(USS LASSEN) Attachment J-10 20 Percent Open Inspect Milestone Reports Due.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- N00024-22-R-4486
About this file
This document provides details on a federal solicitation for the USS LASSEN (DDG 82) FY23 Depot Modernization Period. The Naval Sea Systems Command is seeking proposals for ship maintenance, modernization, and repair services for the USS LASSEN to be performed from December 2022 through August 2024. Interested parties must register in the System for Award Management and the Procurement Integrated Enterprise Environment systems to receive the full solicitation and submit proposals. Proposals are due in September 2022 and contract award is anticipated in September 2022. The solicitation is not set aside for small businesses due to the complexity, magnitude, and duration of the requirement. The work includes over 200 individual work items across various ship systems and compartments as detailed in the restricted solicitation attachments.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prioritized List
| USS LASSEN (DDG 82) FY23 DMP - J-10 Milestone Reports Due | |||||
| No. of reports | Work Item | Title | Para. | Milestone | |
| 3 | 110-11-001 | Underwater Hull; inspect and repair | 3.2, 3.3, 3.4.2, | 20% Open/Inspect (Docking HighPri) | |
| 110-21-001 | Tank Top Structural; repair and preserve | 3.2 | 20% Open/Inspect (Docking LowPri) | ||
| 1 | 110-21-002 | Underwater Hull Structural; repair | 3.2 | 20% Open/Inspect (Docking HighPri) | |
| 3 | 113-11-001 | Bilge Drain Well; repair and preserve | 3.3.1, 3.7.1, 3.8.1 | 20% Open/Inspect (Docking LowPri) | |
| 121-00-001 | Escape Trunk (4-220-2-T); repair and preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 2 | 122-00-001 | Auxiliary Machinery Room No. One Transverse Bulkhead; inspect and repair | 3.2, 3.3 | 20% Open/Inspect (Docking HighPri) | |
| 3 | 122-20-001 | No. 3 Generator Room Bilge; repair and preserve | 3.1.1, 3.3, 3.4.4 | 20% Open/Inspect (HighPri) | |
| 2 | 123-00-002 | Controllable Pitch Propeller (CPP) Hydraulic Oil Sump Tank; repair | 3.1.1, 3.7 | 20% Open/Inspect (Docking LowPri) | |
| 1 | 123-11-001 | Fuel Oil Service Tank; repair and preserve | 3.2 | 20% Open/Inspect (Docking LowPri) | |
| 19 | 123-11-002 | Compensated Fuel Tank; repair and preserve | 3.2 | 20% Open/Inspect (Docking HighPri) | |
| 5 | 123-12-001 | JP-5 Tank; repair and preserve | 3.2 | 20% Open/Inspect (LowPri) | |
| 4 | 123-14-001 | Potable Water Tank; repair and preserve | 3.2 | 20% Open/Inspect (HighPri) | |
| 123-15-001 | Lube Oil Tank; repair | 3.2 | 20% Open/Inspect (Docking LowPri) | ||
| 10 | 123-17-001 | Contaminated Oil Tank; repair and preserve | 3.2 | 20% Open/Inspect (HighPri) | |
| 2 | 123-19-001 | Vacuum, Collection, Holding and Transfer (VCHT) Tank; repair and preserve | 3.4 | 20% Open/Inspect (HighPri) | |
| 2 | 123-19-002 | Waste Water Tank; repair and preserve | 3.2 | 20% Open/Inspect (Docking LowPri) | |
| 9 | 123-21-001 | Accessible Void; repair and preserve | 3.2 | 20% Open/Inspect (Docking HighPri) | |
| 3 | 123-22-001 | Chain Locker and Chain Locker Sump; repair and preserve | 3.2 | 20% Open/Inspect (Docking LowPri) | |
| 130-11-001 | Aircraft Securing Fitting; replace | 3.2 | 20% Open/Inspect (LowPri) | ||
| 150-11-003 | Forward Superstructure Bulkhead; repair | 3.2 | 20% Open/Inspect (HighPri) | ||
| 150-11-004 | 02 Level Deck; repair and preserve | 3.2 | 20% Open/Inspect (HighPri) | ||
| 150-11-005 | 03 Level Deck; repair | 3.2 | 20% Open/Inspect (HighPri) | ||
| 2 | 161-11-001 | Port and Starboard Strut; repair | 3.1 | 20% Open/Inspect (Docking HighPri) | |
| 11 | 163-11-001 | Sea Chest; inspect and repair | 3.2, 3.3, | 20% Open/Inspect (Docking HighPri) | |
| 1 | 165-11-001 | Sonar Dome Pressurization System Valve Replacement; accomplish | 3.5.1 | 20% Open/Inspect (Docking LowPri) | |
| 3 | 165-11-002 | Sonar Dome Rubber Window (SDRW); inspect and repair | 3.1, 3.2, 3.5 | 20% Open/Inspect (Docking HighPri) | |
| 167-11-002 | Watertight Scuttle (01-98-2); preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 167-11-003 | Hatch; repair and preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 167-11-004 | Hatch; repair and preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 167-11-005 | Manhole Bolted Cover; repair and preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 167-11-006 | Hatch; repair and preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 2 | 167-11-008 | Scuttle Lower Sonar Dome; repair | 3.1, 3.2.2 | 20% Open/Inspect (Docking LowPri) | |
| 4 | 243-11-001 | Port and Starboard Stern Tube Shaft Seal; overhaul | 3.2.2, 3.3 | 20% Open/Inspect (Docking HighPri) | |
| 4 | 243-11-002 | Port and Starboard Propulsion Shafting Alignment; accomplish | 3.2, 3.2.2 | 20% Open/Inspect (Docking HighPri) | |
| 5 | 243-11-003 | Starboard Waterborne Propulsion Shafting; inspect and repair | 3.1.1, 3.2.6, 3.4.3, | ||
| 3.7.3.1, 3.8.6, | 20% Open/Inspect (Docking HighPri) | ||||
| 5 | 243-12-001 | Port Waterborne Propulsion Shafting; inspect and repair | 3.1.1, 3.2.6, 3.4.3, | ||
| 3.7.3.1, 3.8.6, | 20% Open/Inspect (Docking HighPri) | ||||
| 6 | 244-11-002 | Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish | 3.1.4, 3.2.5, 3.3.2 | 20% Open/Inspect (Docking HighPri) | |
| 6 | 244-12-001 | Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish | 3.1.4, 3.2.5, 3.3.2 | 20% Open/Inspect (Docking HighPri) | |
| 3 | 245-11-001 | Starboard Controllable Pitch Propeller (CPP) System; repair | 3.3.3, 3.6.6.2, 3.7.3.1 | 20% Open/Inspect (Docking HighPri) | |
| 1 | 245-11-002 | No. 3 Controllable Pitch Propeller Hydraulic Oil Sump Immersion Heater; replace | 3.3.1 | 20% Open/Inspect (Docking LowPri) | |
| 3 | 245-12-001 | Port Controllable Pitch Propeller (CPP) System; repair | 3.3.3, 3.6.6.2, 3.7.3.1 | 20% Open/Inspect (Docking HighPri) | |
| 1 | 245-12-002 | No. 2 Controllable Pitch Propeller Hydraulic Oil Sump Immersion Heater; replace | 3.2.2 | 20% Open/Inspect (Docking LowPri) | |
| 2 | 251-00-001 | No. One Gas Turbine Module (GTM) Clean Air Intake; repair and preserve | 3.4.1, 3.5.1 | 20% Open/Inspect (HighPri) | |
| 2 | 251-30-001 | No. 2 Gas Turbine Module (GTM) Clean Air Intake; repair and preserve | 3.4.1, 3.5.1 | 20% Open/Inspect (LowPri) | |
| 19 | 251-31-001 | Forward Air Intake and Exhaust Louver; preserve | 3.3.1.1, | 20% Open/Inspect (HighPri) | |
| 30 | 251-31-002 | Aft Air Intake and Exhaust Louver; preserve | 3.3.1.1, | 20% Open/Inspect (HighPri) | |
| 3 | 251-32-001 | Forward Gas Turbine Dirty Side Intake; repair and preserve | 3.3.1 | 20% Open/Inspect (HighPri) | |
| 4 | 251-32-002 | Aft Gas Turbine Dirty Side Intake; repair and preserve | 3.3.1 | 20% Open/Inspect (HighPri) | |
| 251-32-003 | No. 3 Gas Turbine Generator Intake Blow-in Panel Bulkhead; repair | 3.2 | 20% Open/Inspect (HighPri) | ||
| 2 | 259-10-001 | Forward Gas Turbine Mixing Room, Uptake, Boundary Layer Infra-Red Suppression System (BLISS) Cap Repair and Preservation; accomplish | 3.4, 3.5.1 | 20% Open/Inspect (HighPri) | |
| 2 | 259-10-002 | Aft Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair | 3.4, 3.5.1 | 20% Open/Inspect (HighPri) | |
| 8 | 259-11-001 | No. 1A, 1B, 2A, and 2B Gas Turbine (GTRB) Exhaust Duct Collector; repair | 3.1,3.2.1 | 20% Open/Inspect (LowPri) | |
| 262-11-001 | No. One and 2 Main Reduction Gear (MRG) Lube Oil Cooler; clean | 3.2 | 20% Open/Inspect (LowPri) | ||
| 437-90-001 | ShipAlt DDG51-77829K, Installation of Radar and TDR TLI for DFM, JP-5 and Potable Water Tank; accomplish | 3.2 | 20% Open/Inspect (HighPri) | ||
| 2 | 441-11-001 | Antenna Tilting Group (ATG), OA-9243A(V)3/SR and OA-9242(V)3,4/SR; repair | 3.3.1 | 20% Open/Inspect (LowPri) | |
| 441-11-002 | OE-82(C) SATCOM Amplifier, Foundation, and Stuffing Tube; repair | 3.2 | 20% Open/Inspect (LowPri) | ||
| 4 | 474-11-001 | MK 137 MOD 10 NULKA Launcher and Cable; repair | 3.4.1 | 20% Open/Inspect (LowPri) | |
| 5 | 512-11-001 | Laundry and Galley Dry Ice Ventilation Cleaning; accomplish | 3.3.1 | 20% Open/Inspect (LowPri) | |
| 4 | 514-20-001 | No. One, 2, 3, and 4 Air Conditioning (A/C) Plant Condenser; mechanically clean | 3.3.6.1 | 20% Open/Inspect (LowPri) | |
| 70 | 520-11-001 | Sea Valve Repair and Replacement; accomplish | 3.3.1, | 20% Open/Inspect (Docking HighPri) | |
| 6 | 551-61-001 | Bleed and Start Air Flexible Hose Assembly; replace | 3.1.2 | 20% Open/Inspect (Docking LowPri) | |
| 2 | 562-11-002 | Port and Starboard Rudder Bearing Seal and Rudderstock Seal; repair | 3.3.3.1 | 20% Open/Inspect (Docking HighPri) | |
| 8 | 562-11-003 | Port and Starboard Rudder; inspect and repair | 3.1.1, 3.2.2.1, 3.3.1.1, 3.4.1 | 20% Open/Inspect (Docking HighPri) | |
| 4 | 571-11-001 | Port and Starboard Sliding Padeye, Tilting; overhaul and preserve | 3.1.2, 3.3.3.1 | 20% Open/Inspect (HighPri) | |
| 571-41-001 | Fueling At Sea (FAS) Station No. 7 Padeye; repair | 3.2 | 20% Open/Inspect (LowPri) | ||
| 8 | 581-11-001 | Anchor and Anchor Chain Inspection and Preservation; accomplish | 3.4.11, 3.5.2, 3.6.3, 3.6.4.4 | 20% Open/Inspect (Docking LowPri) | |
| 1 | 583-11-001 | Boat Handling System; repair (OPTION ITEM) | 3.2.11 | 20% Open/Inspect (HighPri) | |
| 3 | 588-20-001 | Recovery, Assist, Securing and Traversing (RAST) Landing Signal Officer (LSO) Control Station; repair and preserve | 3.1.1, 3.4.1, 3.5.1 | 20% Open/Inspect (LowPri) | |
| 4 | 588-21-001 | Flight Deck and Recovery Assist, Securing and Traversing (RAST) System Track and Plate; clean and preserve | 3.2.1, 3.5.5 | 20% Open/Inspect (LowPri) | |
| 588-30-001 | Port and Starboard Helicopter Hangar Door; repair | 3.2 | 20% Open/Inspect (HighPri) | ||
| N/A | 593-11-001 | Vacuum, Collection, Holding and Transfer (VCHT) Piping System Chemical Cleaning; accomplish | 3.1.4.1 | 20% Open/Inspect (LowPri) | |
| N/A | 593-11-002 | No. 1A, 1B, 2A, and 2B Vacuum, Collecting, Holding and Transfer (VCHT) Ejector Pump and Motor; replace | 3.1.1.2 | 20% Open/Inspect (LowPri) | |
| 1 | 612-21-001 | Helo Safety Net and Frame; repair | 3.1.1 | 20% Open/Inspect (LowPri) | |
| 1 | 624-11-001 | Balanced Joiner Door; remove and store | 3.1.1 | 20% Open/Inspect (LowPri) | |
| 625-11-001 | Helo Control Window; repair and preserve | 3.2 | 20% Open/Inspect (HighPri) | ||
| 631-10-001 | Wiring Trunk Deck Support Structure; preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 1 | 631-11-005 | Vacuum Collecting Holding Tank Room Bilge; repair and preserve | 3.5.1 | 20% Open/Inspect (LowPri) | |
| 631-11-006 | Air Conditioning Machinery Room and Pump Room Bilge; preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 631-11-007 | Sonar Dome Access Trunk; preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 631-11-008 | Access Trunk; preserve | ||||
| 3.2 | 20% Open/Inspect (LowPri) | ||||
| 631-11-009 | Auxiliary Machinery Room No. One; preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 631-11-010 | Ships Service Gas Turbine Generator (SSGTG) Exhaust Overhead and Deck; preserve | 3.2 | 20% Open/Inspect (LowPri) | ||
| 1 | 631-13-001 | Collective Protection System (CPS) Zone One Fan Room; repair and preserve | 3.3.1 | 20% Open/Inspect (HighPri) | |
| 1 | 631-13-002 | Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve | 3.3.1 | 20% Open/Inspect (HighPri) | |
| 1 | 631-13-003 | Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve | 3.3.1 | 20% Open/Inspect (LowPri) | |
| 1 | 631-21-001 | Mast Preservation; accomplish | 3.1.1 | 20% Open/Inspect (HighPri) | |
| N/A | 633-11-001 | Impressed Current Cathodic Protection (ICCP) System; inspect and repair | 3.1.1, 3.3.3 | 20% Open/Inspect (Docking HighPri) | |
| 2 | 634-21-001 | Flight Deck Nonskid; replace | 3.3.1, 3.4.2 | 20% Open/Inspect (LowPri) | |
| 1 | 643-80-001 | Berthing Habitability Project (BOFF-S1055) Installation; accomplish | 3.15.2.1 | 20% Open/Inspect (LowPri) | |
| 1 | 643-80-002 | Berthing Habitability Project (BCPO-S9606) Installation; accomplish | 3.7.2.1 | 20% Open/Inspect (LowPri) | |
| 1 | 643-80-003 | Berthing Habitability Project (BENL-S9608) Installation; accomplish | 3.7.2.1 | 20% Open/Inspect (LowPri) | |
| 1 | 643-80-004 | Berthing Habitability Project (BOFF-S9802) Installation; accomplish | 3.15.2.1 | 20% Open/Inspect (LowPri) | |
| 1 | 644-80-001 | Berthing Habitability Project (HOFF-S1056) Installation; accomplish | 3.15.2.1 | 20% Open/Inspect (LowPri) | |
| 1 | 644-80-002 | Berthing Habitability Project (HCPO-S9607) Installation; accomplish | 3.15.2.1 | 20% Open/Inspect (LowPri) | |
| 1 | 644-80-003 | Berthing Habitability Project (HENL-S9609) Installation; accomplish | 3.15.2.1 | 20% Open/Inspect (LowPri) | |
| 1 | 644-80-004 | Berthing Habitability Project (HOFF-S9803) Installation; accomplish | 3.15.2.1 | 20% Open/Inspect (LowPri) | |
| N/A | 710-11-001 | Ready Service Locker; repair and preserve | 3.1.1 | 20% Open/Inspect (LowPri) |
File details come from the government source that posted it. Updated .