Copy_of_Bid_Form_v3_-_082826_addendum.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 2026-RFP-0504
- Issued by
- Los Angeles County, California
About this file
This is a bid form for a Construction Manager at-Risk (CMAR) plumbing infrastructure maintenance project at the Rose Bowl Stadium in Pasadena, California, administered by the Rose Bowl Operating Company. The project encompasses the replacement and rehabilitation of the stadium's water, sewer, and gas distribution systems beneath the stadium concourse, based on recommendations from the Rose Bowl Sewer and Water Asset Management Plan (2022). The work must be executed at an operating venue with continuous event use, requiring careful coordination to maintain the stadium's domestic plumbing and fire protection service throughout construction. The bid form is structured to capture costs across multiple CSI trade divisions, including general requirements, site demolition and hardscape work, trenching and earthwork, paving, concrete, piping materials and installation, and backflow preventer components. The form accommodates pricing for a base bid focused on water maintenance and seven alternatives addressing sewer infrastructure, gas infrastructure, modified work scheduling, and federal funding reporting requirements under BABA (Buy American/Build American Act) provisions.
The bid form is designed as a template for multiple contractors to submit parallel pricing proposals, with columns for three contractor submissions and unit cost breakdowns presented on both a cost-per-item and cost-per-square-foot basis. Line items include labor, materials, and equipment costs, with subtotals calculated before overhead, profit, insurance, bonding, and gross receipts tax additions. The form explicitly excludes permit fees, geotech fees, and deputy inspector fees from contractor responsibility. The structure indicates a phased procurement approach with preconstruction and design-assist services in Phase 1, and conditional authorization of Phase 2 construction services contingent on RBOC's discretionary option exercise. Key selection criteria emphasize directly relevant wet-utility experience, open-cut main replacement and trenchless sewer rehabilitation capabilities, live-venue event-window phasing expertise, subsurface risk management, financial strength, safety record, and commitment to Pasadena-based subcontractors and local workforce.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Analysis Template
| PROJECT: | Rose Bowl Plumbing Infrastructure | |
| ADDRESS | 1001 Rose Bowl Drive Pasadena, CA. 91103 | PLUMBING MAINTENANCE PROJECT |
BID FORM
| CLIENT: | Rose Bowl Operating Company | |||
| DATE: | Contractor Name: | Contractor Name 02 | Contractor Name 03 |
| Date: | DATE Estimate | DATE Estimate | |||||||
| CSI | Trade Description | QTY | Unit | Cost/Unit | Cost | Cost/SF | Cost | Cost/SF | Cost |
| BASE BID: WATER MAINTENANCE PROJECT | ERROR:#DIV/0! | $ - | ERROR:#DIV/0! | $ - | |||||
| 01 01 00 | General Requirements | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 01 01 00 | General Conditions | ||||||||
| 01 01 00 | Traffic Control | ||||||||
| 01 15 10 | Survey / Utility Locating | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 02 40 00 | Sawcutting / Site Hardscape Demolition & Haul Off | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 11 00 00 | Equipment | ||||||||
| 31 40 00 | Trenching / Over-Excavation / Earthwork | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 31 40 00 | Spoils Export - Haul Off | ||||||||
| 31 40 00 | Dirt Backfill / Recompaction | ||||||||
| 32 12 16 | AC Paving | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 32 17 13 | Parking Striping | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 32 30 01 | Site Concrete | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 32 30 01 | Sand / CLSM Material | ||||||||
| 32 30 01 | Sand / CLSM Placement (Labor) | ||||||||
| 33 05 00 | Geogrid, Tracer Wire, Warning Tape, Other Materials | ||||||||
| 33 05 00 | Geogrid, Tracer Wire, Warning Tape, Other Material Placement (Labor) | ||||||||
| 33 10 00 | Site Domestic Water Piping / Accessory Material | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||
| 33 10 00 | Site Domestic Water Piping / Accessory Installation (Labor) | ||||||||
| 33 10 00 | Backflow Preventer Material | ||||||||
| 33 10 00 | Backflow Preventer Installation (Labor) | ||||||||
| SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | ||||||
| Overhead and Profit | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||
| Insurance / Bonding | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||
| Gross Receipt Tax | ERROR:#DIV/0! | ERROR:#DIV/0! |
Total Project Cost $ - 0 ERROR:#DIV/0! $ - 0 ERROR:#DIV/0! $ - 0
| # | Alternates | QTY | Unit | Cost/Unit | Cost | Cost/SF | Cost | Cost/SF | Cost |
| 1 | Sewer Infrastructure Materials (Alternative 1) | ||||||||
| 2 | Sewer Infrastructure Labor (Alternative 1) | ||||||||
| 3 | Gas Infrastructure Materials (Alternative 2) | ||||||||
| 4 | Gas Infrastructure Labor (Alternative 2) | ||||||||
| 5 | Cost Variance Associated with 6 Day Work Week (Mon - Sat) (All) | ||||||||
| 6 | Cost Variance Associated with BABA / Federal Funding Reporting Requirements (Water - Base Bid) | ||||||||
| 7 | Cost Variance Associated with BABA / Federal Funding Reporting Requirements (Sewer - Alternative 1 only) | ||||||||
| 8 | Cost Variance Associated with BABA / Federal Funding Reporting Requirements (Gas - Alternative 2 only) |
| Exclusions | |
| 1 | Permit Fees. |
| 2 | Geotech Fees and Deputy Inspector Fees. |
File details come from the government source that posted it. Updated .