TIRMS13R00002-A0012.pdf
PDF 39 KB Posted
- Attached to
- ARMED SECURITY GUARD SERVICES
- Solicitation number
- TIRMS-13-R-00002
About this file
SF 30 - Amendment No. 0011
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 1505-0081
1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0012 03/27/2013 D-3-D7-02-GR-D03 000
6. ISSUED BY CODE 12155 7. ADMINISTERED BY (If other than Item 6) CODE
IRS, Midstates Procurement, OS:A:P:B:M 4050 Alpha Rd, 1045NDAL, 9th Flr, Rm 930
Dallas , TX 75244-4203
BERNADETTE GROSS-BRIGGS 9723081938
See Item 6
(x) 9A. AMENDMENT OF SOLICITATION NO.
TIRMS-13-R-00002
x 9B. DATED (SEE ITEM 11)
03/27/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code)
Vendor ID: To All Offerors
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMENDMENT No. 0012 is hereby issued under RFP No. TIRMS-13-R-00002 for the following:
1. Refer to attached solicitation revisions dated 3.27.13
2. Extend the proposal response due date to April 08, 2013, at 3pm CST
Except at provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
BERNADETTE GROSS-BRIGGS
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign)
BY _Bernadette Gross-Briggs_____________ (Signature of Contracting Officer)
27Mar2013
X X
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Computer Generated Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION REVISIONS
AMENDMENT NO. 0012
REVISED 03.27.13
1. REMOVE:
REQUIREMENTS: There will be a 60 day transition period which starts seven (7) days after Contract award of the base period.
REPLACE WITH:
REQUIREMENTS: There will be a 90 day transition period which starts seven (7) days after Contract award of the base period.
2. REMOVE:
M.3.3.1 Evaluation Criteria: The offeror’s management proposal will be evaluated by the following three criteria and applied against the requirements of the PWS.
REPLACE WITH:
M.3.3.1 Evaluation Criteria: The offeror’s management proposal will be evaluated by the following criteria and applied against the requirements of the PWS.
3. REMOVE:
Section FAR 52.212-2, EVALUATION – COMMERCIAL ITEMS (JAN 1999), During the 60-day Transition Period, the following Contractor personnel shall be on-site to observe all operations pertinent to the contract requirements for the maximum period of time specified.
REPLACE WITH:
Section FAR 52.212-2, EVALUATION – COMMERCIAL ITEMS (JAN 1999), During the 90-day Transition Period, the following Contractor personnel shall be on-site to observe all operations pertinent to the contract requirements for the maximum period of time specified.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
File details come from the government source that posted it. Updated .