast Start Date and Actual / Forecast Completion Date for each project provided in Attachment S-4. The manpower charts must show separate stacked areas for each project in the chart. The manpower charts must meet all format requirements stated in “Manpower Charts Format” tab within Attachment S-4. The “Manpower Charts Format” tab within Attachment S-4 includes an example manpower chart formatted to requirements. Provide the following manpower charts:

a) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s remaining outstanding proposals, as provided in Attachment S-4.

b) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s executable award scenario from the Offeror’s remaining outstanding proposals accounting for all un-mitigatable resource conflicts, as provided in Attachment S-4. This manpower chart is not required if it produces the same chart required in (2) a) above.

(3) Manpower Narrative: Provide a narrative to characterize the workload information from the manpower charts required in Section L, paragraph V.B.2a.2.(a)-(b) by describing and quantifying the: historical yard-wide FTE levels, forecasted yard-wide FTE levels, and the composition of historical/forecasted FTE values for: prime straight, prime overtime, subcontracted, and temporary labor. The narrative must explain how and when the Offeror plans to adjust or maintain the current workforce to achieve the proposed forecasted FTE levels and whether the adjustment occurs via additional hiring, use of subcontractors, use of temporary labor, or overtime. Provide supporting data and historical evidence to the maximum extent possible. The narrative should not exceed 20 pages. Address the following possibilities:

a) Any existing constraints between outstanding proposals that would prohibit the Offeror from executing one or more outstanding proposals.

b) Should the Offeror propose to hire additional personnel for the solicited availability, the narrative must quantify the proposed number of hires and describe the plan to hire and manage the additional personnel from Time-now through Contract Completion Date.

c) Should the Offeror propose overtime for the solicited availability, the narrative must include: the historical overtime rate, the forecasted overtime rate, and the plan to manage and provide the overtime from Time-now through Contract Completion Date.

d) Should the Offeror propose temporary labor for the solicited availability, the narrative must include: the historical temporary labor FTE, the forecasted temporary labor FTE, and the plan to manage and provide the temporary labor from Time-now through Contract Completion Date.

e) Should the Offeror propose subcontracted resources for the solicited availability, the Offeror must explain which requirements the prime contractor will complete and which work the subcontractor will complete, including the work item, trade, and duration of each subcontracted requirement. The Government considers the use of subcontractors in excess of 45% of production labor to increase the risk of unsuccessful contract performance. The Offeror must include in its narrative a plan to manage the subcontractor manning levels included from Time-now through Contract Completion Date.

f) The Offeror must explain any atypical circumstances that caused or contributed to poor historical earned value performance. The Offeror must address how its proposed approach for the evaluated project reflects resiliency to atypical causes of risk (e.g.

government furnished material delays or foreseeable trade labor demand).

b) Emphasis Area B – Physical Resource Capacity:

(1) Complete Attachment S-8 Pier and Dry Dock Graphical Representation Template to demonstrate the Offeror has the pier and dry dock available to complete the requirements of the proposed availability. The Attachment S-8 must show (a) the piers and dry docks expected to be in working capacity by month from proposal submission through the Contract Completion Date in Attachment J-3 and (b) the awarded and outstanding projects and work using those resources by month. The Attachment S-8 must include:

a) The piers and dry-docks required to complete work the Offeror currently has under contract based on current contract schedules.

b) The piers and dry-docks required to complete all outstanding proposals, including this proposal, per proposed schedules.

c) The piers and dry-docks required to complete any other anticipated requirements, including but not limited to Non-Navy work, pier and dry-dock upgrades, maintenance or dredging.

(2) Provide a narrative not to exceed 10 pages to support the Attachment S-8 and address:

a) If the Offeror proposes a subcontracted pier or dry dock, explain the resource requirements that the prime contractor will provide and the pier and dry dock that the subcontractor will provide.

b) The Offeror's plan to resolve pier and dry dock resource conflicts as a result of proposed and awarded projects. Piers and dry docks must not be committed to multiple ships during the same time period without explanation.

c) If the Offeror proposes an interval of less than seven days between the unberthing or undocking date of another requirement and the proposed berthing or docking date of this availability or a proposed docking date within the first seven days of this availability, then detail the necessary steps to accomplish this effort.

c) Emphasis Area C - Production Schedule:

(1) Develop a Production Schedule in accordance with the following requirements:

a) Include Key Events, Milestones, tests

b) Schedule each Work Item to the Work Activity level, listing the planned start and planned completion dates, and durations for each Work Activity.

c) Assign each Work Activity with the appropriate predecessor and successor relationships within the contractor’s scheduling software that establish the logic relationship between schedule Work Activities. Each activity must have at least one predecessor and one successor, with the exception of the Key Event Start Availability (which may have no predecessors) and the Key Event Complete Availability (which may have no successors).

Each Event and Activity may have more than one predecessor and more than one successor. The preferred relationships between linked predecessor and successor activities is Finish-to-Start. The use of scheduling Lags and Leads should be minimized.

d) Assign appropriate predecessor relationships to each Key Event and Milestone(s) to ensure there is an accurate logical progression through all work activities leading to their assigned Key Event and Milestone(s), ensure milestones are linked to the Key Events they support, and ensure the Production Schedule supports accurate prediction of Key Event and Milestone(s) attainment.

e) Assign appropriate predecessor and successor relationships between the Work Activities conducted on the same component, or in the same location but under differing Work Items, to ensure all related Work Activities across all Work Items are interdependently linked together.

f) Schedule production work and preliminary inspections generating reports required by Attachment J-10 that could result in a change in work to be accomplished or additional material to be procured to support reporting no later than the first 20 percent of the availability duration.

(2) Provide an export of the Production Schedule data elements in a sortable/filterable spreadsheet format compatible with Microsoft Excel. Include the following minimum data elements for each Work Activity in the schedule, as appropriate:

a) Work Item Number (as appropriate): 4-E specification Work Item number

b) Work Activity Identifier: Numerical designator identifying the Work Activity within the

Work Breakdown Structure (WBS)

c) Title: Descriptive title of Work Item and Work Activity

d) Key Event: Key Event applicable to the Work Activity

e) Milestone (as appropriate): Milestone applicable to the Work Activity

f) System (as appropriate): System(s) affected

g) Component (as appropriate): Component Unit (For example: tank, valve, motor, pump)

h) Location: Work location/compartment number

i) Executing Activity: ID specific organization: Prime KTR, Sub-KTR

j) Baseline Start: The date identified in the Production Schedule when the contractor plans to start the Work Activity

k) Baseline Finish: The date identified in the Production Schedule when the contractor plans to finish the Work Activity

l) Early Start: Software determined date. The earliest point in time that a Work Activity may start based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.

m) Early Finish: Software determined date. The earliest point in time that a Work Activity may complete based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.

n) Late Start: Software determined date. The latest point in time that a Work Activity may begin without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

o) Late Finish: Software determined date. The latest point in time that a Work Activity may be completed without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

p) Duration: The total number of work periods required to complete a Work Activity.

q) Calendar Identification: Number of scheduled workdays per week

r) Total Float: The total number of workdays that the Contractor can delay a Work Activity without affecting the project finish date.

s) Predecessor: An Activity or Event that immediately precedes one or more Activities or

Events with a direct tie in the Total Project Network.

t) Successor: An Activity or Event that immediately follows one or more Activities or

Events with a direct tie in the Total Project Network.

u) Constraints: Constraints used as applicable to Work Item or Work Activity. This may be provided within the predecessor or successor field.

(3) Provide the Proposed Production Schedule in the Native Software file

(4) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows all work item activities, milestones and key events within the Production Schedule.

(5) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows only Critical Path and Controlling Work Items at the Work Activity level and assigned Key Events and/or Milestones.

a) Critical Path: That sequence of Work Activities which forms the work and test chain of the longest duration, and directly affects the completion of the availability. Factors that influence when a Work Activity is on the Critical Path include: time duration required for the Work Activity, space limitations, manpower available, and the predecessor/successor relationships between Work Activities. The Critical Path is determined by automated schedule analysis and will include any sequential set of Work Activities forming the longest chain of events extending throughout the schedule and which has the least Total Float.

b) Controlling Work Items: Those Work Items which include activities that are on the critical path of the Production Schedule, which, by virtue of scope, material requirements, complexity, or other considerations, have the significant potential for impact on the scheduled project Key Events or completion of the availability.

(6) The Offeror shall provide a narrative to explain their Production Schedule. The narrative shall address the following:

a) Describe critical float paths and mention the work items that the Offeror estimates as the most critical and pose the most risk.

b) Demonstrate how the Offeror has scheduled the performance of all work items included in the Availability work package (including both Base and Option items) so as to permit the contract scope increases described in Section B, Note F (all growth work identified in this solicitation) without causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.

3. Non-Price Factor 3 – Past Performance:

Offerors may provide past performance information for up to five (5) previous contracts. If the offeror has not completed any contracts as a prime contractor, within three (3) years of the date of the initial solicitation’s posting to https://piee.eb.mil, information regarding the offeror’s performance with regard to subcontracts and/or commercial contracts may be submitted. Offerors shall complete Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide Attachment S-9 Past Performance Questionnaire (PPQ).

Where the offeror does not have recent or relevant past performance information, the Offeror shall affirmatively state that it does not have recent and relevant past performance information for the Government to consider.

If the Offeror does not have CPARS and is required to submit Attachment S-9, the Offeror shall submit a request to their customers to complete the Past Performance Questionnaires (PPQs) NLT 30 days prior to the closing date of this solicitation. The Offerors request to their customer shall include the request to submit completed PPQs to PCO name, Contracting Officer, PCO email and CS name, Contract Specialist, CS email, prior to the closing date of this solicitation.

NOTE: The Government reserves the right to use the contract information provided in the offeror’s proposal to obtain data from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) database and from the points of contact identified by the offeror in its proposal.

Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .