Attachment 1.01 SOW AMENDMENT NO 1 02262021.pdf

PDF 132 KB Posted

Attached to
UPT 2. 5 Hanger 12 & 64 Renovation
Solicitation number
TYMX215706
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA301621R00130005 SF 30.pdf PDF
Additional RFI Question and Answer.pdf PDF
Revised CarpetSelection - 03022021.pdf PDF
Attachment 18 Meeting Mintutes Pre-Proposal Conference.pdf PDF
Solicitation Amendment FA301621R00130004 SF 30 (1).pdf PDF
Attachment 2 SOW ATTACHMENTS Amended 26 Feb.pdf PDF
FA301621R00130003 SF 30.pdf PDF
UPT 2.5 RFI Questions and Answers.pdf PDF
CarpetSelection - H12-SIGNED-02232021.pdf PDF
Hanger 64 Electric Panel Info.pdf PDF
Solicitation Amendment FA301621R00130002 SF 30.pdf PDF
Solicitation Amendment FA301621R00130001 SF 30.pdf PDF
Sign in sheet H12 and H64 site visit.pdf PDF
Attachment 8 Draft DD Form 1354 - H12.pdf PDF
Attachment 8 Draft DD Form 1354 - H64.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 7 Local Information.pdf PDF
Attachment 5 Ozone Depletion Control Compliance-signed.pdf PDF
Attachment 13 Sample - Cost Estimate Breakdown.xls XLS spreadsheet
UPT 2_5 Renovation Hanger12 and Hanger64.zip ZIP file
Attachment 11 Financial Information Questionnaire.docx DOCX document
Attachment 2 SOW ATTACHMENTS.pdf PDF
Attachment 6 HAZMAT Letter - signed.pdf PDF
Attachment 9 Unescorted_Base_Access_Request.pdf PDF
Attachment 4 AETC Form 47.pdf PDF
Attachment 10 Sample Progress Schedule.xlsx XLSX spreadsheet
Attachment 12 Contractor Responsibility Questionnaire.docx DOCX document
Attachment 1 SOW H12-H64.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPT 2.5: RENOVATE HANGAR 12 & HANGAR 64

TYMX215706

AMENDMENT NO. 1

26 FEB 2021

SECTION 01 11 00.10

1.2.3 DEMOLITION: HANGAR 64

• No changes.

1.2.4 NEW WORK: HANGAR 64

• Change the following statement: Contractor shall provide a minimum 2- 3-inch drain line for washer.

• Add the following work statement: Contractor shall add electric power for full size washer/ dryer unit as required. Additional information regarding electric panels is attached.

1.2.5 DEMOLITION: HANGAR 12

Add the following statement: Contractor can office out of Room 18 in Hangar 12 while construction is ongoing in Hangar 12 only. Once construction is complete in Hangar 12, Room 18 will no longer be available. No additional rooms are available in Hangar 64. Contractor laydown area exhibits were provided within the procurement package.

Room 8:

• Change the following statement: Contractor shall disassemble dismantle all modular furniture and set a-side for customer disposal. , relocate, and reassemble. (See option CLINS FURNITURE GROUPS in Section 1.2.7 below.).

• Delete the following statement: Contractor shall relocate approximately 26 office chairs and leave for immediate use. (See option CLINS in Section 1.2.7 below.)

• Add the following work statement: Contractor shall remove all whiteboards from walls, abate, and store.

• Add the following statement: Remove ceiling grid and ceiling tiles and dispose of.

Room 9:

• Change the following statement: Contractor shall remove and dispose of and demolish ceiling grid, ceiling tiles, and all carpet tiles in Room 9.

Room 10:

Change the following statement: Contractor shall remove and dispose of and demolish ceiling grid, ceiling tiles, and all carpet tiles in Room 10.

• Change the following statement: Contractor shall store all office furniture, as depicted on attached FURNITURE LIST design documents, including four office chairs. (See option CLINS in 1.2.7 FURNITURE GROUPS).

Room 18:

• Change the following statement: Contractor shall remove existing whiteboard attached to wall and abate if necessary. Whiteboard shall be stored during construction.

• Change the following statement: Contractor shall relocate and store all office furniture per attached FURNITURE LIST (see option CLINS in 1.2.7 FURNITURE GROUPS), as depicted on attached design documents, including four office chairs. (See option CLINS in Section 1.2.7 below.).

• Change the following statement: Contractor shall remove and demolish set aside for re-use existing ceiling grid and ceiling tiles. NOTE: Only a portion of ceiling grid and tiles will be re-used.

Room 14:

• Change the following statement: Contractor shall relocate and store all office furniture as depicted on attached FURNITURE LIST design documents, including two office chairs. (See option CLINS in Section 1.2.7 FURNITURE GROUPS below.).

Room 16:

• Change the following statement: Contractor shall disassemble all designated modular furniture, break down by material (wood, fabric, and metal) and recycle to JBSA Recycle Center. and relocate (see option CLINS in 1.2.7).

• Add the following statement: Contractor shall relocate and store all additional office furniture per attached FURNITURE LIST (see option 1.2.7 FURNITURE GROUPS).

Room 4:

• Change the following statement: Contractor shall disassemble all modular furniture. and demolish. Contractor shall take all wooden furniture not containing asbestos that is broken down to JBSA Recycle Center to be recycled. Contractor shall determine is any portion of furniture connected to the wall can be disposed of as HAZ WASTE.

• Change the following statement: Contractor shall remove approximately 5 LF of 5 ½-inch PVC handrail in Main hallway (where door is to be added) and dispose of it set aside for re-attachment.

1.2.6 NEW WORK: HANGAR 12

Proposed New Flight Room (Room 8):

• Change the following statement: Contractor shall cut wall for installation of 4-inch electrical box and conduit with 12 gage wire for electrical outlet and Cable for TV's.

• Change the following statement: Contractor shall paint entire room using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

• Add the following statement: Contractor shall install new ceiling grid and ceiling tile with necessary supports.

• Change the following statement: Contractor shall cut wall and provide one single electrical box every 10-feet and one single data boxes with conduit and wiring per workstations.

• Add the following statement: Contractor shall clean supply and return air ducts. Contractor shall provide test and balance on HVAC system.

Proposed New ITD Room (Room 9 and 10):

• Change the following statement: Contractor shall evaluate heat load for proposed Immersive Training Device (ITD) room and determine size of a new stand-alone HVAC system required to support eight (8) ITD's in the ITD room. See attached ITD specification sheet for ITD heat load and BTU/ hr information. Contractor shall have calculations signed and sealed by professional MEP.

• Change the following statement: Contractor shall paint entire combined room using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

• Add the following statement: Contractor shall ensure that the new standalone HVAC system is to have a local room thermostat. It will not be controlled by EMCS since the Customer must be able to control the room temperature at all times.

• Delete the following statement: Contractor shall clean supply and return air ducts.

Contractor shall provide test and balance on HVAC system.

• Add the following statement: Contractor shall provide and install conduits and new power breaker panel for new room.

Proposed New Room 14: A Flight CC Office

• Add the following statement: Contractor shall install new conduit and boxes for data and phone on west wall.

Proposed New Room 16: DOV Chief Office

• No Changes.

Proposed New Room 18: Flight CC Office

• Change the following statement: Contractor shall repair walls with gypsum board as needed. Contractor shall paint entire room using one (1) coat of primer and two (2) coats of paint. on all repair work. Paint color shall be Sherwin Williams 27886.

• Change the following statement: Contractor shall install new ceiling grid with necessary supports. Contractor shall install new ceiling tiles. NOTE: The new room that opens to Room 8 (the Flight Room), will get new ceiling grid and ceiling tiles with the necessary supports. The other room that opens directly into the hallway will have reinstalled ceiling grid and tiles.

Proposed New Room 4: C Flight CC Office

• Add the following statement: Contractor shall re-size, cut and re-attach handrail to wall in hallway.

1.2.7 [Enter Appropriate Subpart Title Here]FURNITURE GROUPS

• Change title as indicated above. “[Enter Appropriate Subpart Title Here]” should be removed.

• Change the following statement: FURNITURE GROUP 1: Contractor shall store office furniture (desks, bookcases, chairs) as noted on drawings, within limits of JBSA Randolph, most likely Building 873. Contractor shall return office furniture according to plans upon completion of project. Excess furniture shall be turned over to owner.

• Delete the following statement: FURNITURE GROUP 2: Contractor shall disassemble, relocate, and immediately reassemble modular furniture to Hangar 13 (Rooms 104, 105, 106, 107, 108, and 109) located in JBSA Randolph AFB. See attached design documents.

File details come from the government source that posted it. Updated .