This document is a Contractor's Design/Bid/Build (D/B/B) Agreement from the State of Colorado's Office of the State Architect for the University of Colorado Boulder. The project involves upgrading the Chilled Water (CHW) distribution system for future expansion and installing a new 4" service to the PDPS Building, which will be performed while adjacent CHW systems remain energized and buildings remain fully operational and occupied. The contract does not specify exact completion dates or calendar days for project milestones, but emphasizes that timely completion is an essential condition of the agreement, with potential liquidated damages for delays.
The contract includes provisions for funding contingencies, with the total contract sum to be determined based on the contractor's bid and potential alternates. The document indicates that funding is subject to state appropriations, and the contract will not be effective until signed by the State Controller. The agreement covers performance requirements, including executing work to the highest industry standards and substantial completion within a specified timeframe. Notable optional provisions include potential applicability of the Buy Clean Colorado Act, Davis-Bacon Act wage requirements, and state prevailing wage statutes, which can be elected by the Principal Representative.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S AGREEMENT DESIGN/BID/BUILD (D/B/B)
(STATE FORM SC-6.21)
State Agency University of Colorado Boulder Department I.D.
GFB
Contract I.D. Number N/A Project Number Project Name Contractor Name
SC-6.21
Rev. 07/2025 TOC
Principal Representatives: For the Contractor:
For the State:
| Name | Name | ||
| University of Colorado Boulder | Company Name | ||
| 1540 30th Street | Address Line 1 | ||
| Boulder, CO 80301 | Address Line 2 | ||
| City, State ZIP | |||
Designated Representative:
Micheal C. Turman Director, Design & Construction University of Colorado Boulder 1540 30th Street Boulder, CO 80301 mike.turman@colorado.edu
ATTACHMENT 1: The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23)
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
TABLE OF CONTENTS… Page Table of Contents for the entire Agreement is located in THE GENERAL CONDITIONS OF THE CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT (SC-6.23)
| SIGNATURE PAGE | 1 | |
| RECITALS: | 2 | |
| 1 | ARTICLE 1 PERFORMANCE OF THE WORK | 3 |
| 2 | ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS | 3 |
| 3 | ARTICLE 3 TIME OF COMPLETION | 3 |
| 4 | ARTICLE 4 ESSENTIAL CONDITION | 3 |
| 5 | ARTICLE 5 CONTRACT SUM | 3 |
| 5.1 | CONDITION PRECEDENT | 3 |
| 6 | ARTICLE 6 CONTRACT DOCUMENTS | 4 |
| 6.1 | CAPITALIZED TERMS | 4 |
| 7 | ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS | 4 |
| 7.1 | MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation. | 4 |
| 7.2 | MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples | 4 |
| 7.3 | MODIFICATION 1 OF ARTICLE 27: Labor and Wages | 5 |
| 7.4 | MODIFICATION 2 OF ARTICLE 27: Labor and Wages | 5 |
| 7.5 | MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations | 5 |
| 7.6 | MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion | 5 |
| 7.7 | MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages | 5 |
| 8 | ARTICLE 8 NOTICE IDENTIFICATION | 5 |
EXHIBIT A: CONTRACTORS BID
| EXHIBIT B: | PERFORMANCE BOND |
| EXHIBIT C: | LABOR AND MATERIAL PAYMENT BOND |
EXHIBIT D: INSURANCE CERTIFICATE(S)
| EXHIBIT E: | BUILDING CODE COMPLIANCE POLICY |
| EXHIBIT F: | STATE SALES AND USE TAX FORM |
| EXHIBIT G: | APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP CONTRIBUTION RATES |
EXHIBIT H: APPRENTICESHIP UTILIZATION CERTIFICATIONS
SUPPLEMENTARY GENERAL CONDITIONS: UNIVERSITY OF COLORADO BOULDER (Supersedes State Contract Requirements) General Conditions of the Design/Bid/Build (DBB) Agreement (Form SC-6.23)
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS
SC-6.21
Rev. 07/2025 TOC
SIGNATURE PAGE
THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed by the State Controller (or an authorized delegate) per the Fiscal Rules of the individual Institution of Higher Education
Project Number/Name:
Contract ID No.: N/A
SC-5.3
Rev. 02/2022 Page 1
SC-6.21
Rev. 07/2025 15
CONTRACTOR
By:
Date: __________________
STATE OF COLORADO
The Regents of the University of Colorado, a Body Corporate
By:
Date: __________________
OFFICE OF THE STATE ARCHITECT
State Buildings Program
By:
Date: __________________
LEGAL REVIEW
University Legal Counsel
By:
Date: __________________
STATE CONTROLLER
Campus Controller’s Office By:
Effective Date: __________________
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD (D/B/B) AGREEMENT
(STATE FORM SC-6.21)
Department ID: GFB Contract ID #: N/A Project #:
1. PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Regents of the University of Colorado Boulder, a Body Corporate hereinafter referred to as the State or Principal Representative, and having its offices at hereinafter referred to as the Contractor.
2. EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Contractor for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to engage the services of a Contractor for the hereinafter called the Project; and
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment.
WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Dollars ($ ) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and
(WHEREAS, funds are available for only a portion of the services defined herein, as more fully described in the funding Condition Precedent clause in Article 5.1; and)
WITNESSETH, that the State of Colorado and the Contractor agree as follows:
1. ARTICLE 1 PERFORMANCE OF THE WORK
The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.
ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
The Contractor agrees to perform the Work to the highest industry standards and to the satisfaction of the State of Colorado and its contractor in strict accordance with the provisions of the Contract Documents.
ARTICLE 3 TIME OF COMPLETION
The Contractor agrees to Substantially Complete the Project within calendar days from the date of the Notice to Proceed, in addition, the Contractor agrees to finally complete the Project from Substantial Completion to Final Acceptance within calendar days for a total time of completion of the entire Project of calendar days. The Contractor shall perform the Work with due diligence to completion.
ARTICLE 4 ESSENTIAL CONDITION
Timely completion of the Project is an essential condition of this Agreement. The Contractor shall be subject to any liquidated damages described in Article 7.6 for failure to satisfactorily complete the Work within the time periods in Article 3 above.
ARTICLE 5 CONTRACT SUM
The Contractor shall be paid for the performance of this Agreement, subject to any additions and deductions as provided for in Articles 32, 34 and 35 of The General Conditions of the Construction Contract SC-6.23, the sum of DOLLARS AND NO/100 ($ ).
CONDITION PRECEDENT
(At the time of the execution of this Agreement, there are sufficient funds budgeted and appropriated to compensate the Contractor only for performance of the services through and including Insert the project phases that have been fully funded Therefore, it shall be a Condition Precedent to the Contractor’s performance of the remaining services and the State's liability to pay for such performance, sufficient funding must be appropriated and made available to the Principal Representative for the Project prior to and, as a further Condition Precedent, a written Amendment is entered into in accordance with the State of Colorado Fiscal Rules, stating that additional funds are lawfully available for the project. If either Condition Precedent is not satisfied by , the Contractor’s obligation to perform services for Insert the scope pf work or phases that will be completed in the future and the State's obligation to pay for such service is discharged without liability to each other. If funding is eventually made available after , the Contractor has no right to perform services under of this Agreement and the state has no right to require the Architect/Engineer to perform the said services.)
ARTICLE 6 CONTRACT DOCUMENTS
The Contract Documents, as enumerated in Article 1.1 of The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23), (the “General Conditions”). The Contract Documents, including the General Conditions, are all essential parts of this Agreement and are fully incorporated herein.
CAPITALIZED TERMS
Capitalized terms used herein and not defined shall have the meanings ascribed to them in The General Conditions of Design/Bid/Build (D/B/B) Agreement (SC-6.23)
ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
The provisions of this Article 7 alter or enlarge upon the following Articles (the General Conditions of the Contractor’s Design/Bid/Build Agreement SC-6.23):
MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation.
If the box below is marked, certification of apprenticeship utilization is required for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing work on the project.
☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples If the box below is marked, the Buy Clean Colorado Act, §24-92-117, C.R.S., shall be applicable to the Project. The Contractor is responsible for submitting Environmental Product Declaration (EPD) information for all eligible materials to be used on the project.
☐ ______ Principal Representative initial MODIFICATION 1 OF ARTICLE 27: Labor and Wages If the box below is marked, the Federal Davis-Bacon Act shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☐ ______ Principal Representative initial MODIFICATION 2 OF ARTICLE 27: Labor and Wages If the box below is marked, the State prevailing wage statute shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations If the box below is marked, and initialed by the State as noted, the requirement to participate in facilitated negotiations shall be deleted from this Contract. Article 39, Non-Binding Dispute Resolution – Facilitated Negotiations, shall be deleted in its entirety and all references to the right to the same where ever they appear in the contract shall be similarly deleted.
The box may be marked only for projects with an estimated value of less than $500,000.
☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion If the box below is marked the six month guarantee inspection is not required.
☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages If an amount is indicated immediately below, liquidated damages shall be applicable to this Project as, and to, the extent shown below. Where an amount is indicated below, liquidated damages shall be assessed in accordance with and pursuant to the terms of The General Conditions of the Design/Bid/Build Agreement Article 46, Time of Completion And Liquidated Damages, in the amounts and as here indicated. The election of liquidated damages shall limit and control the parties right to damages as the State’s sole and exclusive remedy for delay.
Inability To Use The Project For the inability to use the Project, for each day after the number of calendar days specified in the Contractor’s bid for the Project and the Agreement for achievement of Substantial Completion, until the day that the Project has achieved Substantial Completion and the Notice of Substantial Completion is issued, the Contractor agrees that an amount equal Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due, but amounts remaining are insufficient to cover the entire assessment.
Damages Related to Extended Closeout For damages related to or arising from additional administrative, technical, supervisory and professional expenses related to and arising from the extended closeout period, for each day in excess of the number of calendar days specified in the Contractor’s bid for the Project and the Agreement to finally complete the Project as defined by the issuance of the Notice of Final Acceptance (after the issuance of the final Notice of Substantial Completion), the Contractor agrees that an amount equal to Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due but amounts remaining are insufficient to cover the entire assessment.
ARTICLE 8 NOTICE IDENTIFICATION
All Notices pertaining to this Agreement and the General Conditions (SC-5.23) or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing.
Notice to Principal Representative:
Project Manager University of Colorado Boulder Email
With copies to State Buildings Program (or Delegate:
Micheal C. Turman Director, Design & Construction University of Colorado Boulder mike.turman@colorado.edu
Notice to Contractor
SC-6.21
Rev. 07/2025 1 image1.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
Description of Work/Date Dollar Amount
Base Contract Amount
Alt. #01
Alt. #02
Total Contract Sum $ - 0