Attachment 1 SOW H12-H64.pdf

PDF 892 KB Posted

Attached to
UPT 2. 5 Hanger 12 & 64 Renovation
Solicitation number
TYMX215706
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA301621R00130005 SF 30.pdf PDF
Additional RFI Question and Answer.pdf PDF
Revised CarpetSelection - 03022021.pdf PDF
Attachment 18 Meeting Mintutes Pre-Proposal Conference.pdf PDF
Solicitation Amendment FA301621R00130004 SF 30 (1).pdf PDF
Attachment 2 SOW ATTACHMENTS Amended 26 Feb.pdf PDF
FA301621R00130003 SF 30.pdf PDF
Attachment 1.01 SOW AMENDMENT NO 1 02262021.pdf PDF
UPT 2.5 RFI Questions and Answers.pdf PDF
CarpetSelection - H12-SIGNED-02232021.pdf PDF
Hanger 64 Electric Panel Info.pdf PDF
Solicitation Amendment FA301621R00130002 SF 30.pdf PDF
Solicitation Amendment FA301621R00130001 SF 30.pdf PDF
Sign in sheet H12 and H64 site visit.pdf PDF
Attachment 8 Draft DD Form 1354 - H12.pdf PDF
Attachment 8 Draft DD Form 1354 - H64.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 7 Local Information.pdf PDF
Attachment 5 Ozone Depletion Control Compliance-signed.pdf PDF
Attachment 13 Sample - Cost Estimate Breakdown.xls XLS spreadsheet
UPT 2_5 Renovation Hanger12 and Hanger64.zip ZIP file
Attachment 11 Financial Information Questionnaire.docx DOCX document
Attachment 2 SOW ATTACHMENTS.pdf PDF
Attachment 6 HAZMAT Letter - signed.pdf PDF
Attachment 9 Unescorted_Base_Access_Request.pdf PDF
Attachment 4 AETC Form 47.pdf PDF
Attachment 10 Sample Progress Schedule.xlsx XLSX spreadsheet
Attachment 12 Contractor Responsibility Questionnaire.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYMX215706

UPT 2.5: RENOVATE HANGAR 12 and HANGAR 64

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.10 JBSA SUMMARY OF WORK

01 14 00 JBSA WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 32 33.00 JBSA SPECIAL PROCEDURES FOR HISTORIC TREATMENT

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)

01 33 29 SUSTAINABILITY REPORTING

01 35 13.10 00 SPECIAL PROCEDURES-SURVEYING

01 35 13.20 00 SPECIAL PROJECT PROCEDURES-CAD

01 35 13.30 00 SPECIAL PROJECT PROCEDURES- GIS

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 DESIGN AND CONSTRUCTION QUALITY CONTROL

01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20 ENVIRONMENTAL PROTECTION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.10 JBSA SUMMARY OF WORK

a description of work covered in this contract and is required for use in all JBSA capital projects

01 14 00 JBSA WORK RESTRICTIONS

scope

01 30 00 ADMINISTRATIVE REQUIREMENTS

general administrative and procedural requirements for Contractor management and coordination

01 32 01.00 10 PROJECT SCHEDULE

the preparation and maintenance of the project schedule for construction projects or design-build construction projects

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

the preparation and use of construction schedules for small projects

01 32 33.00 JBSA SPECIAL PROCEDURES FOR HISTORIC TREATMENT

removal and salvage of historic building materials and procedures for working on historic buildings and structures.

01 33 00 SUBMITTAL PROCEDURES

general procedures regarding submittals, data normally submitted for review to establish conformance with the design concept and contract documents

01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)

design/build project, including design development and design submittals. Use this section in a design/build project executed by the Army only.

01 33 29 SUSTAINABILITY REPORTING

providing sustainability documentation for Guiding Principles Validation (GPV), and Third Party Certification (TPC)

01 35 13.10 00 SPECIAL PROCEDURES-SURVEYING

scope

01 35 13.20 00 SPECIAL PROJECT PROCEDURES-CAD

scope

01 35 13.30 00 SPECIAL PROJECT PROCEDURES- GIS

scope

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

safety and occupational health requirements for the protection of Contractor and Government personnel, property, and resources

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

PROJECT TABLE OF CONTENTS Page 1 listing of organizations whose publications are referenced in other sections of the specifications.

01 45 00.00 10 DESIGN AND CONSTRUCTION QUALITY CONTROL

Contractor Quality Control

01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION

Quality Control for small construction projects and repair or maintenance work. It may also be used for minor elements or small quantities of work in larger projects at the discretion of the Government

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

temporary construction facilities, safety systems, construction traffic provisions, construction signage and controls over contractor operations required for use in all projects.

01 57 20 ENVIRONMENTAL PROTECTION

scope

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

the management of non-hazardous construction waste and demolition debris/waste materials

01 78 00 CLOSEOUT SUBMITTALS

closeout submittals including: revised project documents, warranty management, testing, adjusting and balancing, O & M manuals, and cleanup

01 78 23 OPERATION AND MAINTENANCE DATA

Operation and Maintenance (O&M) data packages, manuals and training

01 91 00.15 TOTAL BUILDING COMMISSIONING

Total Building Commissioning requirements for new construction and major renovations

DIVISION 02 - EXISTING CONDITIONS

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

transportation and disposal of hazardous material

02 82 00 ASBESTOS REMEDIATION

safety procedures and requirements for the demolition, removal, encapsulation, and disposal of asbestos containing materials (ACM)

02 83 00 LEAD REMEDIATION

protection of workers, disposal of lead, cadmium and chromium painted material, abatement of lead based paint hazards in target housing and child occupied facilities and limiting occupational and environmental exposure to lead-based paint or paint with lead (LBP/PWL)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

PROJECT TABLE OF CONTENTS Page 2

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

testing, adjusting, and balancing (TAB) of heating, ventilating, and air-conditioning (HVAC) air and water distribution systems

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SECTION 01 11 00.10

JBSA SUMMARY OF WORK

10/19

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor QC approval.

Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Abatement Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 PROJECT DESCRIPTION

The work includes renovation of portions of Hangar 12 and Hangar 64. The Contractor shall provide all personnel, equipment, tools, materials and supervision required to renovate two different facilities in support for the 560th Flying Training Squadron. Starting with Hangar 12, work shall consist of demolishing ceiling grid, light fixtures, ceiling tiles, removal of existing walls, door frames with doors, HVAC duct lines, carpet tiles, and abatement of joint compound on inner walls. Hangar 64 work shall include installation of water line, vent and connection to drain lines for installation of a stackable washing machine and dryer. Both Hangar 12 and Hangar 64 are located on Joint Base San Antonio, Randolph (JBSA-RND) Texas

(TX).

The Government has provided a Lead and Asbestos Assessment Report on both work sites. The Contractor is responsible for reviewing the attached reports. The Contractor shall submit an Asbestos Abatement work plan for approval by 502 Contracting Officer (CO), 802 Civil Engineering Squadron (CES) and 802 Environmental Rep. The Contractor shall submit for a Demolition/Renovation Notification through the Area Specific Environmental Office 15 days prior to any abatement activity, submitted 7 days prior to remediation work.

1.2.2 HOURS OF OPERATION

The Contractor shall schedule work between the hours of 7:00 a.m. to 7:00 p.m., Monday through Friday and Saturdays between the hours of 7:00 a.m. to 4:30 p.m. (weekends and nights only with prior coordination and approval).

The work will be conducted in government personnel office space requiring all personnel under this contract to wear identification badges, appropriate clothing, and safety gear. All Contractor personal must remain within their work area. The government may require phase work due to the nature of the work site.

Government Holidays:

New Year's Day: January 1 Martin Luther king, Jr's Birthday: 3rd Monday in January President's Day: 3rd Monday in February

SECTION 01 11 00.10 Page 1

Memorial Day: Last Monday in May Independence Day: July 4 Labor Day: 1st Monday in September Columbus Day: 2nd Monday in October Veteran's Day: November 11 Thanksgiving Day:4th Thursday in November Christmas Day:ecember 25

Holidays falling on a Saturday will be observed on the preceding Friday;

Holidays falling on a Sunday will be observed on the following Monday.

Contractor will not work on a government holiday without approval by the Contracting Officer. Saturday work will not be available during a holiday weekend.

1.2.3 DEMOLITION: HANGAR 64

DEMOLITION SCOPE OF WORK - HANGAR 64

The word "remove" or "removed" as used in this Statement of Work, shall be understood to mean the Contractor shall disconnect or demolish the items indicated, from its supportive element base and or its mechanical, plumbing and electrical connection, and dispose of the item off the installation, according to UFGS 01-35-35, federal, state, and local requirements. The Contractor shall protect supportive elements to remain, and provide a replacement to match existing if damaged, at no expense to the Government.

Prior to starting any demolition work, Contractor shall review attached Asbestos Report, dated 3/11/2019 to ensure the location of proposed demolition and work does not disturb existing, if any, asbestos.

The Contractor shall remove existing front shower tile walls to entrance of shower stall. Each wall is approximately 12-inches wide by 108-inches tall. Contractor shall ensure existing 4-inch tile curb at entrance to shower is not damaged. Contractor shall ensure there is no damage to other showers.

Contractor shall remove existing shower head and cap water line. Attached are existing water line as-builts.

1.2.4 NEW WORK: HANGAR 64

The Contractor and workers shall refer to the attached Hangar 64 Design Documents prior to beginning any work on the facility. The Contractor shall perform an inspection survey of areas. After completion of surveyed areas, the contractor shall prepare and submit a detailed report to the Contracting Officer (CO).Contractor shall add 4-inch tile to both areas where shower tile was removed. Tile to be added is to match existing as close as possible.

Contractor shall add service water line for stackable washer and dryer unit. Existing as-builts are attached.

Contractor shall provide vent for stackable dryer unit via exterior side of the building.

Contractor shall protect all existing floors in route to construction area if bringing large equipment into facility.

Contractor shall provide a minimum 3-inch drain line for washer.

SECTION 01 11 00.10 Page 2

Contractor shall provide a minimum 2-inch vent for washer.

The Contractor shall provide new piping insulation on new plumbing with required markings on systems (of chilled water or hot water markings;

showing flow) and on any valves.

1.2.5 DEMOLITION: HANGAR 12

The word "remove" or "removed" as used in this Statement of Work, shall be understood to mean the Contractor shall disconnect or demolish the items indicated, from its supportive element base and/ or its mechanical, plumbing and electrical connection, and dispose of the item off the installation, according to UFGS 01-35-35, federal, state, and local requirements. The Contractor shall protect supportive elements to remain, and provide a replacement to match existing if damaged, at no expense to the Government.

Room 8: Prior to beginning any demolition work, Contractor shall abate found asbestos containing material in Hangar 12. Reference attached Asbestos Report.

Contractor shall disassemble all modular furniture, relocate, and reassemble. (See option CLINS in Section 1.2.7 below.).

Contractor shall relocate approximately 26 office chairs and leave for immediate use. (See option CLINS in Section 1.2.7 below.)

Contractor shall store desk (60"x24"). (See Option CLINS in 1.2.7).

Contractor shall remove existing carpet and dispose of it.

Contractor shall remove door frame, door stops and door leading from Room 8 into Room 9. Contractor shall set aside door frames and doors for re-use on this project.

Room 9: Prior to beginning any demolition work, Contractor shall abate found asbestos containing material in Hangar 12. Reference attached Asbestos Report.

Contractor shall remove and demolish ceiling grid, ceiling tiles, and all carpet tiles in Room 9.

Contractor shall demolish existing 8- ft H x 24-ft L wall. Contractor demolition work shall include verification that it is a non-loading bearing wall. Wall contains two blank electric boxes.

Contractor shall remove one light switch on existing wall to be demolished.

Contractor shall temporarily tie up heat device and WiFi to ceiling in the room during construction.

Room 10: Prior to beginning any demolition work, Contractor shall abate found asbestos containing material in Hangar 12. Reference attached Asbestos Report.

Contractor shall remove two (2) door frames, door stops and doors leading from Hallway into Room 10. Contractor shall set aside door frames and

SECTION 01 11 00.10 Page 3 doors for re-use on this project.

Contractor shall tie light fixtures to ceiling. There are approximately 6 light fixtures total within rooms 9 and 10.

Contractor shall remove and demolish ceiling grid, ceiling tiles, and all carpet tiles in Room 10.

Contractor shall store all office furniture, as depicted on attached design documents, including four office chairs. (See option CLINS in 1.2.7).

Room 18: Prior to beginning any demolition work, Contractor shall abate found asbestos containing material in Hangar 12. Reference attached Asbestos Report.

Contractor shall relocate and store all office furniture (see option CLINS in 1.2.7), as depicted on attached design documents, including four office chairs. (See option CLINS in Section 1.2.7 below.).

Contractor shall remove and demolish existing ceiling grid and ceiling tiles.

Contractor shall remove existing carpet within the limits of the newly created Room 18; approximately 138 square feet.

Contractor shall split electrical wiring to support light fixtures for two office areas.

Contractor shall split ductwork for an additional return vent.

Room 14: Prior to beginning any demolition work, Contractor shall abate found asbestos containing material in Hangar 12. Reference attached Asbestos Report.

Contractor shall remove door frame, door stop and door. Contractor shall set aside door frames and doors for re-use on this project.

Contractor shall remove existing light switch.

Contractor shall reroute conduit for electrical outlets, data, and communication lines on West wall.

Contractor shall relocate and store all office furniture as depicted on attached design documents, including two office chairs. (See option CLINS in Section 1.2.7 below.).

Room 16: Prior to beginning any demolition work, Contractor shall abate found asbestos containing material in Hangar 12. Reference attached Asbestos Report.

Contractor shall disassemble all modular furniture and relocate (see option CLINS in 1.2.7).

Contractor shall remove carpet near area at installation of wall bottom plate for new divider wall and haul off and dispose.

Contractor shall remove and demolish existing ceiling grid and ceiling tiles within limits of work area.

SECTION 01 11 00.10 Page 4

Room 4: Prior to beginning any demolition work, Contractor shall abate found asbestos containing material in Hangar 12. Reference attached Asbestos Report.

Contractor shall disassemble all modular furniture and demolish.

Contractor shall remove approximately 5 LF of 5 ½-inch PVC handrail in Main hallway (where door is to be added) and dispose of it.

1.2.6 NEW WORK: HANGAR 12

The Contractor and workers shall refer to the attached Hangar 12 Design Documents prior to beginning any work on the facility. The Contractor shall perform an inspection survey of areas. After completion of surveyed areas, the contractor shall prepare and submit a detailed report to the Contracting Officer (CO).

Proposed new Flight Room (Room 8): Prior to beginning any new work, Contractor shall abate found asbestos containing material in Hangar 12.

Reference attached Asbestos Report.

Contractor shall cut portion of wall to provide/install blocking to support a 32-inch flat screen television at six (6) various locations throughout the room. Contractor shall repair walls with gypsum board as needed. See attached Design Documents for locations.

Contractor shall cut portion of wall to provide/install blocking to support an 85-inch television. Contractor shall repair walls with gypsum board as needed. See attached Design Documents for location.

Contractor shall cut portion of wall to provide/install blocking to support six (6) whiteboards. Contractor shall repair walls with gypsum board as needed. See attached Design Documents for locations.

Contractor shall cut in portion of wall for installation of new door into Room 18 and install door frame and door set aside as reuse. Contractor shall install door stop.

Contractor shall cut wall for installation of 4-inch electrical box and conduit with 12 gage wire for electrical outlet and Cable for TV's

Contractor shall cut wall and provide electrical and data boxes with conduit and wiring for workstations.

Contractor shall paint using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

Contractor shall install new carpet per the attached carpet selection letter.

Proposed new ITD Room (Rooms 9 and 10): Prior to beginning any new work, Contractor shall abate found asbestos containing material in Hangar 12.

Reference attached Asbestos Report.

Contractor shall install visual fire alarms per NFPA requirements.

Contractor shall install new ceiling grid and tiles with necessary supports.

SECTION 01 11 00.10 Page 5

Contractor shall reinstall heat device and WiFi that was temporarily moved during construction.

Contractor shall fill three (3) doors and add matching base cove to adjoining rooms.

Contractor shall install data/ communication next to electrical boxes for each ITD unit. Contractor shall provide testing on all data and communication lines.

Contractor shall evaluate heat load for proposed Immersive Training Device (ITD) room and determine size of a new stand alone HVAC system required to support eight (8) ITD's in the ITD room. See attached ITD specification sheet for ITD heat load and BTU/ hr information.

Contractor shall clean supply and return air ducts. Contractor shall provide test and balance on HVAC system.

Contractor shall install new carpet and matching base cove per the attached carpet selection letter.

Contractor shall paint using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

Proposed new Room 14: A Flight CC Office - Prior to beginning any new work, Contractor shall abate found asbestos containing material in Hangar

12. Reference attached Asbestos Report.

Contractor shall fill East door opening and add matching base cove.

Contractor shall cut and install door frame and door set aside as re-use.

Contractor shall install door stop.

Contractor shall add new light switch.

Contractor shall repair walls with gypsum board as needed. Contractor shall paint using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

Contractor shall repair carpet around area where door work was performed using government furnished stock.

Contractor shall add electrical outlets to walls shown.

Contractor shall reinstall stored furniture per attached design documents.

Proposed new Room 16: DOV Chief Office - Prior to beginning any new work, Contractor shall abate found asbestos containing material in Hangar 12.

Reference attached Asbestos Report.

Contractor shall install new divider wall - 12-ft x 8-ft. with cross bracing.

Contractor shall cut and install door frame and door set aside as reuse.

Contractor shall install door stop.

Contractor shall install new electrical light switch near new divider wall.

Contractor shall install new ceiling grid with necessary supports.

SECTION 01 11 00.10 Page 6

Contractor shall install new ceiling tiles.

Contractor shall install new heat detection device on ceiling grid.

Contractor shall install new return air vent for room.

Contractor shall repair walls with gypsum board as needed. Contractor shall paint using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

Contractor shall install desk (72"x36") that was stored from Room 10.

Contractor shall re-install modular furniture outside newly constructed wall that was to remain.

Proposed new Room 18: Flight CC Office - Prior to beginning any new work, Contractor shall abate found asbestos containing material in Hangar 12.

Reference attached Asbestos Report.

Contractor shall construct new 8-ft H x 13-ft Lx 4-inch thick wall, splitting office into two (2) separate office areas.

Contractor shall install new ceiling grid with necessary supports.

Contractor shall install new ceiling tiles.

Contractor shall repair walls with gypsum board as needed. Contractor shall paint using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

Contractor shall install carpet in newly created "Room 18" only. Room 18 egresses to new Flight Room only.

Contractor shall replace portions of carpet around new wall on opposite side of office with attic stock carpet as needed.

Contractor shall install new detection heat device on ceiling grid.

Contractor shall install new light switch by new door.

Contractor shall install new electrical conduit with boxes for electrical outlets and data on both sides of new wall.

Contractor shall install additional return air vent for new office.

Contractor shall test and balance air ducts.

Contractor shall re-install stored furniture as depicted on attached design documents.

Contractor shall install 60" x 24" desk previously used from Room 8 as depicted on attached design documents.

Proposed new Room 4: C Flight CC Office - Prior to beginning any new work, Contractor shall abate found asbestos containing material in Hangar 12.

Reference attached Asbestos Report.

Contractor shall cut and install door frame and door set aside as re-use.

Contractor shall install door stop.

SECTION 01 11 00.10 Page 7

Contractor shall replace portions of carpet around work with attic stock carpet.

Contractor shall repair walls with gypsum board as needed. Contractor shall paint using one (1) coat of primer and two (2) coats of paint on all repair work. Paint color shall be Sherwin Williams 27886.

Contractor shall install desk (61"x24") and wooden bookcase (33"x16") from stored furniture from Room 10 as depicted on attached design documents.

New Communication Work at Hangar 12 - Additonal Information:

This SOW defines the requirements for the Contractor to engineer, furnish, install, and test 35 dual LAN drops in Hanger 12 on JBSA Randolph. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, and material will be provided by the government.

All communications design/installation shall be accomplished by a BICSI (Building Industry Consulting Service International) certified individual/s.

Project design shall follow: ETL 02-12, UFC Section 16710 Telecommunications Cabling Systems, 38th EIG Handbook 33-01, UFC 3-580-01, BITSEP (Base Information Transport System - Engineering Planning) Handbook, and EIA/ TIA 568B.

NOTE: CONTRACTOR WILL NOT DISCONNECT OR REMOVE ANY COMMUNICATION EQUIPMENT

WITHOUT PRIOR COODINATION WITH THE 502 COMMUNICATION SQUADRON.

IAW ETL 02-12, Para 8.3.3.9.2; Ensure dual/quad telecommunication's jack is provided every 10 ft in administrative areas or as specified.

If applicable, patch panels in rack shall be mounted with cable management throughout, vertical and horizontal.

If applicable, ensure cable management throughout cable path, (J hooks, trays, ladders) from outlets to comm equipment rack.

Provide patch jumper/patch cords, adequately sized to run between patch panels. The number and length to be determined appropriately for equipment and amount of active ports.

NOTE: 502CS/User will determine length and number needed.

All cables shall be labeled and color codes used as per; 38th EIG Handbook 33-01, ANSI, EIA/TIA-606. 568B and C, whichever is more stringent.

Project design shall follow ETL 02-12, Section 16710 Communications Distribution System and 38th EIG Handbook 33-01, dated 01 May 2005, UFC 3-580 and BITSEP Handbook.

All copper cable shall be CAT 6 or better. Plenum rated, solid conductor.

Coordinate all Inside Plant design with the 502nd Comm Squadron.

A continuous horizontal distribution cable run shall not exceed maximum

SECTION 01 11 00.10 Page 8 allowable length of 90 meters, (295 ft), if so, a secondary comm closet is needed as per; ANSI/TIA/EIA 568-B.1

A maximum of two connections per 100 meters (328 feet) is permitted. This means one punch down block in the wiring closet and one wall jack in the office (or cubicle). The term, "home run cabling," describes cabling that extends from the host connection to the wiring closet rack mounted patch panel, with no intermediate connections.

Contractor shall contact 502 CS with time and date of cable test.

Contractor shall provide communication design E drawings for review;

location of all data/voice drops, cable management, as well as communication room layout with rack equipment elevation drawing.

All cable tests will be monitored by 502 CS personnel to ensure compliance to standards. A NOTE: 24 hour advance notification is required.

Label all cable termination points, from face plate to corresponding patch panel jack location in comm rack as per; E&I Handbook, EIA/ TIA, 568B Standards.

TIA/EIA-568-B allows a distance of 3 meters (10 feet), from the client outlet to the client end instrument (computer).

Upon completion, Contractor shall provide communication "As Builts" drawings; Outside Plant, cable count and path, manhole butterfly drawing (Changes In RED), location of all data/voice drops, cable management, as well as communication room layout with rack equipment elevation drawing.

16.20 Note: For questions or clarification contact 502nd Communications Project Management at 210-652-2010.

1.2.7 [Enter Appropriate Subpart Title Here]FURNITURE GROUPS

FURNITURE GROUP 1: Contractor shall store office furniture (desks, book cases, chairs) as noted on drawings, within limits of JBSA Randolph.

Contractor shall return office furniture according to plans upon completion of project. Excess furniture shall be turned over to owner.

FURNITURE GROUP 2: Contractor shall disassemble, relocate, and immediately reassemble modular furniture to Hangar 13 (Rooms 104, 105, 106, 107, 108, and 109) located in JBSA Randolph AFB. See attached design documents.

1.2.8 APPLICABLE CODES

AFI 32-1023 Design and Construction Military Construction Projects American National Standard Safety Code (ANSI) American Society of Heating, Refrigeration, and Air Conditioning Engineers

(ASHRAE)

American Society of Mechanical Engineers (ASME) American Water Works Association (AWWA) ANSI Standard Z87-1989 ANSI Standard Z89.1-2003 ANSI/ASHRAE/IES Standard 90.1 ASHRAE Standard 90.2 ETL 04-3 (Change 1), Design Criteria for Prevention of Mold in Air Force Facilities

SECTION 01 11 00.10 Page 9

Executive Order (EO) 13693 Planning for Federal Sustainability in the Next Decade IICRC S520 Standard and Reference Guide for Professional Mold Remediation Mold Remediation in School and Commercial Buildings, EPA402-K-01-001, March 2001, Office of Air and Radiation, Indoor Environmental Division Texas Mold Assessment and Remediation Rules, TAC Section 295.301-338, May 16, 2004 amended May 2007 IEE C2 National Electrical Safety Code Illuminating Engineering Society of North America (IESNA) Institute of Electrical and Electronics Engineers (IEEE) International Building Code (IBC) 2015 International Plumbing Code (IPC) 2015 JBSA-Environmental Specifications 01 57 20 JBSA-Randolph Architectural Compatibility Standards JBSA-Randolph O&M Standards National Fire Protection Agency (NFPA) 101- Life Safety Code NFPA 70- National Electrical Code NFPA Codes - pertinent to this SOW Occupational Safety and Health Administration (OSHA) OSHA's 29 CFR 1910, subpart I UFC 1-200-02 C3 High Performance and Sustainable Building Requirements UFC 3-301-01 C2 Structural Engineering UFC 3-410-01 C2 Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01 C10 Plumbing Systems UFC 3-501-01 Electrical Engineering UFC 3-520-01 Interior Electrical Systems UFC 3-560-01 C5 Electrical Safety; O&M UFC 3-600-01 C3 Fire Protection Engineering for Facilities UFC 00 00 00 Construction Contract Security Requirements UFC 01 00 00 General Requirements RAND (Revised Apr 15) UFC 01 35 29 13 Health, Safety, and Emergency response Procedures for Contaminated Sites UFC 01 35 35 Environmental Protection (May 12) UFC 01 45 01 Quality Control UFC 01 01 56 00 00 44 Dust Control 02 82 00 Asbestos Remediation Unified Facilities Guide Specifications (UFGS)

1.3 CONTRACT DRAWINGS

N/A

1.4 GOVERNMENT-FURNISHED MATERIAL

Pursuant to Contract Clause FAR 52.245-1 Government Property, the Government will furnish the following materials for installation by the Contractor:

DESIGNATION NO. DESCRIPTION QUANTITY

CARPET TILES 1500 SF

Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities

SECTION 01 11 00.10 Page 10 of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary. Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.

1.5 SALVAGE/ FURNITURE MATERIAL AND EQUIPMENT

Items/furniture designated to be salvaged shall remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located at RANDOLPH AFB, TX near the construction site.

A furniture plan has been provided and is attached. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer.

Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00.10 Page 11

SECTION 01 14 00

JBSA WORK RESTRICTIONS

10/19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. AIR FORCE (USAF)

AFI 40-201 (Incorporating Change 1, 17 December 2015) Radioactive Materials (RAM) Management

AFI 48-148 (20 NOVEMBER 2014) Ionizing Radiation Protection

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor QC approval.

Submit the following in accordance with this section.

SD-01 Preconstruction Submittals list of Contract Personnel; G

Installation Access

1.3 SPECIAL SCHEDULING REQUIREMENTS

All medical and mission critical areas will remain in operation during the entire construction period. The contractor shall conduct his operations so as to cause the least possible interference with normal operations of the activity.

Permission to interrupt any Activity roads, railroads, and/or utility service must be requested in writing a minimum of 30 calendar days prior to the desired date of interruption.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter restricted areas unless required to do so and cleared for such entry. Mark all Contractor equipment for identification

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contract personnel of the Contractor and subcontractors

SECTION 01 14 00 Page 1 including addresses and telephone numbers for use in the event of an emergency, As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.1.2 Installation Access

Non DOD persons (Contractors, vendors, etc) requiring entry to JBSA Randolph AFB shall be sponsored by an authorized DBIDS registered DOD ID card holder.

Sponsors must notify the Security Forces Visitor Control Center for the installation that access is required no later than 10 days prior to the requested entry date. Sponsors or Authorizing Official must request the permit in writing or via email from a .mil address to the Visitor Control Center. An Application for the Installation Access Credential form will be submitted by the Sponsor or Official to the Pass and Registration Office.

Contractor and vendor companies requiring access to JBSA shall provide the credential information for their employees to the sponsor in order to process the access.

All construction contractor employees shall have:

a. One form of picture identification

b. Provide personal (full name, date of birth, ID type, ID number, and state or country) and vehicle information.

The following is also required for passes 60 days or longer:

a. A memo from the construction company on company letterhead stating the reason for entry, contract number, project start and end date, and the location at JBSA of where the jobsite is located.

1.4.1.3 Government Housing Areas

a. Haul routes to and from constructions sites cannot go through the housing, residential areas.

b. When working inside a housing area, working hours are limited to 0800 (8 am) to 1600 (4 pm) unless otherwise approved by the Contracting Officer.

1.4.1.4 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines.

1.4.2 Emergency Response Requirement

Contractors reporting an emergency should provide the 9-1-1 dispatcher with the following information:

a. Building number, address or general location

b. Name

c. Phone number

d. Emergency information (cause of fire, explosion, natural gas leak, SECTION 01 14 00 Page 2 injuries, etc.)

e. Please, do not hang up the phone until directed by the 9-1-1 dispatcher.

IMPORTANT: If calling 9-1-1 from a mobile phone on any JBSA location you will be directed to the local 9-1-1 dispatcher. Advise the local dispatcher of your JBSA location. Immediately, the local dispatcher will transfer the 9-1-1 phone call to a JBSA emergency dispatcher.

1.4.3 Radioactive Materials and Equipment (Use and Storage)

a. Non-Air Force agencies, including contractors, who intend to use, or store, radiation sources on Joint Base San Antonio, Fort Sam Houston and Camp Bullis must obtain proper authorization in accordance with the above references AFI 40-201 and AFI 48-148. Non-Air Force agencies will not use radiation sources on referenced locations without an approved Department of the Air Force Radiation Permit. Such equipment typically includes equipment for Soil Density Testing, Lead-Based Paint Analysis (X-Ray fluorescent analyzer), etc.

b. Non-Army agencies (including civilian contractors) require an Air Force Radiation Permit(s)(AFRP) to use or possess ionizing radiation sources on an Air Force installation. For the purpose of this paragraph, ionizing radiation source means any source that, if held or owned by an Air Force organization, would require a specific NRC license or Air Force radiation authorization - ARA.

c. The non-Air Force applicant will apply by letter with supporting documentation through the Installation Radiation Safety Officer (RSO).

Submit the letter so that the installation representative receives the application at least thirty (30) days before the requested start date of the permit.

d. The Air Force radiation permit (AFRP) application will specify start and stop dates for the AFRP and describe for what purposes the applicant needs the AFRP. See the document in Appendix A for AFRP requirements and instructions to apply for a permit. The following information shall be submitted to the RSO for the AFRP request.

1) Brief Description of Proposed Activities

2) The applicant possesses a valid U.S. Nuclear Regulatory Commission (NRC) Form 347 material license that allows the applicant to use the source as specified in the AFRP application.

3) The applicant possesses a valid Agreement State or Radioactive Material License (Texas Department of Health, Bureau of Radiation Control) license that allows the applicant to use radioactive material (RAM) as specified in the AFRP application and the applicant has filed NRC Form 241, Report of Proposed Activities in Non-Agreement States, with the NRC in accordance with 10 CFR

150.20. A copy of the NRC Rom 241, must accompany the TRC Form 12-1. An AFRP issued under this circumstance will be valid for no more than 180 days in any calendar year.

4) Project Local Point of Contact: Name, Address, and Phone.

5) Company Radiation Safety Officer: Name, Address, and Phone.

6) Copy of Contractual Clause of the Air Force/Army Contract

SECTION 01 14 00 Page 3 describing work to be performed and inclusive dates (from the contract)

7) Provide log of actual equipment usage to the JBSA-FSH RSO.

8) Leak test documentation for the equipment with the radioactive source(s).

9) Site map defining area where radioactive materials/equipment is to be used.

10) Radiation Safety Program to include standard operating procedures (SOP), training program and designation of Radiation Protection/Safety Officer.

11) Written confirmation that the JBSA-FSH RSO can conduct periodic assessments and has authority to suspend contractor operations believed to be unsafe.

12) For naturally occurring or accelerator produce radioactive material (NORM/NARM) and machine-produced ionizing radiation sources, the applicant has an appropriate State authorization that allows the applicant to use the source as specified in the AFRP application or has in place a radiation safety program that complies with Air Force requirements.

e. All AFRPs will require applicants to remove all permitted sources from Air Force property by the end of the work day. (Ft. Sam Houston policy, no radiation producing equipment will be stored on Ft. Sam Houston and Camp Bullis property overnight).

f. Disposal of radioactive material (RAM) by non-Air Force agencies on Air Force property is strictly prohibited. 3.2.3 Review, Approval/Disapproval. Review of the permit request and subsequent approval/disapproval requires approximately 30 days.

g. Submission of Application. Submit three copies of the application with the required supporting documentation to 502nd Air Base Wing Safety Office, Safety Point of Contact:

JBSA Installation Radiation Protection Officer (RSO) 59th Medical Wing/SGPB 559 MDW Office Telephone No: 210.671-7205

1.4.4 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 14 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours..

1.4.5 Permits and Requests

All permit requests must include at minimum the following:

SECTION 01 14 00 Page 4

a. Site Map (8" x 11" or 8" x 14") 5 complete copies

b. 100% Construction Drawings 5 complete copies

c. Project Name and Number

d. Contractor & Subcontractor Name

e. Brief Description of Work - Identify all buildings and/or facilities possibly affected.

f. Desired Date for Work to Begin

g. Estimated Duration of Work

h. 14 Day Advance Notice minimum, unless otherwise noted.

i. Contractor's Representative Contact Information

1.4.5.1 Digging Permits / Utility Locate

a. Digging permits must be obtained prior to prior to any digging, drilling or any excavation work.

b. Digging permit /utility locates are available by submitting the completed US Air Force Form 103 located in Appendix A to the 802D CES Construction Manager.

c. Contractor to allow 7 calendar days for Government review of digging permit requests. A digging permit for a specified area of excavation expires 30 days after the issue date; the contractor shall re-apply for a new permit to perform excavation in the area if the excavation was not started within the 30-day period.

d. Permits will identify all underground utilities within 5 feet of the designated area. Contractor shall be responsible for all repairs, costs, and damages due to excavating without permit or damaging an identified utility.

1.4.5.2 Utility Outage Permit

a. Contractor shall complete and submit a written request 14 days in advance of the requested utility outage to CES Utility Manager through the 802D CES Construction Manager. The request shall include the utility service to be affected, proposed date, proposed time, and outage duration. Form 103 included in Appendix A can also be used for the request.

b. Contractor shall be responsible to coordinate with CPS Energy about any energy or gas outage request. This coordination is separate than the government coordination.

c. Provide CES Construction Manager a copy of the written Utility Outage request.

d. After submitting the request to the government, the contractor shall received approval from the government prior to schedule a utility outage.

SECTION 01 14 00 Page 5

1.4.5.3 Hot Work Permits

Under no circumstances shall hot work operations start without a hot work permit.

All welding and cutting operations shall be performed in accordance with National Fire Protection Association NFPA Standard 5lB Fire Prevention during Welding, Cutting, and Other Hot Work. Contact the site specific JBSA fire department to request an AF Form 592 USAF Welding, Cutting and Brazing Permit. Ensure a copy of the AF Form 592 is located on site. Phone numbers are:

JBSA-Ft Sam Houston/Camp Bullis Fire Prevention

(210) 221-2727

JBSA-Lackland Fire Prevention

(210) 671-2921

JBSA-Randolph Fire Prevention

(210) 652-6915

Permits expire in 30 days. If work will extend beyond 30 day period the contractor shall contact JBSA Fire and Emergency Services to re-issue a new permit.

1.4.5.4 Road Closure Approval Requests

a. Road closings will not be permitted without approval. To get approval for a proposed road closure contractor shall submit a traffic control plan to the 802D CES Project Manager prior to anticipated need for closure

b. The Contractor traffic control plan will include each section of road that will be worked on or impacted as a result of this contract. The traffic control plan shall be in accordance with "Traffic Controls for Street and Highway Construction and Maintenance Operations" of the latest edition of the "Texas Manual on Uniform Traffic Control Devices."

c. Contractor will provide traffic control signs and barricades for all street widening and extensions. At least one lane of traffic must be maintained at all times.

1.4.6 Occupied and Existing Buildings

The Contractor shall be working in existing Hangar 12 and Hangar 62 which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the construction areas during the construction period.

SECTION 01 14 00 Page 6

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

SECTION 01 14 00 Page 7

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

10/19

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor QC approval.

Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

View Location Map; G

Progress and Completion Pictures; G

1.3 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.4 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of work, during work, prior to cover up of permanently concealed work, and at completion of work. Color digital photographs, in JPEG format, shall be provided to the Contracting Officer weekly for unrestricted use by the Government.

1.5 CONTRACTOR SPECIAL REQUIREMENTS

1.5.1 Asbestos Containing Material

All contract requirements of Section 02 82 00, ASBESTOS REMEDIATION assigned to the Private Qualified Person (PQP) shall be accomplished directly by a first tier subcontractor.

1.5.2 Space Temperature Control, HVAC TAB, and Apparatus Inspection

All contract requirements of Section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC shall be accomplished directly by a first tier subcontractor, including the Commissioning Agent. No work required by Section 23 05 93 shall be accomplished by a second tier subcontractor.

SECTION 01 30 00 Page 1

1.6 SUPERVISION

1.6.1 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.

1.6.2 Superintendent Qualifications

The project superintendent must have experience in construction on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting project specifications, project schedule, and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

For routine projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00.00 10 QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.

1.6.2.1 Duties

The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.

The superintendent is required to attend JBSA Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.

1.7 PRECONSTRUCTION CONFERENCE

After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the safety program, quality control program, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work shall also attend.

1.7.1 Start of Construction Work

If the Contractor has submitted the Accident Prevention (Safety) Plan, Quality Control Plan, and Environmental Protection Plan for review prior to this meeting, these may be accepted in to or accepted with comments at the conference. Construction work will not proceed until after this meeting has been held, the plans noted above have been accepted, and the Notice to Proceed has been received and acknowledged by the Contractor.

1.8 PARTNERING

To most effectively accomplish this contract, the Government requires the

SECTION 01 30 00 Page 2 formation of a cohesive partnership within the Project Team whose members are from the Government, the Contractor and their Subcontractors. Key Stakeholders from the Installation, the Contractor and Subcontractors, and the Designer of Record will be invited to participate in the Partnering process. The Partnership will draw on the strength of each organization in an effort to achieve a project that is without any safety mishaps, conforms to the Contract, and stays within budget and on schedule.

The Initial Partnering session should be a part of the Pre-Construction Meeting. Partnering sessions will be held at a location agreed to by the Contracting Officer and the Contractor. The Partners will determine the frequency of the follow-on sessions.

1.9 AVAILABILITY OF CADD DRAWING FILES

After award and upon request, the electronic "Computer-Aided Drafting and Design (CADD)" drawing files will only be made available to the Contractor for use in preparation of construction data related to the referenced contract subject to the following terms and conditions.

Data contained on these electronic files shall not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government.