Unique_Entity_ID_(SAM).pdf

PDF 240 KB Posted

Attached to
Construction Manager At-Risk Plumbing Infrastructure Enhanced Maintenance Project
Solicitation number
2026-RFP-0504
Issued by
Los Angeles County, California

About this file

This is a Unique Entity Identifier (UEI) submission form required by the City of Pasadena for the Construction Manager at-Risk Plumbing Infrastructure Enhanced Maintenance Project. The Rose Bowl Operating Company is soliciting statements of qualifications, technical proposals, and price proposals from qualified contractors to serve as Construction Manager at Risk (CMAR) for the Rose Bowl Stadium Plumbing Maintenance Project in California. The project encompasses preconstruction and design-assist services, including a funded subsurface field investigation program, and conditional Phase 2 construction services for the replacement and rehabilitation of the stadium's water, sewer, and gas distribution systems beneath the stadium concourse. The work must be performed at an operating venue with continuous event use, requiring specialized expertise in live-occupied venue phasing, water and fire service continuity, and open-cut main replacement and trenchless sewer rehabilitation techniques. A Selection Committee will review proposals and select no more than five finalists for shortlisting, interviews, and final scoring based on established RFP criteria.

The submission requires contractors to provide their Unique Entity Identifier (UEI)—a 12-character alphanumeric value from SAM.gov—along with contractor name, business address, contact information, and project details. Failure to submit the required UEI may result in the response being deemed non-responsive. The RBOC prioritizes contractors with directly relevant wet-utility experience, strong safety records, financial strength, demonstrated expertise in subsurface risk management, and commitment to Pasadena-based subcontractors and local workforce development. The project requires contractors to demonstrate a collaborative approach to achieving optimal value within the project budget while accommodating the stadium's event calendar constraints.

View the file

Other files

File Type Posted
Construction_Manager_At-Risk_Plumbing_Infrastructure_Enhanced_Maintenance_Project_(Addendum_#4_Revision).pdf PDF
RBOC_Plumbing_Infra_Sewer_Plan_Check_Comment_Response_Matrix.xlsx XLSX spreadsheet
RBOC_Plumbing_Infra_Water_Plan_Check_Comment_Response_Matrix_.xlsx XLSX spreadsheet
Sewer_Maintenance_Project_-_Plan_Check_Revision_1.pdf PDF
Water_Maintenance_Project_-_Plan_Check_Revision_1_.pdf PDF
WO_798158_RBOC_1001_ROSE_BOWL_DRIVE_PASADENA_CA_NEW_.pdf PDF
LA-01286-14_RoseBowlPlumbing_UtilityRecsLtr_8-13-2026.pdf PDF
099742017-_RBOC_Plumbing_Infra_-_Sewer_Maintenance_Project_Issue_for_Bid.pdf PDF
25270-PW_03-11-2026_ROSE_BOWL_-_UTILITY_SURVEY.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Subcontractor_Listing_(1)_-_RBOC_CMAR.pdf PDF
099742017-_RBOC_Plumbing_Infra_Gas_Maintenance_100_Plans_2026-09-11_Item_4_NEW_S.pdf PDF
RBOC_Plumbing_Infra_Specs_for_IFB_PDFs_-_NEW_Y_Addendum_No._3.zip ZIP file
Copy_of_Bid_Form_v3_-_082826_addendum.xlsx XLSX spreadsheet
Rose_Bowl_Stakeholder_Calendar_for_RFP_-_to_send.xlsx XLSX spreadsheet
099742017-_RBOC_Plumbing_Infra_-_Water_Maintenance_Project_Issue_for_Bid.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred)_-_RBOC_CMAR.pdf PDF
Civil_Litigation_History_Certification_ver02_-_RBOC_CMAR.pdf PDF
Public_Contract_Code_Disclosure_-_RBOC_CMAR.pdf PDF
[P]_Proof_of_Authority_(2)_-_RBOC_CMAR_Plumbing.pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Federal_Required_Certification_(4).pdf PDF
Emergency_FEMA_TC.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF PASADENA

UNIQUE ENTITY IDENTIFIER (UEI)

PROJECT: ___________________________________________________________________

CONTRACTOR NAME: _______________________________________________________

BUSINESS ADDRESS:

STREET: _____________________________________________________________________

CITY: ________________________________________________________________________

STATE: ______________________________________________________________________

ZIP CODE: ____________________________________________________________________

UEI: __________________________

12-character alphanumeric value from SAM.gov

CONTACT NAME: ____________________________________________________________

TELEPHONE NO: _____________________________________________________________

Submit this form with your response. If you fail to submit your UEI, your response may be deemed non-responsive.

PROJECT:
CONTRACTOR NAME:
STREET:
CITY:
STATE:
ZIP CODE:
UEI:
CONTACT NAME:
TELEPHONE NO:

File details come from the government source that posted it. Updated .