Attachment 2 SOW ATTACHMENTS.pdf

PDF 6 MB Posted

Attached to
UPT 2. 5 Hanger 12 & 64 Renovation
Solicitation number
TYMX215706
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA301621R00130005 SF 30.pdf PDF
Additional RFI Question and Answer.pdf PDF
Revised CarpetSelection - 03022021.pdf PDF
Attachment 18 Meeting Mintutes Pre-Proposal Conference.pdf PDF
Solicitation Amendment FA301621R00130004 SF 30 (1).pdf PDF
Attachment 2 SOW ATTACHMENTS Amended 26 Feb.pdf PDF
FA301621R00130003 SF 30.pdf PDF
Attachment 1.01 SOW AMENDMENT NO 1 02262021.pdf PDF
UPT 2.5 RFI Questions and Answers.pdf PDF
CarpetSelection - H12-SIGNED-02232021.pdf PDF
Hanger 64 Electric Panel Info.pdf PDF
Solicitation Amendment FA301621R00130002 SF 30.pdf PDF
Solicitation Amendment FA301621R00130001 SF 30.pdf PDF
Sign in sheet H12 and H64 site visit.pdf PDF
Attachment 8 Draft DD Form 1354 - H12.pdf PDF
Attachment 8 Draft DD Form 1354 - H64.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 7 Local Information.pdf PDF
Attachment 5 Ozone Depletion Control Compliance-signed.pdf PDF
Attachment 13 Sample - Cost Estimate Breakdown.xls XLS spreadsheet
UPT 2_5 Renovation Hanger12 and Hanger64.zip ZIP file
Attachment 11 Financial Information Questionnaire.docx DOCX document
Attachment 6 HAZMAT Letter - signed.pdf PDF
Attachment 9 Unescorted_Base_Access_Request.pdf PDF
Attachment 4 AETC Form 47.pdf PDF
Attachment 10 Sample Progress Schedule.xlsx XLSX spreadsheet
Attachment 12 Contractor Responsibility Questionnaire.docx DOCX document
Attachment 1 SOW H12-H64.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Develop Airmen…Forge Aviators…Deploy Warriors

JBSA Randolph AFB, TX Location Map

HANGAR

HANGAR 12

MAIN GATE

HANGAR 13

HANGAR 6

HANGAR 12: DESIGN DOCUMENTS

Hangar 12 Renovation

=2.5 Flight CC Office

=A Flight CC Office

=DOV Chief Office

=2.5 Flight Room

=2.5 ITD Room

=C Flight CC Office

ITD/Flight Room Demo Work

All dimensions are approximate.

ITD

Desk

ITD

ITD

ITD

36.75 ft10.6 ft9.83 ft

24 ft

Room 10 Room 9 Room 8

Demo Work:

• One wall removed ~ 24 LF

• Remove and dispose of carpet in Rooms 8, 9, and 10.

• Modular furniture per CLIN Options in Room 8, 9, and 10.

• Remove door frames and doors from Room 10 and set aside for reuse.

• Remove ceiling grid and tiles and Room 9 & 10 during demolition of wall x x x

72 x 36 61 x 24

69 x 28

47x23 33x16

Room 8

54 x 30 48x23

54 x 30

48x23

54 x 30 48x23

60 x 24

60 x 24

60 x 24

60 x 24

60 x 30 60 x 30 60 x 30 60 x 30

84 x 24 Desks

60 x 30

36 x

60 x 24

50x18

83 x 36 Table

49 x 25 80 x 32 C ouch

ITD/Flight Room New Work

ITD

DeskDesk

L- Shape Desk/ Chairs

L- Shape Desk/ Chairs

L- Shape Desk/ Chairs

L- Shape Desk/ Chairs

L- Shape Desk/ Chairs

L- Shape Desk/ Chairs

L- Sh ap e D es k/

C ha irs

L- Sh ap e D es k/

C ha irs

Study Table with 10xchairs

Desk/chair w/1 AFNET computer

Desk w/2 AFNET computers & 2 Chairs

New Work:

• Install visual fire alarms to ITD room, per NFPA requirements.

• Install power breakers to ITD room. Install new A/C to ITD room. Install 6 light fixtures to one switch. Install electrical outlets to support ITD’s.

• Reinstall ceiling grid with necessary supports and reinstall ceiling tiles. Reinstall heat device and WiFi.

• Add data/ comm and telephone on sidewalls at new desk. Provide testing on data and comm. Install additional data/ comm next to electrical boxes for each ITD.

• Install new carpet in both rooms and new furniture. Install blockings to support TV’s and whiteboards.

• Repair walls as needed with gypsum board where electrical work was done. Paint using 1 coat primer and 2 coats of paint on all repair work.

• Fill three doors and add base cove. Install door frame, door and door doorstop. Contractor to reuse doorframe and door from demolished door.

• Provide new standalone HVAC to support trainer equipment in room.

• Reinstall supply and return air vents. Provide test and balance on HVAC.

= 32” TV

= Whiteboard

= 85” TV

ITD

ITD

ITD

ITD

ITD

ITD

ITD

FLIGHT ROOM

ITD ROOM

Flight CC Office Demo Work

Demo Work

• Remove, all modular furniture, as shown in picture above.

• Remove handrail in main hallway.

Room 4

All dimensions are approximate.

Existing modular furniture

New Work

New Work

• Add new door frame, door, and doorstop into hallway. Contractor to reuse doorframe and door from demolished door.

• Repair carpet around door work with attic over stock. NOTE: Entire room will not get new carpet – only area around door frame work.

• Paint using 1 coat primer and 2 coats of paint on all repair work.

Room 4

A Flight CC Office Demo Work

Demo Work:

• Remove door frame and door.

• Remove existing light switch.

• Remove furniture per CLIN Options in Room x

Room 14

Desk/chair w/1 AFNET computer

D esk/chair w

/1

AFN

ET com puter

A Flight CC Office New Work

New Work:

• Fill east door opening and add base cove.

• Add door frame and door. Contractor to reuse doorframe and door from demolished door.

• Repair carpet around door work with attic over stock. NOTE:

Entire room will not get new carpet – only area around door frame work.

• Add new west door.

• Add electrical outlets to walls shown. Install new light switch.

• Paint using 1 coat primer and 2 coats of paint on all repair work.

• Install new conduit for data and phone on west wall.

x

Room 14

Desk/chair w/1 AFNET computer

D esk/chair w

/1

AFN

ET com

DOV Chief Office Demo Work

Demo Work:

• Remove Modular furniture per CLIN Options in Room

• Remove carpet for installation of wall bottom plate. Not all carpet should be removed – only enough to install plate.

• Demolish ceiling grid and tiles.

• Cut ceiling grid for installation of new metal studs for wall opening.

Room 16

D esk/chair w

/1

AFN

ET com

Furniture removed/demolished:

Room 16

OPR: ALF CAO: 18 Dec 20

DOV Chief Office New Work

New Work:

• Add north door

• Add electrical light switch

• Install new divider wall – 12-ft x 8-ft. with cross bracing.

• Reinstall ceiling grid with necessary supports

• Reinstall ceiling tiles.

• Cut new door opening. Contractor to reuse doorframe and door from demolished door.

• Install new heat device on ceiling grid.

• Install new return air vent for room.

Room 16

D esk/chair w

/1

AFN

ET com

Demo Work

Demo Work:

• Modular furniture per CLIN Options in Room

• Remove ceiling grid and tile from middle of room (~ 11.5-ft)

• Remove a portion of carpet for construction of new divider wall that will split room.

• Split electrical wiring to support light fixtures for two office areas.

• Split ductwork for additional return vent.

Room 18

Desk/chair w/1 AFNET computer

D esk/chair w

/1

AFN

ET com puter

Desk/chair w/1 AFNET computer

D esk/chair w /1

AFN

ET

com

New Work

New Work:

• Construct new divider wall to split office into two offices.

• Reinstall ceiling grid with necessary supports.

• Reinstall ceiling tiles

• Paint using 1 coat primer and 2 coats of paint on all new work.

• Newly created Room 18 receives new carpet.

Replace portions of carpet around new wall on closed off office with attic stock. NOTE: Entire room will not get new carpet – only area around work from wall.

• Install new light switch by new door.

• Install additional heat device on ceiling grid.

• Install new electrical conduit with boxes for electrical outlets and data on new wall.

Room 18

All dimensions are approximate.

47x22 69 x 28

48 x 30 Case

72 x 36

60 x 24

HANGAR 64: DESIGN DOCUMENTS

Hangar 64 - Add Washer/ Dryer Demo Work

Demo Work:

• Remove existing shower head.

• Remove existing shower tile front walls/doors to entrance of stall. Remove existing shower tile front walls/doors to entrance of stall

– 12- inches each side

Hangar 64 - Add Washer/ Dryer New Work

New Work:

• Add ventilation

• Extend water line connection

New Washer/ Dryer area

JBSA Vision: The Premier Installation in the Department of Defense!

One Team, One Mission

HVAC Zones – Hangar 12

1401561150C Rectangle

1401561150C Rectangle

1401561150C Rectangle

1401561150C Rectangle

1401561150C Typewritten Text

ZONE 1

1401561150C Typewritten Text

ZONE 2

1401561150C Typewritten Text

ZONE 3

1401561150C Typewritten Text

ZONE 4

1401561150C Rectangle

1401561150C Rectangle

1401561150C Rectangle

1401561150C Rectangle

1401561150C Typewritten Text

IMMERSIVE TRAINING DEVICE:

SPECIFICATION SHEET

WITH MOTION

71.5

.2

WITHOUT MOTION

65.0

8.

.0

A

.0

6.

35.1

34.8 21.2

APPROXIMATE DEPTH OF 4U

DETAIL A

SCALE 1 : 10

INCHES

SIGNATURE: DATE:

QA:

MFG:

APPV'D:

DRAWN:

DIMENSIONS ARE IN MM

Sizing Specifications - Immersive Training Device (ITD)

CHRIS RYAN

A4

SHEET 1 OF 1

SCALE: 1:20

COPYRIGHT © RYAN AEROSPACE. CONFIDENTIAL INFORMATION

CONTAINED WITHIN

CHRIS RYAN

NOT YET SPECIFIED kg

0MASS:

FILE NAME:

CONFIG:

PART #:

MATERIAL: AS PER BOM

REVISION:

Weight – 240 lbs Electrics – 120v, the “lower end” ITD’s average 4.5A RMS; the higher end w/motion average 5A RMS. Power in Watts = RMS Volts (V) x RMS Amps (A) x Power Factor.

PF of 1 HEAT LOAD = 600 W or 2,047.3 BTU/hr.

ASBESTOS REPORT: HANGAR 64

PLM Summary Report

Client :

Project :

Project # :

Identification :

Test Method :

JBSA Randolph - 802 CES / CEIE

Hanger 64 Lean-to Renovation

Not Provided

Asbestos, Bulk Sample Analysis

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 3/7/2019, twenty seven (27) bulk material samples were submitted by Edward Vogel of JBSA Randolph - 802 CES / CEIE for asbestos analysis by

PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Lab Job No. :

Report Date :

19B-02617

03/05/2019

03/11/2019

NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

64-WLSH-001-

Sheetrock, Lean-to, ADO None Detected - Drywall Material

None Detected - Paint

64-WLSH-001-

Sheetrock, Lean-to, Training Office None Detected - Drywall Material

None Detected - Texture

64-WLSH-001-

Sheetrock, Lean-to, CAP None Detected - Drywall Material

None Detected - Paint

64-WLSH-001-

Sheetrock, Lean-to, Msn Planning None Detected - Drywall Material

None Detected - Texture / Joint Cmpd

64-WLSH-001-

Sheetrock, Lean-to, Men's Restroom None Detected - Drywall Material

None Detected - Texture

64-WLSH-001-

Sheetrock, Lean-to, Northwest Hallway None Detected - Drywall Material

64-WLSH-001-

Sheetrock, Lean-to, Northwest Hallway Ceiling None Detected - Drywall Material

64-WLTX-001-

Wall Texture, Lean-to, Training Office None Detected - Texture

64-WLTX-001-

Wall Texture, Lean-to, Northwest Hallway None Detected - Drywall Material

None Detected - Texture

64-WLTX-001-

Wall Texture, Lean-to, Smokin Hole None Detected - Texture

64-WLJ-001-011 Float Mud / Joint Compound, Lean-to, Smokin Hole None Detected - Joint Compound

64-WLJ-001-012 Float Mud / Joint Compound, Lean-to, CAP None Detected - Joint Compound

64-WLJ-001-013 Float Mud / Joint Compound, Lean-to, Msn Planning None Detected - Joint Compound

None Detected - Caulking

64-CLLI-001-014 Ceiling Tile, Lean-to, Msn Planning None Detected - Acoustic Tile

64-CLLI-001-015 Ceiling Tile, Lean-to, ADO None Detected - Acoustic Tile

64-CLLI-001-016 Ceiling Tile, Lean-to, Smokin Hole None Detected - Acoustic Tile

Project :

Project # :

Identification :

Test Method :

JBSA Randolph - 802 CES / CEIE

Hanger 64 Lean-to Renovation

Not Provided

Asbestos, Bulk Sample Analysis

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 3/7/2019, twenty seven (27) bulk material samples were submitted by Edward Vogel of JBSA Randolph - 802 CES / CEIE for asbestos analysis by

PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Lab Job No. :

Report Date :

19B-02617

03/05/2019

03/11/2019

NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

64-CLLI-001-017 None Detected - Acoustic Tile

64-FLC-001-018 None Detected - Off-White Mastic

None Detected - Leveling Compound

64-FLC-001-019 None Detected - Off-White Mastic

None Detected - Leveling Compound

64-FLC-001-020 None Detected - Off-White Mastic

None Detected - Leveling Compound

64-FLVCT-001-

None Detected - Black Floor Tile

None Detected - Yellow Mastic

None Detected - White Floor Tile

None Detected - Yellow Mastic

64-FLVCT-001-

None Detected - Gray Floor Tile

None Detected - Yellow Mastic

64-CJC-001-023 2% Chrysotile - Joint Compound

64-CJC-001-024 2% Chrysotile - Joint Compound

64-CBM-001-025 None Detected - Cream Mastic

None Detected - Yellow Mastic

64-CLSH-001-

None Detected - Drywall Material

64-PINS-001-027

Ceiling Tile, Lean-to, Restroom Hallway

Floor Level Compound, Lean-to, Msn Planning 1

Floor Level Compound, Lean-to, Msn Planning 2

Floor Level Compound, Lean-to, Msn Planning 3

12" x 12" Floor Tile (Black and White Checker), Lean-to, Northwest Hallway

12" x 12" Floor Tile (Gray), Lean-to, Smokin Hole

Ceiling Joint Compound, Lean-to, Smokin Hole

Ceiling Joint Compound, Lean-to, Northwest Hallway

Cove Base Mastic, Lean-to, Smokin Hole

Ceiling Sheetrock, Lean-to, Smokin Hole

Pipe Insulation, Lean-to, Northwest Hallway 20% Chrysotile - Thermal Insulation

None Detected - Cotton Wrap

Project :

Project # :

Identification :

Test Method :

JBSA Randolph - 802 CES / CEIE

Hanger 64 Lean-to Renovation

Not Provided

Asbestos, Bulk Sample Analysis

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 3/7/2019, twenty seven (27) bulk material samples were submitted by Edward Vogel of JBSA Randolph - 802 CES / CEIE for asbestos analysis by

PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Lab Job No. :

Report Date :

19B-02617

03/05/2019

03/11/2019

NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Debra O'Sullivan, Jessica ScottAnalyst(s):

Lab Director : Bruce Crabb Approved Signatory :

Thank you for choosing Moody Labs

Lab Manager : Heather Lopez Approved Signatory :

These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate. The test report shall not be reproduced, except in full, without written approval of the laboratory. The results relate only to the items tested. These test results do not imply endorsement by NVLAP or any agency of the U.S.

Government. Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code 102056-0.

This Page Left Intentionally Blank

PLM Detail Report

Project # : Not Provided

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

Hanger 64 Lean-to Renovation

Lab Job No. :

Report Date :

19B-02617

03/11/2019

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Glass Wool Fibers64-WLSH-001-

Drywall Material (White) 65% 03/082% JS

Cellulose Fibers64-WLSH-001-

Drywall Material (White) 65% 03/081% JS

Gypsum / Binders64-WLSH-001-

Drywall Material (White) 65% 03/0897% JS

Cellulose Fibers64-WLSH-001-

DW Paper Facing (Tan) 35% 03/08100% JS

Pigment / Binders64-WLSH-001-

Paint (Tan) <1% 03/08100% JS

Glass Wool Fibers64-WLSH-001-

Drywall Material (White) 90% 03/082% JS

Cellulose Fibers64-WLSH-001-

Drywall Material (White) 90% 03/081% JS

Gypsum / Binders64-WLSH-001-

Drywall Material (White) 90% 03/0897% JS

Cellulose Fibers64-WLSH-001-

DW Paper Facing (Tan) 10% 03/08100% JS

Calcite / Talc / Binders64-WLSH-001-

Texture (White) <1% 03/08100% JS

Glass Wool Fibers64-WLSH-001-

Drywall Material (White) 93% 03/082% JS

Cellulose Fibers64-WLSH-001-

Drywall Material (White) 93% 03/081% JS

Gypsum / Binders64-WLSH-001-

Drywall Material (White) 93% 03/0897% JS

Cellulose Fibers64-WLSH-001-

DW Paper Facing (Tan) 2% 03/08100% JS

Pigment / Binders64-WLSH-001-

Paint (Light Blue) 5% 03/08100% JS

Cellulose Fibers64-WLSH-001-

Drywall Material (White) 10% 03/085% JS

Gypsum / Binders64-WLSH-001-

Drywall Material (White) 10% 03/0895% JS

Calcite / Talc / Binders64-WLSH-001-

Texture / Joint Cmpd (White) 90% 03/08100% JS

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

Hanger 64 Lean-to Renovation

Lab Job No. :

Report Date :

19B-02617

03/11/2019

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Glass Wool Fibers64-WLSH-001-

Drywall Material (White) 88% 03/082% JS

Cellulose Fibers64-WLSH-001-

Drywall Material (White) 88% 03/081% JS

Gypsum / Binders64-WLSH-001-

Drywall Material (White) 88% 03/0897% JS

Cellulose Fibers64-WLSH-001-

DW Paper Facing (Tan) 10% 03/08100% JS

Calcite / Talc / Binders64-WLSH-001-

Texture (White) 2% 03/08100% JS

Glass Wool Fibers64-WLSH-001-

Drywall Material (White) 90% 03/082% JS

Cellulose Fibers64-WLSH-001-

Drywall Material (White) 90% 03/081% JS

Gypsum / Binders64-WLSH-001-

Drywall Material (White) 90% 03/0897% JS

Cellulose Fibers64-WLSH-001-

DW Paper Facing (Tan) 10% 03/08100% JS

Cellulose Fibers64-WLSH-001-

Drywall Material (White) 95% 03/085% JS

Gypsum / Binders64-WLSH-001-

Drywall Material (White) 95% 03/0895% JS

Cellulose Fibers64-WLSH-001-

DW Paper Facing (Tan) 5% 03/08100% JS

Calcite / Talc / Binders64-WLTX-001-

Texture (White) 100% 03/09100% DO

Glass Wool Fibers64-WLTX-001-

Drywall Material (White) 45% 03/092% DO

Cellulose Fibers64-WLTX-001-

Drywall Material (White) 45% 03/091% DO

Gypsum / Binders64-WLTX-001-

Drywall Material (White) 45% 03/0997% DO

Cellulose Fibers64-WLTX-001-

DW Paper Facing (Tan) 10% 03/09100% DO

Calcite / Talc / Binders64-WLTX-001-

Texture (White) 45% 03/09100% DO

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

Hanger 64 Lean-to Renovation

Lab Job No. :

Report Date :

19B-02617

03/11/2019

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Calcite / Talc / Binders64-WLTX-001-

Texture (White) 100% 03/09100% DO

Calcite / Talc / Binders64-WLJ-001-011 Joint Compound (White) 100% 03/09100% DO

Calcite / Talc / Binders64-WLJ-001-012 Joint Compound (White) 100% 03/09100% DO

Calcite / Talc / Binders64-WLJ-001-013 Joint Compound (White) 45% 03/09100% DO

Calcite64-WLJ-001-013 Caulking (White) 55% 03/0950% DO

Binders / Fillers64-WLJ-001-013 Caulking (White) 55% 03/0950% DO

Cellulose Fibers64-CLLI-001-014 Acoustic Tile (Light Tan) 100% 03/0980% DO

Perlite64-CLLI-001-014 Acoustic Tile (Light Tan) 100% 03/0920% DO

Cellulose Fibers64-CLLI-001-015 Acoustic Tile (Light Grey) 100% 03/0950% DO

Mineral Wool Fibers64-CLLI-001-015 Acoustic Tile (Light Grey) 100% 03/0930% DO

Perlite64-CLLI-001-015 Acoustic Tile (Light Grey) 100% 03/0920% DO

Cellulose Fibers64-CLLI-001-016 Acoustic Tile (Light Grey) 100% 03/0950% DO

Mineral Wool Fibers64-CLLI-001-016 Acoustic Tile (Light Grey) 100% 03/0930% DO

Perlite64-CLLI-001-016 Acoustic Tile (Light Grey) 100% 03/0920% DO

Cellulose Fibers64-CLLI-001-017 Acoustic Tile (Light Grey) 100% 03/0950% DO

Mineral Wool Fibers64-CLLI-001-017 Acoustic Tile (Light Grey) 100% 03/0930% DO

Perlite64-CLLI-001-017 Acoustic Tile (Light Grey) 100% 03/0920% DO

Glue Binders64-FLC-001-018 Off-White Mastic (Off-White) 1% 03/09100% DO

Cellulose Fibers64-FLC-001-018 Leveling Compound (Gray) 99% 03/095% DO

Calcite / Binders64-FLC-001-018 Leveling Compound (Gray) 99% 03/0995% DO

Glue Binders64-FLC-001-019 Off-White Mastic (Off-White) 1% 03/09100% DO

Cellulose Fibers64-FLC-001-019 Leveling Compound (Gray) 99% 03/095% DO

Calcite / Binders64-FLC-001-019 Leveling Compound (Gray) 99% 03/0995% DO

Glue Binders64-FLC-001-020 Off-White Mastic (Off-White) 1% 03/09100% DO

Cellulose Fibers64-FLC-001-020 Leveling Compound (Gray) 99% 03/095% DO

Calcite / Binders64-FLC-001-020 Leveling Compound (Gray) 99% 03/0995% DO

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

Hanger 64 Lean-to Renovation

Lab Job No. :

Report Date :

19B-02617

03/11/2019

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Calcite / Vinyl Binders64-FLVCT-001-

Black Floor Tile (Black) 50% 03/09100% DO

Calcite64-FLVCT-001-

Yellow Mastic (Yellow) 1% 03/0940% DO

Glue Binders64-FLVCT-001-

Yellow Mastic (Yellow) 1% 03/0960% DO

Calcite / Vinyl Binders64-FLVCT-001-

White Floor Tile (White) 49% 03/09100% DO

Calcite64-FLVCT-001-

Yellow Mastic (Yellow) <1% 03/0940% DO

Glue Binders64-FLVCT-001-

Yellow Mastic (Yellow) <1% 03/0960% DO

Calcite / Vinyl Binders64-FLVCT-001-

Gray Floor Tile (Gray) 99% 03/09100% DO

Calcite64-FLVCT-001-

Yellow Mastic (Yellow) 1% 03/0940% DO

Glue Binders64-FLVCT-001-

Yellow Mastic (Yellow) 1% 03/0960% DO

Cellulose Fibers64-CJC-001-023 DW Paper Facing (Tan) 25% 03/09100% DO

Chrysotile64-CJC-001-023 Joint Compound (White) 75% 03/092% DO

Calcite / Talc / Binders64-CJC-001-023 Joint Compound (White) 75% 03/0998% DO

Chrysotile64-CJC-001-024 Joint Compound (White) 100% 03/092% DO

Calcite / Talc / Binders64-CJC-001-024 Joint Compound (White) 100% 03/0998% DO

Note: No Ceiling Tile

Calcite64-CBM-001-025 Cream Mastic (Cream) 90% 03/0950% DO

Glue Binders64-CBM-001-025 Cream Mastic (Cream) 90% 03/0950% DO

Glue Binders64-CBM-001-025 Yellow Mastic (Yellow) 10% 03/09100% DO

Cellulose Fibers64-CLSH-001-026 Drywall Material (White) 95% 03/095% DO

Gypsum / Binders64-CLSH-001-026 Drywall Material (White) 95% 03/0995% DO

Cellulose Fibers64-CLSH-001-026 DW Paper Facing (Tan) 5% 03/09100% DO

Chrysotile64-PINS-001-027 Thermal Insulation (White) 85% 03/0920% DO

Binders / Fillers64-PINS-001-027 Thermal Insulation (White) 85% 03/0980% DO

Cotton Fibers64-PINS-001-027 Cotton Wrap (Off-White) 15% 03/09100% DO

JBSA Asbestos Inventory Print Report

Facility Type:

Facility Site: JBSA Randolph

Administrative

Square Footage: 87507Number of Floors: 3

B64.tifDrawing File Name:

Facility Status: Manned

64.jpgPhoto File Name

Date Constructed: 1931

Facility Number: Facility Name:64 FLY TNG CLASSROOM

Facility Owner: 12 CES/CE

Facility Address: 171211 FLY TNG CLASSROOM Asbestos:

Facility Summary Report:

All floor tiles and mastics have been abated throughout the hangar.

04/24/2013 - Assess areas for Entomology - All areas are NAD (No Asbestos detected)

03/13/2013 - Workorder 11012- Replace Carpet through out hangar areas - The following areas are Positive for Asbestos Containing Materials. All Hallways, B Flight Chiefs Office, Survival Equipment Shop Flo and NW Exit, Mission Planning, Ados Aoffice SW End and Ados Office next to Auditorium , See Color Coded floor plan floor plan. All other Non-Asbestos Areas are also identified on the color coded floor plan. One Positive results over rides any negatives or None Detects. Do not disturb any areas that are positive for asbestos containing materials. Under the AHERA rules, we are required to take 3 samples of the same materials.

One positive result over writes any other negative results. Do not disturb by sanding drilling, nailing, scraping cutting, sanding blasting or any other operation that may disturb the positive ACM. This work must be done by a certified asbestos abatement team.

02/19/2013 - Inspect Equipment Room for Asbestos Containing Materials - All Floor tiles and mastic, Sheetrock and Joint Compound is NAD, No Asbestos Detected

11/7/2011 - Inspect Pipe materials for Mr. Kevin Meyers project - All suspect materials are NAD (No Asbestos Detected)

10/31/2011 - Repair leaking drain in restroom foyer area - All floor tiles and mastic in Restroom Foyer area NW side of hangar are NAD, (No Asbestos Detected)

06/20/2011 - Workorder 10358, Install Eye Wash Station in Life Support Section.. All floor tiles and mastic are Positive for Asbestos Containing Materials. All drywall in this area is None Detect for Asbestos Containing Materials.

04/27/2011 - workorder 10268, Relocate and position projectors. Floor tiles and Drywall resulted in NAD (No asbestos Detected)

12 May 10, 2GWLAN ProjectArea of penetration is NAD for Asbestos

01/31/2013 - Abatement of floor tiles and mastics from all Hallways, Room 21-26, ViewFacility Comments:

Facility Comments:

Date User Comment

5/20/2019 elv Request for energy and Ameresco contractors for potential areas of asbestos disturbance. This facility contains asbestos pipe insulation above the ceiling in the leanto area. All other pipes are fiberglass insulation. Ceiling Joint compound is positive for Asbestos Containing Materials on the sheetrock above the dropped ceiling grid. Some floor tiles and mastic may still remain.

Do not disturb any of these materials. Any materials not found in this report are considered suspect materials. These materials must be sampled or assumed Positive for Asbestos containing Materials. Lab analysis reports are available if needed.

4/24/2019 elv Work Order 13798 Assess areas for installation of outlets. All Sheetrock, Float Mud, Joint compounds are NAD, No Asbestos Detected.

3/18/2019 elv Assess all areas in Lean-To for Asbestos Containing Materials.

Pipe insulation above the ceiling tiles in the Northwest Halls, All Ceiling Joint Comppounds throughout are Positive for Asbestos Containing Materials. Any disturbance of these materials must be done by a certified Asbestos Abatement team. Any materials that are hidden behind walls, mirrors etc., could not be assessed and must be assumed positive for Asbestos Containing Materials or analyzed by a DSHS approved Asbestos Laboratory.

7/30/2018 elv Work Order Toxics - 13572- Install Public Address System and replace HVAC System. All areas and materials that could potentially be disturbed in this facility are NAD, No Asbestos Detected. This includes sheetrock, float Mud and Joint Compound throughout facility. All HVAC return and supply lines are fiberglass throughout. Some asbestos floor tiles and mastics still remain, hjowever these materials should not be disturbed during this project.

7/23/2018 elv Work Order 13413 - Assess for expansion and renovation project.

The heritage room, East Restrooms, training room, and West restrooms sheetrock, Float Mud/Joint Compounds are all NAD, No Asbestos Detected. The floor tile in the closet of the heritage room is NAD, No Asbestos Detected. If the floor covering in the heritage room contains floor tile underneath, then this material must be sampled prior to any disturbance.

7/1/2018 elv request for Asbestos Containing Materials for a WIFI project. The only materials that have been found to contain Asbestos Containing Materials througout this facility is floor tiles and mastics.The majority of the floor tiles and mastics have been abaed but floor tiles and mastics still remain in the ADO office.

10/16/2017 elv U3832 - Workers concern for suspect asbestos materials when changing out ceiling tiles. Acoustic Glued on Ceiling tiles are dropping from the attic ceiling onto the ceiling gridded tiles. All ceiling tiles in the grid, attached to the ceiling in the attic and the ceiling mastic in the attic are all NAD, No Asbestos Detected.

2/28/2017 elv Work Order 12108 - Relocate Doors. All sheetrok and float Mud/Joint Compound is NAD, NO Asbestos Detected in Scheduling and the training room.

10/26/2015 elv Work Order 12137 - The Statement of Work for indicates that this will be a major renovation -project. Our asbestos surveys do not include any exterior materials for Hangar 64. Any disturbance of

Asbestos Containing Material (ACM) Results Dimension

AsbestosHSA DescriptionHSA Type Sample # Year ID Location(s) Floor Floor Area

Sample Area Original Sample IDSample ID

0NAD; Fiberglass 2%; Cellulose 1%, Gypsum 97%

2019 1

Off White;Chalky;Gran; Brown FibrousWall - Sheetrock 1 SF

Lean Too 01 SF64-WLSH-001-B-001 ADO

0NAD; Fiberglass 2%; Cellulose 1%, Gypsum 97%

2019 1

Off White;Chalky;Gran; Brown FibrousWall - Sheetrock 2 SF

Lean Too 01 SF64-WLSH-001-B-002 Trng Office

0NAD; Fiberglass 2%; Cellulose 1%, Gypsum 97%

2019 1

Off White;Chalky;Gran; Brown FibrousWall - Sheetrock 3 SF

Lean Too 01 SF64-WLSH-001-B-003 CAP

0NAD; Cellulose 5%, Gypsum 95%

2019 1

Off White;Chalky;Gran; Brown FibrousWall - Sheetrock 4 SF

Lean Too 01 SF64-WLSH-001-B-004 Msn Planning

0NAD; Fiberglass 2%; Cellulose 1%, Gypsum 97%

2019 1

Off White;Chalky;Gran; Brown FibrousWall - Sheetrock 5 SF

Lean Too 01 SF64-WLSH-001-B-005 Mens RR

0NAD; Fiberglass 2%; Cellulose 1%, Gypsum 97%

2019 1

Off White;Chalky;Gran; Brown FibrousWall - Sheetrock 6 SF

Lean Too 01 SF64-WLSH-001-B-006 NW Hallway

0NAD; Cellulose 5%, Gypsum 95%

2019 1

Off White;Chalky;Gran; Brown FibrousWall - Sheetrock 7 SF

Lean Too 01 SF64-WLSH-001-B-007 NW Hallway Ceiling

0NAD; Calcite 100%

2019 1

Off White; Chalky; GranWall - Textured Surfacing Material 8 SF

Lean Too 01 SF64-WLTX-001-B-008 Trng Office

0NAD; Fiberglass 2%; Cellulose 1%, Gypsum 97%

2019 1

Off White; Chalky; Gran; Brown FibrousWall - Textured Surfacing Material 9 SF

Lean Too 01 SF64-WLTX-001-B-009 NW Hallway

0NAD; Calcite 100%

2019 1

Off White; Chalky; Gran; Brown FibrousWall - Textured Surfacing Material 10 SF

Lean Too 01 SF64-WLTX-001-B-0010 Smokin Hole

0NAD; Calcite 100%

2019 1

Off White; Chalky; Gran; Brown FibrousWall - Joint Tape/Joint Compoud 11 SF

Lean Too 01 SF64-WLJ-001-B-0011 Smokin Hole

0NAD; Calcite 100%

2019 1

Off White; Chalky; Gran; Brown FibrousWall - Joint Tape/Joint Compoud 12 SF

Lean Too 01 SF64-WLJ-001-B-0012 CAP

0NAD; Calcite 50%, Non-fibrous 50%

2019 1

Off White; Chalky; Gran; Brown FibrousWall - Joint Tape/Joint Compoud 13 SF

Lean Too 01 SF64-WLJ-001-B-0013 Msn Planning

0NAD; Calcite 100%

2019 1

Off White; Chalky; Gran; Brown FibrousWall - Joint Tape/Joint Compoud 13 SF

Lean Too 01 SF64-WLJ-001-B-0013 Msn Planning

0NAD; Cellulose 80%, Perlite 20%

2019 1

White and Brown fibrous.Ceiling - Lay-in Tile 14 SF

Lean Too 01 SF64-CLLI-001-B-0014 Msn Planning

0NAD; Fibrous 80%, Perlite 20%

2019 1

White and Brown fibrous.Ceiling - Lay-in Tile 15 SF

Lean Too 01 SF64-CLLI-001-B-0015 ADO

0NAD; Fibrous 80%, Perlite 20%

2019 1

White and Brown fibrous.Ceiling - Lay-in Tile 16 SF

Lean Too 01 SF64-CLLI-001-B-0016 Smokin Hole

0NAD; Fibrous 80%, Perlite 20%

2019 1

White and Brown fibrous.Ceiling - Lay-in Tile 17 SF

Lean Too 01 SF64-CLLI-001-B-0017 Restroom Hallway roofing materials, window glazings, insulations, or any other construction materials disturbed will require the material to be assumed positive or samples must be conducted to determine if the materials are asbestos containing prior to any disturbance.

0NAD; Fibrous 5%, Calcite 95%

2019 1

Gray.Floor Leveling Compound 18 SF

Lean Too 01 SF64-FLC-001-B-0018 Msn Planning-1

0NAD; Fibrous 5%, Calcite 95%

2019 1

Gray.Floor Leveling Compound 19 SF

Lean Too 01 SF64-FLC-001-B-0019 Msn Planning-2

0NAD; Fibrous 5%, Calcite 95%

2019 1

Gray.Floor Leveling Compound 20 SF

Lean Too 01 SF64-FLC-001-B-0020 Msn Planning-3

0NAD; Non-fibrous 60%, Calcite 40%

2019 1

12"x12" Black and White CheckerFloor Tile 21 SF

Lean Too 01 SF64-FLTL-001-B-0021 NW Hallway

0NAD; Non-fibrous 60%, Calcite 40%

2019 1

12"x12" Black and White CheckerFloor Tile 21 SF

Lean Too 01 SF64-FLTL-001-B-0021 NW Hallway

0NAD; Non-fibrous 60%, Calcite 40%

2019 1

12"x12" GrayFloor Tile 22 SF

Lean Too 01 SF64-FLTL-001-B-0022 Smokin Hole

0Chrysotile 2%, Non-fibrous 98%

2019 1

Off White; Brown fibrousCeiling - Joint Compound 23 SF

Lean Too 01 SF64-CJC-001-B-0023 Smokin Hole

0Chrysotile 2%, Non-fibrous 98%

2019 1

Off WhiteCeiling - Joint Compound 24 SF

Lean Too 01 SF64-CJC-001-B-0024 NW Hallway

0NAD; Non-fibrous 50%, Calcite 50%

2019 1

Tan; Brown fibrousCeiling - Barrier Material 25 SF

Lean Too 01 SF64-CBM-001-B-0025 Smokin Hole

0NAD; Non-fibrous 100%

2019 1

Tan; Brown fibrousCeiling - Barrier Material 25 SF

Lean Too 01 SF64-CBM-001-B-0025 Smokin Hole

0NAD; Cellulose 5%, Gypsum 95%

2019 1

Off White; Brown fibrousCeiling - Sheetrock 26 SF

Lean Too 01 SF64-CLSH-001-B-0026 Smokin Hole

0Chrysotile 20%, Non-fibrous 80%

2019 1

Off White fibrousPipe Insulation 27 SF

Lean Too 01 SF64-PINS-001-B-0027 NW Hallway

JBSA LBP Inventory Print Report

Lead Based Paint Detected:

Administrative

Square Footage: 29768

Number of Floors: 3

None.dwg

Drawing File Name:

Facility Status: Manned

64.jpg

Photo File Name

Date Constructed: 1931

Facility Number: Facility Name:64 Operations

Facility Owner: 12 MSG/CE

Facility Type:

Facility Address: BASE

Facility Summary Report:

04/24/2013 - Assess area for entomology - All Areas are Negative for LBP

12/13/2013 - Syvia Project - Renovate Equipment Room - All areas are Negative for LBP

08/29/2011 - Workorder 10527 - Paint Exterior Hangar - All peeling paint has been removed and the facility has been prepared by a certified LBP team. The facility is ready to be painted by CEO

Facility Site: JBSA Randolph

ViewFacility Comments:

Facility Comments:

Date User Comment

3/14/2019 elv Project, Renovate Lean-to. All areas are Negative for Lead Based Paint. This does not include any hidden wall surfaces. If any sheetrock is removed during this project, the hidden walls if painted will have to be re-evaluated

7/23/2018 elv Work Order 13413- Assess heritage room, men's restroom, Training rooms and Restrooms West for expansion. All areas are negative for Lead Based Paints.

7/1/2018 elv Numerous areas contain Lead Based Paint. See attached report.

Since this facility was built before 1978 it is common for components to contain Lead Based Paint. Any disturbance of Lead Based Paint materials in this facility must be done by a certified Lead Firm. An work in this facility that disturbs Lead Based Paint is governed by OSHA 29 CFR 1926,62, Lead IN Construction rules. This applies to any amount of Lead in Construction Processes.

2/28/2017 elv Work Order 12108 - relocate Doors in Scheduling and training - all areas are negative for Lead Based Paint

10/26/2015 HMUser Work Order 12137 - bat Proof hangar. All exterior paint is Positive for Lead Based Paints. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping

3 3/14/2019 0.00087Msn Planning A Center Wall Drywall N/A Intact Negativ

4 3/14/2019 0.00097Msn Planning C Center Wall Drywall N/A Intact Negativ

5 3/14/2019 0.00098Msn Planning D Center Wall Drywall N/A Intact Negativ

6 3/14/2019 0.0010ADO A Center Wall Drywall N/A Intact Negativ

7 3/14/2019 0.00078ADO B Center Wall Drywall N/A Intact Negativ

8 3/14/2019 0.00097ADO C Center Wall Drywall N/A Intact Negativ

9 3/14/2019 0.00095ADO D Center Wall Drywall N/A Intact Negativ

10 3/14/2019 0.00109ADO D Right Door Casing Metal N/A Intact Negativ

11 3/14/2019 0.00067CAP A Center Wall Drywall N/A Intact Negativ

12 3/14/2019 0.00092CAP B Center Wall Drywall N/A Intact Negativ

13 3/14/2019 0.00099CAP C Center Wall Drywall N/A Intact Negativ

14 3/14/2019 0.00104CAP D Center Wall Drywall N/A Intact Negativ

15 3/14/2019 0.001CAP B Left Door Casing Metal N/A Intact Negativ

16 3/14/2019 0.0011CAP C Left Door Casing Metal N/A Intact Negativ power washing, blasting, drilling or any brazing/welding operations etc. OSHA 29 CFR 1926.62 Lead in Construction Rules will apply for this project. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater Contain all paint debris and dust. Conduct a TCLP for Lead at a TCEQ certified Lab, TCLP will determine disposal requirements.

Provide a copy of analysis to JBSA specific environmental Office for review and further action.

All materials including all paint chips and debris must be stored in plastic bags in lockable containers until waste characterization has been determined by TCLP analysis. All containers must be lined with plastic sheeting or contain a plastic liner.

All metal with Lead Based Paint may be recycled at an approved metal recycling facility. The receiver of the metal must provide an acceptance letter and a copy provided to the area specific environmental office as proof that the recycling facility will accept metal with Lead Based Paint. All RCRA metal will be manifested for recycling also. A copy of the weight will be provided in order for the Environmental Office to document landfill diversion rates.

All of this must be included in the contract documents

8/27/2015 elv Work Order 11993 Re-attach Drain Spout. All exterior surfaces are Positive for lead Based Paint at the OSHA level of any amount. Do not disturb by any mechanical means such as sanding, drilling, cutting or welding. OSHA 29CFR1926.62 rules will apply to this work order

7/7/2015 elv Work Order 11856 - Paint exterior of Hangar. The following areas are Positive for Lead Based Paints. All concrete wall surfaces, all Drain Pipes. All Exterior electrical conduit. Boiler Room Difuser, Down spout near boiler room, All Window casings, mullions, panes on hangar doors, Mechanical Doors, All Metal on Hangar Doors and Personal Access. Do not disturb any areas that are POS for LBP by any abrasive means such as sanding, scraping blasting, drilling or any brazing/welding operations.etc. OSHA 29 CFR 1926.62 rules will apply for this project. All work must be done by a Lead Certified Firm. The OSHA requirement for these rules apply for any amount of LBP .1 mg/cm2 or greater. A negative determination will be required for this project by a certified Lead Firm before anyone other than a Lead certified worker can disturb the existing LBPpaint by any chemical or abrasive means. The use of Pressure washers to stabilize or abate Lead Based Paint is unauthorized. A TCLP will be required for Lead to determine proper disposal.

17 3/14/2019 0.00094Hallway A Center Wall Drywall N/A Intact Negativ

18 3/14/2019 0.00083Hallway A Center Wall Drywall N/A Intact Negativ

19 3/14/2019 0.00094Hallway A Center Wall Drywall N/A Intact Negativ

20 3/14/2019 0.00096Hallway B Center Wall Drywall N/A Intact Negativ

21 3/14/2019 0.00098Hallway C Center Wall Drywall N/A Intact Negativ

22 3/14/2019 0.00098Hallway C Center Wall Drywall N/A Intact Negativ

23 3/14/2019 0.00078Hallway C Center Wall Drywall N/A Intact Negativ

24 3/14/2019 0.00094Hallway C Center Wall Drywall N/A Intact Negativ

25 3/14/2019 0.00105Hallway C Center Wall Drywall N/A Intact Negativ

26 3/14/2019 0.00098Hallway B Right Door Casing Metal N/A Intact Negativ

27 3/14/2019 0.00958Hallway B Left Door Casing Metal N/A Intact Negativ

28 3/14/2019 0.0947Hallway B Left Door Casing Metal N/A Peeling Negativ

29 3/14/2019 0.00108Hallway B Center Door Metal N/A Chaffing Negativ

ASBESTOS REPORT: HANGAR 12

Project :

Project # :

Identification :

Test Method :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

8668927

Asbestos, Bulk Sample Analysis

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 12/11/2020, thirty two (32) bulk material samples were submitted by Edward Vogel of JBSA Randolph - 802 CES / CEIE for asbestos analysis by

PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Lab Job No. :

Report Date :

20B-13069

12/09/2020

12/17/2020

NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

12-WLSH-001-B-

Chalky; Gran (Off-White), Hall Outside Room 4 None Detected - Drywall Material

12-WLSH-001-B-

North; Chalky; Gran (Off-White), Room 4, In None Detected - Drywall Material

12-WLSH-001-B-

Chalky; Gran (Off-White), Room 8 None Detected - Drywall Material

12-WLSH-001-B-

Chalky; Gran (Off-White), Room 8, Inner None Detected - Drywall Material

2% Chrysotile - Joint Compound

( By PLM )

1.75% Chrysotile - Joint Compound

( By Point Count )

12-WLSH-001-B-

Chalky; Gran; Fibrous (Off-White), Room 9, Outer None Detected - Drywall Material

12-WLSH-001-B-

Chalky; Gran (Off-White), Room 10, Inner None Detected - Drywall Material

12-WLSH-001-B-

Chalky; Gran; Fibrous (Off-White) Room 10, Outer None Detected - Drywall Material

12-WLSH-001-B-

Chalky; Gran; Fibrous (Beige), Room 16, Inner None Detected - Drywall Material

None Detected - Acoustic Texture

12-WLSH-001-B-

Chalky; Gran; Fibrous (Beige), Room 16, Outer None Detected - Drywall Material

12-WLSH-001-B-

Chalky; Gran; Fibrous (Off-White), Room 18, Inner None Detected - Drywall Material

<1% Chrysotile - Textured Paint

( By PLM )

0.75% Chrysotile - Textured Paint

( By Point Count )

12-WLSH-001-B-

Chalky; Gran; Fibrous (Beige), Room 18, Outer None Detected - Drywall Material

12-WLJ-001-B-

Chalky; Gran (Off-White), Room 4 None Detected - Joint Compound

Project :

Project # :

Identification :

Test Method :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

8668927

Asbestos, Bulk Sample Analysis

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 12/11/2020, thirty two (32) bulk material samples were submitted by Edward Vogel of JBSA Randolph - 802 CES / CEIE for asbestos analysis by

PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Lab Job No. :

Report Date :

20B-13069

12/09/2020

12/17/2020

NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

12-WLJ-001-B-

Chalky; Gran (Off-White), Outside Room 4, Hall None Detected - Joint Compound

12-WLJ-001-B-

Chalky; Gran (Off-White), Room 8 None Detected - Texture

12-WLJ-001-B-

Chalky; Gran (Off-White), Room 9, Outer None Detected - Joint Compound

12-WLJ-001-B-

Chalky; Gran (Off-White), Room 10 None Detected - Joint Compound

12-WLJ-001-B-

Chalky; Gran (Off-White), Room 16, Inner None Detected - Joint Compound

12-WLJ-001-B-

Chalky; Gran (Off-White), Room 16, Outer None Detected - Joint Compound

12-WLJ-001-B-

Chalky; Gran (Off-White), Room 18, Outer None Detected - Joint Compound

12-CLLI-001-B-

2' x 2' Coarse Ceiling Tile; Fibrous (Gray and White), Room

None Detected - Acoustic Tile

12-CLLI-001-B-

2' x 2' Coarse Ceiling Tile; Fibrous (Gray and White), Room

None Detected - Acoustic Tile

12-CLLI-001-B-

2' x 2' Coarse Ceiling Tile; Fibrous (Gray and White), Room

None Detected - Acoustic Tile

12-CLLI-001-B-

2' x 2' Coarse Ceiling Tile; Fibrous (Gray and White), Room

None Detected - Acoustic Tile

12-WLTX-001-B-

Gran (Off-White); Brown Paper, Room 4 None Detected - Textured Paint

12-WLTX-001-B-

Gran (Off-White); Brown Paper, Room 9 None Detected - Texture

12-WLTX-001-B-

Gran (Off-White); Brown Paper, Room 10, Out None Detected - Drywall Material

None Detected - Textured Paint

Project :

Project # :

Identification :

Test Method :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

8668927

Asbestos, Bulk Sample Analysis

Sample Number Client Sample Description / Location Asbestos Content

Sample Date :

On 12/11/2020, thirty two (32) bulk material samples were submitted by Edward Vogel of JBSA Randolph - 802 CES / CEIE for asbestos analysis by

PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:

Lab Job No. :

Report Date :

20B-13069

12/09/2020

12/17/2020

NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Polarized Light Microscopy / Dispersion Staining (PLM/DS)

EPA Method 600 / R-93 / 116

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

12-WLTX-001-B-

Gran (Off-White); Brown Paper, Room 10, In None Detected - Drywall Material

<1% Chrysotile - Textured Paint

( By PLM )

0.50% Chrysotile - Textured Paint

( By Point Count )

12-CLSP-001-B-

Fibrous (Brown), Room 4 None Detected - Fiber Board

12-CLSP-001-B-

Fibrous (Brown), Room 8 None Detected - Fiber Board

12-CLSP-001-B-

Fibrous (Brown), Room 10 None Detected - Fiber Board

12-CLSP-001-B-

Fibrous (Brown), Room 16 None Detected - Fiber Board

12-FLMAS-001-B-

Not Provided None Detected - Mastic

Hillary Tuerck, Shaun Wilkerson, Heather LopezAnalyst(s):

Lab Director : Bruce Crabb Approved Signatory :

Thank you for choosing Moody Labs

Lab Manager : Heather Lopez Approved Signatory :

These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate. The test report shall not be reproduced, except in full, without written approval of the laboratory. The results relate only to the items tested. These test results do not imply endorsement by NVLAP or any agency of the U.S.

Government. Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code 102056-0.

This Page Left Intentionally Blank

Project # : 8668927

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

Lab Job No. :

Report Date :

20B-13069 002

12/17/2020

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/162% HT

Cellulose Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/161% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/1697% HT

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/162% HT

Cellulose Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/161% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/1697% HT

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/162% HT

Cellulose Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/161% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/1697% HT

Cellulose Fibers12-WLSH-001-B-

Drywall Material (White) 64% 12/165% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (White) 64% 12/1695% HT

Cellulose Fibers12-WLSH-001-B-

DW Paper Facing (Tan) 1% 12/16100% HT

Chrysotile

(1.75% Chrysotile)

12-WLSH-001-B-

Joint Compound (White) 35% 12/162% HT12/16

12/17

HT

HL

Calcite / Talc / Binders12-WLSH-001-B-

Joint Compound (White) 35% 12/1698% HT

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 95% 12/162% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 95% 12/1698% HT

Cellulose Fibers12-WLSH-001-B-

DW Paper Facing (Tan) 5% 12/16100% HT

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

Lab Job No. :

Report Date :

20B-13069 002

12/17/2020

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Cellulose Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/165% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/1695% HT

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 95% 12/162% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 95% 12/1698% HT

Cellulose Fibers12-WLSH-001-B-

DW Paper Facing (Tan) 5% 12/16100% HT

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 90% 12/162% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 90% 12/1698% HT

Cellulose Fibers12-WLSH-001-B-

DW Paper Facing (Tan) 7% 12/16100% HT

Perlite12-WLSH-001-B-

Acoustic Texture (Off-White) 3% 12/1615% HT

Calcite / Talc / Binders12-WLSH-001-B-

Acoustic Texture (Off-White) 3% 12/1685% HT

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/162% HT

Cellulose Fibers12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/161% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (Light Pink) 100% 12/1697% HT

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

Lab Job No. :

Report Date :

20B-13069 002

12/17/2020

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (White) 80% 12/162% HT

Cellulose Fibers12-WLSH-001-B-

Drywall Material (White) 80% 12/161% HT

Gypsum / Binders12-WLSH-001-B-

Drywall Material (White) 80% 12/1697% HT

Cellulose Fibers12-WLSH-001-B-

DW Paper Facing (Tan) 17% 12/16100% HT

Chrysotile

(0.75% Chrysotile)

12-WLSH-001-B-

Textured Paint (Off-White) 3% 12/16<1% HT12/16

12/17

HT

HL

Calcite12-WLSH-001-B-

Textured Paint (Off-White) 3% 12/1620% HT

Pigment / Binders12-WLSH-001-B-

Textured Paint (Off-White) 3% 12/1680% HT

Glass Wool Fibers12-WLSH-001-B-

Drywall Material (White) 100% 12/162% SW

Cellulose Fibers12-WLSH-001-B-

Drywall Material (White) 100% 12/161% SW

Gypsum / Binders12-WLSH-001-B-

Drywall Material (White) 100% 12/1697% SW

Calcite / Talc / Binders12-WLJ-001-B-

Joint Compound (White) 100% 12/16100% SW

Glue Binders12-WLJ-001-B-

Yellow Mastic (Yellow) 10% 12/16100% SW

Calcite / Talc / Binders12-WLJ-001-B-

Joint Compound (White) 90% 12/16100% SW

Calcite / Talc / Binders12-WLJ-001-B-

Texture (White) 100% 12/16100% SW

Calcite / Talc / Binders12-WLJ-001-B-

Joint Compound (White) 100% 12/16100% SW

Calcite / Talc / Binders12-WLJ-001-B-

Joint Compound (White) 100% 12/16100% SW

Calcite / Talc / Binders12-WLJ-001-B-

Joint Compound (White) 100% 12/16100% SW

Calcite / Talc / Binders12-WLJ-001-B-

Joint Compound (White) 100% 12/16100% SW

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

Lab Job No. :

Report Date :

20B-13069 002

12/17/2020

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Calcite / Talc / Binders12-WLJ-001-B-

Joint Compound (White) 100% 12/16100% SW

Cellulose Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1650% SW

Mineral Wool Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1630% SW

Perlite12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1620% SW

Cellulose Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1650% SW

Mineral Wool Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1630% SW

Perlite12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1620% SW

Cellulose Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1650% SW

Mineral Wool Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1630% SW

Perlite12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1620% SW

Cellulose Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1650% SW

Mineral Wool Fibers12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1630% SW

Perlite12-CLLI-001-B-

Acoustic Tile (Tan) 100% 12/1620% SW

Calcite12-WLTX-001-B-

Textured Paint (Off-White) 100% 12/1620% SW

Pigment / Binders12-WLTX-001-B-

Textured Paint (Off-White) 100% 12/1680% SW

Cellulose Fibers12-WLTX-001-B-

DW Paper Facing (Tan) 5% 12/16100% SW

Calcite / Talc / Binders12-WLTX-001-B-

Texture (White) 95% 12/16100% SW

Sample Number Layer Components % Of

Sample

Analysis

Date

% of

Layer Analyst

Supplement to PLM Summary Report

Client :

Project :

JBSA Randolph - 802 CES / CEIE

RND 12, Multi Room Project

Lab Job No. :

Report Date :

20B-13069 002

12/17/2020

2051 Valley View Lane

Farmers Branch, TX 75234 Phone: (972) 241-8460

Moody Labs NVLAP Lab Code 102056-0

TDSHS License No. 30-0084

Glass Wool Fibers12-WLTX-001-B-

Drywall Material (White) 10% 12/162% SW

Cellulose Fibers12-WLTX-001-B-

Drywall Material (White) 10% 12/161% SW

Gypsum / Binders12-WLTX-001-B-

Drywall Material (White) 10% 12/1697% SW

Cellulose Fibers12-WLTX-001-B-

DW Paper Facing (Tan) 20% 12/16100% SW

Calcite12-WLTX-001-B-

Textured Paint (Off-White) 70% 12/1620% SW

Pigment / Binders12-WLTX-001-B-

Textured Paint (Off-White) 70% 12/1680% SW

Glass Wool Fibers12-WLTX-001-B-

Drywall Material (White) 20% 12/162% SW

Cellulose Fibers12-WLTX-001-B-

Drywall Material (White) 20% 12/161% SW

Gypsum / Binders12-WLTX-001-B-

Drywall Material (White) 20% 12/1697% SW

Cellulose Fibers12-WLTX-001-B-

DW Paper Facing (Tan) 79% 12/16100% SW

Chrysotile

(0.50% Chrysotile)

12-WLTX-001-B-

Textured Paint (White) 1% 12/16<1% SW12/16

12/17

SW

HL

Pigment / Binders12-WLTX-001-B-

Textured Paint (White) 1% 12/16100% SW

Wood Fibers12-CLSP-001-B-

Fiber Board (Tan) 100% 12/16100% SW

Wood Fibers12-CLSP-001-B-

Fiber Board (Tan) 100% 12/16100% SW

Wood Fibers12-CLSP-001-B-

Fiber Board (Tan) 100% 12/16100% SW

Wood Fibers12-CLSP-001-B-

Fiber Board (Tan) 100% 12/16100% SW

Glue Binders12-FLMAS-001-

B-0032

Mastic (Yellow) 100% 12/16100% SW

JBSA Asbestos…