Rose_Bowl_Stakeholder_Calendar_for_RFP_-_to_send.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Construction Manager At-Risk Plumbing Infrastructure Enhanced Maintenance Project
Solicitation number
2026-RFP-0504
Issued by
Los Angeles County, California

About this file

This is a stakeholder calendar spreadsheet for the Rose Bowl Operating Company ("RBOC") related to an RFP for a Construction Manager at Risk (CMAR) to manage the Rose Bowl Stadium Plumbing Infrastructure Enhanced Maintenance Project in Pasadena, California. The project encompasses the replacement and rehabilitation of the stadium's water, sewer, and gas distribution systems beneath the stadium concourse, as recommended by the Rose Bowl Sewer and Water Asset Management Plan (2022). The work will be executed at an operating venue that remains in continuous event use throughout construction, requiring coordination between preconstruction/design-assist services (including a funded subsurface field investigation program) and potential Phase 2 construction services. The RBOC seeks a CMAR demonstrating directly relevant wet-utility experience, capability in open-cut main replacement and trenchless sewer rehabilitation, expertise in live venue event-window phasing while maintaining water and fire service continuity, subsurface risk management proficiency, and commitment to Pasadena-based subcontractors and local workforce development. A Selection Committee will review proposals and select no more than five highest-scoring finalists for shortlisting, interview, and final scoring.

The calendar document serves as a timeline tool for coordinating stakeholder engagement and critical project milestones throughout the RFP process. The spreadsheet facilitates tracking of key dates related to bidder outreach, pre-bid meetings, proposal submission windows, evaluation periods, shortlist notifications, finalist interviews, and award decisions. The document supports the RBOC's objective of managing multiple stakeholder touchpoints while maintaining transparency and consistency across the competitive selection process for this infrastructure maintenance initiative at the Rose Bowl Stadium.

View the file

Other files

File Type Posted
Construction_Manager_At-Risk_Plumbing_Infrastructure_Enhanced_Maintenance_Project_(Addendum_#4_Revision).pdf PDF
RBOC_Plumbing_Infra_Sewer_Plan_Check_Comment_Response_Matrix.xlsx XLSX spreadsheet
RBOC_Plumbing_Infra_Water_Plan_Check_Comment_Response_Matrix_.xlsx XLSX spreadsheet
Sewer_Maintenance_Project_-_Plan_Check_Revision_1.pdf PDF
Water_Maintenance_Project_-_Plan_Check_Revision_1_.pdf PDF
WO_798158_RBOC_1001_ROSE_BOWL_DRIVE_PASADENA_CA_NEW_.pdf PDF
LA-01286-14_RoseBowlPlumbing_UtilityRecsLtr_8-13-2026.pdf PDF
099742017-_RBOC_Plumbing_Infra_-_Sewer_Maintenance_Project_Issue_for_Bid.pdf PDF
25270-PW_03-11-2026_ROSE_BOWL_-_UTILITY_SURVEY.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Subcontractor_Listing_(1)_-_RBOC_CMAR.pdf PDF
099742017-_RBOC_Plumbing_Infra_Gas_Maintenance_100_Plans_2026-09-11_Item_4_NEW_S.pdf PDF
RBOC_Plumbing_Infra_Specs_for_IFB_PDFs_-_NEW_Y_Addendum_No._3.zip ZIP file
Copy_of_Bid_Form_v3_-_082826_addendum.xlsx XLSX spreadsheet
099742017-_RBOC_Plumbing_Infra_-_Water_Maintenance_Project_Issue_for_Bid.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred)_-_RBOC_CMAR.pdf PDF
Civil_Litigation_History_Certification_ver02_-_RBOC_CMAR.pdf PDF
Public_Contract_Code_Disclosure_-_RBOC_CMAR.pdf PDF
[P]_Proof_of_Authority_(2)_-_RBOC_CMAR_Plumbing.pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Unique_Entity_ID_(SAM).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Federal_Required_Certification_(4).pdf PDF
Emergency_FEMA_TC.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Window

CONSTRUCTION WINDOW
October 5, 2026 – August 31, 2027 · week shown Mon–Sun · bold = holiday · red = event blackout
No workSaturdays, potential work daysClear, no events
Flex, "potential impacts"Event, "no impact"Outside window
OCTOBER 2026NOVEMBER 2026
MoTuWeThFrSaSuMoTuWeThFrSaSu
12341
5678910112345678
121314151617189101112131415
1920212223242516171819202122
26272829303123242526272829
30
DECEMBER 2026JANUARY 2027
MoTuWeThFrSaSuMoTuWeThFrSaSu
123456123
7891011121345678910
1415161718192011121314151617
2122232425262718192021222324
2829303125262728293031
FEBRUARY 2027MARCH 2027
MoTuWeThFrSaSuMoTuWeThFrSaSu
12345671234567
891011121314891011121314
1516171819202115161718192021
2223242526272822232425262728
293031
APRIL 2027MAY 2027
MoTuWeThFrSaSuMoTuWeThFrSaSu
123412
5678910113456789
1213141516171810111213141516
1920212223242517181920212223
262728293024252627282930
31
JUNE 2027JULY 2027
MoTuWeThFrSaSuMoTuWeThFrSaSu
1234561234
78910111213567891011
1415161718192012131415161718
2122232425262719202122232425
282930262728293031
AUGUST 2027
MoTuWeThFrSaSu
1
2345678
9101112131415
16171819202122
23242526272829
3031

COOPERATIVE.LA — From A to Built.

Inputs & Criteria

INPUTS & CRITERIA
WINDOW & ALLOWANCES
Construction window start10/05/2026Phase 1 preconstruction start
Construction window end08/31/2027End of RBOC-coded calendar
Phase 1 preconstructionOct 5, 2026 – Nov 1, 2026
Phase 2 constructionNov 2, 2026 – Jul 31, 20279.0 months
Schedule floatAug 1 – Aug 31, 2027
HOLIDAYS MARKED NO-WORK (federal + day after Thanksgiving)
DateDayHoliday
10/12/2026MonColumbus Day / Indigenous Peoples Day
11/11/2026WedVeterans Day
11/26/2026ThuThanksgiving Day
11/27/2026FriDay after Thanksgiving
12/25/2026FriChristmas Day
01/01/2027FriNew Year's Day (also Rose Bowl Game)
01/18/2027MonMartin Luther King Jr. Day
02/15/2027MonPresidents Day
05/31/2027MonMemorial Day
06/19/2027SatJuneteenth — actual day (Sat); federal observed Fri 6/18, noted but left workable
07/05/2027MonIndependence Day observed (7/4 falls on a Sunday)

File details come from the government source that posted it. Updated .