N00024-22-R-4486 A006 conformed.pdf
PDF 2 MB Posted
- Solicitation number
- N00024-22-R-4486
About this file
This solicitation seeks proposals for the execution of the USS LASSEN (DDG 82) FY23 Depot Modernization Period (DMP). The availability includes maintenance, modernization, and repair work requiring a highly capable contractor. The Government expects to award a single contract to complete this availability, which is not set aside for small businesses. Interested offerors must request access to restricted attachments from the Contract Specialist and Technical Librarian. Proposals are due via the Procurement Integrated Enterprise Environment (PIEE) by September 2022. The period of performance is approximately 19 months, from December 2022 through August 2024. Offerors must comply with registration requirements and monitor sources for solicitation releases and amendments.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C X D
EX
X
G F 175 - 186
187 - 204 X H 205 - 214 daniel.j.breedlove@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 214
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
DANIEL J BREEDLOVE 2027810615
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 84
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
85 - 121 122 - 123
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
124 - 127 128 - 136
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 137 - 147 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 148 - 149 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
150 - 173
PART II - CONTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002421FR62098C
5. DATE ISSUED
24 Feb 2022
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002422R4486
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Lot
AVAILABILITY PREPARATION - USS LASSEN
FFP
The Contractor shall provide all labor, materials, facilities, supervision and equipment to meet the requirements outlined in Section C – Statement of Work, paragraph 9. All work shall be completed in accordance with all applicable local, State, Federal and Navy rules and regulations; whether they are explicitly written/referenced in this SF33 or not.
FOB: Destination
PSC CD: J998
NET AMT
ADVANCED MATERIAL PROCUREMENT
FFP
The Contractor shall provide all labor, materials, facilities, supervision and equipment to meet the requirements outlined in Section C – Statement of Work, paragraph 10. All work shall be completed in accordance with all applicable local, State, Federal and Navy rules and regulations; whether they are explicitly written/referenced in this SF33 or not.
OPTION TYCOM
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
PURCHASE REQUEST NUMBER: N0002421FR62098C
OPTION PMS 407 OPN
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION PMS 407 OMN
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
Reserved (CDRLs)
FFP
Reserved FOB: Destination
OPTION Temporary Service; provide
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION GFM Equipment Warehouse Storage Space
FFP
Government Furnished Material and Equipment Warehouse Storage Space;
provide (Option Item)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION Underwater Hull Preservation
FFP
Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION Underwater Hull; preserve (OPTION ITEM)
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION Messing and Berthing Barge Electric
FFP
Messing and Berthing Barge Electric Temporary Service in Contractor Plant;
provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION TYCOM OPTION
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION TYCOM OPTION
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION Berthing Habitability Project
FFP
Berthing Habitability Project (BOFF-S1055) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
FFP
Berthing Habitability Project (BCPO-S9606) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
FFP
Berthing Habitability Project (BENL-S9608) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
FFP
Berthing Habitability Project (BOFF-S9802) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
FFP
Berthing Habitability Project (HOFF-S1056) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
FFP
Berthing Habitability Project (HCPO-S9607) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
FFP
Berthing Habitability Project (HENL-S9609) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
FFP
Berthing Habitability Project (HOFF-S9803) Installation; accomplish (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-88260K ERM Hardware installation
FFP
ShipAlt DDG51-88260K, Enterprise Remote Monitoring (ERM) Hardware Installation; accomplish (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-94451K, Removal of Alfa Laval (AIT)
FFP
Shipalt DDG51-94451K, Removal of Alfa Laval Pure Bilge Oil/Water Separator, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION ORDALT 80831, BMD-MK99 KAS DDG
FFP
ORDALT 80831, BMD-MK99 KAS DDG Illuminator RAM Material Installation;
accomplish (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-91580K, AN/SQQ-89A(V)15 Tech Refresh
FFP
ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish
(OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-86222K and 91580K, AN/SQQ-89A(V)15
FFP
ShipAlt DDG51-86222K and 91580K, AN/SQQ-89A(V)15 (TI-18/17) and AN/UQN-10 NGF (Fathometer), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-80156K, AN/SLQ-32(V)6 (SEWIP)
FFP
ShipAlt DDG51-80156K, AN/SLQ-32(V)6 Surface Electronic Warfare Improvement Program (SEWIP) Block 2 Upgrade; accomplish (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION OrdAlt 79353K, Ablative Upgrade (AIT)
FFP
DDG-51 OrdAlt 79353K, Ablative Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION OrdAlt 74588K, Topside KAS Installation
FFP
DDG-51 Class OrdAlt 74588K, Topside KAS Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-93584K, AIS Cyber Hardening, (AIT)
FFP
ShipAlt DDG51-93584K, AIS Cyber Hardening, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-87785K, AS-4775 Link 16 Antenna (AIT)
FFP
ShipAlt DDG-51 87785K, AS-4775 Link 16 Antenna, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-91027K, GPNTS(V)4, (AIT) Service
FFP
ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-86033K, MOS Mod, (AIT) Support
FFP
ShipAlt DDG51-86033K, MOS Mod, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-95946K, C2P Tech Refresh, (AIT)
FFP
ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-75874K, SSEE Inc F, (AIT) Support
FFP
ShipAlt DDG51-75874K, SSEE Inc F, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-94294K, CANES HW2 Tech Refresh, (AIT)
FFP
ShipAlt DDG51-94294K, CANES HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-79686K and 88635K, Closed-In Weapon
FFP
ShipAlt 79686K and 88635K, Closed-In Weapon System (CIWS) Nex Gen and Blk 1B Overhaul, Alteration Installation Team (AIT) Support Service; provide
(OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-81961K and 85114K, TTWCS v5.6.0 SA
FFP
ShipAlt DDG51-81961K and 85114K, TTWCS v5.6.0 SA and TMPC 6.0.0 HW SA, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-95676K, Enhanced Collection System
FFP
ShipAlt DDG51-95676K, Enhanced Collection System Hardware, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-94692K, AN/SPS-73(V)18 Installation
FFP
ShipAlt DDG51-94692K, AN/SPS-73(V)18 Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-95861K, A/USQ-52A Training Interface
FFP
ShipAlt DDG51-95861K, A/USQ-52A Training Interface Unit, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION SA-93982K, AN/WSN-12 Install, (AIT)
FFP
ShipAlt DDG51-93982K, AN/WSN-12 Install, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION Messing and Berthing Barge Electric
FFP
Messing and Berthing Barge Electric Temporary Service in Contractor Plant;
provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS LASSEN (DDG 82) DURING FY23 DEPOT
MODERNIZATION PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS Lassen (DDG 82) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, C, D, E, and F.
FOB: Destination
OPTION Growth Reservation for CLIN 0003
FFP
Growth Reservation Associated with CLIN 0003. See attachment J-4
See Notes A, B, C, D, E and F.
OPTION Growth Reservation for CLIN 0004
Growth Reservation Associated with CLIN 0004. See attachment J-4
OPTION Growth Reservation for CLIN 0005
Growth Reservation Associated with CLIN 0005. See attachment J-4
OPTION Growth Reservation for CLIN 0007
Growth Reservation Associated with CLIN 0007. See attachment J-4
OPTION Growth Reservation for CLIN 0008
Growth Reservation Associated with CLIN 0008. See attachment J-4
OPTION Growth Reservation for CLIN 0009
Growth Reservation Associated with CLIN 0009. See attachment J-4
OPTION Growth Reservation for CLIN 0010
Growth Reservation Associated with CLIN 0010. See attachment J-4
OPTION Growth Reservation for CLIN 0011
Growth Reservation Associated with CLIN 0011. See attachment J-4
OPTION Growth Reservation for CLIN 0012
Growth Reservation Associated with CLIN 0012. See attachment J-4
OPTION Growth Reservation for CLIN 0013
Growth Reservation Associated with CLIN 0013. See attachment J-4
OPTION Growth Reservation for CLIN 0014
Growth Reservation Associated with CLIN 0014. See attachment J-4
OPTION Growth Reservation for CLIN 0015
Growth Reservation Associated with CLIN 0015. See attachment J-4
OPTION Growth Reservation for CLIN 0016
Growth Reservation Associated with CLIN 0016. See attachment J-4
OPTION Growth Reservation for CLIN 0017
Growth Reservation Associated with CLIN 0017. See attachment J-4
OPTION Growth Reservation for CLIN 0018
Growth Reservation Associated with CLIN 0018. See attachment J-4
OPTION Growth Reservation for CLIN 0019
Growth Reservation Associated with CLIN 0019. See attachment J-4
OPTION Growth Reservation for CLIN 0020
Growth Reservation Associated with CLIN 0020. See attachment J-4
OPTION Growth Reservation for CLIN 0021
Growth Reservation Associated with CLIN 0021. See attachment J-4
OPTION Growth Reservation for CLIN 0022
Growth Reservation Associated with CLIN 0022. See attachment J-4
OPTION Growth Reservation for CLIN 0023
Growth Reservation Associated with CLIN 0023. See attachment J-4
OPTION Growth Reservation for CLIN 0024
Growth Reservation Associated with CLIN 0024. See attachment J-4
OPTION Growth Reservation for CLIN 0025
Growth Reservation Associated with CLIN 0025. See attachment J-4
OPTION Growth Reservation for CLIN 0026
Growth Reservation Associated with CLIN 0026. See attachment J-4
OPTION Growth Reservation for CLIN 0027
Growth Reservation Associated with CLIN 0027. See attachment J-4
OPTION Growth Reservation for CLIN 0028
Growth Reservation Associated with CLIN 0028. See attachment J-4
OPTION Growth Reservation for CLIN 0029
Growth Reservation Associated with CLIN 0029. See attachment J-4
OPTION Growth Reservation for CLIN 0030
Growth Reservation Associated with CLIN 0030. See attachment J-4
OPTION Growth Reservation for CLIN 0031
Growth Reservation Associated with CLIN 0031. See attachment J-4
OPTION Growth Reservation for CLIN 0032
Growth Reservation Associated with CLIN 0032. See attachment J-4
OPTION Growth Reservation for CLIN 0033
Growth Reservation Associated with CLIN 0033. See attachment J-4
OPTION Growth Reservation for CLIN 0034
Growth Reservation Associated with CLIN 0034. See attachment J-4
OPTION Growth Reservation for CLIN 0035
Growth Reservation Associated with CLIN 0035. See attachment J-4
OPTION Growth Reservation for CLIN 0036
Growth Reservation Associated with CLIN 0036. See attachment J-4
OPTION Growth Reservation for CLIN 0037
Growth Reservation Associated with CLIN 0037. See attachment J-4
OPTION Growth Reservation for CLIN 0038
Growth Reservation Associated with CLIN 0038. See attachment J-4
OPTION Growth Reservation for CLIN 0039
Growth Reservation Associated with CLIN 0039. See attachment J-4
OPTION Growth Reservation for CLIN 0040
Growth Reservation Associated with CLIN 0040. See attachment J-4
OPTION Growth Reservation for CLIN 0041
Growth Reservation Associated with CLIN 0041. See attachment J-4
OPTION Growth Reservation for CLIN 0042
Growth Reservation Associated with CLIN 0042. See attachment J-4
OPTION Growth Reservation for CLIN 0043
Growth Reservation Associated with CLIN 0043. See attachment J-4
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS LASSEN DMP:
a. 122,428 direct labor hours (labor hours) and $3,929,868 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS LASSEN DMP work package under CLINS 0044 – 0089.
2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative Contracting Officer’s (ACO) discretion.
3. LOE to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.
4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note F.
5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer (ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO.
Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’
Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’
6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contractor efforts shall be deducted from the labor hours allocated. Subcontractor efforts and materials shall be deducted from the materials allocated. The balance of labor hours and materials remaining in the LOE to Completion CLINs will be recouped by the Government via final contract modification at the end of the availability.
7. Only authorized direct production labor hours shall be deducted from the LOE to Completion direct labor hour ceiling set forth in Section B, Note A, paragraph 1 above. Per Note B paragraph 2 below, all non-production labor shall be included in the Contractor’s fully burdened labor rate. Non-production hours shall not be included in pricing submitted in support of growth issued under the LOE to Completion CLINs. Additionally, Contractor LOE to Completion pricing shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Contracting Officer.
8. Only authorized material dollars shall be deducted from LOE to Completion material reservation set forth in
Section B, Note A, paragraph 1 above. This material reservation consists of the total cost of materials and subcontractor efforts proposed. All subcontractor quotes shall be included in the Change Order Price Analysis (COPA) as per Section C, paragraph 1.13. Material dollars may include freight or duties if specifically itemized on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the settled cost of materials deducted from the material reservation.
9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the ACO in the issuance of one contract modification based on the information received in the final report identified in Section C below, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price.
This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials. Each directed work shall receive approval by the SUPERVISOR and the ACO. (“SUPERVISOR” as defined in NAVSEA Standard Item (NSI) 009-01, paragraph 4.3, refers to the local Government activity responsible for the execution and contract administration of Navy maintenance and modernization work.)
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND
NEW WORK
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1. The Contractor’s fully burdened ship repair growth labor rate and fully burdened ship repair new work labor rate will be used for negotiating growth and new work, respectively, to be performed under this contract. The contractor agrees that the number of hours included in its price proposal submitted in response to Requests for Contract Changes (RCCs), Growth Management Requests (GMRs) and Reservation Task Requests (RTRs) for either Growth or New Work shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics
2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed for either growth or new work, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:
Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors) Security Surveying Administration Transportation
Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental Program Management
3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.
5. Physical materials are goods that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material burden rate applies to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
6. For growth and new work contract changes involving subcontractors, subcontractor quotes will be treated as
Other Direct Costs (ODCs) and will be subject to the applicable contract material burden rate shown in paragraph (7) below. Subcontractor must be submitted with the contractor’s COPA in response to RCCs, GMRs and RTRs issued by the Contracting Officer. For new work only, these subcontractor quotes must be competitively acquired. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, and/or Government authorized vendors. RCCs and RTRs that are subcontracted for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate. Any material burden rate applied to new work shall be approved at the discretion of the ACO, upon receipt of supporting documentation in accordance with FAR 15.404-3 ‘Subcontract Pricing Considerations.
7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth and new work during the availability and up to three (3) months after the Attachment J-3 ‘Contract Complete’ date:
USS LASSEN FY23 DMP
Fully Burdened Ship Repair Growth Labor Rate TBD Fully Burdened Ship Repair New Work Labor Rate TBD Material Burden Growth Rate TBD Material Burden New Work Rate TBD
8. In the event of a one-bid or directed availability, the Contracting Officer may negotiate the Fully Burdened Ship Repair Labor Rate and Material Burden Rate (not to exceed the ceiling rate(s) identified above) with the offeror in accordance with FAR 15.4, Contract Pricing. The rates herein are not considered a Forward Pricing Rate Agreement (FPRA) and are identified solely for the purpose of establishing a ceiling.
9. In the event of an extension due to excusable delay to the delivery date for the USS LASSEN FY23 DMP, the Contractor’s fully burdened ship repair labor rate shall be escalated by 0.59 % commencing 3 months after the Attachment J-3 “Contract Complete” date. Following the “Contract Complete” date identified in Attachment J- 3 (Milestones), this rate shall be escalated quarterly through the 24th month, if necessary, and shall be used to negotiate all growth and new work. Note, in the event of an excusable delay, this escalation rate shall be applied only to growth and new work not previously identified in Attachment J-4 (Pricing Worksheet). The material burden rate shall not increase.
NOTE C: Option item to which the option clause FAR 52.217-7 (NAVSEA Variation II) applies and which is to be supplied only if and to the extent said option is exercised.
NOTE D: SCHEDULE OF DAILY RATES FOR PIERSIDE AND DRY-DOCKING (FULLY BURDENED)
FOR PURPOSES OF A COMPENSABLE EXTENSION TO THE DRY-DOCKING OR DELIVERY DATE
1. In the event of a compensable extension to the dry-docking or delivery date, the Contractor’s fully burdened daily rates for additional dry-dock and/or pierside performance period at the Contractor’s facility will be evaluated by the ACO upon receipt of the Contractor’s certified or other than certified cost or pricing data (certification requirements are subject to FAR 15.403).
2. The Contractor agrees that the daily rates shall include all costs that run with time associated with additional performance days in accordance with the work package specification requirements of this availability. The daily rates shall include all costs associated with additional performance days (whether charged directly or indirectly by the offeror’s accounting systems) including but not limited to:
Temporary Services, including but not limited to:
o Decking services o Pumping services o Electricity
Internet Connectivity Air Conditioning Support Services for the Navy, its agents and Contractors…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .