RBOC_Plumbing_Infra_Specs_for_IFB_PDFs_-_NEW_Y_Addendum_No._3.zip
ZIP file 5 MB Posted
- Solicitation number
- 2026-RFP-0504
- Issued by
- Los Angeles County, California
About this file
This is an Addendum No. 3 to the Plumbing Infrastructure Specifications for the Invitation for Bid issued by the Rose Bowl Operating Company (RBOC) in Pasadena, California. The project involves a Construction Manager at Risk (CMAR) engagement for the Rose Bowl Stadium Plumbing Infrastructure Enhanced Maintenance Project, which includes preconstruction and design-assist services with a funded subsurface field investigation program, and conditional Phase 2 construction services for the replacement and rehabilitation of the stadium's water, sewer, and gas distribution systems. The work encompasses open-cut main replacement and trenchless sewer rehabilitation of utility infrastructure beneath the stadium concourse, consistent with recommendations from the Rose Bowl Sewer and Water Asset Management Plan (2022). Critical project constraints include the requirement to maintain continuous operations at an active venue throughout construction, preserve the combined domestic plumbing and fire protection service system in operational status, and coordinate work within the stadium's event schedule. The Base Bid and each alternate are defined by separate 100% Construction Document sets.
The selection process involves a Selection Committee reviewing proposals based on established evaluation criteria, with up to five highest-scoring finalists shortlisted for interviews and final scoring. Key evaluation areas include directly relevant wet-utility experience, expertise in open-cut main replacement and trenchless sewer rehabilitation, live venue event-window phasing and water/fire service continuity management, subsurface risk management capabilities, collaborative approach to value optimization within budget constraints, financial strength and safety record, and commitment to Pasadena-based subcontractors and local workforce development. This addendum serves to clarify or modify specifications and requirements outlined in the original bid documents, ensuring bidders have the most current technical and administrative information for proposal preparation.
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .