Davis Bacon Wage Determination Ogden.doc

DOC document 54 KB Posted

Attached to
Operations & Maintenance Services for IRS Service Center in Ogden, UT
Solicitation number
TIRWR-10-R-00013
Issued by

About this file

Davis Bacon Wage Determination

View the file

Other files

File Type Posted
TIRWR10R00013-A0007 1 .rtf RTF text file
TIRWR10R00013-A0006 1 .rtf RTF text file
Vendor Questions and Answers.doc DOC document
TIRWR10R00013_Amendment_5.rtf RTF text file
TIRWR10R00013-A0005 1 .rtf RTF text file
TE-6 Required Submittals and Reports_Revision 1.doc DOC document
TE-5_Revision 2.xls XLS spreadsheet
Filter Information.xls XLS spreadsheet
TE-5 Equipment-CMMS Aug 11 2010-Ogden.xls XLS spreadsheet
TIRWR10R00013-A0004 1 .rtf RTF text file
Ogden Site Visit Attendance Sheet.pdf PDF
SubContractors for O M Ogden.doc DOC document
TIRWR10R00013-A0003 1 .rtf RTF text file
TIRWR10R00013_Amendment_3.rtf RTF text file
TIRWR10R00013_Amendment_2.rtf RTF text file
TIRWR10R00013-A0002.rtf RTF text file
TIRWR10R00013-A0001 1 .rtf RTF text file
TIRWR10R00013_Amendment1.rtf RTF text file
TE-5 Ogden Equipment PM List.xls XLS spreadsheet
SCA Wage Determination Ogden.doc DOC document
Ogden_QASP.doc DOC document
TE-3 Ogden Service Call Analysis.xls XLS spreadsheet
Past Performance Questionnaire_TIRWR-10-R-00013.doc DOC document
TE-2 Ogden Facility Components and Equipment.doc DOC document
TIRWR10R00013_.rtf RTF text file
TE-13 Ogden Environmental Management System.pdf PDF
TE-7 Ogden Government Furnished Items.doc DOC document
TE-11 Ogden Certification Requirements.xls XLS spreadsheet
SAMPLE Past Performance Release Letter.doc DOC document
TE-4 Ogden GSA PM Guide Cards.doc DOC document
HSPD_12_PIV_Procedures_Manual.pdf PDF
TE-1 Ogden General Location and Site Information .doc DOC document
TE-10 Ogden Infrared Testing Requirements.doc DOC document
Ogden Offeror's Letter.rtf RTF text file
TE-9 Ogden Applicable Regulations and References.doc DOC document
TE-8 Ogden Glossary of Terminology.doc DOC document
TE-12 Ogden Non-Conformance Notification for Rework.doc DOC document
TE-6 Required Submittals and Reports.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: UT100046 07/16/2010 UT46

Superseded General Decision Number: UT20080046

State: Utah

Construction Type: Building

County: Weber County in Utah.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 03/12/2010

1 04/09/2010

2 07/16/2010

BRUT0001-002 06/01/2009

Rates Fringes

BRICKLAYER.......................$ 20.75 6.55

ELEC0354-008 06/01/2009

Rates Fringes

ELECTRICIAN, Excluding Low

Voltage Wiring and

Installation of HVAC

Temperature Controls.............$ 28.09 4.3%+$8.63

ENGI9993-011 07/01/2008

Rates Fringes

OPERATOR: Power Equipment

(CRANES & ATTACHMENTS)

(1) Up to 35 tons...........$ 24.86 12.71

(2) Over 35 tons to 100 tons........................$ 26.15 12.71

(3) Over 100 tons...........$ 27.49 12.71

OPERATOR: Power Equipment

(1) Mechanic................$ 26.71 12.71

(2a) Grader/Blade...........$ 25.05 12.71

(3) Front End loader

(over 5 cu. yds)...........$ 24.53 12.71

(4) Bulldozer, Front End

Loader (2 to 5 cu. yds.)....$ 23.53 12.71

(5) Asphalt Roller, Front

End Loader (Under 2 cu.

yds.), Oil Distributor......$ 22.53 12.71

(6) Screed..................$ 21.57 12.71

(7) Roller (Dirt and Grade

Compaction).................$ 20.66 12.71

IRON0027-014 07/01/2009

Rates Fringes

IRONWORKER: ORNAMENTAL,

REINFORCING, AND STRUCTURAL......$ 26.61 11.60

* LABO0295-007 07/01/2010

Rates Fringes

Laborer: Mason Tender (Brick, Cement/Concrete).................$ 15.65 5.75

PAIN0077-001 08/02/2008

Rates Fringes

PAINTER: Brush, Roller and

Spray............................$ 18.90 4.80

PLUM0140-008 08/01/2009

Rates Fringes

PIPEFITTER, Excluding HVAC

Pipe Installation................$ 29.22 10.69

PLUM0140-009 08/01/2009

Rates Fringes

PLUMBER (Including HVAC Pipe

Installation)....................$ 29.22 10.69

SFUT0669-001 01/01/2009

Rates Fringes

SPRINKLER FITTER.................$ 28.35 14.80

SUUT2008-010 07/14/2008

Rates Fringes

CARPENTER, Including

Acoustical Ceiling

Installation, Drywall

Hanging, Metal Stud

Installation, Foam Insulation and Form Work....................$ 15.88 0.00

CEMENT MASON/CONCRETE FINISHER...$ 15.68 2.36

ELECTRICIAN (Low Voltage

Wiring and Installation of

HVAC Temperature Controls

Only)............................$ 21.00 4.61

HVAC MECHANIC (Duct and

System Installation Only)........$ 17.00 6.28

LABORER: Common or General......$ 12.02 3.45

LABORER: Landscape..............$ 10.52 0.00

LABORER: Power Tool Operator

(Hand Drill, Jackhammer and

Power Saw Only)..................$ 11.70 0.00

OPERATOR: Backhoe/Excavator.....$ 16.28 6.55

ROOFER...........................$ 13.70 1.17

SHEETMETAL WORKER, Excluding

HVAC Duct and System

Installation.....................$ 23.61 5.45

TEAM0222-011 07/01/2008

Rates Fringes

TRUCK DRIVER (Articulated).......$ 20.73 8.43

TRUCK DRIVER (Flat Rack, Bulk

Cement, Semi-trailers, Mud/Banding and Paint)

Less than 10 tons...........$ 18.06 8.43

10 tons to less than 15 tons........................$ 18.21 8.43

15 tons and less than 20 tons........................$ 18.31 8.43

20 tons and over............$ 18.46 8.43

Pickup Truck................$ 17.99 8.43

TRUCK DRIVER (Oil Spreader)......$ 18.86 8.43

TRUCK DRIVER (Transit Mix)

0 cu. yds. to 8 cu. yds.....$ 18.39 8.43

Over 8 cu. yds. to 14 cu.

yds.........................$ 18.49 8.43

TRUCK DRIVER (Water, Fuel &

Oil Tank)

0 to less than 1,200 gal....$ 18.04 8.43

1,200 gal. to less than

2,500 gal...................$ 18.16 8.43

2,500 gal. to less than

4,000 gal...................$ 18.31 8.43

4,000 gal. to less than

6,000 gal...................$ 18.61 8.43

6,000 gal. to less than

10,000 gal..................$ 18.86 8.43

10,000 gal. to less than

15,000 gal..................$ 19.11 8.43

15,000 gal. to less than

20,000 gal..................$ 18.36 8.43

20,000 gal. to less than

25,000 gal..................$ 19.71 8.43

Over 25,000 gal.............$ 19.86 8.43

TRUCK DRIVER: Dump Truck

(Includes Bottom-end or side)

Less than 8 cu. yds.........$ 18.16 8.43

8 cu. yds. and less than

14 cu. yds..................$ 18.31 8.43

14 cu. yds. and less than

35 cu. yds..................$ 18.46 8.43

35 cu. yds. and less than

55 cu. yds..................$ 18.66 8.43

55 cu. yds. and less than

75 cu. yds..................$ 18.86 8.43

75 cu. yds. and less than

95 cu. yds..................$ 19.06 8.43

95 cu. yds. and less than

105 cu. yds.................$ 19.26 8.43

105 cu. yds. and less than

130 cu. yds.................$ 19.38 8.43

TRUCK DRIVER: Lowboy Truck......$ 21.238 8.43

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction

Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR

Part 7).

Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board

(formerly the

Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .