Additional RFI Question and Answer.pdf

PDF 91 KB Posted

Attached to
UPT 2. 5 Hanger 12 & 64 Renovation
Solicitation number
TYMX215706
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA301621R00130005 SF 30.pdf PDF
Revised CarpetSelection - 03022021.pdf PDF
Attachment 18 Meeting Mintutes Pre-Proposal Conference.pdf PDF
Solicitation Amendment FA301621R00130004 SF 30 (1).pdf PDF
Attachment 2 SOW ATTACHMENTS Amended 26 Feb.pdf PDF
FA301621R00130003 SF 30.pdf PDF
Attachment 1.01 SOW AMENDMENT NO 1 02262021.pdf PDF
UPT 2.5 RFI Questions and Answers.pdf PDF
CarpetSelection - H12-SIGNED-02232021.pdf PDF
Hanger 64 Electric Panel Info.pdf PDF
Solicitation Amendment FA301621R00130002 SF 30.pdf PDF
Solicitation Amendment FA301621R00130001 SF 30.pdf PDF
Sign in sheet H12 and H64 site visit.pdf PDF
Attachment 8 Draft DD Form 1354 - H12.pdf PDF
Attachment 8 Draft DD Form 1354 - H64.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 7 Local Information.pdf PDF
Attachment 5 Ozone Depletion Control Compliance-signed.pdf PDF
Attachment 13 Sample - Cost Estimate Breakdown.xls XLS spreadsheet
UPT 2_5 Renovation Hanger12 and Hanger64.zip ZIP file
Attachment 11 Financial Information Questionnaire.docx DOCX document
Attachment 2 SOW ATTACHMENTS.pdf PDF
Attachment 6 HAZMAT Letter - signed.pdf PDF
Attachment 9 Unescorted_Base_Access_Request.pdf PDF
Attachment 4 AETC Form 47.pdf PDF
Attachment 10 Sample Progress Schedule.xlsx XLSX spreadsheet
Attachment 12 Contractor Responsibility Questionnaire.docx DOCX document
Attachment 1 SOW H12-H64.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional RFI Question and Answer

After conferring with our Electrical Engineer, we have concluded that the following applies:

1) What will the amperage of the panel be? When the heat load is determined, the amperage of the panel can be determined.

2) Will the panel be a 120/08V panel? Depends on the HVAC unit that is sized/ determined/ used.

3) How many breaker spaces does the panel need to be? 3

4) What panel will the new panel be fed from? Depends on the load.

5) Will load calculations on the existing panel be needed YES and will the new panel need to be engineered? YES

The voltage panels are in communication room #12. Room 12 is down the hall from rooms 9 and

10. Circuit directories show spare breaker space.