Sewer_Maintenance_Project_-_Plan_Check_Revision_1.pdf

PDF 66 MB Posted

Attached to
Construction Manager At-Risk Plumbing Infrastructure Enhanced Maintenance Project
Solicitation number
2026-RFP-0504
Issued by
Los Angeles County, California

About this file

This is a plan check revision document for a sewer maintenance project associated with the Rose Bowl Operating Company's Construction Manager at Risk (CMAR) Plumbing Infrastructure Enhanced Maintenance Project in Pasadena, California. The project encompasses the replacement and rehabilitation of the Rose Bowl Stadium's water, sewer, and gas distribution systems beneath the stadium concourse, implementing recommendations from the 2022 Rose Bowl Sewer and Water Asset Management Plan. The work must be performed at an operating stadium that maintains continuous event use throughout construction, with the critical requirement that the stadium's domestic plumbing and fire protection service—which share a single combined system—remain operational during all phases. The RBOC seeks a CMAR to provide preconstruction and design-assist services, including a funded subsurface field investigation program, with Phase 2 construction services contingent upon RBOC's option to authorize that phase. The Base Bid and each alternate are defined by separate 100% Construction Document sets.

The project prioritizes contractors with directly relevant wet-utility experience, demonstrated expertise in open-cut main replacement and trenchless sewer rehabilitation, and proven capability managing live, occupied venue event-window phasing while maintaining water and fire service continuity. The selection process will evaluate proposals based on subsurface risk management expertise, collaborative approach to achieving optimal value within the project budget and stadium event calendar, financial strength, safety record, and commitment to Pasadena-based subcontractors and local workforce. A Selection Committee will review all proposals and shortlist no more than five highest-scoring finalists for interview and final scoring pursuant to Pasadena Municipal Code standards.

View the file

Other files

File Type Posted
Construction_Manager_At-Risk_Plumbing_Infrastructure_Enhanced_Maintenance_Project_(Addendum_#4_Revision).pdf PDF
RBOC_Plumbing_Infra_Sewer_Plan_Check_Comment_Response_Matrix.xlsx XLSX spreadsheet
RBOC_Plumbing_Infra_Water_Plan_Check_Comment_Response_Matrix_.xlsx XLSX spreadsheet
Water_Maintenance_Project_-_Plan_Check_Revision_1_.pdf PDF
WO_798158_RBOC_1001_ROSE_BOWL_DRIVE_PASADENA_CA_NEW_.pdf PDF
LA-01286-14_RoseBowlPlumbing_UtilityRecsLtr_8-13-2026.pdf PDF
099742017-_RBOC_Plumbing_Infra_-_Sewer_Maintenance_Project_Issue_for_Bid.pdf PDF
25270-PW_03-11-2026_ROSE_BOWL_-_UTILITY_SURVEY.pdf PDF
REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION_08022024_v2.pdf PDF
Subcontractor_Listing_(1)_-_RBOC_CMAR.pdf PDF
099742017-_RBOC_Plumbing_Infra_Gas_Maintenance_100_Plans_2026-09-11_Item_4_NEW_S.pdf PDF
RBOC_Plumbing_Infra_Specs_for_IFB_PDFs_-_NEW_Y_Addendum_No._3.zip ZIP file
Copy_of_Bid_Form_v3_-_082826_addendum.xlsx XLSX spreadsheet
Rose_Bowl_Stakeholder_Calendar_for_RFP_-_to_send.xlsx XLSX spreadsheet
099742017-_RBOC_Plumbing_Infra_-_Water_Maintenance_Project_Issue_for_Bid.pdf PDF
CONFLICT_OF_INTEREST_(5).pdf PDF
DESIGNATED_REPRESENTATIVESdocx.pdf PDF
Declaration_of_Elibility_to_Contract_(not_debarred)_-_RBOC_CMAR.pdf PDF
Civil_Litigation_History_Certification_ver02_-_RBOC_CMAR.pdf PDF
Public_Contract_Code_Disclosure_-_RBOC_CMAR.pdf PDF
[P]_Proof_of_Authority_(2)_-_RBOC_CMAR_Plumbing.pdf PDF
DISQUALIFICATION_DISCLOSURE_(4).pdf PDF
Pasadena_Taxpayer_Protection_Amendment_Disclosure_(2).pdf PDF
RELEVANT_EXPERIENCE_FORM.pdf PDF
DoIT_Technical_Questionnaire.xlsx XLSX spreadsheet
Unique_Entity_ID_(SAM).pdf PDF
Exclusive_Negotiation_Agreement__TEMPLATE.pdf PDF
Disclosure_of_Lobbying_Activities.pdf PDF
Federal_Required_Certification_(4).pdf PDF
Emergency_FEMA_TC.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .